Beruflich Dokumente
Kultur Dokumente
Ka-62
kicks off its trials
[p.24]
MiG-29K
back on deck
[p.38]
Russian new
spacecraft and LVs
[p.44]
IFC entering
global market
[p.14]
Ka-62
kicks off its trials
[p.24]
MiG-29K
back on deck
[p.38]
Russian new
spacecraft and LVs
[p.44]
IFC entering
global market
[p.14]
Advertisment
OBORONPROM Corporation, a Russian Technologies State Corporation company, is a diversied industrial-investment group
inthe engineering and high technologies sectors
The Corporation integrates more than 30 leading Russian helicopter and engine manufacturing companies in 12 Russian regions
Russian Helicopters Company, a subsidiary of OBORONPROM Corporation, is the leading Russian designer and manufacturer
ofrotary-wing aircraft equipment
United Engine Corporation, a subsidiary of OBORONPROM Corporation, is the leading Russian industrial group producing
engines for aircraft, aerospace industry, gas compression stations and power plants
UNITED INDUSTRIAL CORPORATION OBORONPROM I 29/141 Verejskaya st. Moscow 121357 Russia I oboronprom@oboronprom.ru I www.oboronprom.ru
November 2013
Editor-in-Chief
Andrey Fomin
Deputy Editor-in-Chief
Vladimir Shcherbakov
Editors
Artyom Korenyako
Yevgeny Yerokhin
Columnist
Alexander Velovich
Special correspondents
Alexey Mikheyev, Victor Drushlyakov, Dear reader,
Andrey Zinchuk, Valery Ageyev,
Natalya Pechorina, Marina Lystseva,
You are holding the latest issue of the Take-off magazine, special
Dmitry Pichugin, Sergey Krivchikov,
Sergey Popsuyevich, Piotr Butowski, English-language supplement to VZLET Russias national aerospace
Alexander Mladenov, Miroslav Gyurosi magazine, dedicated this time to the Dubai airshow which stands
among the major respectable international aerospace exhibitions. Russian
Design and pre-press participants interest in it grows up as the Middle East and North Africa
Grigory Butrin region becomes one of the leaders in Russian-made aircraft procurement
Mikhail Fomin and establishing international aerospace cooperation.
Translation Russian aircraft are widely known in the region. Two years ago
Yevgeny Ozhogin two brand-new Ilyushin Il-76MF transport planes were delivered to
Jordan while Irkut corporation provided Algeria in the recent years with
Cover picture 44 supermaneuvrable Su-30MKI(A) multirole fighters and 16 Yakovlev
SuperJet International
Yak-130 combat trainers. Russian-made transport and combat helicopters
traditionally have a high popularity in the region. Today Russian
Publisher Helicopters holding company consolidating major Russias rotor-wing
aircraft developers and manufacturers offers its new products both
military and commercial ones.
Director General Just about two months before this Dubai airshow, the town of Zhukovsky
Andrey Fomin in the Moscow Region saw the completion of the 11th International Aviation
and Space Salon MAKS 2013 the aviation-related event of the year in
Deputy Director General Russia. According to numerous MAKS 2013 exhibitors and visitors, the
Nadezhda Kashirina show became far more impressive, with the number of exhibitors growing
Marketing Director noticeably, number of foreign delegations increasing and infrastructure
George Smirnov of the show improving. The status of MAKS as a business event and a
place to conduct scientific fora and conferences has been bolstered. New
Business Development Director products of Russian aerospace industry unveiled at MAKS 2013 became
Mikhail Fomin the topics in this issue.
Special Projects Director As usually we also focus our attention on the main events in Russian
Artyom Korenyako aviation life of recent months, with preference given to those of them that
could be of special interest to the current and potential users of Russian
aircraft in the Middle East and North Africa.
News items for In Brief columns are prepared by editorial I wish you fruitful work at the Dubai airshow, useful contacts and
staff based on reports of our special correspondents, press lucrative contracts!.
releases of production companies as well as by using information
distributed by ITAR-TASS, ARMS-TASS, Interfax-AVN, RIA Novosti,
RBC news agencies and published at www.aviaport.ru, www.avia.ru,
www.gazeta.ru, www.cosmoworld.ru web sites
COMMERCIAL AVIATION
Launch customers for Tu-204SM? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
November 2013 Cuba receives its third An-158 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
New MC-21 orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
MILITARY AVIATION
The fifth T-50 is in the air! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
More Su-34s for RusAF. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Irkut carries on with Yak-130 deliveries to Russian Air Force . . . . . . . . . . . . . . . . . . . . 35
Su-30SMs fielding to start in autumn . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
38 RusAF looks forward to Su-35S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
MiG-35 awaiting order by Russian Air Force. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
COSMONAUTICS
44 Space novelties of MAKS 2013 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Alexey Mikheyev
Both examples of the upgraded
Tupolev Tu-204SM medium-haul
airliner were part of the recent
MAKS 2013 air shows flight pro-
gramme and static display. The
aircraft with reg. RA-64150 was
flown in the flight demonstration
programme, while the one regis-
tered as RA-64151 was shown as
a static exhibit Tupolev JSC used
it for visits of potential customers.
During the air show in Zhukovsky,
two Russian carriers VIM-Avia
and Red Wings displayed actual competition on the charter opera- Tu-204SM programme. The carrier bly shop of the Aviastar plant.
interest in the Tu-204SM, the inter- tions market and the ouster of is said to have been eager at the Its airframe had been completed
est that led to the signature of companies lacking orders for inter- time to acquire 10 Russian-built more than two years back, but the
documents. national operations led to VIM-Avia airliners. The Tu-204SMs recent work on it has been dragging its
On 29 August, the third day of having launched a whole range certification by the IAC Aircraft feet since then. The fuselages of
the air show, the Ilyushin Finance of scheduled services since 2011, Registry has made VIM-Avia get- two more aircraft (64153, 64154)
Co. leasing company and VIM-Avia even though it had initially posi- ting the Russian aircraft more fea- have been mated and other
signed a memorandum on financial tioned itself as solely a charter air sible. According to the airline, it components of their airframes
leasing of five Tu-204SM airliners carrier. In 2012, its airliners were will begin to decommission its have virtually been completed.
in the course of 201415, with five conducting scheduled flights to Boeing 757s in 2014. In addition to Hopefully, the Tu-204SMs long-
options. The carriers news release as many as about 30 cities. Today, the Tu-204SM agreement, howev- awaited certification earlier this
read: The seating layout of the around 80% of VIM-Avias services er, MAKS 2013 saw VIM-Avia and year and the agreements signed
new aircraft is supposed to be 215 are scheduled. Ilyushin Finance Co. sign a letter of during MAKS 2013 will speed up
seats. The Tu-204SMs will fly the The altering of the development intent on leasing of five advanced their assembly.
carriers current lines and expand approach influenced the moderni- Canadian Bombardier CS300s. The The GTLK State Transport
its scheduled operations further. sation of the carriers aircraft fleet, carrier also has plans to procure Leasing Company may partner
According to the Federal Air which aircrafts age exceeds 20 short-haul Boeing 737s or Airbus with Ilyushin Finance Co. in the
Transport Agency, VIM-Avias air- years and cabins have been worn A319 on the used aircraft market. Tu-204SM deliveries to Red Wings
craft fleet comprised eight Boeing out considerably when the planes At present, the Red Wings air- and VIM-Avia. The two leasing
757-200s in mid-August. Three hauled tourists to the most popu- line, which has recently got a new companies came to agreement on
more medium-haul airliners of the lar destinations (Egypt, Tunisia, owner but retained is development that at the air show in Zhukovsky.
type were in the aircraft fleet of the Turkey). At least two years ago, strategy seems to be a more prob- However, it is worth repeating that
Bashkortostan airline that was a the company began to ponder able commercial operator of the the documents signed by both
subsidiary of the VIM-Avia group approaches to the renovation of Tu-204SM, as it uses eight Tupolev carriers are preliminary and their
(the planes have been returned its aircraft fleet. In addition to the Tu-204-100s now. Businessman transformation into firm orders
to the parent company already). expected deal on leasing Russias Sergei Kuznetsov has bought the shall depend on the suppliers and
The operator bought the planes first Boeing 717s, which did not carrier. He has made a statement manufacturers ability to ensure
in the mid-2000s, which enabled happen, news arrived in summer that its aircraft fleet would grow by acceptable competitive financial
it to have become a leader of 2011 that VIM-Avia was interested means of Russian-built aircraft. On terms of the deals and guarantee
the charter operations market. In in the Tu-204SM. The carrier and 30 August, Red Wings and Ilyushin quality aftersales maintenance.
2005, VIM-Avia launched its first Tupolev JSC made a bilateral agree- Finance Co. signed at MAKS 2013 As is known, the Tu-204SM is
scheduled services. Ever more stiff ment on cooperation under the a number of important agreements a heavily upgraded version of the
on the leasing of 30 Russian-made production-standard Tu-204-100
Alexey Mikheyev
Vasily Koba
er in July 2012. The first two planes
were ferried to Cuba between April
and July this year.
As is known, the Republic of ers. According to Ilyushin Finance By the early summer, the its trials and display at the MAKS
Cuba and Ilyushin Finance Co. made Co. Director General Alexander An-158s had performed on domes- 2013 air show) completed the first
an agreement for three An-158 with Rubtsov, the delivery is under way tic services by Cubana de Aviacion, flight in Kiev on 20 August 2013
three more options in August 2011 in line with the Russian govern- flying from Havana to Santiago and headed for Cuba from Kiev on
during the MAKS 2011 air show. By ments resolution No. 141 issued de Cuba and Guantanamo. Cuban 11 October.
the time, Ilyushin Finance Co. and in February 2013 and setting the pilots are very satisfied and pas- The third An-158s delivery
the Antonov state company had procedure for the provision of guar- sengers too. The fuel consumption to the Cuban carrier brought the
signed a contract for the construc- antees for governmental loans. is quite acceptable for a hundred- total number of the aircraft sup-
tion of 20 An-158s. The aircraft are At the customers request, the seat aircraft 1.8 t of kerosene plied by Russian leasing company
leased to the Cuban carrier for 14 airliners have the 97-seat economy per hour, said Ilyushin Finance Ilyushin Finance Co. to Cuba up to
years, with Panamanian company class cabin, with the cabin interior Co. Director General Alexander 10. Previously, the leasing com-
South American Aircraft Leasing manufactured by Russian company Rubtsov. According to him, when pany had delivered four Tupolev
(SAAL) acting as the lessor and Rusaviainter. more An-158s arrive, the Cuban Tu-204-100E/CE medium-haul
Ilyushin Finance Co. arranging the The first of the Cuban An-158s airliners will start flying on foreign passenger and cargo aircraft and
deal and the funding of the airliners (c/n 201-01, Cuban reg. CU-T1710), lines in the region; particularly, three Ilyushin Il-96-300 long-haul
construction by Antonov (a number the lead production-standard air- flights from Havana to Mexico airliners. In addition, the delivery
of their assemblies are supplied by craft of the type, conducted its and the Dominican Republic are of the third An-158 to Cuba marks
Russias VASO Voronezh Aircraft maiden flight in Kiev on 20 March planned. Ilyushin Finance Co.s jubilee deliv-
Joint Stock Company). 2013 and was handed over to the The second Cuban An-158 (c/n ery: the aircraft is the 50th com-
Ilyushin Finance Co. and SAAL customer on 18 April following a 201-02, reg. CU-T1711) first flew mercial plane the company sup-
signed the contract in July 2012. brief test programme and paint- in Kiev on 24 June 2013 and was plied to its customers.
Under the contract, SAAL is to ing. It came to Havana on 22 April, in Havana as soon as 25 July. In parallel with the delivery
take delivery of three An-158s having performed a long flight with The third aircraft (c/n 201-03, reg. of the third An-158 to Cubana,
with 12 more An-158 and An-148 stopovers at Keflavik in Iceland and CU-T1712, temporary Ukrainian another firm order for three more
options for Latin American carri- Halifax in Canada. reg. UR-EXC for the duration of An-158s was placed. The planes
are slated for delivery in 2014.
