Sie sind auf Seite 1von 15

International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al.

Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

2. Future studies may include variables of the role should use multiple respondents. ISSN: 2089-6271
of government, business environment analysis 4. Researchers should exercise more caution in
and other contextual factors to determine determining the research samples since most
Vol. 4 | No. 1
the effect of each variable on the export exporting SMEs do not produce their own
performance of SMEs. products. This causes biases on several matters
3. To reduce a monoresponse bias caused by
respondents biased perception, future studies
in the evaluation of information and competitive
strategies.
Operations Strategy Formulation:
Shifting from Grasberg Open-Pit Surface Mining
REFERENCES to Underground Mining
Anonymous. (2004). Peningkatan Daya Saing Industri Manufaktur.
Butler, A.S. (2000). Developing Your Companys New Business. The Journal of Business Strategy. 21 (3), 13-17.
Crisman, K. (2004). Why should small businesses adopt e-business?. Latitude Consulting Group, Inc.
Cavusgil, S.T. (1984). Changing Nature of Firms International Market Research Activities during The Internationalization
Rafiq Sulistyo*, Alibasjah Soedjarno**, Togar M. Simatupang***
Process. In Kaynak E. (ed.), International Marketing Management, (pp. 207-218), New York: Praeger Publishing Company.
Damanpour, F. (2001). E-business E-commerce Evolution: Perspective and Strategy. Managerial Finance, 27 (7), 16-33. School of Business and Management, Bandung Institute of Technology, West Java - Indonesia

Denis, J.E., & Depelteau, D. (1985) Market Knowledge, Diversification and Export Expansion. Journal of International Business
Studies, 7(1), 77-89.
Ellitan, L. (1998). Pengaruh Sumber Keunggulan Kompetitif terhadap Kinerja Industri Manufaktur di Indonesia, (Unpublished ARTICLE INFO ABSTRACT
Thesis), Universitas Gadjah Mada, Yogyakarta.
Ghozali, I. (2005). Aplikasi Analisis Multivariate dengan Program SPSS. Edisi 3. Semarang: Badan Penerbit Universitas Received: January 01, 2011 PT Freeport Indonesia has decided to alter its mining operations from
Diponegoro. Final revision: March 15, 2011
open-pit mining to underground mining in Grasberg. A change of
Julien, P.E., & Ramangalahy, C. (2003). Competitive Strategy and Performance of Exporting SMEs: An Empirical Investigation of Keywords: mining area focus directly affects its related departments, and even
The Impact of Their Export Information Search and Competencies. Entrepreurship Theory and Practice, 27 (3), 227-245. operations strategy, need new operations strategy to address the transition. Considering
open pit mining,
Hair, J.F., Anderson, R.L., Tatham, dan W.C., Black. (1988). Multivariate Data Analysis, 5th (ed.), Upper Saddle River, New underground mining,
its long-term run of mining operations, its strategic issues are assessed
Jersey: Prentice Hall, Inc. PT Freeport Indonesia. by using Slack and Lewis operations strategy model, and decisions
Kleinnschmidt, E.J., & Ross, R.E. (1986). Export Performance and Foreign Market Information. Relation for Small High are made through the Quantitative Strategic Planning Matrix (QSPM)
Technology Firms. Journal of Small Business and Entrepreneurship, 4(1), 14-25. tool. Previously, the assessment of companys current business and
Phan, D.D. (2001). E-Business Management Strategies: A Business to Business Case Study. Information System Management, corporate strategy was conducted by applying SWOT analysis and
Fall, 61-69. complemented with the Strategic Factors Analysis Summary (SFAS) as
Raharjo, B. (1999). Implementasi Teknologi Informasi di Industri Kecil Menengah. Bandung: Pusat Penelitian Antar Universitas the point-of-reference of the operations strategy.
bidang Mikroelektronika(PPAUME) Institut Teknologi Bandung.
2011 IRJBS, All rights reserved.
Santoso, S., & Tjiptono, F. (2004). Riset Pemasaran: Konsep dan Aplikasi dengan SPSS. Jakarta: Elex Media Komputindo. Corresponding author:
Samice, S., Walters, P.G.P & Dubois. (1993). Exporting as an Innovative Behavior: An empirical investigation. International
*
rafiq_sulistyo@fmi.com
**
alibasjah_soedjarno@yahoo.com
Marketing Review, 10 (3), 5-25. ***
togar@sbm-itb.ac.id
Seringhaus, R. (1993). Comparative marketing behavior of Canadian and Austrian high-tech exporters. Management
International Review, 33 (3), 26-36.
Sekaran, U., (2003). Research Method for Business: A Skill-Building Approach. fourth edition. New Jersery: John Wiley and

M
Sons, Inc.
Susilo. Y.S, Sutarta, A.E., Sieroso, A. (2008). Strategi Bertahan Industri Kecil Pasca Kenaikan Harga Pangan dan Energi: Kasus ine Electrical Maintenance (or Mine underground. It has brought challenge to Mine
pada Industri Makanan di Kota Yogyakarta. Proceeding from National Seminar of Science and Technology-II 2008. Electrical) is a new department, under Maintenance that is responsible for all maintenance
Lampung: University of Lampung.
the Mine Maintenance Division, PT activities of equipments operating in both surface
Suprianto. (2004). Kinerja UKM dalam Kegiatan Ekspor. Jakarta: Direktorat Neraca Produksi, Badan Pusat Statistik.
Freeport Indonesia (PTFI). It was a joint force of and underground mines, and mainly Mine Electrical
Tambunan, Mangara. (2004). Tiga Kendala Besar Pengembangan UKM Berorientasi Ekspor. Article from Panel Discussion on
Micro Entrepreneurship Development, Jakarta. Grasberg and Underground Electrical sections. the unit of analysis in the project, as it has to prepare
Turban, E., Mc. Lean, E. Wetherbe, J. (2005). Information Technolgy for Management: Transforming Organization in the Digital According to mine production forecast released resources to face the focus shifting properly.
Economy. New York: John Wiley and Sons. in early 2011, the Grasberg open pit mine was
Wang, S., dan Cheung, W. (2004). E-Business Adoption by Travel Agencies: Prime Candidates for Mobile e-business.
planned to continue until 2017, due to very limited The department has to formulate a strategy in
International Journal of Electronic Commerce. Spring 8(3), 43-63.
ore left to be mined from the surface that makes order to face this transition smoothly, operational-
www.ekonomi.okezone.com, March 17, 2010.
www.ekonomi.okezone.com, March 23, 2010.
it uneconomical and to some extent: unsafe. The wise and manpower-management-wise, because
www.ekonomi.okezone.com, April 23, 2010. ore-body will then be mined from below through while adding people to the underground is a

