PRIVATE VILLA

BILL No. 3 CONCRETE WORKS


B + G + 1 + RT
MV50, Jumeirah Island, Dubai, UAE BILL OF QUANTITIES
Item Unit Rate Total Price
Item Description Quantity Unit
Ref. (Dhs) (Dhs)

BILL No. 3
CONCRETE WORKS

SUB-STRUCTURE

CONCRETE WORK

Supply and installation of reinforced poured concrete,


complete, including all required/ any type of waterproofing,
bitumen paints, polythene sheets, accessories, its expansion/
construction joints, steel protections and formworks in
accordance to Drawings, Specifications Section 033000 and
035300 and/or as directed by the Engineer.

PLAIN CONCRETE

50mm thick surface blinding to take waterproofing


3.1 786 m 0.00
(waterproofing elsewhere measured), using C20.

REINFORCED CONCRETE

Supply and Reinforced casting of reinforced concrete for


foundations, ground beams and wherever required. Include for
concrete works, steel works,shutting & all required to complete
the works.

3.2 Raft (C50/60) 489 m 0.00

3.3 Retaining walls (C40/50) 170 m 0.00

3.4 Shear walls (C40/50) 58 m 0.00

3.5 Columns (C40/50) 13 m 0.00

3.6 Beams and inverted beams (C32/40) 27 m 0.00

To Collection Dhs 0.00

EDGE-MV50.BOQ.17.001 REV06 MV50 VILLA DUBAI B3- 1


PRIVATE VILLA
BILL No. 3 CONCRETE WORKS
B + G + 1 + RT
MV50, Jumeirah Island, Dubai, UAE BILL OF QUANTITIES
Item Unit Rate Total Price
Item Description Quantity Unit
Ref. (Dhs) (Dhs)

BILL No. 3
CONCRETE WORKS

REINFORCEMENT

NOTE: The Contractor is to provide the Engineer with


reinforcement details and bending schedules, which are to be
prepared from the Engineer's Municipality submission
drawings, for the Engineer's comment. These details are to be
lodged with the Engineer 21 days prior to the date on which the
reinforcement will be required on site.

Only bending schedules signed and approved by the Engineer


will be considered for valuation and final account payment.

High bond steel reinforcement (hot rolled ribbed bars of


high yield steel BS 4449)

3.7 Raft 34,600 kg 0.00

3.8 Retaining walls 34,000 kg 0.00

3.9 Shear walls 11,600 kg 0.00

3.10 Columns 3,250 kg 0.00

3.11 Beams and inverted beams 5,400 kg 0.00

FORMWORK

Formed surfaces shall be in accordance as defined by the


specifications.

Type A = Plain Smooth; Type B = Fine Smooth;


Type C = Superior

3.12 Raft (Type A) 54 m 0.00

3.13 Retaining walls (Type B) 443 m 0.00

3.14 Shear walls (Type B) 426 m 0.00

3.15 Columns (Type B) 116 m 0.00

3.16 Beams and inverted beams (Type B) 198 m 0.00

To Collection Dhs 0.00

EDGE-MV50.BOQ.17.001 REV06 MV50 VILLA DUBAI B3- 2


PRIVATE VILLA
BILL No. 3 CONCRETE WORKS
B + G + 1 + RT
MV50, Jumeirah Island, Dubai, UAE BILL OF QUANTITIES
Item Unit Rate Total Price
Item Description Quantity Unit
Ref. (Dhs) (Dhs)

BILL No. 3
CONCRETE WORKS

SUPER-STRUCTURE

CONCRETE WORK

3.17 Slabs (C32/40) 660 m 0.00

3.18 Beams and inverted beams (C32/40) 70 m 0.00

3.19 Shear walls (C40/50) 125 m 0.00

3.20 Columns (C40/50) 31 m 0.00

3.21 Stair (C32/40) 11 m 0.00

3.22 Composite Columns (C40/50) 12 m 0.00

Light weight concrete

3.23 On slabs (C32/40) 13 m 0.00

REINFORCEMENT

NOTE: The Contractor is to provide the Engineer with


reinforcement details and bending schedules, which are to be
prepared from the Engineer's Municipality submission
drawings, for the Engineer's comment. These details are to be
lodged with the Engineer 21 days prior to the date on which the
reinforcement will be required on site.
Only bending schedules signed and approved by the Engineer
will be considered for valuation and final account payment.

High bond steel reinforcement (hot rolled ribbed bars of


high yield steel BS 4449)

3.24 Slabs 74,050 kg 0.00

3.25 Beams and inverted beams 14,000 kg 0.00

3.26 Shear walls 25,000 kg 0.00

3.27 Columns 7,750 kg 0.00

3.28 Stair 1,650 kg 0.00

To Collection Dhs 0.00

EDGE-MV50.BOQ.17.001 REV06 MV50 VILLA DUBAI B3- 3


PRIVATE VILLA
BILL No. 3 CONCRETE WORKS
B + G + 1 + RT
MV50, Jumeirah Island, Dubai, UAE BILL OF QUANTITIES
Item Unit Rate Total Price
Item Description Quantity Unit
Ref. (Dhs) (Dhs)

BILL No. 3
CONCRETE WORKS

FORMWORK

Type A = Plain Smooth; Type B = Fine Smooth;


Type C = Superior

3.29 Shear Walls (Type B) 983 m 0.00

3.30 Columns (Type B) 287 m 0.00

3.31 Slabs (Type B) 2482 m 0.00

3.32 Stair (Type B) 45 m 0.00

3.33 Beams and inverted beams (Type B) 77 m 0.00

To Collection Dhs 0.00

EDGE-MV50.BOQ.17.001 REV06 MV50 VILLA DUBAI B3- 4


PRIVATE VILLA
BILL No. 3 CONCRETE WORKS
B + G + 1 + RT
MV50, Jumeirah Island, Dubai, UAE BILL OF QUANTITIES
Item Unit Rate Total Price
Item Description Quantity Unit
Ref. (Dhs) (Dhs)

BILL No. 3
CONCRETE WORKS

ADDITIONAL ITEMS

The Tenderer is to identify and attached to this Bill of


Quantities any other items with quantities, enumerated or
itemized and price rates which are not previously included, to
complete the build-up of the lump sum price.

Should the Tenderer fail to insert any items here, it will be


deemed that their lump sum price includes all items either
shown on the drawings, or implied interpretation, or described
in the specifications.

The lump sum price shall represent the entire value of the
works and no subsequent claim for any additional items will be
entertained.

To Collection Dhs 0.00

EDGE-MV50.BOQ.17.001 REV06 MV50 VILLA DUBAI B3- 5


PRIVATE VILLA
BILL No. 3 CONCRETE WORKS
B + G + 1 + RT
MV50, Jumeirah Island, Dubai, UAE BILL OF QUANTITIES
Item Unit Rate Total Price
Item Description Quantity Unit
Ref. (Dhs) (Dhs)

BILL No. 3
CONCRETE WORKS

COLLECTION

Page B3 - 1 0.00

Page B3 - 2 0.00

Page B3 - 3 0.00

Page B3 - 4 0.00

Page B3 - 5 0.00

TOTAL FOR BILL No. 3 - CONCRETE WORKS 0.00


Dhs
Carried to General Summary

EDGE-MV50.BOQ.17.001 REV06 MV50 VILLA DUBAI B3- 6