To bankroll the deal, a trilater-
al agreement on financing the
201415 An-148/158 deliveries to
Cuba was signed at the MAKS
2013 air show. The agreement
was made by Ilyushin Finance
Co., Vnesheconombank and
Roseximbank. It provides for
arranging the funding of the sale
of up to four An-148 and An-158
Alexey Mikheyev
in list prices. The planes will be deliv- port of MC-21 aircraft operators.
ered during 2018 throughout 2022. The document makes provision for
Previously, the companies had made cooperation in aftersales support of
a leasing agreement for the acquisi-
tion and leasing of manufacturing
equipment to Irkut under the MC-21
aircraft family development and pro-
ductionising programme.
In addition, the UTair carrier and
VEB-Leasing signed a memorandum
Andrey Fomin
CUSTOMERS
American continent. The first of the Interjet-
ordered aircraft of the type (MSN 95023,
Mexican reg. XA-JLG) was ferried to its
operators base airport on 23 July 2013. The
Brand-new Russian-built Sukhoi Superjet 100 aircraft launched scheduled ferry flight from the airport of Venice, where
services for Mexican air carrier Interjet on 18 September 2013, thus starting the the airliner was tailored to the customers
SSJ100s operation by the first customer in the Western hemisphere. In addition requirements at SuperJet International facil-
to Russia and Mexico, Superjets also are in use in Indonesia and Laos. The ity, was conducted by the operators crew.
number of the airliners buyers and operators is increasing steadily. The ailiner departed Venices Marco Polo
The developer, Sukhoi Civil Aircraft Company, has used the recent MAKS international airport on 20 August and made
2013 air show with success to maximise the number of its planes demonstrated, stopovers in Iceland, Canada and the United
with the planes having been built for different customers. One could see States, having spent almost 15 hours in
the Superjets of Indonesias Sky Aviation, Laoss Lao Aviation and Russias flight. The second aircraft (MSN 95024, reg.
Gazprom Avia and Rosoboronexport at the air show in Zhukovsky. Day in and XA-IJR) followed in its footsteps on 24
day out, they would fly one after another as if in the kaleidoscope, with some August 2013.
of them heading for their new owners right from the air show. An important Soon after Superjets coming to Mexico,
result produced by MAKS 2013 was several lucrative deals clinched for delivery they were subjected to a tough intensive tech-
of Superjets to the current and new customers. During the show, a total of 27 nical flight regimen, during which Mexican
airliners of the type were sold in line with firm orders and 25 more under letters flying and ground crews were trained in flying
of intent, while a joint market promotion memorandum on 50 aircraft more was and maintaining the aircraft that were new
signed. The total value of the deals exceeded $3.5 billion in catalogue prices. to them.
SuperJet International
SuperJet International
The first Interjets SSJ100 in Mexico
Roberto Acevedo
Having completed the preparations and The operation of the two airliners remained airport in the capital, one of the two most
training that had taken almost two months, just as intensive on the subsequent days. After heavily used Latin American airports, the
XA-JLG departed Mexico Citys airport the first month of scheduled services, the two other one being the airport of Brazils Sao
with passengers aboard and headed for the Mexican SSJ100s had flown 204 flights each Paolo. In 2012, Mexico Citys airport ser-
Mexican city of Torreon at 07.37 local time by 18 October 2013, with XA-JLG having viced almost 30 million passengers. The
on 18 September. XA-IJR departed on its logged 304 flight hours and XA-IJR 272 flight airport sits in mountainous terrain, with its
first commercial operation several miniutes hours. Thus, the average monthly flight time runways being at 2,230 m above sea level. The
later, at 07.50, and headed for Aguascalientes. per plane accounted for about 290 h in the rarefied air makes takeoff and landing longer
The two aircraft landed successfully at their first month of operation, with each of the and more complicated. Hence, the two run-
destinations after about 1 h 10 min to take off two airliners flying an average of almost seven ways measure 3.9 km long. The SSJ100 is
for their next services after merely 2530 min services a day and remaining airborne 9 to 10 certificated to operate from airfields situated
on the ground. hours. at up to 2,600 m above sea level and is quite
Owing to the quick turnaround at the air- The Superjets operate 5001,000-km fit for operations under conditions like that.
ports on the very first day of their commercial routes so far. The longest flight from In addition to the airport in the capital city,
operation, the Superjets had conducted eight Mexico City to Campeche measures a lit- Interjets destination network established for
revenue sorties each, logging almost 20 h of tle more than 900 km long as the crow flies. the Russian-made regional airliners initial
flying time. In doing so, they covered the All services are domestic so far, but Interjet operation includes several high-elevation
whole initial-stage destination network by is planning to use its new regional airliners airports. For instance, General Leobardo
carrying passengers to the cities of Torreon, on international lines as well. Although the Ruiz international airport in Zacatecas sits at
Aguascalinetes, Mazatlan, Minatitlan, carrier is headquartered in Toluca, most of 2,177 m above sea level, Torreons Francisco
Campeche and Zacatecas. the flights are performed via Benito Juares Sarabia international airport at 1,124 m and
Sergey Sergeyev
in Venice since 20 June following its maiden
flight on 24 March of this year. It was fer-
ried to Mexico on 56 November 2013.
The fourth aircraft (MSN 95036) first flew
in Komsomolsk-on-Amur on 20 June 2013 New deliveries (reg. RA-89015) had been flight-tested on
came to the facility in Venice on 15 October. The second of the 12 SSJ100 air- 2 July 2013, becoming the 12th Superjet
The aircraft MSN 95034 and MSN 95038 are craft ordered by the Sky Aviation airline delivered to the flag carrier and the second
being prepared in Zhukovsky for handover to (MSN 95027, reg. PK-ECM) departed aircraft of the type in full configuration.
SuperJet International. Their maiden flights Zhukovsky for Indonesia on 20 August 2013. It replaced Aeroflots second SSJ100-95B
took place in Komsomolsk-on-Amur on 28 The third aircraft earmarked for the car- light configuration airliner (MSN 95010,
August and 6 October 2013 respectively. The rier (MSN 95031, reg. PK-ECN), which reg. RA-89002) that was returned to the
seventh of Interjets aircraft (MSN 95040) was flight-tested on 3 June 2013, has been manufacturer under the contract (it could be
first flew on 2 November 2013, while five tailored to the customers requirements and seen in the skies over Zhukovsky during the
more (MSN 95042, 95045, 95046, 95048 and is in Zhukovsky now. MAKS 2013 air show too).
95050) were in various stages of final assem- The second SSJ100 intended for Laotian On third day of the air show, 29 August, the
bly at the SCAC facility in Komsomolsk-on- carrier Lao Aviation (MSN 95039, reg. first SSJ100-95LR extended-range airliner
Amur. Thus, there are ten aircraft gearing RDPL-34196) and subjected to maiden flight (MSN 95033, reg. RA-89018) was delivered
up for delivery in addition to the first two on 20 May 2013, took part in the flight dem- to the Gazprom Avia air carrier in a ceremo-
Superjets being operated in Mexico. As is onstration programme in the early days of the ny. The extended-range version had received
known, under the firm order awarded in MAKS 2013 air show. It left Zhukovsky on the its supplemental type certificate from IAC
January 2011, Interjet is to take delivery of second day of the air show, 28 August, for the Aircraft Registry a week before the air show.
20 Sukhoi Superjet 100-95Bs in the 93-seat handover to the customer. Mention also should be made that anoth-
single-class confiuration with the seat pitch Another aircraft was handed over to the er Russian carrier, Moskovia, started using
extended to 34 inches. The contract also SSJ100s Russian launch customer, Aeroflot, Superjets on its lines in August. The first flight
makes provision for 10 options. on the same day. The aircraft MSN 95029 of its SSJ100 (MSN 95021, reg. RA-89021)
Victor Drushlyakov
from Moscows Domodedovo to Tivat in The first SSJ100-95LR aircraft designed for commonised-design aircraft are going to be
Montenegro took place on 11 August 2013, certification tests (MSN 95032, reg. 97006) made further down the line and be delivered
and the second of Moskovias SSJ100s (MSN has been built early this year and completed either as the SSJ100-95B baseline model or as
95008, reg. RA-89001) conducted its first its first flight in Komsomolsk-on-Amur on the SSJ100-95LR extended-range variant at
revenue service from Domodedovo to Yerevan 12 February 2013 to be ferried to Zhukovsky, the customers request. The extended-range
on 23 August. The latter became Aeroflots Moscow Region, for continued trials just version is powered by SaM146-1S18 engines
first Superjet in June 2011 and was returned to three days later. The new versions certifica- featuring a 5% thrust increase and issued with
Sukhoi Civil Aircraft this spring in exchange tion took half a year, and the IAC Aircraft EASAs certificate early in 2012.
for a new full-configuration airliner. Registry issued the RRJ-95LR-100 (SSJ100- The SSJ100-95LR certification test pro-
95LR) with Supplementary Type Certificate gramme comprised stability, controllabil-
First SSJ100LR for Gazprom Avia CT322-RRJ-95/D16 on 20 August 2013. ity, high-alpha, ultimate strength, buffeting,
The first production-standard Sukhoi The SSJ100-95LR is a derivative of the shimmy, powerplant and automatic control
Superjet 100-95LR extended-range aircraft SSJ100-95B baseline model capable of seating equipment tests. In addition, the takeoff
designed for the Gazprom Avia airline came the same number of passengers (98) on servic- and landing performance and environmen-
to Zhukovsky from Ulyanovsk on 28 August es out to 4,580 km (3,050 km by the baseline tal noise were tested too. The SSJ100-95LR
2013. The carrier became the launch cus- model). Its range was extended by increasing (MSN 95032) flew over 60 sorties under the
tomer for the SSJ100 extended-range ver- its maximum takeoff weight from 45,880 kg to test programme, having logged a total of 115
sion. Sukhoi Civil Aircraft Company and 49,450 kg with minor design modifications. In flight hours.
Gazprom Avia had signed the contract for particular, the wing and wing centre section The extended-range versions certification
10 airliners of the type two years ago, in structure was reinforced, with the approach to gave the green light to the deliveries of pro-
August 2011. be applied to the baseline model as well. Thus, duction-standard aircraft in this variant.
The first SSJ100 in VIP version was Earlier, during the Le Bourget air show in ment with a major Russian lessor, Sberbank
derived from the third production June 2013, Ilyushin Finance Co. and Sukhoi Leasing, on the acquisition of 20 SSJ100 air-
Superjet (MSN 95009)
Civil Aircraft Company signed a tentative liners for leasing them subsequently.
agreement for 20 Sukhoi Superjet 100s, which In fine, SCAC landed orders for 27 SSJ100s
has now firmed up. and signed letters of intent for 25 options
Another first-day contract at MAKS 2013 in the course of the MAKS 2013. Given the
was on the delivery of a Sukhoi Superjet 100 50 aircraft planned for by the memorandum
VIP version for Rosoboronexport JSC (more of intent signed with Sberbank Leasing, the
details to follow hereinafter). value of the documents signed may exceed
On the remaining days of the air show, $3.5 billion at list prices.
SCAC signed a few other agreements and Besides, MAKS 2013 saw a number of
memoranda of intent, e.g. a memorandum of meetings and negotiations with potential
intent was signed with the Sberbank Leasing Russian and foreign customers for Superjets,
during which interest was displayed in SSJ100
acquisition and cooperation expansion agree-
ments with current partners were made.
GLOBAL MARKET
Russian leasing company Ilyushin Finance Co. (IFC), which is going to mark its
the 120125-sweat aircraft market. However,
the Brazilians have said they are not going to
stretch their aircraft and are just improving the
current designs to refine their fuel efficiency.
