ELECTRICAL
TESTER The industrys recognised information tool

Between a
rock and
a hard place
remains fully operational, reliably delivering energy
Damon Mount - Power sales manager
to the DNOs customers.

Distribution network operators (DNOs) are facing It is clear that substantial investment may be
a tough challenge. They need to offer speedy required, but DNOs operating in the UK are
and reliable connections for a diverse range of comparatively well placed when it comes to
renewable energy sources, but at the same time securing this investment. The energy market in
they must protect the reliability of their networks. the UK is stable, and energy supply is a privatised
In the UK, the RIIO-ED1 regulation and price control industry with established regulatory processes.
package from Ofgem, the government regulator These factors make investments in energy
for the gas and electricity markets, means that if infrastructure an attractive proposition.
they get it wrong they will potentially suffer severe Nevertheless, DNOs will still have to demonstrate
financial penalties. that they can produce an attractive return on this
a low carbon, sustainable energy sector at value performance including customer satisfaction, safety,
The very nature of power generation and investment which, to put it bluntly, means that they
for money for existing and future consumers. network reliability and availability, environmental
distribution is changing, and this is creating a have to operate profitably. And their profitability is
RIIO-ED1, which applies to the energy distribution impact, social obligations and connection terms.
real headache for DNOs. They have a distribution now almost completely dependent on RIIO-ED1,
Ofgems regulation and price control instrument. sector, came into force in April 2015, and will
network that was designed to accommodate Incentives are provided for speed of connection
remain in force for eight years.
a comparatively small number of large power RIIO is an acronym for Revenue = Incentives + and for customer engagement, factors that have
stations, and are now having to adapt this to the Innovation + Outputs, a formula that neatly Energy pricing is regulated by Ofgem and rises are a particular relevance in relation to new energy
world of embedded generation, where a large encapsulates its intentions. In Ofgems own words, capped, so DNO revenue depends almost entirely sources. Generating over-capacity in the UK
number of small power sources is the norm. The these are to drive real benefits for consumers, on RIIO. Innovation and outputs are measured, and network in 2014 was around 6%, but a programme
changes required are by no means trivial, especially by providing companies with strong incentives RIIO-ED1 has attractive incentives for exceeding of closing old environmentally damaging coal-fired
as they must be accomplished while the network to step up and meet the challenges of delivering the targets. These are set for many aspects of Continued on page 2

Get your ROCOF right!


occur with the power network, and the resulting instruments, allowing the required test function
loss of capacity may make the problems worse. to be selected quickly and easily. Full manual
control and configuration are also supported and,
To help guard against this situation, G59/3
in addition to the touchscreen, the Sverker 900
islanded generator, but this can only be done if was revised in 2014 to require new settings for
Lennart Schottenius - Support Specialist is provided with a large rotary knob that can be
a fast and dependable way of detecting islanding ROCOF protection when used in conjunction with
Niclas Wetterstrand - Program Manager configured as required to control the voltage and
is available. Many approaches are possible, generators connected to the UK power network.
The grace period that was granted for adoption of current generators.
but one that is widely used is rate of change
Embedded or distributed generation schemes, of frequency (ROCOF) protection, which the new settings in conjunction with certain classes When testing ROCOF protection, the Sverker 900s
where a local generator is connected directly to the has established a reputation for responding of equipment expires in July 2016. After this date, ramping instrument is used. Because this generates
distribution network, are becoming widespread. faster and more reliably than alternative ROCOF protection for all generating sites with a a very smooth and accurately controlled ramp, this
The operators of these schemes face an important protection techniques. capacity in excess of 5 MW that are connected to has proved to be an excellent and dependable tool
challenge: how to ensure that the system behaves the UK power network must comply fully with the
ROCOF protection relies on the fact that once a for these tests. The instrument is easy to configure
safely and predictably if the local generator new requirements.
generator is islanded, its output frequency will for ROCOF testing and, once the start and stop
becomes isolated from the network a condition
no longer be locked to that of the network, but The foregoing makes it clear that a reliable method criteria have been defined, it can be used to check
known as islanding.
will change rapidly to a frequency determined by of checking the settings and accuracy of ROCOF the operation of low and high level trips and also
There are numerous potential hazards associated its own characteristics and those of the loads it is protection is essential. Suitable functionality is to verify the trip time delay set for low and high
with islanding, not the least of which is that engineers still supplying. It is this change in frequency that is provided by Meggers innovative three-phase level operation.
working to restore the network connection may not detected by ROCOF protection devices. Sverker 900 instrument, which has been conceived Detailed guidance on ROCOF testing with
realise the system is still powered. Another hazard as an engineers multifunction test box for
ROCOF protection conforms to engineering the Sverker 900, including information about
is that the generator may continue to supply local protection testing.
requirements such as G59/3 in the UK and connections and instrument settings, is available
loads but, without support from the network, this
standards such as ANSI 81R in the USA. There This novel instrument does not need to be in the form of an application note. This can be
may result in it being heavily overloaded.
are strict guidelines for ROCOF settings and connected to a PC and features an intuitive user obtained free-of-charge on request from Megger,
The solution usually adopted to address these unless these are optimised, the protection may interface with a colour touchscreen. This provides or it can be found on the Megger website
hazards is to immediately shut down the unnecessarily trip a generator when problems access to a wide range of pre-configured virtual test (www.megger.com).