- 20 - - 21 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

must, support to surface mine production cannot and Quantitative Strategic Planning Matrix (QSPM), Although Grasberg open-pit mine is currently the The unit of analysis in this project is Mine Electrical
be abandoned either at all the sudden. Balance each alternative would then be assessed to find the biggest contributor to PTFI production output, it is Maintenance, which has the responsibility to perform
is the keyword for successful transition as hiring best one that will serve as the operations strategy. It expected to continue only until end 2017. Thus, the maintenance works on electrical equipment (or
too many employees to fill underground slots will would be followed by detail implementation plans future of the company will lie on the underground electrical-side of equipment) and provide service
create another problem when Grasberg eventually complete with estimated timeline and person in mines. Other than DOZ and Big Gossan thats to various customers in the form of new/additional
closes as there will an excessive workforce around charge during the execution. already in production phase, there are the GBC, electrical installation, electrical wiring/function
than needed. There will be decision-making on Deep Mill Level Zone (DMLZ) and Kucing Liar that modification, moving/removing, part replacement,
how this manpower requirement can be fulfilled Company Profile are currently in development. These mines are troubleshooting and engineering design/drawing.
without causing other operation suffers; how to PTFI is a copper and gold mining company located presented in Figure 1. Major equipments under Mine Electrical is shown
better managed all equipment-related works and in Papua, the easternmost province of Indonesia. in Table 1
service requests in a more advanced but easy- It started operation in the country after signing
to-handle system that will ensure target-budget Contract of Work (COW) with Government of
conformity and easy tracking for both customers Indonesia in 1967. PTFI is owned by Freeport-
and maintenance crews. There is also issue about McMoRan Copper & Gold Inc. (FCX) which holds
the lack of proper Key Performance Indicator (KPI) 81.28% of its shares, the GOI (9.36%) and PT
to measure the service-based works, causing the Indocopper Investama (9.36%). FCX is the worlds
departments difficult to improve that dimension of largest publicly traded copper company. Based
its tasks. Bottom line, Mine Electrical management in Phoenix, Arizona, United States, the company
has to set up a long-term operations strategy in mines geographically diverse, long-lived reserves
order to make a smooth transition of its operations of copper, gold and molybdenum. It performs
aligning it with PTFI management mission, operations through some major affiliates: PTFI,
objectives and the ever-dynamic circumstances of Freeport-McMoRan Corporation and Atlantic
commodity market, while at the same time taking Copper.
significant efforts to improve particular dimensions
of its performance. Right now, PTFI applies two mining techniques,
open-pit (surface mine) and underground.
Operations strategy reconciles market requisition Crushed ore from both areas is transported to the
with operations resources in the form of decisions mill trough a series of conveyor and ore passes.
pattern that shape long-term capabilities of the Combined crushing techniques are used, including
operations (Slack and Lewis, 2008: 18). The aims the use of Semi Autogenously Grinding (SAG) and Figure 1. PTFI Mine Ore Bodies
of this project are to provide clear steps for Mine Ball Mill to crush ore to become very fine grinded
Electrical management before, during and after sand. Next, there is flotation process using reagent,
the transition period, to assess overall capacity an alcohol and lime-based chemical, to separate Table 1. Mine Electrical Major Equipments Responsibility
required by operations and the way to fulfill it, concentrate containing copper, gold and silver,
Equipments Area Quantity
to assess the condition of current work request where these minerals will float to the surface and
management system and recommendation for then skimmed-off as final product. The remainder Shovel GRS 12
improvement and to assess the issue regarding of the rocks that doesnt have economical value, Drill GRS / UG 75
Gen Set/Compressor GRS / UG 49
proper KPI to measure service-based works. the tailings, will settle at the bottom of the flotation
Over Head Crane GRS / UG 64
In the following, after assessing PTFI current cell as sediment, and will be released through
Switchgear/Ring Main Unit (RMU) GRS / UG 38
business and corporate strategy using strategic river flow to the Modified Ajkwa Deposition Area
Substation/Load center/Transformer GRS / UG 161
management model presented by Wheelen and (ModADA) in lowland area. As for the concentrate,
Loader UG 144
Hunger (2008), operations strategy formulation it will flow from the mill to dewatering plant in Haul Truck UG 271
started with business issue exploration and analysis Amamapare port through a 110-km-pipeline. It will Rock Breaker UG 26
to have better understanding and come up with then be stored and shipped to smelters around Ore Chute UG 30
alternative solutions. Using the pro-contra analysis the world. Ventilation Fan UG 210

