Tim Godfrey
An
Integrated
Grid
2014 Electric Power Research Institute, Inc. All rights reserved. 2 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
The utility communications hierarchy
Core
LAN
Fiber
Microwave
WAN
Private Field Public Carrier
Area Network Network
PV FAN
Sensor
Collector Collector
Cap NAN
Bank
Cap
Bank
Premises
2014 Electric Power Research Institute, Inc. All rights reserved. 3 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Trends Impacting Utility Communications (1)
Transition from application-specific (overlay) networks, to
integrated and unified networks
Past Overlay Approach
Energy Mgmt
Load Mgmt
Dist. Mgmt
Load Mgmt
Dist. Mgmt
Integrated Network
Common Equipment and Interfaces Image Credit:
Great River Energy
2014 Electric Power Research Institute, Inc. All rights reserved. 5 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Trends Impacting Utility Communications (3)
2014 Electric Power Research Institute, Inc. All rights reserved. 6 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Other Trends Impacting Utility Communications
2014 Electric Power Research Institute, Inc. All rights reserved. 7 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Utility Communications Options
Unlicensed
Public Wireless No
Operator
spectrum No
Infrastructure? meets
requirements?
Yes
Yes
Select
Mobile Unlicensed Private
Wireless Mesh Licensed
Operator(s) or P-mP Spectrum
2014 Electric Power Research Institute, Inc. All rights reserved. 8 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Pros and Cons of Integrated Comm Networks
Pros Cons
Scalable Criticality is magnified: Design
for reliability, resilience, and
security
Maintainable (evolution over
technology lifecycle)
Challenges of legacy device
migration
Manageable
There is no universal
Improved ROI communications solution
Challenges coordinating a
strategic development across
the organization
2014 Electric Power Research Institute, Inc. All rights reserved. 9 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Demo Members
2014 Electric Power Research Institute, Inc. All rights reserved. 10 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Cyber-security in integrated comm networks
2014 Electric Power Research Institute, Inc. All rights reserved. 11 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Penetration Testing
Collaborative research
between FAN Demo and
Cyber Security
2014 Electric Power Research Institute, Inc. All rights reserved. 12 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
The challenge of integrated communications
2014 Electric Power Research Institute, Inc. All rights reserved. 13 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Communicatinos andthe
DataDrivenGrid
YES,thegridwillbesmart
Smartisthealternativetobig.
Whenthegridwasfirstbuilt,itwasallaboutexpansion morepower,
deliveredubiquitously
Whenyoureachalimit,youbuiltMORE
Whywestillfocusonmore,butthefirstthoughtnowisgettingmorefrom
whatwehave.
AndShockleysaidlettherebetransistors
Therateoftheimprovementingrid
componentswasslowinginthe1980s.
Electricitypriceswerelowand
stable
Reliabilitywasveryhigh
Everythinghadbeeninvented
Then solidstateelectronicsenteredthe
powerindustry
metering
communications (731million)
control
powerelectronics
Anditwastimetoreconsider/reinvent
everything
LivingintheInterestingTime
ooo
1883 1990 2025?
ControlThroughAngular AnalyticallyDrivenControl
Momentum
Transition
Advanced
AgileControl Architecture
(Fractal)
Next
Generation
Advanced
Communications Grid CyberSecurity
Advanced
BigData
Analytics
Distributed
Generation
Advanced
AgileControl Architecture
(Fractal)
Next
Generation
Advanced
Communications Grid CyberSecurity
Advanced
BigData
Analytics
Distributed
Generation
Advanced
AgileControl Architecture
(Fractal)
Next
Generation
Advanced
Communications Grid CyberSecurity
Advanced
BigData
Analytics
SmartAppliances
Estimates of 45
Center of Million Smart
Appliances by 2020
Control?
Navigant Sept 2012
TheFear
EPRI:10^4moredata
IBM:10^5moredata
Surprise!!DidntHappen,but:
Issues
Transportationbottleneck
Reportingbyexception
99.998%redundantinformation
BuildingfortheInterestingDay
Neededforindustrial Reliability Speed
operation,butnot
addressedbygeneral
internetproviders
Area
Latency
Served
Security
Substantial
responsibilityleft
tousers
TaxonomyofCommunications
KeyOrganizationsfortheTrustworthyInternet
Internet2
InternetofThings
IndustrialInternet
Internet2
Whatisnonprescriptivecybersecurityand
whydoweneedit?