www.megger.com ELECTRICAL TESTER - August 2016 1


ELECTRICAL
The industrys recognised information tool TESTER
Contents Continued from page 1. for approving the design, defining the tests that criteria against which the DNOs are measured,
are needed, and providing the connection to nor are they the only factors that impact network
power stations and end-of-life nuclear facilities
the network. ER G59/3 provides similar guidance reliability. To ensure profitable operation, the DNOs
means that the figure for 2015 was just 2.1%. The
for the connection of distributed generation to also need to monitor and care for key assets that
intention is that the new small-scale generators will
Between a rock and a hard place.....................p1,2 the network. include transformers, circuit breakers and cables.
fill this gap.
Damon Mount - Power sales manager
These ERs include examples of tests that the DNO For all of these, regular testing is the key to
The RIIO-ED1 mechanism does not, however,
may require the consumer to perform before maximising availability and service life while
Get yor ROCOF right............................................p1 depend on incentives alone; there are also penalties
Lennart Schottenius - Support Specialist for DNOs who miss their targets. Performance providing a network connection, but these are very reducing as far as possible the risk of unexpected
Niclas Wetterstrand, Program Manager is reviewed retrospectively using agreed key general. ER G81, for example, states that tests must failure. This is particularly beneficial for power
performance indicators (KPIs). Assessment criteria be carried out to verify the complete installation cables as poor joints and ageing insulation are
Three-phase support for substation test............p2 has been installed correctly and is safe to energise. among the most common causes of failure and
include speed of connection, results of customer
Matz Ohlen- Director transformer test systems Wise applicants will, therefore, look to CIGRE downtime in power networks. However, modern
surveys and views from stakeholders. Based on the
reviews, the Ofgem panel has the power to impose and even IEEE standards for further guidance, as test methods can readily identify incipient problems,
Turns ratio testing: Hand crank well as considering new test methods, such as allowing them to be remedied before they lead to
penalties of up to 0.9% of a poorly performing
versus automatic..................................................p3 partial discharge analysis for cables, that provide cable failure.
DNOs revenue, and also to order it to make GSOP
Jill Duplessis - Global technical marketing dependable results while saving time and money.
(guaranteed standards of performance) payments To cope with the move toward sustainable energy
manager and Editor
to customers for late delivery of services. Being able to provide the DNO with comprehensive from renewable resources, which means that huge
Power Quality: Some Fundimentals.................p4-5 A key factor in determining the profitability of a and reliable test data will be increasingly important numbers of small generators are requiring new
Andy Sagl - Product manager DNO is clearly its ability to handle new connections since connecting an installation that does not grid connections, energy networks are currently
quickly and efficiently without compromising operate as expected may impact network evolving faster than they have ever done at any
Exhibit A: Megger hand cranked network performance. To help with this, the UK performance, leading to the imposition of financial point in their history.
insulation test set.................................................p5 Engineering Networks Association has produced a penalties on the DNO. With this in mind, the
This presents DNOs with many challenges, but RIIO-
Andrew Dodds - Group Technical Director series of Engineering Recommendations (ERs). DNOs can understandably be expected to take the
ED1 means that those who successfully address
line that, If you cant prove that youve carried
ER G81 provides a framework and guidance for these challenges have excellent opportunities
PD measurement saves refinery millions .........P6-7 out all of the necessary testing correctly, we wont
Alexander Lpschen - Asset Consulting Engineer, the installation and connection of commercial for financial reward. While it may not at first be
connect you.
Koopmann Energie und Elektrotechnik and industrial loads. The applicant (that is, the apparent that testing is a key element to achieving
consumer) is responsible for the design, installation This article has focussed for the most part on new this success, consideration of the points raised in
Wind farm cable failure averted!......................... P7 and testing, along with the supply of all records connections to the distribution network, but it is this article will hopefully demonstrate that testing
Javier Luiz Leiva - Mexico Area Sales Manager and documentation, while the DNO is responsible important to remember that these are not the only really does have a crucial role to play.
Washington Cabrera - Regional Sales Manager,

Three-phase support for substation test


Mexico

Questions and Answers - Earth resistivity ..........p8

Matz Ohlen - Director transformer test systems


Tesla and the Pigeon of death............................p8
Keith Wilson - Electrical engineer
Engineers whose work involves testing in
substations face two important challenges. The
Reminder: Knowhow delivered online ..............p8
first is having the right equipment at hand to carry
out the wide range of tests that are often required,
and the second is carrying out those tests safely and
as quickly as possible, so as to minimise downtime
and cost. The recent appearance in the market of
When you have finished with
versatile integrated substation test systems in the
this magazine please recycle it.
Megger TRAX range has done much to help hard-
pressed engineers address these challenges.

These high-performance test sets have been


specifically designed to offer a convenient and
The rights of the individuals attributed in Electrical Tester to be
identified as authors of their respective articles has been asserted
comprehensive solution for transformer and
by them in accordance with the Copyright, Designs and Patents general substation testing. They are capable of In principle this isnt a major issue, but in practice These innovative test sets can generate and measure
Act 1988. Copyright Megger. All rights reserved. No part
performing more than 20 different test functions, it quickly becomes an annoyance, and the time a wide range of currents and voltages with high
of Electrical Tester may be reproduced in a retrieval system, or
transmitted in any form or by any means, electronic, mechanical, including measurement of winding resistance, taken to change the connections soon adds up, precision. While the TRAX220 has a maximum AC
photo-copying, recording or otherwise without the prior written turns ratio, excitation current, short-circuit especially if those connections are on top of current output capability of 200 A, the TRAX280
permission of Megger.
impedance, tan delta / power factor, capacitance, transformer and every change means climbing up extends this to 800 A. The output current capability
frequency response of stray losses, CT and VT and down a ladder! of both units can be further extended to 2000 A
To request a licence to use an article in Electrical Tester, please
testing, and circuit breaker timing and motion with an optional current booster.
email electricaltester@Megger.com, with a brief outline of the With this in mind, Megger has introduced
reasons for your request. analysis. Clearly, when one of these novel test sets
the TSX130 three-phase switchbox. Available Other key features of Meggers new and innovative
is available, ensuring that all of the necessary test
as an optional accessory for all TRAX test TRAX test sets include state-of-the-art transformer
equipment is at hand is no longer a challenge!
All trademarks used herein are the property of their respective winding resistance measurements with true DC test
sets, this new unit allows three-phase
owners. The use of any trademark in this text does not imply TRAX test sets also significantly reduce the time currents up to 100 A and up to 50 V compliance
transformers to be conveniently tested without
trademark ownership rights in such trademarks, nor does use
taken to perform tests. They have an intuitive user voltage; dynamic on-load tap changer (OLTC)
of such trademarks imply any affiliation with or endorsement of the need to reconfigure the test lead connections
interface that offers full manual control or guided measurements; and exceptional interference
Electrical Tester by such owners. for each phase. An added benefit is that
testing using the built-in TRAX apps. Each of suppression to secure accurate readings even in
switching between phases is controlled by the
these apps implements a specific test function high noise switchyards.
A printed newsletter is not as interactive as its email equivalent test set, which means that test sequences can
for example, turns ratio measurement or winding A wide operating frequency range of 5 to 500 Hz
so to help you find items quickly on www.megger.com, we have be automated.
resistance measurement and automatically (1 to 500 Hz for tan delta measurements) is also
underlined key search words in blue.
configures the instrument for the selected test. At the same time, Megger has further extended
included, as is individual temperature correction of
All unnecessary information is removed from the the versatility of the TRAX system by launching
tan delta measurements using Meggers patented
Views expressed in Electrical Tester are not necessarily display, with only information relevant to the another invaluable accessory, the TDX120, which
the views of Megger.
technology; and automatic voltage dependence
test in hand remaining. This app-based approach facilitates the use of the test sets to perform tan detection, which is another unique feature covered
The word Megger is a registered trademark
makes TRAX test sets safe, fast and easy to work delta and capacitance measurements. by Megger patents.
with as well as eliminates the need for extensive Despite the wide range of functions offered by
Editor Jill Duplessis Todays substation engineers are under constant
user training. TRAX test sets, they are exceptionally light and
E electricaltester@megger.com pressure to work faster and more efficiently while
Megger Limited But even the best can be made better! Until now, compact. The TRAX220, which has a maximum maintaining the highest standards of safety. The
Archcliffe Road Dover Kent CT17 9EN one limitation of the TRAX test sets was that when AC current capability of 200 A, is the lightest test new integrated substation test sets, of which
T +44 (0)1304 502100 they were being used to test three-phase assets such set of its type, weighing just 32 kg in its transport the Megger TRAX instruments are the leading
E electricaltester@megger.com as transformers, it was necessary to change the test case, which means that it can be transported by air example, make it possible to respond positively to
www.megger.com connections after testing each of the phases. as check-in luggage. this relentless pressure.

