Sie sind auf Seite 1von 2

ESR-Fume Treatment Plant

ESR-Fume Treatment Plant Revamping EZZ Steel Rebars Sadat

The Civil works Fume Treatment Plant (FTP) for al ezz melt shop
Located of the project Nasr city, Cairo

The scope of work includes the


following:

1- Fume dust plant (the stack) with


15m height.

2- Dusts filter foundations &


pedestals.
3- Main & booster fans foundations.

4- Extension of hair pin cooler with


planting dowels between old &
new foundations and walls.

5- New floor in electrical cabin


building which its columns planted
with dowels.
6- Demolishing old settling chamber
and make new chamber.

Das könnte Ihnen auch gefallen