In other words, Embraer planes remain in
15th year on the aviation market, is known as a supplier of up-to-date Russian
the regional airliner category, the traditional
and Ukrainian-built airliners and freighters. IFCs customers operating the Il-96,
Tu-204/214, An-148/158 and An-124 family aircraft now include Russian and some market segment of Brazilian aircraft. There
foreign carriers. In August this year, IFC supplied a customer with its 50th aircraft will be some competition with the CS100,
another An-158 intended for Cubana de Aviacion. probably. However, it is not expected to have
As part of its efforts to step up its commercial aircraft leasing business, IFC an impact on us, because we have ordered
has made a number of major contracts for advanced aircraft this year, having only the larger version, the CS300, and will
become, inter alia, an early customer for advanced Bombardier CSeries airliner receive our aircraft three to four years before
(32 CS300s have been ordered with 10 options). This is the first order a Russian the Embraer E2 models hit the market.
leasing company has placed for foreign-made airliners. In addition, IFCs With the commencement of the flight tests
orderbook holds orders for 20 cutting-edge Russian-made SSJ100 regional of the CSeries, carriers have become keener
jets, 50 prospective MC-21 short/medium-haul airliners, 20 An-158 regional on it. I guess aviation professionals keep an
jets, Bombardier Q400 regional turboprops (Letter of Intent for 50 units has eye on the Airbus A350 and Bombardier
been made), etc. IFC plans to lease a sizeable number of the aircraft to foreign
CSeries. The maiden flights of commercial
carriers, thus having consolidated its positions on the international aircraft
planes built from scratch do not happen
leasing market. Stewart R. Cordner, foreign sales and marketing director, IFC, is
in charge of this line of business. He agreed to take Take-offs questions as to very often, which turns them into world-
how IFC was going to promote aircraft on the global market. class events. Monitoring the news of flight
tests, airline specialists take a great interest in
Mr. Cordner, to which regions of the world CSeries are facing good prospects in Latin advanced aircraft, which makes it easier for us
do you give priority? Where are you going to America and certain Asian nations. The thing to deal with them.
export IFC-owned planes? is that there is a large gap between regional We had talked to potential customers prior
Certainly, many Asian countries, no doubt, aircraft and narrowbodies from Airbus to the first flight of the CS100 prototype and
are of interest to IFC. Latin America may well and Boeing. It is the niche the advanced afterwards and we noticed a keener interest in
become very promising too, though Boeing aircraft models offered by IFC that should the CSeries. During talks, potential customers
and Airbus aircraft dominate it so far. fill in nicely. We urge airlines to take a cold try to clarify points more often, and this
Meanwhile, Boeing and Airbus are often hard look at them. Thorough analysis of signifies that the subject is of true interest to
too big for them to be operated efficiently on the actual passenger traffic on the route them. Carriers are most interested in the fuel
the current services. Therefore, we believe networks of numerous air companies has consumption data produced in the trials, and
the advanced Russian-built Sukhoi Superjet shown that aircraft with the dimensions in Bombardier regularly provides IFC, one of
100 regional aircraft and the latest Canadian between regional and narrowbody medium- its first customers for the CSeries, with rather
detailed information on the trials. We are The great marketing job done by of products enables it to offer carriers the
pleased with the way the things are. At the Bombardier worldwide over the past several aircraft fleet management programmes tailored
same time, no matter how much we want to years since the launch of the programme has to meet their needs. This is very important to
get our planes as soon as possible, we should been very useful to us too. Therefore, many us, because such programmes make a carrier
arm ourselves with patience. potential customers already know what they a long-term customer of ours and enable us to
When is IFC going to start taking delivery can expect from the aircraft we offer them. cooperate with it for 10 years or longer.
of its CSeries? Are you not concerned about You are promoting on the global market not Mr. Cordner, what does the Dubai show
the teething troubles inherent in any radically only the CSeries but also advanced Russian mean to you? Why did you decide to participate
innovative aircraft, the teething troubles your planes. IFC has recently ordered such aircraft in it proactively?
customers are to encounter? from UACs subsidiaries Sukhoi Civil The Dubai Airshow is considered to be the
We would have never ordered early- Aircraft Company, the Irkut corporation and major Middle East air show and rightly so, and
series aircraft, especially from a foreign Antonov as well we regard the region as a very promising one
manufacturer. We are not the launch The air carriers I deal with have been asking as far as the aircraft we offer are concerned.
customer for the CSeries: there are several ever more often about the Sukhoi Superjet 100. IFCs international department personnel
carriers, including Lufthansa Group, Malmo This is due, probably, to the aircraft having been have started preparations for the event a long
and airBaltic, that had ordered their planes certificated by several foreign states, particularly, time ago. We would not have ordered a chalet
directly from the manufacturer and will Indonesia that ranks fourth in terms of population of our own at the show in Dubai, unless we
receive them first. IFCs turn will come some in the world and grows fast in economic terms. saw a sales market here, we would not have
time by late 2015. The MC-21 ranks second as far as inquiries spent money, unless we hoped to recoup it.
Lufthansa was first to sign up for the by airlines are concerned. There has been a The Middle East is a growing market, with
CSeries and has been proactive in its spike in the interest in it in the wake of several solvent demand bolstered by politics and an
development. We know they can bring planes recent air shows, where its manufacturer said the excess of petrodollars. In addition, there are
to the right condition. Then there is Malmo. advanced aircrafts operational costs would be many Soviet- and Russian-built aircraft here,
The companys owner runs operations himself, lower than those of the Airbus airliners, including transports in the first place, which excellently
goes into detail and controls the expenditure the promising aircraft of the A320neo family. Also endure the harsh local basing conditions at
of every cent. I think he will do his best so that we advise our foreign customers to take a closer austere dusty sand-covered airfields at high
his aircraft fleet of 10 is like clockwork. Big look at the An-148/158 as well. Personally, I like ambient temperature. In possession of a
carriers, such as Lufthansa, stake on large- the plane very much. wide range of products made up of the latest
scale operation, while small airlines, e.g. At times, a potential customer first Russian, Ukrainian and Canadian aircraft,
airBaltic, had to know operational economic considers a CSeries proposal, and thorough the Ilyushin Finance Co. leasing company has
issues inside out. With customers like that, we comparative analysis reveals that the cat wont opened new vistas on this market.
feel confident. I hope the latest CSeries will jump. Then, we suggest the potential customer
have been debugged and cured of all teething should assess the Superjet. Actually, we at IFC IFCs future aircraft fleet as per contracts and
agreements with manufacturers
troubles possible by the time our turn comes. are interested in working with air carriers,
Manufacturer Type Quantity
IFC also is among the first leasing including swapping information and expertise
Bombardier CS300 32
companies that have ordered the CSeries, and gained in the course of implementation of
Bombardier Q400 50*
the fact will give us extra competitiveness on aviation programmes.
UAC (Irkut) MC-21-300 50
the market. Few will have been able to lease Such an exchange sometimes leads to a
UAC (SCAC) SSJ100-95 (B, LR) 20
such aircraft prior to 2020. Talking with an better understanding of the targets and
UAC (VASO) An-148 34**
air carrier, we tell them that they will get their objectives of a carrier and enables us to come UAC (Aviastar) Tu-204SM 20*
aircraft four years earlier, if they cooperate up with a better solution together. For instance, Antonov An-158 20***
with us, and that they will get a profit of $2 a solution may include the Superjet for the * LoI, MoU
million to $5 million per annum from each of three to five years, followed by the larger CS300 ** 9 have been delivered.
their planes during that period. or MC-21. A leasing companys wide range *** 3 have been delivered.
Victor Druslyakov
communications gear, etc. Phase I is
slated for completion in November.
Based on the outcome of the trials,
the customer will issue a preliminary
acceptance report clearing the full-
rate production of the airlifter. suite, including the introduction of increase of the PS-90A-76 engine, clinched a deal for 156 PS-90A-76
The first flying prototype of the the glass flight deck. A number of the range of the aircraft hauling engines worth in excess of 30 billion
Il-96MD-90A (c/n 01-02) conduct- considerable design improvements 52 t of cargo was extended from rubles (approx $950 million) to fit
ed its maiden flight in Ulyanovsk were introduced too. With the wing 4,000 km to 5,000 km. The higher the 39 Il-76MD-90As ordered by the
on 22 September 2012 and then section and wing shape remaining thrust also afforded a takeoff/land- military. The Perm Engine Plant will
was ferried to Zhukovsky on 30 unchanged, a new structural layout ing performance improvement, make and deliver the engines. The
January 2013 for more tests. The was introduced: the wing panels with the length of the maximum first PS-90A-76s to be manufac-
19-sortie developmental testing became one-piece, they are made takeoff weight run dropping from tured to equip production-standard
phase took place there between of long riveted stringer panels (pre- 1,750 m to 1,600 m. To facilitate Il-76MD-90As are planned for ship-
18 March and 21 May this year, viously, the stringers were milled the planes performance, its TA-6A ment before year-end.
following which the plane was sub- together with the panels), and the auxiliary power unit was replaced Another order is due to be awarded
jected to improvements and prepa- number of spars dropped from three with the more up-to-date TA-12A. by the government in the near future,
ration for its flight trials. to two, ensuring a sizeable structural The Kupol-II analogue flight navi- this one for deriving a 30-ship batch
The features setting the upgraded weight reduction and a manufactur- gation suite was ousted by the digi- of advanced tanker planes derived
Il-76MD-90A apart from the II-76MD ability increase. tal Kupol-III-76M(A), and the digi- from the Il-76MD-90A and delivering
earlier produced by Tashkent-based Owing to the advanced wing and tal SUA-76 automatic flight control them to the Russian Air Force. The
TAPC corporation are its more reinforced landing gear, the maxi- system capable of ICAO Category II tanker plan derivative will be desig-
powerful and efficient PS-90A-76 mum takeoff weight grew from landing approach and RNP and nated as Il-78M-90A. The construc-
engines from the engine maker 190 t to 210 t and the maximum RVSM navigation replaced the ana- tion of the first flying prototype of
in the city of Perm (the engines payload from 47 t to 60 t com- logue SAU-1T-2B. The traditional the aircraft has begun in Ulyanovsk.
had been tested on Il-76MF and pared to the production-standard steam-gauge instruments on the It is due to be complete before year-
Il-76MD-90 prototypes by then) and Il-76MD previously built by TAPC. flight deck were succeeded by the end 2014. The Il-78M-90As official
a substantial reshuffle of its avionics Owing to a 12% fuel efficiency KSEIS integrated electronic display trials are scheduled for 2015. Their
and warning system, including eight completion will pave the way for the
colour multifunction liquid-crystal types deliveries. In addition, plans
displays. An advanced satellite navi- provide for manufacture of Il-76MD-
gation system was furnished too. 90A airframes designed for subse-
Now, Aviastar-SP is manufactur- quent conversion to special-purpose
ing the first three production-stand- planes, in particular, new-generation
ard Il-76MD-90As (c/n 01-03, 01-04, airborne early warning and control
01-05). Under the order the govern- aircraft.
ment placed on 4 October 2012, 39 Defence Ministry plans also stipu-
production-standard Il-76MD-90A late an upgrade of the in-service
airlifters are to be delivered to the Il-76MD airlifter and Il-78M tanker
Russian Defence Ministry before plane fleets under the Il-76MDM and
2020. The first two of them are to be Il-78M2 programmes respectively,
Marina Lystseva
Alexey Filatov
75 seats in economy class. It is the
first in the series of aircraft under
the contract made by UAC and the
Defence Ministry in May this year for
15 An-148s worth about 18 billion VASO is intent on completing the The test-flown An-148 (61718) tion of an An-148-100EA VIP plane
rubles (about 1.2 billion rubles or assembly and flight-testing the sec- became the fourth aircraft for the Federal Security Services
around $37.5 million apiece) and to ond An-148 for the Defence Ministry of the type, built by VASO this air arm at the same time with
be delivered during 201317. before year-end. The May 2013 con- year. In 2013, an An-148-100EA finalizing the assembly of the sec-
The new aircrafts six-sortie facto- tract stipulates the delivery of one (RA-61720) VIP aircraft designed ond An-148-100E for the Defence
ry test programme had been fulfilled An-148-100E in 2013, four in 2014 for the Rossiya special flight Ministry.
by late September. In October, the and 2015 each and three in 2016 detachment and two An-148-100EM Late in September, a VASO
plane has been painted and submit- and 2017 each. The efficient and (RA-61715 and RA-61717) con- spokesman said that the An-148
ted for the next stage of the trials, sturdy An-148 is gradually to replace vertible passenger/medevac planes orderbook comprised 16 firm
comprising six acceptance sorties, the Defence Ministrys Tu-134 jet have been flight-tested and deliv- orders, with a contract for two
after which it will be delivered. The fleet, which full-rate production was ered earlier this year. Now, the more An-148-100Es for the Angara
delivery may be due in November. discontinued as far back as 1984. plant is completing the construc- airline being due soon.