2 ELECTRICAL TESTER - August 2016 www.megger.com


ELECTRICAL
The industrys recognised information tool TESTER

Turns Ratio Testing:


Hand crank versus automatic
concept (a no-load test) for a moment. Primary
Jill Duplessis - Global technical marketing
current, i1, is the sum of an exciting component,
manager and Editor
iex, and a load component, iL. The ratio between
A transformer turns ratio test provides a quick the secondary current, i2, and the load component,
verification of the most fundamental operational iL, of the primary current is given by:
characteristic of a transformer its ability to N1iL = - N2i2 (1)
transform voltage as anticipated. In doing so, the
This can be rewritten as:
test provides invaluable reassurance to the operator.
Open- and short-circuit conditions in transformer N1/N2 = - i2/iL (2)
main and tap windings may cause the transformer where the turns ratio = N1/N2, iL = i1 - iex,
turns ratio to change and therefore this test is at and iL is always < i1
once providing useful diagnostic information.
For an ideal transformer, N1/N2 = i2/i1 (present at
Engineers have noted, however, that traditional the terminals), but for a real transformer, the actual
hand-crank TTR instruments sometimes give turns ratio (given by equation 2 and which cannot
values for turns ratio that are different from those be directly measured) is greater than the ratio of
given by modern automated TTR instruments. the terminal currents (voltages).
Indeed, many insist that the traditional instruments
In general, where transformers have large leakage
provide results that are more dependable. But is The main source of error with this method is that There are very good reasons why hand
reactance, high magnetising current, high primary
this actually true? And why do the instruments the primary induced voltage in the transformer crank instruments are now being used less
resistance or a combination of these, a higher
produce different results? under test, EX, and the primary induced voltage frequently. These include:
error will be introduced into the measurement of
Background the turns ratio because these factors increase the in the reference transformer, ET, are likely to be
1. Their use is considered dangerous because:
To answer these questions, lets start by considering difference between V1 and E1. slightly different. Although the same voltage, Vo,
an ideal transformer. For such a transformer, the (e.g., 8 V) is applied to both transformers, the a. High voltages up to 1,000 V AC can be produced
Measuring techniques at instrument terminals. Since the transformer
ratio of the terminal voltages (that is, the field- reference transformer and the transformer under
Now lets look at turns ratio measurement is tested from the LV side, a high voltage is
measured no-load voltage ratio, V1/V2) equals the test will have different characteristics, which
techniques. An automated TTR instrument produced on the HV side. If the transformer
true ratio of the number of turns on each winding, means that, in general, EX and ET will not be the
measures the voltage applied to the primary ratio is greater than 130:1, this voltage will be
N1/N2 the ratio of transformation. This is not true same. When the reference transformer and the
winding terminals and the resulting voltage at the
with a real transformer. Heres why. transformer under test both have the same turns in excess of 1,000 V.
secondary terminals. The instrument calculates the
ratio that is, when the null detector senses no b. The test leads must be short, which often means
The turns ratio is equal to the ratio of the voltages ratio of these voltages and presents this as the
current flow the secondary voltages of the that the user of the instrument has to stand on
induced by the resultant mutual flux (E1/E2) when transformer turns ratio.
two transformers will also differ by this same the transformer during testing.
a transformer is energized. The voltage induced in
Hand-crank turns ratio instruments work in a percentage error.
a single turn is the same irrespective of whether 2. Using hand crank TTRs is inefficient because:
different way. The test set is arranged so that
it is part of the primary or part of the secondary Note that the difference between ET and EX,
the transformer to be tested and the adjustable a. Only one phase at a time can be tested
winding, so the total voltage induced in each of the however, will always be less than the difference
ratio reference transformer within the test set are b. The instrument requires manual balancing
windings by the common flux must be proportional between ET or EX (whichever is the smaller) and
connected in parallel and excited from the same c. The instrument must be cranked and balanced
to the number of turns. That is E1/E2 = N1/N2. But in Vo (which represents the error with the automatic
voltage source (see diagram). This measurement at the same time
a real transformer, E1, the primary induced voltage, method). Also note that in some cases the
technique is called a transformer bridge d. Leads must be changed for each phase tested
does not exactly equal the applied voltage, V1. In difference may be small, in which case the error in
measurement. e. Results have to be recorded manually then
fact, V1 is equal to the phasor sum of E1 plus the the measured turns ratio will also be small. In fact,
transferred manually to the test reports
primary leakage reactance voltage drop due to Note that the instrument normally excites the where the transformer under test has the same
f. Manual calculation is needed to determine the
the exciting current plus the voltage drop due to transformer under test from its secondary (low characteristics as the reference transformer, the
percentage error
the resistance of the primary winding multiplied voltage) windings. The secondary windings error in the turns ratio will be zero. For this reason,
g. Total test time is approximately three to four
TTR reference transformers are designed to match
times longer than with an automatic TTR if the
typical distribution and power transformers.
time taken to complete the report is included
Why choose automated over hand crank?
3. Hand-crank instruments have limited
Transformer manufacturers provide true turns
capability when testing instrument
ratio (N1/N2 or E1/E2) on the nameplates of their
transformers. (They are designed to measure
products and for some transformers, a hand
accurately turns ratios of no more than 130/1).
crank TTR will give a result closer to this ratio
of transformation than measuring the terminal 4. Hand-crank instruments excite the
voltages of the windings. Note, however, that transformer under test from the LV winding.
Figure 1. Equivalent circuit diagram for a transformer with no load
some users claim the hand-crank model provides Some transformers draw excessive magnetising
limited resolution on typical transformer ratios current and the instruments output may be
by the exciting current (Figure 1). The ratio of (which, in the case of the transformer under test, insufficient to excite them from the low voltage
such as 20/1.
transformation is therefore only approximately is actually the primary winding) are connected in winding for example, network transformers of
equal to the ratio of the primary and secondary series opposing through a null detector. If a transformer core is not of an optimum quality,
the 15000/115 V class and some voltage regulators.
terminal voltages, e.g., the voltage ratio as as is sometimes the case, the error in the ratio
When the ratio of the reference transformer is Conclusion
measured with an automated test set will be
termed in IEEE C57.152-2013.
adjusted so that no current flows in the secondary There are a few instances where hand crank TTR test
greater than the error in a measurement carried
In all real transformers, the no-load voltage ratio circuit, as shown by the null detector, two sets will give a result thats closer to the nameplate
out with a hand-crank instrument. In such cases, it
(measured in the field) is less than the transformation conditions are simultaneously fulfilled. The first is common practice to acknowledge the deficiency turns ratio than a modern automated TTR test
ratio (i.e., the turns ratio). This is because real is that the voltage ratios of the two transformers of the core, or to revert to the older, hand-crank set. This apparent benefit is, however, more than
transformers have losses and magnetic leakage, are equal and the second is that there is no load method. Another approach, provided that the offset by the many disadvantages of hand crank
and they require excitation. Consider, for example, on either transformer. The no-load voltage ratio of transformer has been operating correctly, is to use TTRs, which include time-consuming operation
the ratio of primary to secondary currents. Both the reference transformer is known, so the voltage the turns ratio measured with an automated TTR and safety concerns. For these reasons, automated
currents exist together only when the transformer ratio of the transformer under test is known, and as a reference point to which future measurements TTRs are replacing their hand-crank counterparts,
is serving a load so put aside the ratio testing its turns ratio is therefore also known. can be compared. and this is a trend that will undoubtedly continue.