- 22 - - 23 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Equipment-based maintenance activities are raised how the corporation will achieve its mission and
according to routine schedule set in system called objective by effectively manage environmental
Ellipse and then trigged by a certain period or opportunities and threats in light of corporate
operating hours, inspections result or breakdown strengths and weaknesses (Wheelan and Hunger,
events. These kinds of activity mostly are preventive 2008: 14 & G-9). Output of this stage is formulation of
maintenance (PM) and reactive maintenance corporate strategy and business strategy. Beckman
(breakdown). Service works are created based and Rosenfield (2008: 17) state that corporate
on user/customer requests or ongoing projects. strategy identifies the industries and markets in
In total number and duration, service work orders which a firm will compete. It is usually categorized
are almost equal to those equipment maintenance as growth, stability or retrenchment. Business
ones, with a ratio reaches 48:52. This characteristic strategy is competitive and cooperative strategies
has made Mine Electrical different from most of that emphasize improvement of the competitive
departments in Mine Maintenance division. For position of a corporations products or services in
both surface and underground areas, the role of a specific industry or market segment (Wheelen
the department is critical to provide electric power and Hunger, 2008: G-1).
and maintenance service to equipments, buildings,
shops and lightings. The next step will be formulating functional
strategies, based on the corporate and business
METHODS strategy. In this project, the scope is only operations
The research method used is a combination strategy. As mentioned before, model developed
Figure 2. Operations Strategy Model by Slack and Lewis (2008)
between the strategic management model by Slack and Lewis (2008) was used in this stage.
presented by Wheelen and Hunger (2008) and This model is shown in Figure 2. Content of
operations strategy model introduced by Slack operations strategy is mainly about an interaction
and Lewis (2008). The desired final output is the between operations performance objectives and
operations strategy and implementation plan for the decisions that need to be made regarding its combine the intuitive thinking of managers with the strategy started with external and internal
Mine Electrical in response to the shifting of mining resources, processes and capabilities. In this project analytical process to decide the best strategy for the environmental scanning. PEST analysis and Porters
focus from Grasberg to underground mines. The performance objectives are determined by upper organization success. (www.mba-tutorials.com, Five Forces were used to analyze external factors
strategic management model will be used to derive management target and influenced by the corporate 2009). Key factors used as comparison parameter then combined with the internal situation analysis
corporate strategy and business strategy which will goals and also from customer needs. Competition were the performance objectives. The weight for in the SWOT and SFAS. Summary of PEST analysis
serve as guidance and reference for the operations is non-existence neither does market positioning, each key factor was determined from historical data is shown in Table 2, while summary of Porters
strategy developed later. since Mine Electrical is a department in a company. and discussion with several key team members. Five Forces analysis is given in Figure 3. Important
Performance objectives will refer to what the model Then, each of the alternative solution was rated by points include:
Analysis began with environmental scanning: offers: quality, speed, dependability, flexibility and its influence to the key factors, and an Attractiveness Indonesias volatile and unstable political
external and internal environment. External cost. Operations decision areas are concerned with Score (AS) was given. The range for Attractiveness situation provides risk to PTFI operations.
environmental scanning was done using Porters the capacity, process technology and development Score is 1= not attractive, 2 = somewhat attractive, Political instability might lead to companys
Five Forces and PEST analysis. Internal environment and organization. 3 = reasonably attractive, 4 = highly attractive. Total property destruction and interruption of
scanning tries to analyze organizations structure, Attractiveness Score (TAS) is the product of weight activities.
culture and resources. The results of this scanning After all problems in each decision areas were and AS. After all examinations are done, the Sum Companys revenue is highly influenced by
will be used as the base of SWOT analysis analyzed, several alternatives solution will be Total Attractiveness Score (STAS) is calculated and production output and commodity prices.
complemented with the use of Strategic Factors offered. All alternatives will then be elaborated alternatives solution with highest STAS is the one Copper price averaging $3.42/lb during 2010,
Analysis Summary (SFAS). Next, there will be review and also analyzed to better understand the pros to be chosen. ranged from $2.76/lb to $4.42/lb. Gold reached
and assessment of companys current mission, and cons of each. Decision will then be made $1,500/oz on third week of April.
vision, values and objectives. This stage is important using the Quantitative Strategic Planning Matrix RESULTS AND DISCUSSION Copper has been benefited from the emergence
to compare between target and resources because (QSPM). QSPM is a strategic tool which is used Business and Corporate Strategy of India and China as the next industrial
strategy is a comprehensive master plan that states to evaluate alternative set of strategies. The QSPM Assessment of PTFI current business and corporate countries.

- 24 - - 25 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Table 2. PEST Analysis PT Freeport Indonesia Table 3. FCX Selected Financial Ratio

Political -Legal Economical Financial Indicator 2010 2009

Uncertainties in Indonesias political situation. Fluctuative but increasing commodity prices Current Ratio 2.62 2.48
Quick Ratio 1.64 1.49
New Mining Law that might affect the current COW High demand of copper from industrial countries,
especially China Assets Turnover 65% 58%
Profit Margin 29% 23%
Constant protest and demonstration on PTFI existence Instability of foreign currencies
Return on Assets 19% 14%
in Papua
Return on Equity 38% 33%
Complex and evolving environmental law Limited non-renewable energy sources
Dept Equity Ratio 1.02 1.42
Regulation on greenhouse gas emission and climate Increasing inflation rate from end of 2010
change
US debt condition
Since mid July 2009, there have been 12 motivated freshmen as the next generation of
shooting incidents inside PTFI COW area the mine operations. It provides broad range
Social Technology
causing 5 casualties that has led to unrest of development programs for its employees,
Unrest among community after numeruous shooting Not many breakthrough in mining techniques
within community. complemented with offsite training programs
since 2009 developed in last decade
Mining techniques havent gone far for the last whenever required.
Sporadic terror from separatist groups of Free Papua
decades, causing no significant breakthrough PTFI has several key Corporate Social
Illegal panners Technological developed vastly for mining support
occurs and usually just small production Responsibility (CSR) programs as stated in
activities such as remote control, automation, high
Most of the local tribe in nearest area still illiterate capacity/capability equipments improvement. FCX 2010 Form 10-K (2010: 28):
High number of malaria and HIV/AIDS case in Papua Top 10 copper producers are comprised 50% job training programs

Local and national media coverage of PTFI operations of total worldwide copper production. FCX basic education programs
ranked second among these firms with 9% public health programs (including malaria
contribution. control)
agricultural assistance programs
Internal environmental scanning result highlights small and medium enterprise development
include: programs
From FCX selected financial ratio shown in cultural preservation programs, and many
New Entrans:
Table 3, it can be seen that 2010 has been an im- others.
- Small mining companies
provement year compared to 2009, especially PTFI also participated in Partnership Fund,
due to the increase in copper and gold price. where it provide one percent of its annual reve-
H
PTFI site is one of the safest mine in the world, nue for development programs aimed at local
Sippliers:
Coal providers supported strongly by its concern in safe people. PTFI contributed $64 million in 2010,
Chemical provider Buyers: production. In 2006 and 2010, PTFI succeed in $59 million in 2009 and $34 million in 2008.
Competitors:
Various spare part PT Smelting (Gresik) maintaining the fatal rate to zero. One of the Some less supporting facts about the operations
L Top 10 world copper L
vendors Atlantic copper
producers biggest challenges to this, workers factor aside, and area including: only one land road
Food & accomodation Other parties
Other mines is operation locations, which are located in available from lowland to highland and from
services
Health care service M unusually difficult terrain in a very remote area. highland to mine area. Any disruption to part
On the deposit side, PTFI has huge ore reserve of the road will lead to halt of material and
L that can be mined until the end of the Contract employee transportation and even the halt
of Work, including the two 10-year extensions. of operations. Underground mine manpower
Substitutes:
-Almost none for The deposit represents opportunities to stay requirement ramp-up also means that proper
copper among the top players of copper and gold and adequate accommodation available for all
Fake Jewelries industries in the world for years to come. employees and contractors, which currently
PTFI is equipped with high-skilled and still significantly lack of capacity.
experienced employees, combined with strong
Figure 3. Porters Five Forces Analysis for PTFI

