API Rec

comm
mend
ded P
Practtice 1
1FSC
C
Facilitties Sys
stems Comple
C etion Planning
g and Exxecutio
on

FIRST EDITIION | JULY 201


13 | 11 PAGES | $60.00 | PRO
ODUCT NO.G1F
FSC01

This document applies to a wide varietyy of projects within


w Forr ordering inforrmation:
the oil and gas
g industry excluding subsurface. Althou ugh
intended for oil and gas inndustry, the process describbed in Onlline: www.apii.org/pubs
this docume ent can be app plied to other industries as well.
w
It is intende
ed that the pro
ocesses and practices Phoone: 1-800-854-7179
established herein can be e adapted and d applied from
ma (Toll-freee in the U.S. and Canada)
single piecee of tagged equipment to a complex
c
petrochemiccal facility. The
e process desscribed is inten
nded (+1) 3033-397-7056
to be applieed at a system level. (Local an
nd Internationa
al)

The systemss completion process


p is the sequential Faxx: (+1) 303
3-397-2740
activities within a project that verify and d prove the
construction n, installation,, integration, testing, and APII members receeive a 30% disscount where a
applicable.
preparation of systems ha ave been com mpleted as
designed, and thus, the fa acility is readyy for start-up and
a
operations. The systems completion
c process is desiggned
to help preppare and mana age the transffer of care, cusstody,
and control of facilities unnder constructtion through
appropriate e certification and
a documenttation, such th hat
the details of
o progress are evident.

www.api.org
Contents

Page

1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 Terms, Definitions, and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2.1 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2.2 Abbreviations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3 Systems Completion Planning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.2 Planning and Organization. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4 Systems Completion Execution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4.2 Factory Acceptance Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4.3 Verification of Mechanical Completion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4.4 Pre-commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4.5 Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.6 Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4.7 Performance Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4.8 Operations Assistance and Project Closeout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Annex A (informative) Turnover and Completions Package. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Bibliography . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Figure
1 Systems Completion Execution Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Table
1 Systems Completion Planning and Organization Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Das könnte Ihnen auch gefallen