www.megger.com ELECTRICAL TESTER - August 2016 3


ELECTRICAL
The industrys recognised information tool TESTER

Power Quality: some fu


Andy Sagl - Product manager

In our last issue, we reported that power quality


issues are a growing concern all over the world,
and we noted in particular that the adoption
of the smart grid would do little to address this
concern. The primary function of the smart grid is
to increase the reliability of power delivery any
positive impact it may have on power quality is
no more than incidental. With these thoughts in
mind, in this issue we are going to look at some
of the fundamentals of power quality, and in
particular at the most common types of power
quality problems and why they occur.

Under-voltage
Under-voltage is a decrease in rms voltage to less
than 0.9 pu for a duration longer than one minute.
Typical values encountered in practice are between
0.8 and 0.9 pu. Under-voltages are most often
caused by the switching of loads and capacitor
banks and may persist until the voltage regulation
equipment on the system has time to react
and bring the voltage back within acceptable
tolerance. Overloaded circuits can also cause
under-voltages.

It is worth noting that the term brownout is


sometimes used to describe periods when the
supply voltage has been deliberately reduced as voltage (the rms voltage of the supply calculated cables and other forms of insulated electronics in the phase voltages can produce a much larger
a strategy for reducing power delivery. The type over a half cycle) falls below the sag threshold. The as capacitors, with the insulation acting as the unbalance in the phase currents.
of supply disturbance caused by a brownout is event ends when the Urms(1/2) is equal to or greater dielectric of the capacitor. The capacitance of the
Unbalanced voltages can adversely affect many
essentially the same as an under-voltage, but than the sag threshold plus the hysteresis voltage. system provides a path for the transient pulse.
types of equipment including induction motors
the term brownout has no formal definition On poly-phase systems, the sag begins when the If the transient pulse has sufficient energy, it will
and variable speed drives. In addition, unbalanced
and, to avoid possible confusion, its use should Urms(1/2) voltage of one or more channels is below damage the insulation.
voltages can cause heating in transformers and
be avoided. the sag threshold and ends when the Urms(1/2)
Lightning is a major source of transients. Lightning neutral conductors.
Over-voltage voltage on all channels is equal to or greater than
strikes, which can be more than 8 km long and
the sag threshold plus the hysteresis voltage. Flicker
Over-voltage is an increase in rms voltage to reach temperatures in excess of 20,000 C, and
Flicker is a very specific problem related to human
more than 1.1 pu for a duration longer than For Class A swell detection on single-phase the electromagnetic fields produced by such
perception of the light output of incandescent
one minute. Typical values are between 1.1 and systems, a swell is defined as beginning when the strikes, can induce voltage and current transients
light bulbs. It is not a general term for voltage
1.2 pu. Over-voltages typically result from load Urms(1/2) voltage rises above the swell threshold, in power lines and communication lines. These fluctuations. The human eye is very sensitive to the
switching, particularly when large loads like and finishing when the Urms(1/2) voltage is equal transients are typically unidirectional. light flicker that is produced by voltage variations.
motors are switched off; variations in reactive to or less than the swell threshold minus the
The switching of capacitor banks is another Because of this, flicker is almost always the limiting
compensation, usually the switching of capacitor hysteresis voltage. On poly-phase systems, the
common source of transients. When a capacitor criterion for controlling small voltage fluctuations.
banks; poor system voltage regulation capabilities; swell begins when Urms(1/2) on one or more
bank is switched, there is an initial inrush of If the sensitivity of the human eye to flicker
and incorrect tap settings on transformers. channels rises above the swell threshold and
current, which produces a low-frequency transient is assessed by considering the eyes response
Voltage sags and swells finishes when Urms(1/2) on all of the measured
that has an oscillatory ringing characteristic. Such to flicker from a 60-watt incandescent bulb
Voltage sags (also called dips) and swells are two channels is equal to or less than the swell threshold
oscillatory transients can cause equipment to trip for rectangular voltage variations at various rates,
of the most common power quality problems. minus the hysteresis voltage.
out as well as malfunctions in uninterruptible it is found that that the sensitivity is a function
They are impossible to eliminate completely; as Transients power supply (UPS) installations. of the rate of fluctuations and is also to
impedances change over the course of a day, There are two main types of transients over
Less frequently encountered are extremely fast some extent dependent on the voltage of the
the system voltage will also momentarily change. voltages. Low-frequency oscillatory transients lighting supply.
transients (EFTs) that have rise and fall times in the
This is unfortunate, as even short duration sags have frequency components in the hundreds-of-
nanosecond region. These are caused by arcing In general, flicker is measured using the method
can lead to process shutdowns that take many hertz range. Low frequency oscillatory transients
faults, such as bad brushes in motors, and are defined in IEC 61000-4-15. This method takes
hours to re-start. Voltage swells are one of the are typically caused by capacitor switching.High-
rapidly damped by even a few metres of distribution the instantaneous voltage and compares it with
most frequent causes of circuit breaker nuisance frequency or impulsive transients have frequency
wiring. Standard line filters, which are included in a rolling average voltage. The deviation between
tripping. In short, sags and swells can cause components in the hundreds-of-kilohertz range.
almost all electronic equipment, are very effective these two is multiplied by a value taken from a
major financial losses, particularly in the High frequency impulse transients are typically
at removing EFTs, but EFTs may still cause problems weighted curve based on the sensitivity to flicker of
manufacturing sector. caused by lightning or the switching of inductive
in installations with very short cable runs, such as the human eye to incandescent bulbs operating at
loads.
Voltage sags are often caused by sudden increases those found on off-shore platforms. either 120 V 60 Hz or 230 V 50 Hz. The result the
in load, such as short circuits or faults, motors Transient over voltages can lead to dielectric percentile unit is subjected to further statistical
Unbalance
starting or electric heaters turning on. They can degradation or failure in all classes of equipment. analysis in order to calculate two values, Pst and Plt.
Unbalance is a condition in a poly-phase system
also be the result of sudden increases in the source Large magnitude transients with a fast rise time
where the values of the fundamental component Pst, or short-term flicker is calculated from the
impedance of the supply, typically caused by a contribute to insulation breakdown in equipment
of the line voltages, or the phase angles between percentile unit and is based on behaviour over
loose connection. Voltage swells are almost always such as switchgear, transformers and motors, while
consecutive line voltages are not equal, as a 10-minute interval. Plt, or long-term flicker is
caused by sudden decrease in the load on a circuit repeated exposure to lower amplitude transients
defined by IEEE 1159 and IEC 61000-4-7. Voltage calculated from Pst and is based on a two-hour
that has a poor or damaged voltage regulator, can cause slow degradation of insulation, leading
unbalance is most commonly seen in relation to interval. The criteria for evaluating the results are
although they can also be caused by loose or to eventual failure and reducing mean time
individual customer loads with an imbalance of straightforward. If Pst is less than 1.0, the flicker
damaged neutral connections. between failures (MTBF).
the loads on the phases, especially where large levels are good but if Pst is greater than 1.0, the
For Class A sag detection on single-phase systems, The mechanism by which transients damage single-phase loads, such as arc furnaces, are in flicker levels may be high enough to be annoying.
a voltage sag event begins when the Urms(1/2) insulation can be understood by considering use. It is important to note that a small unbalance All of this applies only to incandescent lighting

