Sie sind auf Seite 1von 4

DISCIPLINE:

WORK CLEARANCE

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

CONSTRUCTION AY C QC

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 1 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and
DISCIPLINE:

WORK CLEARANCE MECHANICAL

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

AYC Site Engineer - MECHANICAL AYC QC - MECHANICAL

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 2 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and
DISCIPLINE:

WORK CLEARANCE TELECOM

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

AYC Site Engineer - TELECOM AYC QC - TELECOM

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 3 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and
DISCIPLINE:

WORK CLEARANCE PLUMBING

Date:
Project Name : ISFB Industrial Support Facility / EPC-6

Location of Installation

Applicable Installation
References Specification :
SATIP / SAIC:
Drawing No:
Others:

Description of Installation:

Installation executed and completed by: Installation Inspected by:

AYC Site Engineer - PLUMBING AYC QC - PLUMBING

Comment:

Installation ACKNOWLEDGED by:

SAPMT

NOTE:
This CLEARANCE is an internal document of AYC - ISFB Project. It does not represent or replace an RFI.
Any inspections that needs PID inspections and release, must be raised by an RFI which can support to this
Page 4 of
CLEARANCE. This does not constitute PID acceptance 4 release or as a SAIC replacement.
and

Das könnte Ihnen auch gefallen