Yevgeny Yerokhin
onstration programme and the other,
the recently-made OP-3 powered by
Russian-made Klimov TV7-117Vs,
was unveiled at a static display. The
Canadian powerplant-equipped Mi-38
version is dubbed Mi-38-1 now and The very first prototype, OP-1, was als to the summer of last year and production. It is to be assembled
the variant fitted with Russian-built converted to the Mi-38-2 variant then to 2013. Nonetheless, a stan- in January 2014. The OP-4 stan-
powerplant is known as Mi-38-2. with TV7-117V turboshafts, but the dard set of TV7-117V engines has dard helicopter will differ from the
Only the Mi-38-1 (OP-2) has need of debugging the engines and been supplied to equip the Mi-38s OP-3 prototype in a shockproof fuel
been used in the flight tests so far. main gearbox put off its flight tri- third flying prototype built by Kazan system from Aerazur and larger
Helicopters this spring. The engines windows, Russian Helicopters told
were mounted on the helicopter that Take-off. The fourth prototype of
is to start flying its test sorties this the Mi-38 will be the last of the pro-
autumn. totypes, which tests are expected to
Meanwhile, Kazan Helicopters is produce the final data relevant to the
Alexey Mikheyev
Debut of Mi-171A2
Another debut at the recent MAKS Mi-171A1, built by the Ulan-Ude most widespread helicopter family grow from 230 km/h to 260 km/h and
2013 air show was made by the first Aviation Plant and certificated by the in the future. its range on its main fuel tanks will
example of the heavily upgraded Mil IAC Aircraft Registry and Brazilian The upgraded machine features be extended from 715 km to 850 km.
Mi-171A2 medium transport helicop- aviation authorities, was used for the sophisticated Klimov VK-2500PS-03 The upgraded rotorcraft will have a
ter at the static display of the Russian upgrade. The programme is aimed at engines (emergency power rating much-improved yawing stability and
Helicopters holding company. a hefty increase in the performance 2,400 hp for 30 min and 2,700 hp an increased allowable crosswind
The Mi-171 (Mi-8AMT) upgrade and a reduction in the maintenance for 2.5 min), the Safir 5K/G auxiliary speed allowing the machine to hover.
programme was given the green and flight hour costs. The Mi-171A2 power unit, composite-blade rotor sys- The helicopter can operate within
light by the holding companys is supposed to serve the baseline tem, beefed-up powertrain, X-shaped the -50/+50C ambient temperature
management in March 2011. The production-standard model of the tail rotor and up-to-date KBO-17 bracket in any clime.
avionics suite from Radioelectronic The operation of the machine will
Technologies holding. change much. Plans provide for a
The Mi-171A2s maximal takeoff considerable extension of the assigned
and landing weight totals 13,000 kg life and time between overhauls of the
(with cargo slung underbelly helicopter and its systems, with the
13,500 kg). The machine hauls switch to on-condition maintenance
4,000 kg of cargo inside the cabin further down the road.
and 5,000 kg of cargo on the under- The flight tests of the first Mi-171A2
belly sling. The Mi-171A2s pas- (OP-1) are planned for this autumn,
senger variant can be fitted with 26 while the completion of its certifica-
Yevgeny Yerokhin
standard or 18 crashworthy seats. tion tests and the issuance of its type
The Mi-171A2 will feature a maxi- certificate are slated for late 2014, with
mum speed increase from 250 km/h the full-rate production and deliveries
to 280 km/h. Its cruising speed will scheduled for 2015.
Andrey Fomin
entered full-scale production in 2009. Air detachment in 2011. cal control system-equipped version states and Southeast Asian, African
To date, the Defence Ministry has Since helicopters equipped with with Type Certificate Supplement and Latin American countries.
taken delivery of as many as 18 the fly-by-wire control system have
production-standard Ansat-Us fielded not been certificated anywhere in the
with the Syzran affiliate of the Air world yet, there are no basic stan-
Force Academy that specialises in dards to such sophisticated system
helicopter pilot training for the Air in the world. Therefore, to speed up
Force. Under the contract effective the machines hitting the global mar-
until 2018, the deliveries proceed at a ket, a decision was taken to adjust
rate of six units a year. Another batch the Ansat programme with respect
is due for delivery in November. to the current requirements to the
Two Ansat-Us were shown at static traditional helicopter hydromechani-
displays by the Russian Air Force cal control system. The hydrome-
Alexey Mikheyev
investment in the program will total the agreement will firm up into a
about $100 million. Bombardier will full-fledged contract once the joint
provide all relevant nonmaterial assets, venture has been established.
such as production technology, design Another procurement agreement
During the MAKS 2013 air show, Rostec plans to launch the assembly documentation, intellection property for 50 Q400s was signed by the
the Rostec state corporation and as soon as 18 months. rights and knowhow. Ilyushin Finance Co. leasing com-
Canadian company Bombardier The implementation of the pro- The letter of intent stipulates pany. Under the agreement, Ilyushin
signed a letter of intent on setting up gramme in cooperation with our phased implementation of joint Finance Co. is going to buy 50 planes
a joint venture in Russia to manufac- potential partner, Bombardier, would efforts. It planned that at the initial from the Russian-Canadian joint
ture 78-seat Bombardier Q400 tur- facilitate the renovation of the air- stage the production will be fully venture to be set up. The overall
boprop regional planes. According to craft fleets of Russian air carriers, handled by Bombardier in Canada, value of the firm order, which could
expert estimates, the planes market enhancement of Russian aircraft and the plant in Ulyanovsk will only be signed in case the agreement is
capacity in Russia and other CIS safety, introduction of more flexible customize planes to the require- implemented, will be $1.695 billion
nations will exceed 250 until 2030. regional traffic pricing and a reduc- ments of its customers. Aircraft in catalogue prices.
Andrey Fomin
paid for by Russian investors, nev- modifications to the planes base-
ertheless. In all, about 60 supersonic line configuration have resulted in
bizjet aerodynamic configuration vari- a radical revamp of its exterior. In
ants (tailless, canards, tri-plane) pow- particular, to maximize the time
ered by various numbers of engines separation between the fuselage
(two, three or four) were consid- sonic boom and wing sonic boom,
ered, with the dimensions and take- the wing was shifted rearwards and
off weight growing steadily from given the swept configuration, lead-
Andrey Fomin
35 t of the Gulfstream-VI-Su to 52 t ing edge kink, span-wise V-shape
of the latest versions of the S-21. and complex twist. A large part
Supersonic bizjet models were tested of the fuselage nose section was
in TsAGIs and SibNIAs wind tun- shaped like a cone, and the fuselage
nels. Later on, the supersonic bizjet itself, measuring about 45 m, was From 2005 to 2009, Sukhoi supersonic bizjet, a 24-seat super-
programme, renamed SSBJ (Sukhoi given curved sides, which allowed Civil Aircraft Company, teamed sonic business taxi and superson-
Supersonic Business Jet), was hand- the N-shaped sonic boom shock- up with TsAGI and TsIAM, offered ic airliners for 50 and 100 seats.
ed by the Sukhoi design bureau over wave of the 52-tonne aircraft to be its supersonic bizjet design for However, their future is hinged on
to the Sukhoi Civil Aircraft Company transformed into a multiple pressure use under the European Unions three basic factors (the same goes
and then to Advanced Sukhoi Civil surge shockwave, thus reducing the HISAC (Environmentally Friendly for the rest of supersonic bizjet
Technologies. design overpressure in both pres- High Speed Aircraft) programme and supersonic passenger aircraft
Virtually at the time with the sure surges and the cruising sonic on comprehensive research into programmes). The first one is the
kickoff of the S-21 programme, the boom volume down to 6567 dBA. supersonic bizjet problems and emergence of acceptable supersonic
development of the 50-seat 90-tonne Two variants of mounting the super- development feasibility. It is the bizjet sonic boom volume interna-
S-51 supersonic passenger aircraft sonic bizjets engines are on the configuration from SCAC, TsAGI tional standards that neither FAA,
began, albeit at a far slower pace. table. One provides for the engines and TsIAM that was selected for not ICAO is prepared to consider
It was reported in the late 90 that to be housed by under-wing engines further research under the pro- until a supersonic demonstrator of
the Sukhoi design bureau and TsAGI nacelles and the other for mounting gramme. sonic boom reduction technology is
were pursuing a joint programme them as a pack in the tail section The supersonic bizjet model dis- developed. The second factor is the
on developing the 70-tonne MSDS to reduce drag and environmental played at the MAKS 2013 air show devising of supersonic bizjet certifi-
intercontinental supersonic busi- noise. The Rolls-Royce RR260 and is merely part of the supersonic cation airworthiness standards. The
ness jet designed to carry eight to RR557 turbofans, which are still on passenger aircraft family being con- third one, naturally, is funding, for
ten passengers in business class the drawing board, and variants of sidered by Advanced Sukhoi Civil the efforts are to be to the tune of
or 30 in economy class. Despite Russian engines have been mulled Technologies now. The family com- hundreds of millions dollars or even
the pins taken by the designers, over as the powerplant for the bizjet. prises at this point of an 810-seat billions of dollars
Debut of PD-14
The focus of the United Engine eters in February 2013, and the be on a par with the best foreign and mechanical equipment. Its
Corporations exposition in third phase of the trials, which designs equipped with the FADEC time before first overhaul will be
Oboronproms pavilion during the included, inter alia, the engines and lacking any hydromechanical 20,000 h. The DT-14 fuel meter-
MAKS 2013 air show in August operation in takeoff mode, was backup. ing unit handles the metering of
was the advanced PD-14 engine conducted in July. The design of the PD-14s auto- fuel to the engine on a signal from
the first one of the future family of Aviadvigatel JSC Deputy Director matic control system began to the electronic controller and con-
engines in the 918-tonne class, General Igor Maximov, dual-hatted clarify in 2011, and the early sets trols the compressors mechanical
being developed by the Perm- as chief designer of the PD-14 of units were manufactured a year equipment and the heat exchang-
based engine maker in conjunc- engine family, said at MAKS 2013 later. The automatic control system ers. The DT-14s time between
tion with other UEC subsidiaries that the engine demonstrator had of the PD-14 engine consists of overhauls is set at 40,000 h. For
to fit the MC-21 short/medium- logged 78 hours in 134 cycles by the RED-14 electronic controller, the first time in Russian aggre-
haul airliner, future MTA medium August 2013 and the demonstra- BN-14 pump unit and DT-14 fuel gate industry, Category B interna-
transport aircraft and other appli- tion core engines had accumulated metering unit. tional fire resistance requirements
cations. Previously, only PD-14 over 115 hours in 173 cycles. The key component of the (the ability to enable the engines
scale models and mock-ups had The most important component PD-14s control system is the aggregates to operate for 5 min in
been displayed at shows, a full- of the PD-14s competitive edge RED-14 electronic controller per- the face of the engine fire) have
scale engine demonstrator was is the engines up-to-date con- forming integrated all-mode control been applied to hydromechanical
unveiled to aviation experts and trol systems being developed and of the engine, enforcing the param- aggregates.
enthusiasts this time around. made by STAR JSC in the city of eter limits, conducting engine diag- Basic components of the PD-14s
Its first start-up took place in Perm. nostics and protection, and swap- control system were unveiled at
June 2012, and the first phase of Aviadvigatel JSC as prime con- ping the data with other systems MAKS 2013. This year, a RED-14
indoors test bench trials had been tractor for the PD-14 develop- of the aircraft and its engine. The electronic controller certification
completed by August last year, ment set rather tough require- share of advanced Russian-made request is to be submitted to the
with the engine demonstrators ments to the characteristics of parts and electronic components in IAC Aircraft Registry. The control-
basic operating modes tested. the future automatic control sys- the controller has been maximized. ler is to pass the whole set of
A year ago, in September 2012, tem. Particularly, the engines The RED-14s time before first over- certification trials during 201415
the PD-14 engine demonstrator time between overhauls and time haul will be 40,000 h. and to enter full-rate production in
(No. 100-01) passed its outdoors before failure were to be extended The BN-14 pump unit compris- 2016 or in 2017.
test bench trials phase, during by far. The weight of the control ing a booster pump and a gear type The PD-14s chief designer Igor
which its acoustic characteristics systems units was to be slashed pump is being developed with the Maximov said at MAKS 2013 that
were gauged. The second engine drastically halved compared use of high-strength wear-resist- the PD-14 (No. 100-03) proto-
demonstrator passed the tests of to in-service examples. Overall, ant materials. The BN-14 supplies type is to be prepared for tests
its basic thermodynamic param- the flight control system was to fuel to the engine, automatics this autumn. The prototype will
be used for testing STARs latest
control system and proving its
performance capability. Another
PD-14 prototype, No. 100-04, is
slated for assembly in December.