4 ELECTRICAL TESTER - August 2016 www.megger.com


ELECTRICAL
The industrys recognised information tool TESTER

undamentals
other types of lighting cannot be evaluated in Harmonics can be characterised by their order harmonic is a negative sequence harmonic and the the THD is now 100%! This is deceptive as THD
this way. In addition, the weighting curves apply which is equal to their multiple of the fundamental third order harmonic is a zero sequence harmonic. appears to be very high, but the only reason for
only to lighting that operates at 120 V 60 Hz or frequency. Thus a 180 Hz harmonic in a 60 Hz In balanced three-phase systems, the fundamental this is that the load is drawing so little current at
230 V 50 Hz. supply system is a third order harmonic. Odd currents cancel each other out, so that there is no the fundamental frequency.

Harmonics harmonics are harmonics with odd order numbers current in the neutral. Zero sequence harmonics To avoid this problem, total demand distortion
Harmonics are sinusoidal periodic waves with and even harmonics are those with even order however, such as the third harmonic, add together, (TDD) measurements should be used for current
frequencies that are integer multiples of the numbers. resulting in high neutral currents. harmonic measurements. TDD references the total
fundamental frequency. Harmonics can cause Even harmonics are often produced by faulty root-sum-square harmonic current distortion to
Total harmonic distortion
many problems, including excessive heating in rectifiers and produce waveform distortion that the maximum average demand current recorded
Total harmonic distortion (THD) is a measure
neutral conductors, overheating of motors and is non-symmetrical. Triplens are harmonics with during the test interval. The reference value is,
of the sum of the harmonic components in a
transformers, and failure of electronic equipment. therefore, the same throughout the test interval,
orders that are multiples of three. These do not distorted waveform, and it can be calculated for
ensuring that the TDD result obtained is valid.
IEEE 519 defines a harmonic as a component of cancel out in three-phase systems and, as a result, either current or voltage. THD is the rms sum of
TDD is calculated in accordance with the IEEE
order greater than one of the Fourier series of they give rise to high neutral currents. the harmonics, divided either by the rms value
519 document, Recommended Practices and
a periodic quantity. IEC 61000-4-30 defines a Harmonics can also be characterised by sequence, of the fundamental or the rms value of the
Requirements for Harmonic Control in Electrical
harmonic frequency as a frequency which is an based on the direction of rotation of the magnetic total waveform. Most often, THD is quoted as a
Power Systems.
integer multiple of the fundamental frequency, field they produce. Positive sequence harmonics percentage of the fundamental.
In summary, the power quality industry has
and defines a harmonic component as any of the create a magnetic field in the direction of rotation THD values can be misleading, especially when
developed certain index values that can be
components having a harmonic frequency. of the fundamental. Indeed, the fundamental can used in relation to current. The THD value is
used to assess the waveform distortion caused
Linear loads such as incandescent lights and be considered to be a positive sequence harmonic. typically calculated with reference to the amplitude
by the presence of harmonics. The two values
heating elements draw current equally at every Negative sequence harmonics produce magnetic of the fundamental. With voltage calculations, this most frequently encountered are THD and TDD.
point of the supply waveform. These loads do not fields that rotate in the opposite direction, which voltage fundamental will always be present, but Individual harmonic values are also indexed in
generate harmonics. However, non-linear loads reduces torque in motors and increases the current the amplitude of the current fundamental changes various specifications, such as the North American
such as switching power supplies and variable required to drive a given load. Zero sequence according to the load as the load decreases, IEEE 519 document and the European EN 50160
speed drives usually draw current only at the peaks harmonics do not produce a rotating magnetic so does the fundamental current amplitude. If standard issued by CENELEC.
of the supply waveform. It is these non-linear field. Zero sequence harmonics can be in phase. the current drawn by the load is low close to
Conclusion
loads that cause harmonics. Typically, current This can lead to high neutral currents, high neutral zero the THD value will, therefore, appear to be
This article has introduced some of the most
harmonics do not propagate through a system, to ground voltages, transformer losses as well as very high.
important concepts relating to power quality, and
but voltage harmonics will propagate as they can equipment overheating. For example, if the total harmonic current in a future articles in this series will build on these.
pass through transformers. Voltage Harmonics Positive, negative and zero sequence harmonics circuit is 0.2 A and the fundamental current is The next article will look at Class A recording and
occur when current harmonics are great enough run in sequential order positive, negative and 200 A, the THD is 3.16%, but if the fundamental this will be followed by an article examining the
to start clipping the voltage in various locations then zero. Since the fundamental frequency is current being drawn by the load drops to 0.2 impact of transients and harmonics on motors
throughout the waveform. a positive sequence harmonic, the second order A, and the harmonic current remains the same, and transformers.