- 26 - - 27 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

and competitors actions are not applicable. perform service to trailing cables. The electric
Market
segmentation
Customer needs defined as all items required by shovel section is responsible to the availability of
the customers which are performance target from the shovels by doing routine maintenance and
the upper management set to the department troubleshooting. Dispatch system maintenance
and all dimensions of customers requests. List of technicians are responsible to the smooth operation
Operations Operations customers with their needs is shown in Table 4. As of the dispatch system components: the display, the
Market Operations
performance strategy decision
positioning capabilities for Mine Electrical, the performance is measured communication network, etc. It is a complex work
objectives areas
by certain parameter targets which are availability, and involves different sections in Mine Electrical and
Mean Time between Failure (MTBF), KPIs (five of also different departments in Mine Maintenance, to
them) and also target of other department that it accomplish the preset target.
Competitor supports. All of these targets are shown in Table 5.
activity
In terms of supporting production targets of Surface Analysis of current operations resources capabilities:
Mine and Underground Mine division, as mentioned Experienced workforce, 51% of employees
Figure 4. The Allignment of Operations Resources with Market Requirements before, Mine Electrical has vital role in providing have more than 10 years, 41% of those have 15
power to equipments, buildings and workshops, years or more of service.
also in performing maintenance work on the Excellent process know-how especially for old
The SWOT-SFAS analysis of PTFI is shown acquisition or strategic alliances with other firms equipments. For example, to achieve 154,000 tpd equipments and tasks. Years-of-experience in
in Appendix 1. Assessing mission, vision (IR in the same industry. For PTFI, horizontal growth target in surface mine, the department, in this case performing similar projects and maintenance
Guidebook, 2009: vii viii) and objectives of the means developing its internal resources, in this case surface power distribution section, plays important on same equipments has developed in-depth
company and comparing them to the SWOT-SFAS the ore deposits, by investing capital to improve the part in ensuring that electric power available knowledge and skill required and the team has
result, showed that they are still in line with the capabilities of the productive mines and perform through transmission lines from switchgears, to improved the learning curve. Theres challenge
situation in which the organization is presently development projects in the future underground substations, from substations to electric shovels. though to upgrade the knowledge and skill
facing, external and internal. So, theres no mines (DMLZ, GBC, Kucing Liar). The section also responsible to connect and especially to new and updated systems and
requirement to revise them to adapt to the current disconnect trailing cable from substation to shovels equipments through training and hands-on
environment. Operations Strategy whenever they plan to move or relocate, to maintain experience.
Every operations has objective to align market the switchgears and substations and to repair/ Close relationship to customers.
Recalling PTFI mission and vision about being requirement and operations capability. This
the lowest-cost copper producer, indicates the alignment is called fit, or approximate balance
companys intend to choose lower cost as its between required market performance and Table 4. Mine Electrical Main Customers Needs
competitive advantage. Also, since copper is a actual operations performance (Slack and Lewis,
common commodity and PTFI sells to numerous 2008: 228). The alignment can be approached Main Customers Needs

smelting facilities, the competitive scope is broad. in two ways, first by identifying current market Mine Maintenance Management Availability, MTBF, KPI
Thus, the business strategy that suits the company requirements and then align the internal operations Surface Mine Division Production target, regular requests, safety
best is cost leadership. resources; second by understanding resources and Underground Mine Division Production target, regular requests, safety
processes and identify core capabilities and then
Loading and Support Mtc Dept. Availability, regular requests, safety
While for corporate strategy the most logical seek market opportunities that align with those
Haulage, Welding & Tire Service Dept. Availability, regular requests, safety
directional corporate strategy that PTFI will choose capabilities. The flow as discussed by Slack and
Underground Mechanical Mtc Dept. Availability, KPI, regular requests, safety
is Growth. There are huge opportunities to produce Lewis (2008: 232) is presented in Figure 4. Note
Concentrating Division Production target, availability
higher revenue due to market condition. Combining that it is only for the first approach that will be used
Human Resources and Industrial Relations Dept. Regular requests, safety
this momentum with PTFI internal strong resources, in this project.
organizational capabilities and especially ore Management Information System (MIS) Dept. Regular requests, safety

deposits, theres big probability that the plan will go The Slack and Lewis model derives market PT Redpath Indonesia Production target, regular requests, safety

on successfully. According to Wheelen and Hunger requirements from market segmentation (customer Central Service Division Project target, regular requests, safety
(2008: 169), a company can grow horizontally needs), market positioning and competitors Quality Management Services Departement Regular requests, safety
through internal development or externally through actions. In Mine Electrical case, market positioning Supply Chain Management Division Regular requests, safety

- 28 - - 29 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Table 5. Availability, KPI and Customers Target for 2011