Prescriptivecybersecurityrequirestheusertoidentifythe
characteristicsofsuspiciouscommunications
Nonprescriptiveistheopposite
PrescriptiveSecurityrequires:
Knowingthethreat
Knowingthesystembeingprotected
Havingupdatesdevelopeddiligently
Knowledgeableusers
Maintainingsystemscontinuously
Therehavebeenfailuresinalloftheabove
FullPacketCapture
Datacollectionto
supportdevelopment
Completelypassive
NetOptics TPCU3
(copper)
Stealth LPC100G4
Canalsosupportfiber
Opensourcesoftware
AutomatedNetworkMapping
1. Tcpdump forconfigurablefullpacketcapture
2. Bro IDStocharacterizenetworktraffic
1. Brocut tocreateCSVdata
2. Afterglow tocreategraphviz filesfromCSVdata
3. Neato todrawgraphsofobservednetwork
Distributed
Generation
Agile Cyber
Control Security
Next
Advanced Generatio Advanced
Communica
tions
nGrid Architecture
(Fractal)
Advanced
Analytics BigData
THESOLUTIONTOTHEDATAISSUE
MUSTBEROOTEDINARCHITECTURE
Allgridapplicationshavethesamebasicstructure
ImplementAction
ImplementAction
DeriveDecision
DeriveDecision
PerformAnalysis
PerformAnalysis
TransformandOrganizeData
TransformandOrganizeData
CollectData
CollectData
AbstractionModel
Action
Decision
Analysis
Information
Data
Communications & Cyber Security: Foundations of the Modern Grid
Transmission
Emerging Grid Distribution
Technology Modernization Information
Technology
Develop Deploy
Operate
2014 Electric Power Research Institute, Inc. All rights reserved. 42 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
The Electric Grid: Past vs. Present vs. Future
Future
Past Present Path
2014 Electric Power Research Institute, Inc. All rights reserved. 43 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Strategy for the Integrated Grid
Drivers
DistributedEnergyResources
DemandResponse
ElectricVehicles
InPremiseAutomation
CybersecurityThreats
AgingInfrastructure
BigDataComplexity
StrandedAssets
Smart
Assets
SmartMeter
Open Standard Node
Transformer
Internet Protocol
OtherNodes
Line
Radio Connectivity
UTILITY
Sensor
ELECTRICGRID
Distributed
DATA CENTER
Energy
Resources
Head
IntelligentSwitch
Network Head
X
StreetLight Router End B
SmartGeneration
IP
Head
Continuous Network
SUPPLY
End N
Emission
Monitoring
WeatherSensor
2014 Electric Power Research Institute, Inc. All rights reserved. 45 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Field Message Bus: The Distributed
Internet of Things Enabler
CIM
DDS
DMS
Router
Corporate
Virtual Private
Software Network
Tier 5
DIP Node
<50min
1-5 ms Field Area
Legend
Network
Protection (FAN)
& Control Local Area Core Processor
Network Router Application Processor
Distributed (LAN) Physical Transport
Energy Virtual
Resources Software Virtual Firewall Virtual Telemetry
2014 Electric Power Research Institute, Inc. All rights reserved. 47 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
How Should We Evolve Our Cyber Security Capabilities?
2014 Electric Power Research Institute, Inc. All rights reserved. 48 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
A Distributed, Standards-Based, Inter-Operable System Also
Provides Significantly Enhanced Cyber Security Capabilities
2014 Electric Power Research Institute, Inc. All rights reserved. 49 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Why is this Important for Duke Energy?