Exhibit A:
Megger hand cranked
insulation test set
It all started in the 60s in London, when gangsters
Andrew Dodds - Group Technical Director like the Krays and the Richardsons ruled the back
streets. Murder, extortion, torture and everything
Meggers test instruments are well known for their in between were everyday activities for these
reliability and versatility and the many decades perpetrators.
of reliable service theyve provided in the electrical
Charlie and Eddie Richardson, crime gang leaders
industry can certainly testify to that. However, it is
from Camberwell in South East London, were
this versatility that has landed a 1950s version of
running a series of unsavoury businesses behind the
the popular insulation test set in court!
camouflage of a respectable (and thriving) scrap
The test set in question, which is at present metal merchant and a fruit machine dealership. In controlled a mineral claim in the Ghost Mountains was a Megger insulation tester the electrical
exhibited in New Scotland Yards Black Museum, is reality, the brothers were involved in racketeering, of the Transvaal. generator which was operated by gang member
a nicely dovetailed, wooden cased, 1950s Series 1 illegal drugs, extortion, money laundering, robbery,
Roy Hall to inflict pain on torture victims.
Megger - a 500V hand cranked insulation test set. prostitution and when necessary, contract killing. The murder, it later transpired, was the result of
Unfortunately, the series of events that landed this misunderstandings and voting rights amongst Stories in the press describe the so-called black
The Richardson gang were also known as the the mine shareholders. When sentenced to hang,
instrument in court, and subsequently in a crime box of torture, with claims that the generator
Torture Gang given their reputation for intimidating Bradbury offered to turn Queens evidence and
museum are quite gruesome so read on at your came from an army field telephone or from a
their victims with sadistic methods of persuasion. informed on the Richardson gang of which he was
own risk! WWII bomber. A keen electrician however will be
These included but were not limited to severe part, in exchange for a pardon and immunity. able to spot the fact that the item on display at
beatings, nailing feet to the floor, cutting off toes
The Richardson brothers were found guilty of New Scotland Yards Black Museum is not a death
and fingers, extracting teeth and electrocution!
fraud, extortion, assault and grievous bodily harm. box, but rather a 500 V hand cranked insulation
A public turf war and shoot-outs with rival firm test set which was built with the absolute opposite
Charlie Richardson was sentenced to twenty-five
the Krays in the 1960s, along with increasing intentions to make equipment and buildings safe
years in prison, and Eddie had ten years added
pressure on the police from the gangsters victims for users!
to his existing five year sentence for affray. Roy
led to the Richardsons capture. Key evidence was
Hall got ten years for his acts of torture with an
provided by Lawrence Johnny Bradbury, who The history of the Megger insulation testers is
electrical generator.
was convicted for the murder of Tom Waldeck, a interesting and without a doubt exciting to follow.
mineral prospector and business partner of Charlie The Torture Trial convened at the Old Bailey in Yet the use of this particular instrument will go
Richardson in the Perlite Mining Company which April 1967 and amongst the evidence and exhibits down in history for all the wrong reasons!

www.megger.com ELECTRICAL TESTER - August 2016 5


ELECTRICAL
The industrys recognised information tool TESTER

PD measurement saves

What is less well known is that these tried-and- It is worth mentioning, however, that had the needs to be prepared for all possible incidents that
Alexander Lpschen - Asset Consulting Engineer,
tested techniques also significantly improve the diagnostic tests been carried out earlier, even can occur on site. Thats why the company relies
Koopmann Energie und Elektrotechnik
ability to respond effectively to emergencies, the limited damage that did occur could have on the most powerful VLF testing systems with
as well as making it much easier to determine been avoided. cosine-square technology from Megger, which are
With a Megger Centrix cable test van, Koopmann the location of a cable fault. This means that integrated into all of its test vans.
Energie und Elektrotechnik, a service company The incident
from the perspective of a service company like
The Koopmann 24-hour service team was called These systems are the only way of testing
that specialises in handling emergencies in the Koopmann, the question of whether or not a cable
to an incident in an oil refinery. A 20 kV medium extremely long cable routes in a way that complies
energy supply sector, was able to prevent losses test van should incorporate diagnostic tools is
voltage cable had appeared to fail suddenly, with the applicable standards, a feature that the
amounting to millions of Euros at an oil refinery in completely redundant. The answer, unequivocally,
with the result that the circuit breaker supplying Koopmann engineers find particularly valuable.
Germany. The emergency arose when a medium- has to be yes.
power to a high-pressure tank had tripped. For Contrary to expectations, however, no breakdown
voltage cable failed, causing a circuit breaker to
In fact, status-oriented servicing is now well the refinery, the consequence was devastating occurred; the cable at the refinery withstood
trip and stopping the oil transport pumps. Not only
established as the best and most efficient servicing all of the pumps failed. Operations came to a this high stress without any problems. Apart
did this halt production, but if the situation had
strategy for network operators. This is the only complete standstill because the oil being supplied from slightly increased leakage current, yet again
not been remedied rapidly, very costly damage to
servicing strategy that Koopmann recommends via the pipelines could no longer be processed. no abnormalities were discovered. The cable
the plant would have resulted.
to its customers, as it demonstrably offers the The refinery was facing enormously costly damage fault, which certainly seemed to exist, was
Background best balance between economic efficiency and that would be almost impossible to rectify, and the proving elusive!
Network operators responsible for supply reliability supply reliability. immediate challenge was to contain this damage
An air of tension admittedly started to spread
usually want cable test vans that are perfectly within tolerable limits.
This is because the network operator only needs slowly among the members of the experienced
tailored to suit their own infrastructure. Before a to take action if the cable diagnostic tests indicate Koopmann team. All of the standard methods that
Insulation measurement
test van is purchased however, the question often that problems exist, rather than acting purely on had always been so successful did not seem to be
The first action taken by the emergency team was
arises whether it should be used exclusively to suspicion by replacing cables for no better reason yielding results this time.
to switch the power supply to another cable to put
deal with urgent incidents, or whether it would be than their age or, even worse, waiting until cable at least some of the pumps back into operation. The circuit breaker
more beneficial to use its diagnostic systems for faults occur and cause damage, meaning that But where was the original fault? As a first step For safety reasons, it was then decided to check
status-oriented servicing to help ensure that cable costly rectification work is carried out far too late. to answering this question, the team used its contact resistances at the circuit breaker, as the
faults do not occur in the first place. Of all available servicing strategies, this last one Centrix cable test van to carry out a standard pumps would stop only if this breaker tripped.
waiting until a fault occurs is the most expensive DC insulation measurement at 1000 V, along
Today, many sophisticated cable diagnostic The Koopmann team routinely carries a Megger
and the least efficient, but unfortunately it is still with capacitance measurements on the 20 kV
techniques are available, including tan delta MOM2 micro-ohmmeter in its emergency kit
the strategy most frequently adopted. cable. This preliminary insulation measurement
measurements as well as PD measurements using for situations of this type. Its compact dimensions
VLF test voltages with 50 Hz slope technology or This can have serious consequences, as is clearly usually determines whether the fault is solely and convenient weight of just 1 kg means that
damped AC (DAC) voltages, which can be used shown by the following report, which describes a the result of a short circuit, whether it is a high it is easily stored in any test van and, despite its
to test underground cables in a gentle, non- situation where, by using Megger DAC diagnostic impedance fault or indeed whether there is any small size, the MOM2 provides a test current
destructive manner. These methods have become systems, Koopmann saved an oil refinery from fault at all. Comparing the insulation resistances of 200 A.
widely known and accepted. the threat of millions of Euros worth of damage. and capacitance values of all phases often gives an
indication of the type of cable fault. This was not But even the contact resistance measurements at
the case here, however. There was no short circuit the circuit breaker did not yield any explanation.
and no significant differences in the insulation In fact, all of the tests performed indicated that
resistances of the phases. the supply network was essentially in tip-top
condition. The decision was therefore taken that it
Reflection measurement was safe to re-energise the cable. When this was
The service team then carried out a traditional done, everything worked perfectly; the problem
reflection measurement using a Megger Teleflex appeared to have been resolved. The refinery was
VX test set. It proved very easy to recognise the once again running at full output, much to the
end of the cable, thanks to the length-dependent satisfaction of the client. But still no one knew why
amplitude compensation. There were no the problem had occurred.
significant variations between the phases, which
reliably indicated that there were no particular The second event
issues anywhere between the measuring point Three days later, Koopmann received another
and the end of the cable. Neither was any problem call from the refinery. The section had tripped
found at the end of the cable. again. Once again, the standard tests described
above were carried out without success, raising
VLF test suspicions that this was a periodically occurring
Next, the team enhanced protection and fault that would continue to elude all traditional
connected its VLF system. A voltage of 3 x Vo fault location methods, unless someone happened
36 kV was used, with the intention of causing to be testing the cable section at exactly the
The Koopmann 24-hour deployment team was quickly on site
a breakdown. As a service provider, Koopmann right time.

