Complaince for the Report on Consultants Observations

Sr.No Photo No Flat No Location Description Remark

Utility area slab between B49 & B50


1 14 102 (@ ceiling level) Light point not in the centre(CL22) As per drawing

2 22 102 Master Toilet Light point is at 2220mm instead of 2260mm from FFL Tile Finishing is needed.

3 23 102 Master Toilet Switch box is at 1220mm instead of 1200mm Tile Finishing is needed.

4 29 102 Master bedroom Switch box edging is not proper POP Finishing is needed.

5 34 102 Common Toilet Switch box at 1210mm instead of 1200mm Tile Finishing is needed.

6 35 102 Common Toilet Basin centre and electrical point not in line Tile Finishing is needed.

Mixer point is at 1340mm instead of 1250mm as per


7 61 102 Kitchen the sheet no.8 Repair & replacement will be initiated

8 62 102 Kitchen Exhaust point missing POP Removal is required

Electrical point near main door is not in centre of the


9 65 102 Main door wall Dimensions not in the drawings

10 74 101 Hall Switch box is at 1180mm instead of 1200mm Floor level variations

11 75 101 Hall Switch box is at 580mm instead of 600mm Floor level variations

12 76 101 Hall Switch box is at 1190mm instead of 1200mm Floor level variations

13 77 101 Hall Switch not proper Floor level variations

14 79 101 Common Toilet Basine centre and electrical point not in line Tile Finishing is needed.

15 93 103 Kitchen GLD point is at 580mm instead of 600mm Floor level variations