Results
Sl. No. Make Ratio VA Class RCT
(Ok/Not Ok)
Acceptance Criteria: There shall not be any loose connections and Terminal connections
shall be as per approved Drg.
3. Polarity test
16/T-468547 S1-S2 OK OK
Acceptance Criteria: If Meter Deflects Forward then the polarity and terminal marking is okay
4. Ratio test
Results
Pri (A) Sec (mA)-
Terminals (Ok/Not Ok) Remarks
(Injected) (Measured)
Resistance in
CT Ref. Measurement Ref. (M) Remarks
Primary Earth >1G OK
Secondary Earth >1G OK
NCT
Primary- Secondary >1G OK
Resistance in
CT Ref. Measurement Ref. Remarks
()
NCT S1 S2 5.7 OK