2014 Electric Power Research Institute, Inc. All rights reserved. 50 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Questions / Discussion
2014 Electric Power Research Institute, Inc. All rights reserved. 51 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Bio Bob Yinger
2014 Electric Power Research Institute, Inc. All rights reserved. 52 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Communications and Cyber Security: Foundations of
the Modern Grid
Irvine Smart Grid Demonstration
Bob Yinger
Advanced Technology
Southern California Edison
October 28, 2014
Charlotte, NC
Project Description
2014 Electric Power Research Institute, Inc. All rights reserved. 55 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Surprises Field Area Networks
2014 Electric Power Research Institute, Inc. All rights reserved. 56 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Reaching Beyond Field Area Networks
2014 Electric Power Research Institute, Inc. All rights reserved. 57 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Project Successes Cyber Security
2014 Electric Power Research Institute, Inc. All rights reserved. 58 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Surprises Cyber Security
2014 Electric Power Research Institute, Inc. All rights reserved. 59 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Reaching Beyond Cyber Security
2014 Electric Power Research Institute, Inc. All rights reserved. 60 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Questions
Bob Yinger
Advanced Technology
Southern California Edison
Robert.Yinger@sce.com
2014 Electric Power Research Institute, Inc. All rights reserved. 61 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Presenter Bio:
Joe Nowaczyk, Director, SRP
30 years at SRP
Variety of experiences including, Strategic Planning,
Joe Nowaczyk
Resource Planning, Marketing, Metering & Field
Customer Services Substation and Transmission Line
Design & Construction, Gas Fired Generation
Engineering, Substation Maintenance, and more..
Director of Electronic Systems for 7 years including, Pages
Communications, Control, and Protection Systems. 78-79
Pages
52-54
2014 Electric Power Research Institute, Inc. All rights reserved. 62 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Communications & Cyber Security:
Foundations of Modern Grid
Background
SRP Field Area Network (FAN) Pilot
Proposal
2014 Electric Power Research Institute, Inc. All rights reserved. 64 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Background:
SRP Territories
Microwave
Fiber
2014 Electric Power Research Institute, Inc. All rights reserved. 65 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Current Environment
Different applications are utilizing different communications solutions
Distribution Feeder Automation (DFA) Unlicensed 900MHz
Water SCADA Licensed and Unlicensed 900MHz
Capacitor Control (VOLT/VAR) 150MHz Licensed Paging System
Field Emergency Communications 150MHz Licensed Paging
System
Trunked Radio 900MHz Licensed Land Mobile Radio System
AMI 900 MHz Unlicensed Mesh, Commercial Cellular Backhaul
Vehicle Location Commercial Cellular
Truck Mounted Laptops Commercial Cellular
Power Quality Meters Commercial Cellular
2014 Electric Power Research Institute, Inc. All rights reserved. 66 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Future Business Drivers
Future grid automation and customer programs will bring proliferation
of intelligent electronic devices (IEDs) to the field requiring
communications.
DFA expansion supporting reliability improvements
Renewable energy resource integration
VOLT/VAR optimization for power quality & reduced losses
Remote fault indication to improve outage response
Distribution and meter data for real-time operations
Automation of water delivery infrastructure
Remote video surveillance to mitigate risks
2014 Electric Power Research Institute, Inc. All rights reserved. 67 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
LEGEND
FAN Pilot: Wireless Connectivity
Crew Vehicles
Secure
Customers/Meters
Private Network
Water Facilities
Mobile Computing
2014 Electric Power Research Institute, Inc. All rights reserved. 68 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
SRP FAN Pilot Objectives
SRP, in partnership with EPRI, launched a FAN Pilot in
May 2012 with the goal to define a strategy for next
generation field area communications
Implement base stations at three locations
Define requirements, integrate, and test 2-way communications for
various end user applications
Assess technology (WiMAX vs. LTE, RF spectrum & cyber
security)
Evaluate alternative public/private models
Assess the business case
Develop strategy & proposal
2014 Electric Power Research Institute, Inc. All rights reserved. 69 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
SRP FAN Deployment
Network
operational
since Feb
2013
2014 Electric Power Research Institute, Inc. All rights reserved. 70 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Implementation Models
Public Private Hybrid PSBN
Availability
Scalability
Traffic Prioritization/SLA
Fault Tolerance/Resiliency
Cyber Security Control
Service Coverage Control
Network Customization
Capital Expense (CAPEX)
Operational Expense (OPEX)
2014 Electric Power Research Institute, Inc. All rights reserved. 71 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Scenario Evaluation
Lic. LTE 3.65 WiMAX WIFI Mesh
Spectrum
Technology Longevity
Equipment Availability
Total Cost of Ownership
Labor Resources
Cyber Security
2014 Electric Power Research Institute, Inc. All rights reserved. 72 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Pilot Conclusions
SRP is well positioned with backhaul, geography, real
estate, and experience
Unification of existing wireless systems is feasible
Numerous application benefits enabling grid
modernization & optimization
Private is better than public networks
Long Term Evolution (LTE) is preferred
Licensed spectrum is preferred
Strategy to deploy private field area networks common in
utility industry
2014 Electric Power Research Institute, Inc. All rights reserved. 73 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Business Case Conclusion
A private wireless broadband network will enable
application benefits and cost optimization
Enables advanced grid automation & customer programs
FAN decision similar to fiber build out strategy
Private provides improved reliability and competitive NPV
Unified platform needed in advance of project requirements
Economy of scale optimizing cost and security architecture
Private promotes use while public promotes minimization
Large number of potential SRP customers
Supports capital based funding model versus O&M
2014 Electric Power Research Institute, Inc. All rights reserved. 74 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Pilot Surprises
Numerous Wireless Internet Service Providers (WISPs)
Utilizing 3.65GHz
FCC Database Inaccuracies
Security vulnerability discovered related to rogue WiMAX
base stations
Gathering application requirements is challenging.