6 ELECTRICAL TESTER - August 2016 www.megger.com


ELECTRICAL
The industrys recognised information tool TESTER

refinery millions
Luckily for the refinery, the Koopmann team on Koopmann has been using DAC test equipment The fault is found!
site that day had a Megger Centrix 1 80 PD partial from Megger for PD measurements for years, as It was precisely this test that ended up paying
discharge analysis system, which incorporates it is still to this day the only non-destructive PD off in this situation, as it revealed increased PD
sophisticated diagnostic functions for DAC testing. measurement device on the market. When this levels at a coupling, which were indicative of a
The team recommended to the refinery that a equipment is used, even critical cables can be put serious abnormality.
partial discharge (PD) measurement be carried out. back into service following PD diagnostics.
The accompanying image clearly shows partial
discharges at a coupling 120 metres away (the
x-axis is the cable length, the y-axis the PD level).
In Koopmanns experience, it is the PD frequency
rather than its level that is the decisive factor in
intermittent faults. As there was only this one PD
weak point in this particular case, it was easy to
work out what had caused this intermittent fault. Mapping for V <= Vmax (L1, L2, and L3)

Using the refinerys exemplary documentation,


Summary
the Koopmann team was immediately able to A cable fault location system with a non-destructive
work out exactly where the faulty coupling was PD measurement function, as is currently offered
located, and what type of coupling it was an oil- only by Meggers DAC technology, is undoubtedly
filled coupling sleeve. Without further delay, the the best cable fault location system. Without this
team found and replaced the coupling. A repeated technology or with another cable fault location
VLF test, as prescribed by VDE Standard 0726 (HD system from other manufacturers, the Koopmann
XY) and additional PD measurements showed no team would not have been able to finally locate
further abnormalities. The partial discharges at the this elusive cable fault. The refinerys exemplary
coupling were no longer there. Full operation was documentation also played an important role, as it
immediately resumed, and the cable section has allowed the correct coupling to be located quickly
The central Centrix control unit means that tests can be carried out in quick succession
not failed since. and accurately.

Wind farm cable


failure averted!
are difficult or impossible to charge with VLF sine-
Javier Luiz Leiva - Mexico Area Sales Manager wave equipment unless the frequency is reduced
Washington Cabrera - Regional Sales Manager, below 0.1 Hz, which then makes the testing non-
Mexico
compliant with IEEE 400.3.

Mexico already has over 3 GW of installed wind For the cable at the Mexican wind farm however,
power capacity and plans are in place to increase the test set was configured to operate at 20
this to more than 9.5 GW by the end of 2018. kV. Partial discharge activity was immediately
This ambitious target can only be achieved if the detected on all three phases at the near ends
installation and commissioning of a new plant of the cables, and at 1.8 km on phases L1 and
proceeds smoothly and the plant proves reliable L2. The near-end activity was of little concern,
The splices were removed and opened, and a the lack of mastic remained undetected and
in operation. because the connection between the test set
visual inspection revealed that no sealing mastic the cable been put in service, however, it would
To help achieve the necessary high levels of and the cables is rarely PD free. The PD activity at
had been used in the mechanical connector screw almost certainly have failed in a relative short time,
reliability, partial discharge (PD) analysis is routinely 1.8 km was much more puzzling as the cable
housings on the L1 and L2 phases. (See Figure causing costly disruption and damage.
carried out on newly installed cables and has operator had no knowledge of any cable feature
2). This shortcoming was quickly remedied and,
proved invaluable in detecting poor workmanship at this distance. With modern test equipment that uses cosine-
on retesting, the cable was found to be free of
and splice defects. This was amply confirmed by a rectangular waveform technology, experience
Despite this, the indication provided by the TDS NT PD activity.
recent experience with a 6.3 km XLPE cable. on Mexican wind farms has clearly shown that
test set was clear and unequivocal, as is shown by
the screen capture in Figure 1. With this in mind, This exercise in preventive and predictive PD analysis, even on long cables, is a convenient
The cable was tested with a Megger TDS NT
60 kV test set using standards-compliant VLF the cable operator checked the documentation for maintenance revealed a problem that was possible and cost-effective form of insurance against
cosine-rectangular test technology operating the installation and discovered that this had been to address relatively easily and inexpensively. Had premature failure.
at a frequency of 0.1 Hz. This test technology is updated. The new version revealed that there was
ideally suited to testing the long cables often a joint in the cable at 1.8 km, in exactly the location
encountered in wind farm applications, as these where unexpected PD activity had been detected.

