State Load Despatch Center,Airoli (MSETCL) Statement I

Daily system Report for 23/Oct/2017 MONDAY


I GENERATION (MUs) II EXCHANGES (MUs)
A) MSPGCL Daily Monthly E) InterState Exchanges Daily Monthly
1) Thermal 117.579 2590.241 1) Gujrat 0.609 -57.317
2) Hydro 3.148 161.848
3) Gas 6.558 163.245 2) Madhya Pradesh 12.370 258.648
Total MSPGCL 127.285 2915.334
B) 1) APML 49.108 1085.761 3) Chattisgarh 6.050 152.220
2) JSWEL 23.755 563.316
4) Maharashtra Net 114.598 2653.170
3) VIPL 12.709 217.886
4) RPL(AMT) 4.598 197.843 5) Goa (Amona) -0.220 -4.224
5) WPCL 2.492 46.997
6) PGPL 0.000 0.000
Total 133.407 3002.497
7) Other IPP 5.658 139.825
a) Mumbai Schedule 22.554 547.183
C) 1) TPCL Thermal 13.850 318.017
80.806 b) Mumbai Drawl 30.939 758.282
2) TPCL Hydro 5.466
3) TPCL Gas 2.297 60.121 c) MSEDCL Bilateral * 37.289 782.194
4) R-INFRA Thermal 10.244 187.241 Include PX 0.077 44.797
D) STATE d) Mumbai Bilateral * 22.554 546.333
1) Thermal 239.993 5347.127 Include PX 4.470 92.814
(A1+C1+C4+(B1-B6)) Include Standby 0.000 0.850

2) Hydro (A2+C2) 8.614 242.654 H) ENERGY CATERED (MUs)


3) Gas (A3+B6+C3) 8.855 223.366 1) MSEDCL 338.535 7577.968
4) Wind 7.338 106.475 2) Mumbai Discoms 62.796 1404.460
6) SOLAR 3.124 60.316
TOTAL STATE 267.924 5979.938 TOTAL STATE 401.331 8982.428
* Displayed for information, not added in total.
DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW) Statement II
PARTICULARS A. Morning Peak at B. Day Peak at 16 C. Evening Peak at D. Night Minimum
12 Hrs Hrs 20 Hrs at 3 Hrs
MSPGCL Thermal 5092 5241 5412 4255
MSPGCL Hydro 65 149 166 66
MSPGCL Gas 267 266 274 275
MSPGCL Total Generation 5424 5656 5852 4596
Central Sector Receipt 6377 6088 5724 4762
WIND 364 197 191 418
CPP / IPP Thermal 4314 4512 4520 3580
CPP / IPP Gas 0 0 0 0
SOLAR 442 270 0 0
Exchange with Mumbai -1553 -1342 -1222 -1061
MSEDCL DEMAND MET 15368 15381 15065 12295
Load Shedding 0 0 0 0
MSEDCL DEMAND 15368 15381 15065 12295
TPCL GENERATION 1114 1285 1152 583
R-INFRA GENERATION 499 501 501 375
MUMBAI DEMAND 3166 3128 2875 2019
STATE DEMAND MET 18534 18509 17940 14314
STATE DEMAND 18534 18509 17940 14314
Frequency (Hz) 49.94 49.94 50.01 49.97
FREQUENCY PARTICULARS
MAXIMUM FREQ. MINIMUM FREQ. AVERAGE FREQ. FREQ. BELOW 49.2 Hz
50.12 Hz at 18.01 Hrs 49.77 Hz at 16.43 Hrs 49.95 0 % of Time(min)
Note : The report is based on Operational Data and is for statistical purpose only.

