ICCESReport
ESR2495
ICCES|(800)4236587|(562)6990543|www.icces.org Reissued04/2016
000 Thisreportissubjecttorenewal04/2017.
DIVISION:030000CONCRETE
SECTION:032100REINFORCINGSTEEL
REPORTHOLDER:
DAYTONSUPERIORCORPORATION
1125BYERSROAD
MIAMISBURG,OHIO45342
EVALUATIONSUBJECT:
BARLOCKCOUPLERLANDS/CASERIESSYSTEMSFOR
CONNECTINGSTEELREINFORCINGBARS
LookforthetrustedmarksofConformity!
2014RecipientofPrestigiousWesternStatesSeismicPolicyCouncil
(WSSPC)AwardinExcellence ASubsidiaryof
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not
specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a
recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as
to any finding or other matter in this report, or as to any product covered by the report.
Copyright2016ICCEvaluationService,LLC.Allrightsreserved.
ICC-ES Evaluation Report ESR-2495
Reissued April 2016
This report is subject to renewal April 2017.
www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed
as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as
to any finding or other matter in this report, or as to any product covered by the report.
1000
Copyright 2016 ICC Evaluation Service, LLC. All rights reserved. Page 1 of 4
ESR-2495 | Most Widely Accepted and Trusted Page 2 of 4
is inserted and the lock-shear bolts must be tightened and axial forces in frame members, structural walls
following the same procedure. The lock-shear bolts must and coupling beams, with the Bar-Lock Coupler
then be tightened in a random, alternating pattern. At least systems, mill certificates of reinforcing bars must be
two passes of tightening each lock-shear bolt must be submitted to the code official as evidence that the
done before the lock-shear bolt heads are sheared off. steel reinforcing bars comply with ACI 318-08 Section
21.1.5.2.
4.3 Special Inspection:
5.5 Under the 2006 IBC, for structures regulated by
Special inspection is required in accordance with Section
Chapter 21 of ACI 318-05 (as required by 2006 IBC
1705 of the 2012 IBC (Section 1704 of the 2009 and 2006
Section 1908.1), to splice uncoated, deformed
IBC). The inspector's duties include verifying that the
reinforcing bars resisting earthquake-induced flexure
coupler is identified and installed in accordance with this
and axial forces in frame members and in structural
report, verifying grade and size of reinforcing bars, coupler
wall boundary elements, with the Bar-Lock Coupler
identification, position of coupler, rebar insertion length, the
systems, mill certificates of reinforcing bars must be
bolt tightening pattern and placement of rebar splices as
submitted to the code official as evidence that the
well as installation of coupler to rebars.
steel reinforcing bars comply with ACI 318-05 Section
5.0 CONDITION OF USE 21.2.5.
The Bar-Lock mechanical splice systems described in this 5.6 Special inspections must be provided in accordance
report comply with, or are suitable alternatives to what is with Section 4.3 of this report.
specified in, those codes listed in Section 1.0 of this report,
5.7 The minimum concrete cover must be in accordance
subject to the following conditions:
with the IBC, and must be measured from the outer
5.1 The splice systems must be installed in accordance surface of the coupler.
with the applicable code, the manufacturers
6.0 EVIDENCE SUBMITTED
instructions, and this report. In the case of a conflict
between the manufacturers published instructions Data in accordance with the Acceptance Criteria for
and this report, this report governs. Mechanical Connector Systems for Steel Reinforcing Bars
(AC133), dated December 2012.
5.2 Splice locations must comply with applicable code
requirements and be noted on plans approved by the 7.0 IDENTIFICATION
code official.
Each S/CA-series coupler is stamped with the coupler size
5.3 Under the 2012, for structures regulated by Chapter designation, the Series designation S, the production
21 of ACI 318-11 (as required by the 2012 IBC lot number, the Series designation CA, and the type
Section 1905.1), to splice uncoated, deformed designation Type 1. Each L- series coupler is stamped
reinforcing bars resisting earthquake-induced flexure, with the coupler size, the Series designation L, the
axial force, or both, in special moment frames, special production lot number, and the type designation Type 2.
structural walls, and all components of special Each bundle, pallet or skid of couplers has a shipping tag
structural walls including coupling beams and wall bearing the Bar-Lock Coupler Systems company name
piers, with the Bar-Lock Coupler systems, mill and address, the product designation and size, the
certificates of reinforcing bars must be submitted to production lot number, the installation instructions, and the
the code official as evidence that the steel reinforcing evaluation report number (ESR-2495).
bars comply with ACI 318-11 Section 21.1.5.2.
5.4 Under the 2009 IBC, for structures regulated by
Chapter 21 of ACI 318-08 (as required by 2009 IBC
Section 1908.1), to splice uncoated, deformed
reinforcing bars resisting earthquake-induced flexural
ESR-2495 | Most Widely Accepted and Trusted Page 3 of 4