Its configuration will feature the
maximized resemblance to that
of future production-standard
engines of the type. The prototype
will be employed for checking the
operation of all systems and units
of the advanced powerplant.
The flight tests of a prototype
PD-14 on the Il-76LL flying test-
bed are to kick off in less than a
year in September 2014, with
the first flight of the MC-21 aircraft
powered by PD-14 engines being
planned for November 2015 now.
It is expected that the PD-14 will
wrap up its certification tests and
get its type certificate from the IAC
Yevgeny Yerokhin
Andrey FOMIN
Photos by Alexey Mikheyev
and Turbomeca in April 2011, and the parties assembly. The fourth prototype is to join them On 27 August, the first day of MAKS 2013,
signed an agreement on 19 May of the same under the test programme in 2014. Aspiring Russian Helicopters clinched another deal
year for production of the first batch totaling 40 plans of Russian Helicopters provide for the for advanced helicopters, when Colombian
engines of the type. The helicopter developer completion of the Ka-62 certification tests company Vertical de Aviacion ordered five
had taken delivery of the first two of them by by the end of next year so that deliveries can Kamov Ka-62s and five Mil Mi-171A1s. The
the summer this year and used them to equip begin early in 2015. Ka-62s are to be operated in support of
the so-called iron bird a Ka-62 example As is known, the launch customer for the the Colombian oil industry. Their delivery is
designed for ground tests of the powerplant, Ka-62 is Brazilian company Atlas Taxi Aereo planned to commence in 2016.
powertrain, rotor system and other systems. that placed an order with Russian Helicopters Time will tell whether the manufacturer
This summer, two engines to fit the first flying for seven units with seven options on 14 can stick to the tough schedule and what
prototype were delivered from France and the December 2012. The contract was signed slice of the market will be grabbed by
first several powertrain sets were supplied by within the framework of Brazilian President the Ka-62. So far, it is the fact that the
Austrias Zoerkler. Dilma Vana Rouseffs visit to Russia. Under eye-catching Ka-62 full-scale mockup,
The preparations of the first flying Ka-62 the contract, the first two Ka-62s are to be which made its debut at the HeliRussia
prototype for flight tests began right after delivered as soon as the first quarter of 2015. in May 2012 and was later shown at the
the aircraft had taken part in MAKS 2013. Four helicopters more are to be shipped Farnborough air show and this summers
The machine is slated for its maiden flight to Brazil before year-end 2015, with the Le Bourget air show, has attracted keen
in November. Two more flying prototypes seventh, and the last, Ka-62 to follow suit attention of onlookers and potential
are supposed to be built before year-end. As in the first quarter of 2016. The Ka-62s are customers. No doubt, the display of the
of late summer, the second flying prototype intended for use in Brazil as part of offshore first Ka-62 flying prototype at MAKS 2013
was sitting in an assembly jig in the town of operations in support of Brazils national oil has only stoked the interest in the latest
Arsenyev, and the third one was in aggregate company Petrobras. programme of Russian Helicopters.
Artyom Korenyako
a speed of 500 km/h. The fuel burn $560820 depending on the upgrade
drop equaling virtually 30% is a cause variant selected.
for confidence. As is known, during the Gidro-
The test results have shown a aviasalon 2012 air show where
twofold reduction in the takeoff run
compared with that of the production-
standard Yak-40, a 1.5-fold drop in
the time and fuel consumption during
climb, a twofold fuel consumption
reduction during landing approach
and a reduction in the landing roll
by 1.251.5 times. The flying test-
beds developmental tests are to be
completed in late 2013, after which
the institute is ready to launch the
Andrey Fomin
Zhukovsky, where it was displayed ten new Mi-26s are in service with
as part of MAKS 2013. the Air Force units in Khabarovsk,
By early this year, the Rostvertol- Uprun and Rostov. Another Mi-26
Avia air carrier had had three built for the Russian military took to
Another Mil Mi-26T superheavy- for export and, since 2011, for Mi-26Ts (RA-06259, RA-06293, the air in Rostov in April this year.
lift helicopter has been delivered the Russian Defence Ministry. RA-06299) made in 1990, 2003 and It has been painted and issued side
to a Russian commercial operator The delivery of the new helicop- 2006 respectively, which it flies on number 53. In July, with Rostvertol
after a long lull. Lately, machines ter (RA-06255) has been made unique transport services. Now, it launched the flight tests of another
of the type have been made only to the Rostov-based Rostvertol- comprises four units of the type. Defence Ministry-ordered Mi-26.
Rostvertol
lem was (one had only fit the
controls to the front combat sta-
tion), the development and con-
struction of the Mi-28UB proved 2007 and given side number 37. It to six machines per unit operat- Force and Air Defence Force units
to be time-consuming enough. A had been brought to the plant last ing Mi-28N helicopters. For his in the Western Military District,
decision was taken that the work year where its nose section was part, Rostvertol Director General said that a new Army Aviation
would be done at the manufactur- replaced with a new one devel- Boris Slyusar assured the Mi-28UB air base has been activated at
ing plant, with support to be pro- oped using the afore-said digital would enter full-rate production as the Ostrov airfield in the Pskov
vided by the developer (Rostvertol models. In addition to introducing soon as next year, all the more so Region in 2013. It will be an abso-
and the Mil helicopter plant made a full backup set of controls in that the helicopter is the point of lutely new air base fielded with new
the contract to this effect as far the front part of the cockpit, other interest of not only the Russian Ka-52, Mi-35, Mi-28, Mi-26 and
back as April 2009). The Mi-28UB modifications were made, e.g. the military, but potential foreign cus- Mi-8MTV-5 helicopters, Maj.-Gen.
became Rostvertols first aircraft cockpit became wider a bit, its tomers as well the ones eyeing Makushev said. The base will be
productionised with the use of canopy transparency and entrance the Mi-28NE now. manned by best-trained personnel.
digital modeling, rather than tra- door were altered, the area of Now, Rostvertol is ramping The pilots have been at CCTC in
ditional techniques. This called for the side cockpit transparency was up the output of the production- Torzhok already. The unit will be
the plant to modify its produc- increased to improve visibility and standard makes. According to the stood up within the first six months
tionising technologies consider- the crash-absorbent seats were companys annual report, it built of the year.
ably, buy advanced manufacturing redesigned. 48 helicopters in 2012, including On 9 August 2013, a Western
equipment (including cutting-edge Following a series of test sor- 14 Mi-28Ns for RusAF. In addition Military District spokesman
computers) and learn to use it. ties, the Mi-28UB OP-1 was shown to the Army Aviation Combat and announced that the first pair of
However, the plant has gained a to Russian Air Force Commander- Conversion Training Centre (CCTC) Mi-28N helicopters flew to their
wealth of experience that will be in-Chief Lt.-Gen. Victor Bondarev. in the town of Torzhok, Mi-28Ns base at a military airfield of the
used in productionising advanced The demonstration flight took had been operated by the military Western Military District in the
helicopter models: molding lofts place in Rostov on 9 August 2013. units stationed in Budyonnovsk, Pskov Region on that day. The
and master plates are sinking into The service chief liked the new Korenovsk and Rostov-on-Don in Western Military Districts Air
oblivion, with all things digital machine: speaking of his impres- the Southern Military District by Force personnel have completed
being the wave of the future. sions of what he had seen, the gen- early this year. Recently, the type the Mi-28N pairs flight tests and
A decision was made to derive eral said the Mi-28UB would speed has cropped up in the Western accepted the combat helicopters,
the Mi-28UBs prototype, OP-1, up pilot training by two to three Military District as well. In an inter- the spokesman said. Thus, the
from a low-rate initial production times and promised that RusAF view to the Red Star daily in the Mi-28N became the first helicop-
(LRIP) Mi-28N the machine with would acquire 4060 aircraft of spring of this year, Maj.-Gen. Igor ter type to base at the new Army
c/n 02-01 made by Rostvertol in the type prior to 2020 four Makushev, commander of the Air Aviation base at Ostrov.
MOTOR SICH
PROGRAMMES
Vyacheslav BOGUSLAYEV,
IN HELICOPTER INDUSTRY
President, MOTOR SICH JSC
MOTOR SICH JSC is a S-500V-01 engine having takeoff in September 2007 finished the Mil Moscow Helicopter Plant, and in
company specialized in designing, power of 810 hp. On the basis of work on development of the April 2013 the Ministry of Defense of
manufacture and aftersales this engine, we developed versions V3-117V-SB1V turboshaft the Russian Federation successfully
servicing of the gas turbine engines having takeoff power from 630 hp engine. This engine meets up-to-date completed joint flight testing.
for civil and military aviation, (S-500V engine) up to 950 hp requirements and has type certificates For application of new helicopters
industrial gas turbine drives, as well (S-500V-02 engine). issued by the Aviation Register of of this class in the projects, new
as gas turbine power generating The D-136 engine developed on Interstate Aviation Committee and versions of the engine, namely
sets and gas pumping units with the basis of gas generator of the V3-117V-SB1V series 1
these drives. Great experience engine with the FADEC system and
enables our company to act on V3-117V-SB1V series 2 engine
the world markets flexibly and Mi-8MSB with new electronic governor are
efficiently. Quality and reliability under development. The use of new
of the aero engines manufactured automatic control systems will result
by our company is substantiated in further improvement of performance
by many years of operation in the of the engines and helicopters.
aircraft and helicopters all over The V3-117V-SB1V series
the world. 4 and 4E engines (with pneumatic
MOTOR SICH JSC is one of the and electrical starting systems) are
main participants on the market of versions of the V3-117V-SB1V
the helicopter gas turbine engines.