Shift Engineer Shift Incharge


0 of 6
State Load Despatch Center,Airoli (MSETCL) Annexure-1
Daily and Progressive Generation,Maximum,Minimum for 23/Oct/2017
Generation Generation
Generating unit Daily Monthly Max Min Generating unit Daily Monthly Max Min
(Mus) (Mus) (MW) (MW) (Mus) (Mus) (MW) (MW)
Koradi PENCH (MS)
Unit 5 0.00 0.00 0 0 Pench (MS) 0.44 12.78 37 0
Unit 6 0.00 0.00 0 0 Total 0.44 12.78
Unit 7 0.00 0.00 0 0 Koyna
Unit 8 10.90 245.59 520 417 Stage 1-2 1.76 61.04 200 40
Unit 9 0.00 0.00 0 0 Stage 4 0.00 46.18 0 0
Unit 10 9.84 235.55 484 280 Stage 3 0.57 26.26 80 0
Total 20.74 481.14 Total 2.33 133.48
Bhusawal Hydro
Unit 2 0.00 0.00 0 0 KDPH 0.00 2.03 0 0
Unit 3 0.00 0.00 0 0 VTRNA 0.00 4.68 0 0
Unit 4 10.54 192.22 500 360 TILLARI 0.00 0.23 0 0
Unit 5 10.62 191.39 500 370 BHTGR/VEER 0.00 0.00 0 0
Total 21.16 383.60 BHIRA T.R. 0.17 5.25 40 0
Parli RNGR+BHTSA 0.38 7.09 16 15
Unit 4 0.00 0.00 0 0 BHANDARDRA 0.00 1.80 0 0
Unit 5 0.00 0.00 0 0 ELDARY 0.00 0.00 0 0
Unit 6 0.00 60.41 0 0 SMLHY_PTN 0.10 4.81 5 4
Unit 7 0.00 34.96 0 0 GHATGHAR 0.17 2.47 110 0
Unit 8 2.25 29.19 203 0 Total 0.82 28.37
Total 2.25 124.55 Wind
Chandrapur Total 7.34 106.48 0 0
Unit 3 0.00 0.00 5 0 Total 7.34 106.48
Unit 4 4.29 67.29 190 161 CPP
Unit 5 0.00 182.65 0 0 APML(Mus) 49.11 1085.76 0 0
Unit 6 0.00 107.21 0 0 JSWEL(Mus) 23.76 563.32 0 0
Unit 7 10.12 218.76 455 362 VIPL(Mus) 12.71 217.89 0 0
Unit 8 10.26 169.00 500 296 RPLAMT(Mus 4.60 197.84 0 0
Unit 9 10.13 189.46 458 357 WPCL(Mus) 2.49 47.00 0 0
Total 34.80 934.37 Other(Mus) 5.66 139.82 0 0
Paras Total 98.32 2251.63
Unit 3 5.57 83.34 250 190 SOLAR
Unit 4 5.62 106.56 257 180 Total 3.12 60.32 0 0
Total 11.19 189.91 Total 3.12 60.32
Khaparkheda Tata
Unit 1 1.10 1.10 135 0 Trombay 5 9.20 198.04 490 312
Unit 2 4.20 37.64 195 160 Trombay 6 0.00 0.00 0 0
Unit 3 0.00 0.00 0 0 Trombay 7A 1.27 33.93 61 48
Unit 4 4.24 57.33 196 160 Trombay 7B 1.02 26.19 47 39
Unit 5 9.64 212.10 450 360 Trombay 8 4.65 119.98 247 166
Total 19.18 308.17 TATA Hydro 5.47 80.81 456 19
Nasik Total 21.61 458.94
Unit 3 3.93 65.49 170 160 R-INFRA
Unit 4 4.32 46.19 200 156 DTPS U-1&2 10.24 187.24 501 375
Unit 5 0.00 56.82 0 0 Total 10.24 187.24
Total 8.25 168.50
Uran
All Units 6.56 163.24 286 255
Total 6.56 163.24
PGPL
Unit 1 0.00 0.00 0 0
Unit 2 0.00 0.00 0 0
Total 0.00 0.00
1 of 6
* Infirm Power Summary Summary
Particulars Daily (Mus) Monthly Monthly Monthly
Particulars Daily (Mus) Particulars Daily (Mus)
(Mus) (Mus)
MSPGCL Thermal 117.58 2590.24 MSPGCL Total 127.28 2915.33
MSPGCL Thml+Gas 124.14 2753.49 Koyna 1,2 & 4 Total 1.76 107.22
MSPGCL Hydro 3.15 161.85 State Total 267.92 5979.94

2 of 6
State Load Despatch Center,Airoli (MSETCL) Annexure-2
Hourly Load Data As on 23/Oct/2017

TIME MSPGCL GEN. CPP / IPP Mum. MSEDCL LOAD MSEDCL


CS CS MUMBAI STATE FREQ.
SR. TOTAL WIND SOLAR NET DEM. SHEDDI DEM.
SHARE RECPT DEMAND DEMAND (Hz)
NO. THM HY GAS THM GAS EXCH. MET NG WITH LS