Figure 2. Circuit 7, L1 joint without seal mastic in the mechanical connector screw house Figure 1. PD activity showed by the TDS NT software in circuit 7 of the wind farm

www.megger.com ELECTRICAL TESTER - August 2016 7


ELECTRICAL
The industrys recognised information tool TESTER

Q&A
Not long ago, the need to measure earth resistivity or the resistance of an earth electrode
was, for most engineers, a rare occurrence. With the advent of small generating schemes
and, in particular, solar and wind energy schemes, this situation has changed. Most of these
schemes have their own earthing systems and, to ensure safe operation, these need to be
checked. This has led to a large increase in the number of questions our helpline receives
about earth testing; here is a selection of the most common.

Q: When Im measuring the resistance consist of a large number of rods or plates and Meggers invaluable publication, Getting Down below some specified maximum acceptable
of an earth electrode or system, how far away other metallic structures bonded together. to Earth, which can be downloaded free of value, there are certain applications where high-
from it should I place my test spikes? Q: My earth system is very large, so charge from the Megger website. resolution measurements are necessary. These
A: As far away as possible and ideally at to make measurements in the usual way I Q: Ive used the stakeless technique to include the determination of earth resistance
least 6 to 10 times the maximum dimensions of would need very long leads. This simply isnt measure the resistance of an earth electrode using the slope technique mentioned in an earlier
the earth system. To provide some rough rules of practical. Whats the alternative? and the result is very obviously too low.
question, and the evaluation of earth resistivity
thumb, for a single earth electrode, the current Whats going on?
A: You can work with the test spikes at over large areas. High-resolution instruments,
reference spike C can usually be placed 15 m shorter distances from the earth system if you use A: The most likely answer is that youre actually
such as the Megger DET2/2 automatic earth
from the electrode under test, with the potential the slope test technique. With this technique, the reading a metallic loop in the earth system. This
tester, typically use the four-terminal method of
reference spike P placed about 9.3 m (62% of the current spike is inserted at a distance of about 2 is a very common problem as most equipment is
measurement and include additional features
distance to C) away. With a small grid of two earth to 3 times the maximum dimension of the earth bonded to ground, and this bonding frequently
such as variable test frequency, that help users to
electrodes, C can usually be placed about 30 to 40 system. Measurements are then made with the creates earth loops. Unfortunately, you may not
be able to use the stakeless technique in your obtain good results even in difficult conditions. As
m from the electrode under test; P correspondingly voltage spike at 20%, 40% and 60% of the
application. well as earth electrode resistance measurements,
can be placed about 18.6 to 24.8 m away. If the distance to the current spike. By using various
earth electrode system is large, consisting of Q: What are the applications that these instruments are ideally suited for soil
criteria to evaluate the results obtained from these
several rods or plates in parallel, for example, the three tests and, if necessary performing further require high-resolution measurements of resistivity measurements, which can be used
distance for C must be increased to possibly 60 m, tests, a reliable value for the resistance of the earth resistance? to establish the optimum electrode design and
and for P to some 37 m. Youll need even greater earthing system can be obtained. Theres no space A: While in most cases it is only necessary location, as well as for performing archaeological
distances for complex electrode systems that here for the full details, but they can be found in to show that the earth electrode resistance is and geological investigations.

Tesla and the pigeon of death


American Institute of Electrical Engineers finally This event was proof, once again, that despite his that he had now accomplished all that he was
Keith Wilson - Electrical engineer
decided to award him a medal for his contribution outstanding intellect, Tesla lacked social skills and supposed to.
to technology, it was the Edison Medal. This was refused to observe societal norms, considering that Nikola Tesla died in 1943, in debt, at his apartment
Nikola Teslas name is synonymous with pioneering
indeed bittersweet recognition, as the accolade only science is ever of any use to human beings. in the New Yorker hotel. His passing was at the
electrical developments, and he is accepted as
was set up by Thomas Edisons supporters the All other things were considered to be trivial and time unremarkable and only decades later was his
the originator of many devices not the least of
same Thomas Edison who took Teslas patents and non-important in the greatness of the universe he reputation restored as one of the greatest thinkers
which is the AC induction motor which we now
made a fortune out of them without crediting him. was hoping to build. of the twentieth century.
take for granted. His inventions form the basis
The award meeting took place at the Engineering Unfortunately, as he aged, Tesla started showing
of much of the technology we currently use and
Society Building in New York on May 18. Modestly, signs of obsessive-compulsive disorder, and was

Reminder:
although controversial, his life is now celebrated potentially a high-functioning autistic.
the 60-year-old Tesla graciously accepted the award
by engineers and history pundits alike. for his lifetime achievements, and then proceeded He gradually withdrew from public life and his

Knowhow
However, this was not always the case and during to hold an extremely lengthy acceptance speech quirks slowly took over. He became obsessed with
his lifetime, Tesla rarely received the recognition he that went on for hours, much to the desperation hygiene and when he shook peoples hands he
deserved for his work. Ironically, when in 1917 the of his captive audience. felt compelled to wash his hands three times. The
fixation on number three and its multiples was
affecting every area of his life for instance he delivered
online!
had to have 18 napkins at the dinner table and
he would count the steps he walked during a day.
Tesla also claimed to have an abnormal sensitivity
to sounds, as well as an acute sense of sight. By his In the February issue of ET, special note was
own admission, he had a violent aversion against made of Meggers series of live monthly
webinars that make it easier for busy power
the earrings of women, and the sight of a pearl
engineers to keep up to date with the latest
would almost give me a fit he even sent his
testing techniques and technology. These have
secretary home one day upon seeing her choice
been formulated by the companys experts,
of accessories! who have consulted widely with customers
As Teslas world became more and more contorted, to identify the topics that are of the most
he found solace in observing and feeding pigeons. immediate interest. Register today at http://
Having remained a bachelor his entire life, his us.megger.com/company/media-centre/events/
twilight years were spent fixating on a specific for an upcoming webinar, including:
white female pigeon, which he claimed to love Friday, August 19th 2016 Improving the
almost as one would love a human being. efficiency of transformer commissioning
Allegedly, the white pigeon visited Tesla one night.
Friday, September 23rd, 2016 An
The bird flew in his hotel room though an open
approach to CT testing in the field
window. He believed the bird had come to tell him
she was dying. Tesla apparently saw two powerful Friday, October 21st, 2016 Testing
beams of light in the birds eyes: Yes, it was a complex relays

real light, a powerful, dazzling, blinding light, a All of the webinars start at 10:00 United States
light more intense than I had ever produced by the Central Time. For the benefit of anyone who
most powerful lamps in my laboratory. finds these times and dates inconvenient,
The white pigeon died in the inventors arms, the seminars are being recorded and will be
which made a profound impact on his already available to view online on the Megger website
(www.megger.com) within a few days of being
anguished psyche. He believed that the
presented.
pigeons death symbolized his own mortality and