Mine Electrical by customers in priority order are enables it to produce its products and services:
Availability/KPI/Department Target speed, quality (including reliability), dependability, operating expenditure, capital expenditure and
flexibility and cost. On the other hand, management working capital (Slack and Lewis, 2008: 41).
Electric Shovels availability 88%
sees quality as the higher priority. Speed and quality
GRS Electric Drills availability 80%
are the most important things especially when Capacity Strategy
Switchgear/Substation/Load Center availability* 98%
dealing with the production groups, because they Capacity strategy is defined as the set of decisions
Service Tram #1 availability 92% always going for the production target, which is concerned with how operations configure and
Service Tram #2 availability 95% the ore. This fact revealed based on the feedback change their overall capacity in order to achieve
UG Electric drills availability 83% from customers and interview with Mine Electrical a particular level of output potential (Slack and
UG Remote Loaders availability 80% Manager, Agung Hariyadi, on 10th March 2011 as Lewis, 2008: 69 70). Main focus would be the
Rock Breakers and Loading Points ava 85% quoted below: decision on overall level of operations capacity,
Ventilation Fans availability 85% One of the disadvantages in carrying out our because the number and size of sites, the location
KPI #1 - Scheduled Work Order Compliance* 80% duty is the fact that our task still considered of sites and capacity change were either not a
KPI #2 - PM Schedule Compliance 90% as non-core business although in reality significant issue or already predetermine by the
our role is inseparable to the production department. Overall capacity is analogized as the
KPI #3 - Planned Work Order Raised* 60%
chain. The core is ore. So its a bit hard to total manpower required running the operations,
KPI #4 - PM Effectiveness* 85%
be professional in terms of bringing the best because Mine Electrical is in the business to provide
KPI #5 - Actual Man Hours for Planned Work* 60%
quality to our work. Our clients opt for speed services. The number then will be distributed based
Surface mine 154,000 tpd
and flexibility, while our management asks on the how many manpower required for each
UG - DOZ Mine 80,000 tdp
for reliability (quality and dependability) equipment in each area.
UG - Big Gossan Mine 2,500 tdp
Cost is not a big concern at this point. As long
UG - DMLZ Mine 1334 m/month as you can justify each of the expenditure, As reference, this project will use data forecast
the money is there to spend. Also, so far, of equipment requirement in both surface and
customers almost never complain about the underground mines. Each component of the
cost they have to spend to buy materials and forecast has certain ratio that can be used to convert
Strong support from vendors and happening in the industry, is required to keep spare parts or to fund their projects. equipment number to manpower number. For
manufacturers. PTFI is considered as major the team well-informed and make adjustments baseline calculation, the number and ratio used for
customer by vendors and manufacturers due as necessary. Aspects to be considered from each performance year 2011 will be used as comparison. As Grasberg
to its buying power and purchase volume. Ability to adjust schedule and resource objective are: open-pit mine will last until 2017, calculation will
Mine Electrical has advantage of this condition requirement. One of the challenges of Quality: the specification conformance between cover manpower requirement up to that year.
because suppliers tend to give more serious performing PM is the ability to execute it on planned/requested and actual delivered, the Manpower distribution will also refer to the current
attention on the department needs and schedule. Operational priority often gets in the conformance to standard/reference, and the organization chart added with necessary adjustment
requirements. way to accomplish this. Team ability to adjust reliability of work result. for each year. Number of equipments forecast and
Adequate operational budget. Annually, in total, to the issue and appropriately re-assign crews Speed: the time required for PM on equipment men/machine ratio for each equipment are shown
theres adequate operational budget available and resource to other location and task. to be executed, the total time required to repair in Table 6. The number of manpower required
to be used for maintenance process: for the Good reputation among customers. Beside equipment/installation and the total time to for non-equipment factors is dynamic, subject
equipments and for the crews. the fact that the department is the sole service complete a project or work request. to mine development or activity decrease in the
Support of proper tools. PTFI provides a wide provider of all electrical-related work orders Dependability: the difference between respective areas, but as comparison, 2011 figures
range of tools ready to be ordered by each in the mine, it is also known for consistently promised completion time of work given to will be used. Current ratio used is shown in Table 7.
department requires from the warehouses. delivering good results and service to the customers and the actual completion time. Actual manpower requirement for each of the non-
In case a special tool is needed, they can be customers. This information is gathered from Flexibility: the ability to change the variety equipment category was assessed by calculating
acquired through direct charge process from feedback of customers through emails or of product and services, the level of the type and number of job per day, manpower required
suppliers. supervisors. operations aggregated output, and planned or per job and duration needed to perform each job.
Access to new technology updates and assumed delivery dates. End result was the proper manpower number per
information. Frequent updates of what is The performance objectives demanded from Cost: any financial input to the operation that shift. Assumption used was that the work roster

- 30 - - 31 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Table 6. Equipment Forecast and Men/Machine Ratio Table 7. Manpower Requirement Ratio for Non-Equipment (Current)

Man/Machine 2011 2011 2013 2014 2015 2016 2017 Non-Equipment/Area Required
Equipment
Ratio Units Units Units Units Units Units Units HV Power Distribution - Maintenance 3 /shift
Axera 5 0.5 1 0 0 0 0 0 0 LV Power Distribution - Maintenance 4 /shift
Axera 7 0.5 28 31 30 29 30 30 30 Fixed Plant - Shops & Lamp Room 2 /shift
Axera T08-290 0.5 6 5 5 5 5 5 4 Tram, Hoist & Paste Plant 6 /shift
Axera T08-360 0.5 5 6 7 7 7 7 5 Dispatch, Communications & Instrumentation 6 /shift
Cubex 0.5 8 8 8 8 4 4 8 Big Gossan Power Distribution 2 /shift
Robolter 5 0.5 3 7 5 4 4 4 4 DMLZ Power Distribution 2 /shift
Cabolter 7 0.5 5 5 5 5 5 5 5 GBC Power Distribution 2 /shift
Solo 7-15 0.2 3 5 5 9 13 14 14 Expansion Mines Construction 2 /shift
Compressor 0.2 12 14 16 20 20 20 20 Power lines 6 /shift
Main Fans 0.1 22 22 22 24 24 24 24 Cable Repair 2 /shift
Auxiliary Fans 0.03 188 188 200 200 240 240 240 Fixed Facility Mtce 3 /shift
Welding Machine 0.05 45 60 60 60 60 60 60 Dispatch technician 2 /shift
Hi-Vac 0.2 1 2 2 2 2 2 2 Rotation 4 /shift
Lighting Plants 0.2 2 2 2 2 2 2 2 Planners 5%
Fixed Crane 0.1 28 31 34 38 38 38 38 Supply Chain Management Division 4%
Rockbreakers 0.3 26 26 28 32 32 34 38
Ore Chutes 0.2 30 30 32 34 34 42 46
Remote Control Loaders 0.5 10 10 12 12 12 12 12 the Underground division works and need to 6.9 men per shift (calculated from 146 / 3 shifts /
36 Ton Locomotive 1.5 6 6 10 10 10 10 12 electrical power; 7 hours). Rounding up to 7 men per shift, it can be
43 Ton Locomotive 1.5 1 1 1 6 8 10 12 Install, move, relocate, remove, maintain the seen that the ratio still matched of what the upper
Battery Locomotives 1.5 0 0 0 0 0 0 4 jumbo box, the drill control panel, that follow management uses.
Battery Stations 2 0 0 0 0 0 0 1 the drill everywhere it goes;
Surface Substation Mtce 0.25 17 17 17 17 17 17 17 Perform maintenance on the load centers, For the moment, the ratio of 3/shift and 4/shift