1 4644 61 275 4980 346 3578 0 0 4962 4708 -1360 12252 0 12252 2317 14569 49.95

2 4310 66 286 4662 391 3578 0 0 4656 5092 -1186 12537 0 12537 2143 14680 49.93

3 4255 66 275 4596 418 3580 0 0 4622 4762 -1061 12295 0 12295 2019 14314 49.97

4 4317 61 275 4653 430 3585 0 0 4692 4728 -983 12414 0 12414 1940 14354 49.95

5 4417 66 276 4759 435 3633 0 0 4690 4861 -944 12743 0 12743 1901 14644 49.97

6 4666 66 286 5018 391 3767 0 0 5145 5315 -998 13493 0 13493 1955 15448 49.92

7 4967 60 276 5303 384 4024 0 9 5793 4992 -1046 13667 0 13667 2020 15687 49.94

8 4921 70 277 5268 337 4115 0 83 5626 5717 -1124 14396 0 14396 2149 16545 49.96

9 4631 186 275 5092 262 3846 0 214 5758 6151 -1338 14227 0 14227 2566 16793 49.93

10 4761 340 282 5383 355 3894 0 331 5740 5895 -1430 14428 0 14428 2827 17255 49.89

11 5095 230 271 5596 397 4246 0 400 5997 5842 -1745 14736 0 14736 3137 17873 49.93

12 5092 65 267 5424 364 4314 0 442 6579 6377 -1553 15368 0 15368 3166 18534 49.94

13 5063 65 266 5394 265 4261 0 445 6550 6465 -1505 15325 0 15325 3156 18481 49.94

14 5019 65 255 5339 225 4409 0 425 6060 6342 -1445 15295 0 15295 3087 18382 49.96

15 5087 206 263 5556 222 4467 0 343 6120 6134 -1359 15363 0 15363 3120 18483 49.94

16 5241 149 266 5656 197 4512 0 270 6150 6088 -1342 15381 0 15381 3128 18509 49.94

17 5297 264 265 5826 205 4521 0 137 5729 5810 -1280 15219 0 15219 3069 18288 49.89

18 5351 214 269 5834 177 4450 0 25 5232 5272 -1182 14576 0 14576 2960 17536 49.94

19 5361 259 270 5890 204 4509 0 0 5700 5492 -1200 14894 0 14894 2965 17859 49.94

20 5412 166 274 5852 191 4520 0 0 5941 5724 -1222 15065 0 15065 2875 17940 50.01

21 5467 99 274 5840 214 4419 0 0 5895 5401 -1503 14370 0 14370 2763 17133 50.03

22 4812 171 274 5257 274 4129 0 0 5615 5713 -1469 13904 0 13904 2580 16484 50.00

23 4724 84 285 5093 358 3983 0 0 5237 5501 -1329 13605 0 13605 2529 16134 49.96

24 4669 69 276 5014 296 3979 0 0 5167 5028 -1335 12982 0 12982 2424 15406 49.93

117.5
MUs 3.15 6.56 127.28 7.34 98.32 0.00 3.12 133.66 133.41 -30.94 338.53 0.00 338.53 62.80 401.33 49.95
8
NOTE : ALL VALUES IN MW
Mumbai Net Exch is shown with reference to MSETCL system and (-) sign indicates MSETCL periphery to Mumbai system.

3 of 6
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 23/Oct/2017
Position as on 6.30 Hrs of 24/Oct/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date

PLANNED OUTAGE

TPC-G Trombay 6 500 15/07/2015 17.08 Continued. Economic shutdown.

CENT.SECTOR TARAPUR 4 540 23/04/2017 19:55 Continued. Annual Maintenance


3 months outage for
CENT.SECTOR Tarapur 1 160 04/06/2017 19.09 Continued.
refuelling.
Coal shortage form
MSPGCL Koradi Unit 9 660 07/09/2017 00.38 Continued. 12.09.2017.converted to
AOH dt.1.10.2017.
FORCED OUTAGE

RGPPL Dabhol 1B 230 28/05/2013 22:02 Continued. Gas Shortage.