More than 80% of the Mil and Kamov
helicopters including the most heavy V3-117V-SB1V
lifting helicopter Mi-26 all over the series 4
world are flying in the sky owing to D-36 turbofan engine is the largest
the power of engines manufactured helicopter engine manufactured by
in Zaporozhye. Our strategy of MOTOR SICH JSC.
development consists in consolidation Designers of Ivchenko-Progress SE
of our positions on this market by developed a project of upgrading of the
designing radically new engines. D-136 engine, which will be fulfilled in
Considering change in conjecture cooperation with MOTOR SICH JSC.
of the world helicopter market, our New D-136-2 engine provides for
company is working on development takeoff power of 11,500 hp, which
of family of the turboshaft engines of is maintained up to ambient air
new generation, such as MS-500V, temperature of 50. In addition,
in the class of takeoff power of emergency power rating of 14,500 hp
600 to 1000 hp designed to power is introduced. The D-136-2 engine State Aviation Administration of engine and are designed for re-engining
helicopters of various purposes with is designed to power the i-262 Ukraine
Uk i iin 2007
2007. off the
h earlier
li manufactured
f Mi-8T
d Mi 8T
takeoff weight of 3.5 to 6 tons. upgraded helicopter. In 2009 the V3-117V-SB1V type helicopters in order to improve
According to assumptions of the In order to improve performance engine was put into service by the their performance, especially when
experts, the segment of market of of the i-28, i-8V, i-17 Ministry of Defense of Ukraine. operating them under hot climate
the helicopters of this class due to (i-171), and -52 helicopters In 2012 the V3-117V-SB1V conditions and in high-level lift-off
their versatility will be one of the and their efficiency when operating engines passed successfully sites. The engines maintain the power
most promising in the coming years. in high mountain areas of the hot preliminary flight testing as part at higher ambient air temperatures,
The basic engine of the family is the climate countries, MOTOR SICH JSC of the i-8V-5-1 helicopter at airfield height and flight altitude
compared to the TV2-117 engines radio equipment for communication, Thus, MOTOR SICH JSC step I-20, I-24, I-9V and I-9 engines
powering the Mi-8T helicopters now. navigation, landing and air traffic by step proceeds with pathway of all versions;
The engines inherited the best control with due regard to the ICAO in mastering of the helicopter - Delivery of spare parts, assemblies,
design decisions aimed at provision requirements for international flights, manufacturing industry. Nowadays, modules and engines manufactured by
of better parameters and service as well as with the extended set of we are working on development of MOTOR SICH JSC;
lives, which were developed on equipment, which provides for the home-produced helicopter having - Extension of service life on
the V3-117V-SB1V engine. possibility of day-and-night efficient use take-off weight of 5 to 6 tons and the basis of Service Bulletins and
This has made it possible to of the helicopter under visual flight rules are looking for the entities ready for decisions issued by the designer and
establish total service life for the weather conditions and instrument cooperation in this subject. supplier;
V3-117V-SB1V series 4 and 4E flight rules weather conditions, in In addition, MOTOR SICH JSC - Advanced training of technical
engines as high as 15,000 hours/ mountainous area and flat terrain, in is performing technical support specialists of the Customer;
cycles and to introduce emergency hot climate at all permissible altitudes of our products during the overall - Training.
power condition of 2.5 and and flight speeds. service life and is interacting with It is planned to carry out repair and
60-minutes power with one engine uupgrading of the helicopters in the
inoperative, which is not available in nnearest future.
the TV2-117 engine. In addition, under the guidance
In 2011 the Aviation Register of the oof MOTOR SICH JSC, scientific and
Interstate Aviation Committee issued technical conferences of Association
te
supplement to the type Certificate for oof Aero Engines Manufacturers
the V3-117V-SB1V series 4 and with participation of the leading
w
4E engines. manufacturers of the aero engine
m
At present, MOTOR SICH JSC is manufacturing industry of Ukraine and
m
extensively working in the field of Russia take place regularly in Sharjah.
R
helicopter industry. Our company
established design bureau and
helicopters production aimed at
designing, updating, overhaul and MSB-2
re-engining of the helicopters.
At the 13th International Dubai
Airshow 2013, MOTOR SICH JSC Since 2012 MOTOR SICH JSC
will demonstrate a number of new mastered overhaul of the Mi-2
developments of our company, helicopter of standard configuration.
nfiguration.
including upgraded Mi-8MSB In case of necessity, duringg overhaul,
helicopter powered by the the avionics may be upgraded ed and the
V3-117V-SB1V series 4E cabin may be re-equipped.
engines and full scale mockup of the Since low reliability ity and AI-450
MSB-2 upgraded helicopter powered insufficient power is the main
by the I-450 engines. drawback of the Mi-2 helicopters,
elicopters,
In August 2013 the i-8SB the MOTOR SICH JSC nowadays wadays is our representative offices all over the Nowadays, activity of MOTOR
helicopter powered by the developing and implementing nting the world. SICH JSC to the full extent meets
V3-117V-SB1V series 4E program of overhaul and upgrading Technical Center in UAE (Sharjah) is requirements of the market economy
engines of new generation at the of the Mi-2 helicopters to a MSB-2 one of our representative offices. The criteria. Business strategy of our
Kirovskoye airfield in Feodosiya helicopter powered by the AI AI-450M
450M main
i fields
fi ld off workk off the
th Technical
T h i l company iis ttargeted
t d on iincrease iin
established 11 world records, up-to-date engines having higher Center are maintenance and overhaul volume of manufacture and marketing
including the absolute record in power, lower fuel consumption of the aero engines manufactured by of products, mastering the series
class -1 (helicopters) according and FADEC control system; MOTOR SICH JSC, which are operated production of new advanced products,
to the FAI classification level replacement of avionics in order as part of the aircraft and helicopter development of markets of sales,
flight maximum altitude of 9,150 m to bring it to compliance with the in the countries of Middle East and attainment of the maximum profits
reached on 14 August 2013, and of ICAO requirements; improvement Northern Africa. from all kinds of activity.
operating altitude ceiling of 5,440 m in the ergonomical characteristics Technical Center in UAE promotes:
with cargo of 5,000 kg reached on of the helicopter cabin. The above - Co-operation with Aviation
20 August 2013. upgrading of the helicopter will administration of UAE and countries
The i-8SB helicopter may improve its performance. It is of region in matters of assurance of
be represented in several versions: expected that the MSB-2 helicopter airworthiness of the aero engines;
transport, passenger, rescue, medical, compared with the Mi-2 helicopter - Provision of maintenance
fire-fighting, agricultural, military. will provide for the following: support pertaining to maintenance
The maximum weight of the cargo - Decrease in hourly fuel of the products manufactured by MOTOR SICH JSC
airshipped in the cargo compartment consumption more than by 30%; MOTOR SICH JSC; 15, Motorostroiteley av.,
Zaporozhye, 69068, Ukraine.
of the i-8SB helicopter is 4,000 kg - Increase in hover and service - Establishment of maintenance
Phone: +38 (061) 720-48-14
and 3,000 kg if carried on the external ceilings; of the products manufactured by Fax: +38 (061) 720-50-05
load sling system. - Increase in efficiency of use MOTOR SICH JSC; E-mail: eo.vtf@motorsich.com
At Customers request, the i-8SB of the helicopter under hot climate - Carrying out of light overhaul and www.motorsich.com
helicopter may be furnished with conditions and in mountainous areas. overhaul of the D-36, D-18, V3-117,
Alexey Mikheyev
programme in Komsomolsk-on-
Amur the aircraft will be ferried to
Zhukovsky near Moscow where the
first four T-50 flying prototypes are
now being under flight tests. Two years since the previous air show ers have begun to test the AESA flight operating modes. This spring
more planes are involved in ground in Zhukovsky, the PAK FA pro- radar and several other sophisti- T-50 was flown by the first military
tests also one as a complex ground gramme has made good progress: cated avionics systems, conducted pilot, with the PAK FA prototypes
stand and the other for static tests. two more prototypes joined the mid-air refuelling experiments, due to start the official trials at the
As many as three T-50 proto- flight tests (T-50-3 in late 2011 expanded the fighters flight enve- Defence Ministrys testing facility
types took part in the recent MAKS and T-50-4 in late 2012). Using lope and been gradually learning in Akhtubinsk.
2013 air show. Over the past two these two prototypes, the design- the rope in ever more advanced Three T-50s flew as part of the
flight programme of MAKS 2013,
flown as a troika by Sukhoi test
pilots Sergei Bogdan, Roman
Kondratyev and Sergei Chernov. In
addition, Sukhois chief test pilot
Hero of Russia Sergei Bogdan per-
formed solo aerobatics on a T-50.
A number of advanced avionics
systems designed for the PAK FA
were unveiled at the stands of the
air show. For instance, Tikhomirov-
NIIP displayed an X-band side-
looking AESA in UACs pavilion
(the company unveiled the PAK
Sukhoi
FA-intended forward-looking
X-band AESA at the previous air
show). In the pavilion of the Rostec
corporation, the stand of the Urals
Optical and Mechanical Plant (a
subsidiary of the Shvabe holding)
featured a number of subsystems of
the integrated optronic suite being
developed for the PAK FA.
By early November, more than
350 flights were carried out under
the flight test programme on five
Sukhoi
T-50 prototypes.
Sergey Lysenko
Yak-130 batches to the flying school
in Borisoglebsk in May through
October 2013.
Thus, since early this year, Irkut
has supplied the Defence Ministry of tactical aircraft of the Russian fielded with Kuschevskaya train- The bright red-and-white colour
with 15 aircraft of the type, and Air Force. In all, plans for this ing AFB). pattern is a tribute to the traditions of
the Borisoglebsk training AFB is year provide for the construction One of the latest Yak-130 deliv- the Yakovlev design bureau that has
operating 40 Yak-130s used for and delivery of 18 Yak-130s (the ered to the Borisoglebsk training painted its light sports and trainer
training by cadets future pilots next three aircraft are going to be AFB by Irkut in July this year could aircraft like that since the AIR-2
be seen at the Russian Air Force one of the early Yakovlev planes
display area at the recent MAKS developed in 1928.
2013 air show. A prototype Yak-130 Besides the Russian Air Force,
sporting an unusual red-and-white the Yak-130 new-generation combat
paintjob took part in the demonstra- trainer is in service with the Algerian
tion flights at the air show too. In Air Force (Irkut delivered 16 aircraft
the future, the colour pattern might of the type to Algeria in 2011). In
be used on the Yak-130s of the Air addition, the Republic of Belarus has
Forces new aerobatic team, which placed an order for the type, and
Andrey Fomin
establishments feasibility has been talks have been under way with a
repeatedly mentioned by the service number of other CIS countries and
chief. nations from farther abroad as well.
Marina Lystseva
ordered 30 more fighters of the type
from Irkut in December 2012.
The Su-30SM supermanoeuvra-
ble multirole two-seat fighter is a
derivative of the Su-30MKI fight- Radioelectronic Technologies hold- Akhtubinsk, paving the way for the flew to the Lipetsk-based State Air
ers family the Irkutsk Aviation Plant ing. The fighters weapons suite has warplane to combat units of the Personnel Training and Operational
has been building for export since been modified too. Russian Air Force. Evaluation Centre where conversion
2000. The tailoring of the aircraft by The first two Su-30SMs designed On 17 August, in the run-up to the training is being given to the combat
the Sukhoi design bureau to meet for the Russian Air Force (side num- Day of the Air Fleet, Russian Air Force unit personnel earmarked for start-
the requirements of the Russian Air bers 01 and 02) were made and Commander-in-Chief Lt.-Gen. Victor ing Su-30SM operations in the near
Force covered the radar, navigation, flight-tested in Irkutsk in September Bondarev said that the delivery of the future. In late September another
radio communication and identifi- 2012 and delivered in November of first large batch of 12 production- production Su-30SM (side number
cation friend-or-foe (IFF) systems, the same year, after which they were standard Su-30SM fighters was due 57) joined them in Lipetsk. Six more
ejection seat and a number of aux- subjected to their official trials in the this autumn. The service chief added production-standard fighters of the
iliary systems. The Su-30SM carries State Flight Test Centre in the town the aircraft would be fielded with type were assembled and flown in
the Tikhomirov-NIIP Bars-R phased- of Akhtubinsk. Another aircraft (side Domna AFB vic. the city of Chita. Irkutsk. Their deliveries to RusAF
array radar being able to track 15 number 54) joined them this spring. With MAKS 2013 being over, the started in November.
aerial targets and attack 4 of them. On 28 June 2013, a preliminary two Su-30SMs (side numbers 55 and During MAKS 2013, Irkut arranged
The full-rate production of the Bars is report on the results of the Su-30SM 56) returned to Irkutsk to be handed Su-30SM familiarisation flights for
run by the Ryazan State Instrument- official tests was released in the over to the Defence Ministry on 13 pilots of the Air Forces Russian
Making Plant, a subsidiary of the Chkalov State Flight Test Centre in September. On the next day, both Knights aerobatic team, with the
flights including supermanoeuvrable
advanced aerobatics. The Russian
Knights gave raving reports of the
aircraft. As is known, the conversion
of the Kubinka AFB-based legend-
ary aerobatic team to the advanced
Su-30SM and Su-35 fighters is
being pondered. In addition, Maj.-
Gen. Alexander Kharchevsky, chief
of the State Air Personnel Training
and Operational Evaluation Centre,
flew a familiarisation sortie on the
Su-30SM in Zhukovsky. I have
always dreamt of something unu-
sual, but the sortie on the Su-30SM
Alexey Mikheyev
Alexey Mikheyev
first phase. The preliminary report
gave the green light to the types full-
scale production and fielding with
combat units. To date, the Defence
Ministry has accepted as many as the Russian Air Force prior to 2015 the cutting-edge Tikhomirov-NIIP subsidiary of the Radioelectronic
10 production-standard Su-35S jets, was signed in August 2009. Irbis phased array radar featuring a Technologies holding.
with the first several fighters of the According to Sukhoi, the Su-35s unique aerial target acquisition range The negotiations on the Su-35s
type expected to be fielded with a key features setting it far apart from and an enhanced simultaneous first export delivery are due for
combat unit in the Russian Far East other aircraft of the Su-27 fam- multiple-target tracking and engage- completion in the near future. The
by the end of this year. ily are a drastically sophisticated ment capability. The Irbis radar has contract for a Su-35 batch for the
The contract for the construction avionics suite based on the digital been productionised by the Ryazan Peoples Republic of China may be
and delivery of 48 Su-35S fighters to information and control system and State Instrument-Making Plant, a signed next year.