SHvl Electrical 2.45 11 11 8 8 4 3 0 transformers, switchgears, ring main units are adequate for the group. But, considering the
(RMU), vacuum circuit breakers (VCB) located ramping up of DOZ production in 2015 to cover
in DOZ, Big Gossan, DMLZ, GBC and Kucing open-pit production stop in 2017, there has to be
would be managed as three shifts per day, consists responsibility, average men and duration required Liar on monthly and yearly basis including to an adjustment prior to that year in term of the ratio.
of four crews (each day, one crew will be on day off for each task to finally come up with the ideal men/ handle trouble on this equipments. DOZ development activities which require more HV
schedule). Per shift, effective work hours are seven shift ratio number. power installation, make it sensible to increase the
hours, considering meal break and travel time on In average, there are six equipments per day ratio to 4/shift starting 2015 for HV power distribution
early and end of shifts. When required, a steady HV and LV Power Distribution Maintenance. scheduled for monthly preventive maintenance maintenance. The result of this calculation
day personnel could be established to maintain This group has responsibility to maintain and where three persons are required to perform through year 2017 is presented in Table 9.
the work better, especially for area where most perform power expansion projects in DOZ. Due to the task in about two hours. Jumbo box related
projects are likely to be executed in during daylight. their similarity in working process, the HV and LV jobs in this area are about six per day, requiring Tram, Hoist and Paste Plant. The main responsibility
For groups where troubleshooting are part of their power distribution and maintenance groups can be two crews to work in a task that takes averagely is to perform preventive and reactive maintenance
job description, an extra man hours to troubleshoot, considered as one team. So, there will be 7 crews three hours (including travel time). Four power on each of these plants. Service Tram #1 and
10% of subtotal man hours, is added to the equation. available per shift. The job description includes: expansion projects that take about five hours #2, at GBT area, have routine PM schedule each
Samples of calculation are given to better explain Pull and install cable, distribution panel to per job usually handled by three crews. Detail week which in average need eight hours and
how the process went, from describing the development areas where electric drills need calculation shown below in Table 8. In one day, a required four personnel to perform. One crew also
responsibility of the group, area/equipment of to operate and other areas where sections of total of 146 man hours are required. It is equivalent needed performs shift inspection for about two

- 32 - - 33 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Table 8. Required Man Hours for HV and LV Power Distribution Table 11. Manpower Requirement Forecast Tram, Hoist and Paste Plant

Job Qty Crew Duration Man Hours Non-Equipment/


2011 2011 2013 2014 2015 2016 2017
Area
PM 6 3 2 36
Tram, Hoist &
Jumbo box 6 2 3 36 32 32 32 32 32 32 32
Paste Plant
Expansion 4 3 5 60
Subtotal 132
Troubleshooting 14 Table 12. Number of Work Requests in Selected Period
Total 146
Jan-Nov Jan-Apr
Periode 2015e
2010 2011
Total number of work
Table 9. Manpower Requirement Forecast HV and LV Power Distribution 25,000 9,000 43,000
request

2011 2011 2013 2014 2015 2016 2017 Average per day 77 78 118
Non-Equipment/
Area Average per shift 26 26 39
N/S N/S N/S N/S N/S N/S N/S
HV Power
Distribution - 12 16 16 16 20 20 20
Maintenance Forecast through 2017 is shown in Table 11. In underground mines. Based on historical data,
HV Power the forecast, other than six crews per shift, eight during the year of 2010 (up to 17th November), Mine
Distribution - 16 16 16 16 16 16 16 personnel have been added to the equation to Electrical planners have processed about 25,000
Maintenance represent the need of steady day crews in paste work orders, equivalent to 78 work orders per day or
plant and trams. Because although Table 2-19 26 per shift. During January to April 2011, the number
shows plenty of time still remain in each day (12 still range at average 77-78 work orders (total 9300).
Table 10. Required Man Hours for Tram, Hoist and Paste Plant man hours), the fact that these plants are located It is estimated that with DOZ mine development
separately (trams at GBT, hoist and paste plant and production, Big Gossan mine development and
Job Qty Crew Duration Man Hours in Big Gossan) makes it difficult for the team to production, DMLZ and GBC development occurs
Tram PM 0.14 4 8 5 switch area quickly or move to other site to provide simultaneously in 2011 to 2014, and will be added
support when problem occurred. With additional with DMLZ production kick-off starting 2015, total
Hoist PM 0.05 5 10 3
steady day crews, it is hoped that projects can be number requests per day that has to be managed
Tram Inspection 3 2 2 12
executed during day shift, so shift crews can focus will increase significantly by about 50% in 2015. It
Hoist Inspection 3 2 3 18
on maintenance duty. These plants are planned equals about 120 work requests per day, 40 per shift,
Paste Plant 1 8 7 56
to still be operating under the same condition as or double the capacity one planner can handle.
Projects 1 3 7 21 today by 2017. There will be no changes in the These numbers presented in Table 12. By April,
Subtotal 115 functionality or major modifications on the system work requests from underground area make about
Troubleshooting 12 that will require additional manpower. Thus, from 56% of total request received during 2011.
Total 127 2011 to 2017 the total manpower will be flat at 32
personnel. Calculation summary of manpower Without the overload situation, the current system
requirement for equipment and non-equipment already has several flaws:
hours. The Big Gossan Hoist is scheduled for PM construction and will be commissioned in mid of category is presented in Appendix 2. high involvement of manual data input (by user,
every three weeks, performed by five crews for May 2011. Separate study shows that as many as 2 planner, engineering, action team)
ten hours. Similar to the trams, shift inspection by crews per shift added with 2 persons in day shift will Process Technology Strategy high redundancy (same email has to be
one crew is also performed for two hours. In both be adequate for the paste plant. The calculation is The issue that is closely related to the increased forwarded several times)
areas, electricians also perform building and shops presented in Table 10. The result shows that 6 men/ volume of jobs in underground mine areas and lost of information still occurred due to no
electrical installation inspection and maintenance shift is required for a group. in need of the touch of technology is handling of feedback from action team after work has
duty. Paste plant on the other hand is still under the abundant work requests in both surface and been done, planner forget to update status etc.,