RGPPL Dabhol 1X 290 27/06/2013 21.46 Continued. Gas Shortage

RGPPL Dabhol 1A 230 27/06/2013 21.47 Continued. Gas Shortage

MSPGCL Koradi Unit 6 210 09/07/2015 00.00 Continued. EE R&M LE Work

IPP SWPGL U-1 135 16/02/2016 17.09 Continued. No PPA.

IPP SWPGL U-2 135 29/02/2016 21.46 Continued. No PPA

MSPGCL Parli Unit 5 210 01/04/2016 00.00 Continued. Economic shutdown

MSPGCL Parli Unit 4 210 01/04/2016 00.00 Continued. Economic shutdown

MSPGCL Bhusawal Unit 2 210 14/06/2016 19.35 Continued. Shutdown

MSPGCL Uran Unit 8 108 14/08/2016 07.56 Continued. Maintenance work

RGPPL Dabhol 2A 230 24/08/2016 13.31 Continued. Change Over.


ID Fan problem, Converted
to Zero Schedule By
MSEDCL from 00.00hrs/22-
MSPGCL Koradi Unit 5 200 05/09/2016 00.21 Continued. 9-16. Shutdown taken on
18.10.2016 at 00:00Hrs for
Turbine inspection and
maintenance work
PGPL PGPL U1 262 07/02/2017 17.30 Continued. No Schedule

PGPL PGPL U2 126 07/02/2017 17.30 Continued. No Schedule


due to common pressure
MSPGCL Ghatghar Unit-2 125 28/07/2017 00.00 Continued.
shaft with unit 1.
CPP SWPGL U-3 135 26/08/2017 17.40 Continued. Boiler Tube Leakage
Coal Shortage From
MSPGCL Bhusawal Unit 3 210 27/08/2017 07.43 Continued.
29.08.2017.
MSPGCL Khaparkheda Unit 1 210 08/09/2017 12.23 23/10/2017 10.45 Coal Shortage

MSPGCL Chandrapur Unit 3 210 12/09/2017 00.00 23/10/2017 23.40 Coal Shortage

MSPGCL Khaparkheda Unit 3 210 12/09/2017 00.00 Continued. Coal Shortage

MSPGCL Koradi Unit 7 210 12/09/2017 00.12 Continued. Coal Shortage

IPP RPL(AMT) U-3 270 17/09/2017 00.02 Continued. Coal Shortage

IPP RPL(AMT) U-5 270 17/09/2017 02.01 Continued. Coal Shortage

MSPGCL Uran Unit 7 108 05/10/2017 00.06 Continued. Gas Turbine Work

MSPGCL Uran Unit B0 120 05/10/2017 00.11 Continued. Gas Turbine Work

Problem in submerged
IPP RPL(AMT) U-1 270 06/10/2017 00.45 Continued.
Scrapper chain. (Coal

4 of 6
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 23/Oct/2017
Position as on 6.30 Hrs of 24/Oct/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date

shortage)

MSPGCL Parli Unit 7 250 12/10/2017 00.00 Continued. ZERO SCHEDULE.

MSPGCL Parli Unit 6 250 14/10/2017 17.04 Continued. zero schedule by msedcl.

MSPGCL Nasik Unit 5 210 14/10/2017 21.05 Continued. zero schedule by msedcl.
Flame Failure Converted
IPP RPL(AMT) U-4 270 16/10/2017 14.47 Continued. into zero schedule.(21.30
hrs. Dt 16-10-2017)
IPP RPL(AMT) U-2 270 18/10/2017 02.57 23/10/2017 03.34 zero schedule.
aph support bearing
IPP Adani U-2 660 18/10/2017 05.58 Continued. abnormal sound and oil
leakage.
Zero Schedule By
MSPGCL Parli Unit 8 250 18/10/2017 22.18 23/10/2017 06.03
MSEDCL
MSPGCL Chandrapur Unit 5 500 20/10/2017 18.40 Continued. Boiler Tube Leakage

MSPGCL Chandrapur Unit 6 500 21/10/2017 19.25 Continued. Boiler Tube Leakage

MSPGCL Khaparkheda Unit 4 210 24/10/2017 02.52 Continued. Boiler Tube Leakage

5 of 6
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 23/Oct/2017
Position as on 6.30 Hrs of 24/Oct/2017

Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type

400 KV LINE Outages/Trippings


Line converted as 220 kV Solapur
Karad Solapur (PG) InterState 03/05/2017 11:49 Continued. PO
(PG)- Jeur from LOC 403
Dhule Sar'Sarovar II InterState 18/10/2017 17.27 23/10/2017 06.56 HT Over Voltage

Kolhapur Solapur (PG) II InterState 22/10/2017 20.31 Continued. HT Over Voltage

Dhule Sar'Sarovar I InterState 23/10/2017 18.00 Continued. HT Over Voltage

Ektuni-Bableshwar ckt II IntraState 06/10/2017 15.03 Continued. EO To attend Hot Spot

Karad-Jaigad - I IntraState 16/10/2017 18.39 Continued. HT Over Voltage

karad -kolhapur-I IntraState 17/10/2017 17.28 Continued. HT Over Voltage

Bhusawal-Aurangabad IntraState 18/10/2017 19.09 23/10/2017 06.32 HT Over Voltage


Distance Protection (RFC from
Chandrapur-II - Nanded ckt I IntraState 20/10/2017 23.57 Continued. T
21/10/17@ 16:18 hrs.)
Lonikand I - Koyna stage-IV IntraState 22/10/2017 21.36 23/10/2017 09.46 HT Over Voltage

Lonikand I - Koyna stage-IV IntraState 23/10/2017 23.05 Continued. HT Over Voltage

220 KV LINE Outages/Trippings

Talandage - Chikodi InterState 01/06/2017 00.01 Continued. PO NO SCHEDULE.

Mudshingi - Chikodi InterState 01/06/2017 00.06 Continued. PO NO SCHEDULE.

Mahalakshmi Amona InterState 19/10/2017 00.19 23/10/2017 18.46 T Over Voltage

Tillari Amona InterState 19/10/2017 00.19 23/10/2017 18.46 T Over Voltage


Bunching of conductor Loc no 86
Disconnecting of jumper at Loc no
Chandrapur GCR - Warora - I IntraState 05/04/2015 09.13 Continued. PO
86 & 107 and de-energising the
line bet.86 to 107.
Bunching of conductor Loc no 86
Disconnecting of jumper at Loc no
Chandrapur GCR - Wani IntraState 05/04/2015 09.15 Continued. PO
86 & 107 and de-energising the
line bet.86 to 107.
Distance Relay Faulty at pusad
Pusad - Hingoli IntraState 11/09/2017 20.06 Continued. HT
end
B Phase CT Burst at Pedambe
Pedambe-Nerle IntraState 23/09/2017 00.50 Continued. T
End
Shivajinagar-Gangapur IntraState 22/10/2017 11.17 Continued. HT Conductor alarm appears.
Tata Borivli MSETCL Borivli 4 IntraState 23/10/2017 07.10 23/10/2017 07.26 T trip due to cb problem.

Kharghar Trombay IntraState 23/10/2017 07.10 23/10/2017 07.26 T tripped only from end.

Nashik-Padgha IntraState 23/10/2017 07.12 Continued. PO 765 line crossing work.

Padghe - Jindal IntraState 23/10/2017 07.25 Continued. T 766 line crossing work.

Talandge-Hamidwada IntraState 23/10/2017 10.05 23/10/2017 16.42 PO ct Oil Leakage Attending work.

Karad(400kv) -Mudshingi Ckt 2-Tak IntraState 23/10/2017 10.15 23/10/2017 16.25 PO Routine Maintenance Work

Malharpeth - Karad(400kv) IntraState 23/10/2017 10.36 23/10/2017 15.09 EO Attending Hot Spot

Padegaon-Sawangi IntraState 23/10/2017 15.30 23/10/2017 18.13 PO To attend red hot on CB.

Tata Borivli MSETCL Borivli 5 IntraState 23/10/2017 15.40 Continued. EO Attending Hot Spot

220 KV ICT Outages/Trippings


Failed on internal Fault(Now
220/100 Kv 200 MVA ICT III
IntraState 21/09/2014 09.16 Continued. T repaired and ready for
@Borivali
commissioning)
Replacement 220/110KV 100MVA
220/110kv 100MVA ICT-II @Miraj IntraState 18/09/2017 11.27 Continued. PO ICT 2 by new 220/132-110KV
200MVA ICT

HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage

6 of 6