Yevgeny Yerokhin
multirole fighter that was unveiled in
its current incarnation at MAKS 2013,
with the Russian Air Force planning
to acquire it. The fighter represents
a new family of commonised ver-
sions of the legendary MiG jet. The variant was designated as MiG-29M2. programme and for familiarisation 156) equipped with thrust vector
first members of the family were the The MiG-29M and MiG-29M2 are flights conducted by pilots of poten- control engines).
MiG-29K/KUB multirole carrierborne identical to the MiG-35 in terms of air- tial customers. At present, the type is It was expected that the Russian
fighters that are being supplied to frame design, but their avionics suite in full-rate production at Lukhovitsy. Defence Ministry could order the
the Indian Navy and manufactured was altered. For instance, they carry The long-awaited order of a batch MiG-35S during the air show. For
for the Russian Navys air arm (the the upgraded Zhuk-ME slotted array of MiG-35S fighters by the Russian instance, MiGs Director General
first production-standard MiG-29KUB radar similar to the one equipping the Air Force had been pushed back Sergei Korotkov said in late May 2013
intended for the Russian naval aviation production-standard MiG-29K/KUB to the front burner by this sum- that the Defence Ministry was going
made its maiden flight on 15 October and MiG-29SMT fighters. mer. The afore-mentioned aircraft to order a 24-ship MiG-35S batch in
2013). The heavily upgraded MiG-35 A MiG-29M2 and a MiG-29M (side numbers 741 and 747) were summer 2013, while the Russian Air
multirole combat aircraft is to succeed prototypes were manufactured by recently groomed as MiG-35S Forces need in the fighter in the near
the in-service MiG-29 and MiG-29SMT the MiG corporations Production standard model and could be seen future was estimated at 37 units. Not
fighters on the global warplane market Complex in the town of Lukhovitsy at MAKS 2013 as static displays long before the kickoff of MAKS 2013,
in the near future. two years ago. The former, the two- and in demonstration flights (dur- however, the word leaked out that the
To meet the requirements of a num- seat MiG-29M2 (side number 747), ing the air show, MiGs test pilot MiG-35S order would be put on the
ber of its customers, MiG corporation first flew on 24 December 2011, and Stanislav Gorbunov flew a MiG-35, back burner until 2016 at the Finance
also developed a somewhat simpli- the MiG-29M single-seater was flight- while MiGs chief test pilot Mikhail Ministrys suggestion. Later, it was
fied (hence, less expensive) MiG-35 tested a little more than a months Belyayev performed supermanoeu- announced, however, that the delay
derivative. Its single-seat version was later, on 3 February 2012. The planes vrable aerobatics on the experi- would not be that long and the contract
dubbed MiG-29M and its two-seat were used in support of the test mental MiG-29M OVT (side number could be signed as soon as 2014.
MIG-29K
BACK ON DECK
REPORT FROM VIKRAMADITYA
Mid-September 2013 saw the successful completion of all kinds of tests of the Project 11430 Vikramaditya aircraft
carrier the former Russian Navy Northern Fleets Admiral Gorshkov through-deck cruiser upgraded by Sevmash JSC
for the Indian Navy. The final phase of the trials took place in the Barents Sea and was aimed at completing the testing of
the ships aircraft operations equipment, i.e. the hardware relevant to aircraft basing and operation. Naturally, the focus
of the trials was the flights of MiG-29K/KUB multirole fighters, the major calibre of the ship. The tests were arranged by
Sevmash JSC and RSK MiG Corp. assisted by the Northern Fleet command element, Defence Ministry State Flight Test
Centre and Kamov JSC. According to the news release by MiG Corp. with respect to the MiG-29K/KUB fighter trials on
board the Vikramaditya during August and September 2013, in the course of the sorties, MiG Corp. aircrews tested the
aircraft operations equipment of the aircraft carrier. The test programme included, among other things, a series of night
sorties from the carrier, takeoffs and deck landings in pairs at minimal time intervals and flights with the full payload.
In all, the deck flight trials phase during August and September 2013 witnessed two planes a MiG-29K and a
MiG-29KUB logged 57 sorties, including 47 deck landings. 12 takeoffs and deck landings were performed at night,
which had not been done by Russian carrierborne aviators since 1999. In addition, tests of the Kamov Ka-27PL and
Ka-31R helicopters and their compatibility with the carriers aircraft operations equipment were conducted at the same
time. Overall, 30 helicopter sorties were flown from the deck, let alone the SAR support provided to the fighter trials by
the Northern Fleets Ka-27PS aircrews.
Take-offs correspondents covered those flights in August and September 2013.
Vladimir Karnozov
Alexey Mikheyev
MiG-29K with a combat load
of two Kh-35E ASMs, two R-73E AAMs
and underbelly drop tank just landed
at Vikramaditya, 21 August 2013
As is known, the bulk of the MiG-29K/KUB maximal enduring flights and tanker plane The ship had been repaired and prepared
tests onboard the Vikramaditya aircraft operations with the use of drop tanks and in Severodvinsk for the final phase of her
carrier was conducted a year ago, during detachable refueling units. running tests before summer this year and
the ships first 108-day sea trials. The MiG- Prior to last years sea trials of the ship, she put out to sea again on 3 July 2013. By
29K and MiG-29KUB flew upwards of Defence Ministry State Flight Test Centre the end of the month, the Vikramaditya
100 sorties, in excess of 40 takeoffs/deck personnel had begun to test its aircraft complement led by their commanding officer
landings and numerous touch-and-gos operations equipment, e.g. aircraft pre- Capt. 1st Rank Igor Ryabko and the head of
from the carrier from July to September flight preparation gear, hangar mechanisms, the sea segment of the trials, Capt. 1st Rank
2012. At the time, the planes were flown by elevators, etc. The tests carried on in Alexander Shevchenko, had completed the
MiG Corp.s test pilots Mikhail Belyayev, the course of the flight trials, with the test phase in the White Sea, with the carrier
Nikolay Diorditsa and Andrey Shishov arrestors and flight and combat operations having produced, inter alia, a maximal
and Defence Ministry State Flight Test support gear tested. At the same time, State speed of 29.2 kt, and had been prepared for
Centre test pilots Col. Oleg Mutovin and Flight Test Centre helicopter test pilots the final series of flights by carrier-borne
Maj. Dmitry Demenev. Last years flights assessed the feasibility of landing on the aircraft. For this purpose, MiG Corp. had
fulfilled the aircrafts test programme in ships various pads at varying wind force two prototypes a MiG-29K (side number
terms of takeoff and landing with varying and illumination. In the final analysis, the 941) singleseater and a MiG-29KUB (side
weights, various payloads (air-to-air and MiG-29K/KUB night flight programme number 204) twinseater ferried to the
antiship missiles, smart and dumb bombs, remained unfulfilled then due to the need Arctic in early August.
drop tanks), takeoff from various launch for the aircraft carrier to return to the The Barents Sea flights kicked off on
positions (including the short 125-m run), shipyard for repair of her propulsion plants 5 August 2013 with State Flight Test Centre
deck landing during limit ship motions, boiler thermal insulation coating. aircrews flying the Ka-27PS helicopter and
a Su-33 fighter to test the carriers radars programme. The feature of the sorties was in 2007 to have completed training course
and other electronic gear as well as Luna that the planes had been based on deck on flying the T-45 Goshawk off US aircraft
optical landing system. On the next day, 6 throughout the test phase, with Indian carriers. Having converted to the MiG-29,
August, MiG-29K/KUBs started their flight personnel being shown all stages of their Ahuja had an opportunity to try his hand on
operations. MiG Corp. chief pilot Mikhail pre-flight preparation. The deck operations the prototype MiG-29K (side number 311)
Belyayev landed his MiG-29K (side number were supervised by the carriers future as far back as 2001, when the Indian Navy
941) on the carrier the first deck landing captain, Commodore Suraj Berry, chief of air was faced with a choice of how to develop its
of 2013. Soon, he was followed to the deck operations Capt. Janak Bevli and Commodore carrierborne aviation further.
by the MiG-29KUB (side number 204) Surendra Ahuja, a test pilot with the Indian The Vikramaditya carrier departed the
twinseater flown by MiG Corp. test pilots inspector team. Interestingly, Capt. Janak roadstead of the seaport of Severomorsk on
Andrey Shishov and Sergey Rybnikov. Bevli has a wealth of experience in flying the morning of 21 August 2013 to have spent
The subsequent two weeks had been the Sea Harrier (over 400 deck landings), three days at a Northern Fleet training area.
dedicated to test flights under the acceptance while Cdre. Ahuja was the first Indian pilot At 14.35, the MiG-29K, hauling a standard
Vladimir Karnozov
Alexey Mikheyev
The success of the MiG-29K/KUB weather and hovered near the flight deck for and four two-seat MiG-29KUB combat
nighttime deck landings crowned the hours in support of the MiG-29K/KUBs trainers) delivered by MiG Corp. during
carriers cruise in September. An important flights. 200911 under the 2004 contract. The unit,
gate of the aircraft carrier and carrierborne MiG Corp. Director General Sergey INAS 303 Black Panthers, was stood up in a
fighter test programme, which also, probably, Korotkov spoke highly of the team that ceremony at Hansa in the state of Goa on the
was the most difficult gate, was cleared. ensured round-the-clock flights of the west coast on 11 May 2013.
According to Sevmash JSCs spokesperson, fighters in the Barents Sea: The flights The 29 options for MiG-29K/KUB
47 deck landings, including 12 nighttime from the aircraft carrier crown an important fighters for the Indian Navy, stipulated by the
ones, were performed as part of the trials in phase of the Project 11430 aircraft carriers 2004 deal, firmed up in March 2010. MiG
2013. Rear Adm. Hari Kumar, head of the life cycle and that of the whole of the Corp. launched the assembly of the aircraft
Chairman of Indian Delivery Acceptance MiG-29K/KUB programme that MiG Corp. under the second contract in 2011, with
Team, told a Severodvinsk TV channel in is running in the interest of the Indian Navy. the first four fighters delivered in December
an interview: The ship has proven herself The technical team on board the carrier was 2012. The deliveries shall continue in 2013
completely and displayed full operability led by Alexander Chumakov. Sergey Shalnev throughout 2015. Two more IN air squadrons
round the clock. and Igor Malikov, representing MiG Corp.s based at the same Hansa air base are supposed
Special mention is due to Kamov management, were on board the ship too and to follow in INAS 303 footsteps, converting
JSCs helicopter test pilots A. Smirnov, facilitated prompt resolution of problems. to the MiG-29K/KUB.