- 34 - - 35 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

causing incompliance or severe delay measure each departments performance. The from other equipments that are maintained by the MANAGERIAL IMPLICATIONS
high possibility of double record and double current KPIs are on equipment fleet vs. owner base, rest of maintenance departments. There is a KPI to Proposed Solutions
work order raised from the same email a condition where all equipments are mapped to a measure Scheduled WO Compliance (was Backlog The overall capacity of Mine Electrical operations is
information certain owner, and it is the assigned-departments Compliance), that suppose to describe how many determined by the number of equipment and the
responsibility to achieve the target. of the scheduled works within period X that are size of area that require their services. There are
What the current system tries to achieve basically completed also during period X. To be considered gaps, first in the current fulfillment between the
is the uniformity of customers request through These KPIs cant recognize other sections as planned work, a work order must be raised approved manpower requirement and actual in the
one door, which is the planner, to prevent back- contribution, although in reality most of the before period X starts, maximum at 18:00 on X 1 field, and the second in the increase of underground
and-forth communication between users and equipments successful maintenance programs are day. The time frame is shown in Figure 5. area manpower and the decrease of surface area
field supervisors, the lost or lack of information result of collaborative acts of several departments. manpower. Manpower number is very important
due to each partys dependence on the others to The worst disadvantage for Mine Electrical happens This is where the weakness of the logic lies, to ensure that adequate resources available for all
maintain those information, the delay in execution in underground. Underground electrical KPIs are because any work order raised within period the teams to be able to achieve their targets. First
due to wrong-directed information and to ensure calculated only for equipments they owned: X to be executed during the same period (and option to be considered is to fill the gap with new
that all requests are stored, maintained, reminded, switchgears, load centers, RMUs, VCBs, and comply), will be considered as unplanned, thus hires and do lay-off as necessary; Second option
updated and reported regularly. User will submit transformers, while their work and dedication in will not be counted in this KPI. In fact, this event will be to fill the gap with local contractor/regular
request using standard form, fill in the mandatory performing maintenance for rock breakers, loading will decrease department achievement on KPI employee provider; Third option will be to fill gap
field and send the form back to planners. Planners points, electric drills, ventilation fans, compressors, Planned Work Order Raised. But actually the case is, with professional/skilled contractors; Fourth option
will then verify the data, record in the database over head cranes, service trams, hoists and many when discussing about service work, the important is to relocate manpower from Grasberg open-pit
and raise work order. All fields in the database others will not be recorded as their achievement, thing is not whether it is planned or not, but more area to underground mines area as per manpower
have to be filled in manually by planners with but rather it will contribute positively to the owner like the service level or service quality, such as: requirement.
correct corresponding information, thus opening of those equipments. For example, every time a responsiveness, reliability, assurance that reflected
more possibility of fault or mistyping leading to the drill is on PM schedule, mechanic and electrician in customers satisfaction. In reality, a customer The decision of work request management system
incompliance or delay. work together on the machine. Automatically, out might ask for a service early in the morning to be is important because good strategy at this point of
of whatever KPI achievement is, 50% contributed done in the evening or in the next day or even in time will influence the performance of the whole
Currently, the task of raising daily work order is by the electrical group. The similar thing applied the next month. System limitation that strictly differ group during the transition period. Because half of
handled by the shift planners, one person per shift, for KPI Actual Man Hours for Planned Work. planned and unplanned work due to KPI parameter the departments working load is the service-type
that have average ability to process about 15 to Say, PM work orders contribute about 60% of requirement may be unable to accommodate new jobs where success factors include: information
20 work orders, subject to the complexity of each the total work order of the drills. Then for the KPI in service works. Not only that the creation of quality, responsiveness, dependability and the
work orders, because some might need spare manpower works on PM activities alone, electrical new KPI will enable the fairer and better judgment service quality itself. With the high level of manual
parts to be completed while others might need group contributed about 20% 30% of the KPI of Mine Electrical performance, it will also increase handling in the current system, a vision of process
no parts; some might located in hazardous area achievement. Unfortunately, for this issue it is the moral of the crew, because they will feel that technology usage on the issue should be consi-
where pre-work communication with area owner impossible to be repair, because system (Ellipse) their hard work in the field is appreciated in a more dered. To improve performance in the long run,
is required while others might located in nearby limitation, where for one equipment, there can only appropriate way and it will encourage them to do there are three alternatives that can be selected:
shops. For the moment, shift planners only available be one reference for each of the KPI. Modification better in the future. As-is condition, using the conventional system
for underground area. For surface mine, due to has suggested, to change the KPI from equipment-
very limited resources, all planners are on steady based to work-group-based, to have a system
day basis, manage PM, inspection and corrective better and fairer in describing a departments true
maintenance work orders, also manage the part performance.
inventory.
The most important thing to be addressed is Mine
Development and Organization Strategy Electrical service works performance indicator. As
To make good improvement actions, an organization far as the Mine Electrical management concern,
needs to have indicators to measure its performance five KPIs implemented has failed to measure
properly and accurately. At the moment, there are most of the departments service-nature duties,
five KPIs used in Mine Maintenance division to because the object has different characteristic Figure 5. Time Frame of KPI Data Acquisition

- 36 - - 37 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

using standard form in spreadsheet and email underground respectively. Having analyzed the decision to relocate manpower from Grasberg to require very high fee compared to other alternatives.
as main communication channel; Collaborate departments objectives and situation, they are in underground, because most of the manpower that This fact fortunately is counterbalanced by option
with Management Information System (MIS) line with contracting goals, presented by Levitt in will be sent to underground will mostly have more 4, where almost no cost will be incurred. Overall,
department to develop online call center/work The Handbook of Maintenance Management (2009: than five years experience thus giving them a good this decision should able to improve performance
request management system; Develop new web- 121), which are to get maintenance work executed base to broaden the knowledge in underground in the future.
based and database system by internal resources at higher quality, faster, safer or at lower cost than area. Combined total manpower will provide
using existing tools. it would be possible with own resources; allows department with resources as forecasted, making In the process technology strategy, the use of more
organization to maintain profit margins during dependability and flexibility easier to achieve. The advanced information technology (IT) for work
The presence of proper performance indicator downturns as contractors people can be sent trade-off is on cost, because skilled contractors request management system in the form of online
will enable an organizations performance to be home without severance or adverse publicity; and
described and measured fairer and better. This to concentrate talent, energy, resources into core
point of time is critical to make the decision, competencies area.
because proper KPI will also help management of
Table 13. Pros-Cons Overall Capacity Alternative Solutions
Mine Electrical and also Mine Maintenance to have Dependability, speed and quality are very important
better view of the performance and determine work factors of the online call center. With the system No Alternatives Prerequisite Pros Cons
requirements in the future. First solution to consider implemented, data lost can be minimized or 1 New Hires External fres and strong motivated new Extended cost and time for
is to maintain the as-is condition, using only the even eliminated, thus ensuring that all customers and Lay-Offs manpower employees hiring especially for training
five KPIs and measure only for jobs related to requests, especially ones related to panels, draw resources pool
equipments. Second solution is to modify the logic points, draw bells and tunnels development, are Good mutual manpower requirement Cost of Compensation
in the current KPIs to accommodate service-based completed as per required with no significant agreement terms independence on each area Complaints from the fired
works. Third, new KPI created with parameters delays, minimizing also the loss opportunity employees