Changes
Initially planned on leasing 1.4GHz
Had to use 3.65GHz due to spectrum holder of 1.4 going
bankrupt
2014 Electric Power Research Institute, Inc. All rights reserved. 75 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Pilot:
Lessons Learned
The Phoenix area has a 3.65GHz user group for coordinating the use
of 3.65GHz. Theres no information on this on the FCC website.
Coordinating with the users group would be important for any
additional deployments of 3.65GHz. We discovered this when we
interfered with local WISP. Action was taken and the issue was
addressed coordinating through the users group.
The 3.65GHz band would be challenging to deploy throughout SRPs
service territory as the bulk of SRPs distribution system is
underground. 3.65GHz would be better as an intermediate wireless
backhaul solution from fixed clients that allowed for higher antenna
heights. There would also be the potential for others to start deploying
3.65GHz and interfere with our system as we did with the WISP.
2014 Electric Power Research Institute, Inc. All rights reserved. 76 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Proposal:
SRP FAN Proposal
Implement a private broadband network utilizing licensed
spectrum as a strategic asset to get in front of future
communications needs.
Two new labor resources for O&M required
Outdoor wireless coverage for power and water
Long Term Evolution (LTE) 30 sites
Focus on reliability, performance & cyber security
End point devices not included (Support is included)
Requires licensed spectrum acquisition
2014 Electric Power Research Institute, Inc. All rights reserved. 77 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Proposal:
SRP FAN Proposed Wireless Coverage
~2,000 Square Miles
10Mbps
9K-15K devices
2014 Electric Power Research Institute, Inc. All rights reserved. 78 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Proposal:
Potential FAN Applications
2014 Electric Power Research Institute, Inc. All rights reserved. 79 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
FAN Proposal:
Implementation Risks
Risk Impact Mitigation
Availability of Lack of spectrum for procurement Research and test other scenarios while
Licensed would eliminate the licensed option continuing pursuit of licensed spectrum
from consideration.
Spectrum
Immaturity or lack of availability of LTE Extend schedule to 3 years to allow the
Advanced compatibility, re-banding in market to mature. WiMAX equipment could
LTE Device
licensed frequency obtained and/or be considered as alternative to LTE.
Availability limited equipment availability would
impact schedule.
Large scale CPE deployments could Extend schedule to 3 years to allow
strain resources. Difficult coordinating coordination of end-user application plans.
Application
multiple budgets around FAN Work with stakeholders to ensure effective
Coordination availability could create schedule resource planning
issues.
Resources may be constrained due to Extend schedule to 3 years to avoid peak
conflicting priorities and availability workloads currently anticipated in FY15.
Resource
causing delays. Add additional positions to cover ongoing
Constraints support requirements. Ensure effective
resource planning.
2014 Electric Power Research Institute, Inc. All rights reserved. 80 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Questions / Discussion
2014 Electric Power Research Institute, Inc. All rights reserved. 81 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Discussion Questions
2014 Electric Power Research Institute, Inc. All rights reserved. 82 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
Discussion Questions
2014 Electric Power Research Institute, Inc. All rights reserved. 83 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond
TogetherShaping the Future of Electricity
2014 Electric Power Research Institute, Inc. All rights reserved. 84 EPRI / DOE The Smart Grid Experience: Applying Results, Reaching Beyond