A. Cherednichenko and N. Naumov as well The MiG-29K/KUBs deck landings and Before year-end, the MiG-29K/KUB are
as navigators A. Oschepkov and V. Yurtayev, takeoffs enable the Indian personnel to to start fielding the Russian Navy air arm as
who tested the feasibility of their machines observe the whole set of works pertinent to well. The Russian Defence Ministry placed
operation from the Vikramaditya. Sevmash maintaining the planes and preparing them a contract for 24 aircraft of the type in
JSC Deputy Director General Sergey and their crews for flight operations. February 2012. Russian Navy commander
Novosyolov emphasized the selfless work of Next in line is for the Indian naval Adm. Victor Chirkov said in 2013: Two
the crew of the Ka-27PS SAR helicopter aviators to learn to fly the MiG-29K/KUB MiG-29Ks and two MiG-29KUBs are
pilot Maj. Maxim Bessonov (a State Flight from the Vikramaditya. The training will slated for delivery this year, eight MiG-29Ks
Test Centre test pilot who performed over begin once the ship has arrived in India. and two MiG-29KUBs next year and
400 landings on the Vikramaditya during MiG Corps ground crews and test pilot will 10 MiG-29Ks in 2015. The first several
her trials) and navigators Col. Vladislav take part in it. carrierborne MiGs designed for Russian
Tomilin and Maj. Denis Ostretsov. Along As is known, the Indian Navy has naval aviators are being groomed for tests
with supporting the tests of the ships aircraft activated its first 16-ship-strong air squadron now. The first MiG-29KUB for the Russian
operations equipment, they would haul of MiG-29K/KUB multirole carrierborne Naval Aviation made its maiden flight on 15
various kinds of cargo at any time and in any fighters (12 MiG-29K single-seat aircraft October 2013.
Alexey Mikheyev
Advanced Orlan
At MAKS 2013, the Zvezda scientific and
production company unveiled its cutting-edge
Orlan-MKS spacesuit designed for spacewalks.
According to Chief Designer Sergey
Pozdnyakov, the advanced spacesuit features
an automatic temperature control system and
polyurethane parts instead of rubber ones.
Polyurethane allows a 50%-plus extension of
the Orlan-MKSs service life. While in-service
Russian spacesuits are fit for 15 spacewalks at
the most, the advanced Orlan-MKS will endure
20 spacewalks or more.
Another novelty is that the Orlan-MKSs
control panel is equipped with a sophisticated
quality display that is larger and brighter and
offering a better information display capability.
PTK NP spacecraft interior: A detailed diagram of a cosmonauts position
new crew seats
on the outside of the International Space Station
will be shown on the display automatically.
Marina Lystseva
Igor Afanasyev
more ergonomic than the Kazbek seats now to be completed and the hardware is to
in use. If six cosmonauts have to be brought be manufactured, including mock-ups for
into LEO, the cabin can be furnished with experimental development and a produc-
six old-type seats. tion-standard prototype for flight trials.
According to Vladimir Pirozhkov, presi- The first unmanned launch is slated for
dent, ASTRAROSSA industrial design and 2017 or early 2018, while the first manned
innovation centre, who contributed to the flight is to take place by 2020. A name for
development of the cabins interior, the the spacecraft has not been selected yet.
PTK NP test programme includes five Anybody can suggest a name, with the best
launches, of which three are unmanned one to be selected.
and two are manned. The first three test
launches are planned to rely on Proton Angara and MRKS
launch vehicles blasting off from Baikonur, At this years MAKS air show, the
and the subsequent two may involve Khrunichev space centre exhibited large-
advanced Angara LVs at the Vostochny scale mock-ups of launch vehicles of
space centre under the manned test pro- the Angara family and Phase I Reusable
gramme, Pirozhkov said. Space Rocket System (Russian acronym
The PTK NP programme has been given MRKS-1). The purpose of the latter, a
a green light by the Scientific and Technical two-stage system, is cost-effective orbiting
Council of the Federal Space Agency, says of cargo, manned and unmanned spacecraft
Energia General Designer Vitaly Lopota. weighing 2535 t and, further down the
Now, the engineering documentation is road, up to 70 t.
Andrey Fomin
Soyuz-5 and others system development programme enjoying less expensive than its venerable predeces-
The interesting novelties showcased at governmental backing. The question is, why sor. However, it is too early to discuss the
MAKS 2013 included the Soyuz-5 launch develop the Soyuz-5? The question was cost, because the programme has just been
vehicle. The Samara-based TsSKB-Progress answered by TsSKB-Progress representa- kicked off. The launch vehicles design has
company is developing the future LV under tives in the course of the air show. The thing not been set in stone yet, and its future is
the Magistral research programme to replace is the venerable workhorse of the Soviet and hazy. In any case, the initiative taken by
all in-service descendants of the famous Russian space programme, the Soyuz, has TsSKB-Progress is laudable, inter alia, from
Korolevs R-7. According to TsSKB- grown obsolescent hopelessly in terms of the point of view of preserving the techno-
Progress Director General Alexander Kirilin, performance. Suffice it to say that its coni- logical capabilities generated as part of the
two variants of the future launch vehicles are cal strap-on boosters lack a single structural designing of the Rus-M rocket system in
in development now. The baseline model, ring identical to another one. Clearly, the 200911.
designated as Soyuz-5.1, is to have a lift prime cost of the rocket designed almost 60 The Samara-based companys stand
capacity of up to 8.5 t and a two-stage mono- years ago shall keep on growing continu- also displayed scale mock-ups of the
block layout. Its first stage may be fitted with ously at the present time. The Soyuz-5.1bs Soyuz-2.1v, Soyuz-2.1b and Soyuz-FG
the RD-0164 rocket motor and its second burning five fuel components LOX, kero- launch vehicles. The maiden flight of
stage with the RD-0124M. Both engines sene, cryogenic nitrogen, hydrogen dioxide the Soyuz-2.1v light rocket is slated for
being designed by KBKhA in Voronezh are and helium makes the operation of even November or December this year. Its first
to burn the LOX-LNG mixture. The Soyuz- the latest variant of the LV quite complicat- stage is known to have been equipped with
5.2 emerges through fitting the aforesaid ed. To cap it all, hundreds of personnel have the NK-33 engine and RD-0110r control
baseline model with two strap-on boosters, to be present at the launching facility to thruster. Another set of tests of the former
each housing an RD-0164 engine. The pay- perform manual operations during the pre- has been complete in Samara. The tests
load capacity of the rocket is to account for flight preparations. Clearly, the rocket shall were focused on proving the NK-33s qual-
about 25 t. The third member of the family is lose its competitive edge sooner or later. ity characteristics, given the technological
the 16-tonne-capable Soyuz-5 sporting two For this reason, TsSKB-Progress decid- solutions introduced into the newly-made
strap-on boosters too, but lacking the third ed to preempt the above and launched combustor units the collector and rubber
stage. Should the design be given the nod and the development of a launch vehicle that parts of the combustors assemblies. By the
the programme be provided with adequate would be more sophisticated in techno- way, specialists of the Aerojet Rocketdyne,
financing, the first Soyuz-5 may blast off in logical terms, but simpler and comprising the US user of the Samara-made engine,
202022. fewer components. The Soyuz-5, which took part in the test firing. The three suc-
On the face of it, the programme is a is being designed under the one rocket cessful bench tests resulted in a total of
dead-ringer for the Angara space rocket engine per stage concept, is supposed to be 616s logged by the NK-33.
Andrey Fomin
Igor Afanasyev
558 ARP
OFFERS AIRCRAFT UPGRADE
equipped with gyro-stabilized surveillance-and-
sighting system, modern system of navigation
and electronic indication, set of night vision
equipment, modern system of flight data
recording. New guided weapons are introduced
into the range of helicopter armament.
Upgrade of Mi-24 helicopter includes
installation of gyro-stabilized surveillance-
and-sighting system, new system of navigation
and electronic indication, set of night vision
equipment, enhancement of capabilities of
flight data recording system, increase of firing
accuracy and automation of sighting process
thus increasing combat capacity and efficiency
of the helicopter.
Apart from that, one of the aircraft uprade
The main area of activity of the 558th longitude, altitude), velocity vector as well as directions is installing of onboard equipment
Aircraft Repair Plant is overhaul and upgrade the current time by the signals from GLONASS of individual radio-technical protection
of the Mi-8MT (Mi-17) and Mi-24 (Mi-35) satellite navigation system and NAVSTAR Satellite system. Due to it the hitting by missiles
helicopters as well as Su-27, MiG-29, An-2, GPS in any point of the globe at any moment with radar homing heads is ruled out with high
L-39, Su-22 and Su-25 aircraft. 558 ARP irrespective of the weather conditions. The degree of precision and jamming is produced
performs full cycle of overhaul of airframe upgraded Mi-8 helicopters obtain BUR flight to all enemys radar homing weapons (fighters,
and all component items, including a data recording system, which allows recording ground-to-air missiles).
package of modifications and additional the flight data with an increased accuracy The efficiency of modifications introduced
preventive measures increasing reliability of and performing automated data processing. on the aircraft and helicopters is affirmed by the
aviation materiel. It saves considerable time for data decoding experience of flight tests and operation.
Apart from overhaul, the enterprise and processing, ensures complete data safety 558 ARP is a dynamically developing
successfully mastered upgrade of Su-27 in case of heavy flight accidents; it also allows enterprise which is always open for business
and MiG-29 fighters and Mi-8 helicopters. connecting additional sensors and annunciators cooperation.
The upgraded Su-27BM (Su-27UBM) and to receive more reliable information about the
MiG-29BM fighters acquire fundamentally state of systems and equipment during flights for
new features and combat capabilities: the maintaining airworthiness of helicopter. Night
information-control field of cockpit is vision equipment enables to observe external
updated by adding the multifunctional color environment of the helicopter in conditions of 558 Aircraft Repair Plant JSC
LCD displays, radar fire-control system natural night illuminance with maximal vision Bldg. 7, 50 let VLKSM, Baranovichi,
Brest region, 225320, Republic of Belarus
and navigation system are upgraded and range of 24 km necessary for takeoff, hovering, Tel.: +375 (163) 42-99-54
the range of armaments is considerably piloting with visual monitoring of the underlying Fax: +375 (163) 42-91-64
increased, being complemented by new air- terrain, approaches and landings to unequipped E-mail: box@558arp.by
to-air missiles and guided means of ground and unlit areas. The upgraded helicopters are http://www.558arp.by
(naval) targets destruction. In March 2005
the pilots of upgraded MiG-29BM aircraft
established 15 world records!
In 2004 558 ARP mastered upgrade of
Mi-8MT (Mi-17) helicopters. The purpose
of upgrade is creation of round-the-clock
combat transport helicopter. Gyro-stabilized
surveillance-and-sighting system installed
aboard the helicopter ensures twenty-four-
hours survey and sighting with representation
of a thermal image on the displays, wide-
band control over the line of sight and target
ranging with use of a laser range finder with an
accuracy of 5 m at a distance of 10 km. The
system of navigation and electronic indication
is designed for determination of the current
position data of the helicopter (latitude,
Advertisment
OBORONPROM Corporation, a Russian Technologies State Corporation company, is a diversied industrial-investment group
inthe engineering and high technologies sectors
The Corporation integrates more than 30 leading Russian helicopter and engine manufacturing companies in 12 Russian regions
Russian Helicopters Company, a subsidiary of OBORONPROM Corporation, is the leading Russian designer and manufacturer
ofrotary-wing aircraft equipment
United Engine Corporation, a subsidiary of OBORONPROM Corporation, is the leading Russian industrial group producing
engines for aircraft, aerospace industry, gas compression stations and power plants
UNITED INDUSTRIAL CORPORATION OBORONPROM I 29/141 Verejskaya st. Moscow 121357 Russia I oboronprom@oboronprom.ru I www.oboronprom.ru