derived from a known standard to measure service incurred. Delays in three to five draw points per day Hard to find skilled freshmen
level or service quality or other common standard can cause loss opportunity of $128,000 to $192,000. 2 Local Reliable Averagely lower cost Low skill and experience
Contractor manpower Provider usually have many Training required for safety,
for service organization.
providers manpower resources ready to area-specific tools and
The decision on this issue is mainly focused for the
work equipments, trade
In the QSPM, weights for each performance long-run operations of the department. Most users
Providers already have had Most of the contractors
objective were determined from data and discussion might be satisfied for how Mine Electrical provide contracts with PTFI asked to be transfered to
with key members, resulting with the following: service to them, but such acknowledgement is PTFI
quality (30%), speed (25%), dependability (20%), very hard to quantify if its based only on person- User still have to deal with
cost (15%), and flexibility (10%). There was also to-person communication between supervisors in employment-related matters
risk of loss sales opportunity cost that should be the field and its also hard to present it as evidence 3 Skilled Proven and Qualified and experience Higher fee
Contractors qualififed workforce
considered, derived from one draw point inability of performance without the proper system to
manpower
to produce in a day ($64,123 note: there are accommodate it. So, the decision to create new contractor
125 active draw points) and one shovel failure KPI should be welcomed by the team, because Long-term No more training time required
to operate in a day ($788,199 note: there are 20 it will give them a target and reference on how to contract to ensure except for safety-related
shovels). Results of analysis are shown in Table 13. provide service in the future to the customers. All the supply of Users only deal with job
manpower assignment; employment deal
results were then mapped to the operations strategy
by contractor management
In this project, the decision taken is to combine matrix presented in Appendix 3.
Unlikely to ask for PTFI
alternatives 3 and 4 into one integrated strategy,
employee status
which is by using the skilled contractors to fill in In the capacity strategy, hiring skilled contractors
4 Manpower Comprehensive Employees already Not all employee willing to
the current manpower shortage, and subject to will increase the quality and speed of the Relocation area specific work accustomed to departments be relocated to underground
contractors performance, also for the upcoming workforce significantly because this decision training to prepare culture and environment
years while manpower relocation will be more enable department to cut the time required manpower from No so many training needed Lack of motivation due to
used to cover the dynamic decrease and increase on people development. The effect to the first Grasberg saturated feeling in long-
No extended cost for hiring/
of manpower requirement in surface mine and two performance objectives is similar from the firing serving employees

- 38 - - 39 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Table 14. QSPM of Alternative Solutions for Overall Capacity Strategy Table 16. QSPM of Alternative Solutions for Work Request Management

Alternative I Alternative II Alternative III Alternative IV Alternative I Alternative II Alternative III Alternative IV
Criterion Weight Criterion Weight
AS TAS AS TAS AS TAS AS TAS AS TAS AS TAS AS TAS AS TAS
Quality 0.30 2 0.6 1 0.3 4 1.2 3 0.9 Quality 0.30 2 0.6 1 0.3 4 1.2 3 0.9
Speed 0.25 2 0.5 2 0.5 4 1 3 0.75 Speed 0.25 2 0.5 2 0.5 4 1 3 0.75
Dependability 0.20 1 0.2 2 0.4 3 0.6 3 0.6 Dependability 0.20 1 0.2 2 0.4 3 0.6 3 0.6
Cost 0.15 2 0.3 4 0.6 1 0.15 4 0.6 Cost 0.15 2 0.3 4 0.6 1 0.15 4 0.6
Flexibility 0.10 3 0.3 2 0.2 2 0.2 3 0.3 Flexibility 0.10 3 0.3 2 0.2 2 0.2 3 0.3
STAS 1.90 2.00 3.15 3.15 STAS 1.90 2.00 3.15 3.15

Table 17. Pros-Cons KPI Alternative Solutions

No Alternatives Prerequisite Pros Cons


Table 15. Pros-Cons Work Request Management Alternative Solutions
1 As-Is Not needed No time and cost required Inability to represent
No Alternatives Prerequisite Pros Cons Condition for new KPI development service-based works

1 As-Is Condi- Not needed Internal team and users are fami- Too many manual handling of Inability to measure true
tion liar with the system information performance
No extended cost needed Events of information lost 2 Modification Discussion of responsible Some parts of the service- Due to modification of
No development time required Unnecessary data flow redun- of current KPI parties to find opprtunities based works might be existing system, not all the
dancy for logic modification to covered required parameter can be
accommodate service- System ready to be used covered
Different dara handling/treat-
based works
ment
Back-and-forth question from Almost all people alread Modified calculation
user familiar with current KPIs logic might impact to
other department's KPI
2 Collaboration Approval of MIS and Proven system in order depart- Additional time and cost for
translation
with MIS Mine Maintenance ments development
management 3 Create new Approval from Represent true KPI Development and
KPI Mine Maintenance performance perfecting requires time
Feasibility study of Many features for future deve- Socialization phase internally
management
the current condi- lopment and to users
tion User can check status by their Development time depend on Task force to handle Cover all aspects required Socialization to all team
own other departments resources project or give to measure service involved
Infrastructure is available responsibility to OpEx organization performance
team
Standard process flow
Comprehensive study/ Act as reference for future
Minimal human intervention
understanding of some decision making
regarding data input
standard in the world
Most users already familiar with
similar call centers by other
departments Table 18. QSPM of Alternative Solutions for KPI

3 Develop sys- Comprehensive skill Customized to the needs of the Hard to estimate development Alternative I Alternative II Alternative III
tem internally and knowledge in IT department time as internal resources Criterion Weight
dont have proper skill and AS TAS AS TAS AS TAS
experience Quality 0,30 2 0,6 2 0,6 4 1,2
No need to depend on other More time needed to repair Speed 0,25 2 0,5 2 0,5 3 0,75
departments resources the bug
Dependability 0,20 1 0,2 2 0,4 3 0,6
Users still need time to accus-
Cost 0,15 4 0,6 3 0,45 2 0,3
tom to the new system
Socialization phase internally Flexibiity 0,10 1 0,1 2 0,2 1 0,1
and to users STAS 2 2,15 2,95

- 40 - - 41 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

web-base call center will have positive effect on and conduct socialization. An estimated cost of period, when theres need of another strategy decision area, especially regarding to the availability
quality (better service quality; complete information $6,000 will incur as the cost to MIS department. change, theres possibility that supply network (out of the Top 50 and Top 100 critical part in Mine
leads to higher conformance of request), speed Development of new KPI for service works of scope in this paper) become an important Electrical.
(user-friendly menu makes it easier for user to requires a formation of task force, with
submit request; simple process and approval flow assigned person from Mine Electrical involve in
with minimal data redundancy makes it easier for it, together with OpEx team and Maintenance
planners to process the request), and dependability Engineering staff. No cost will incur because
(complete request data including user-proposed OpEx have their contract PTFI paid as a
required date enable planner and action team to package. An estimated $6,000 will be required REFERENCES
estimate job duration better and when required, for MIS to merge with existing online KPI.
Beckman, S., & Rosenfield, D. (2008). Operations Strategy: Competing in the 21st Century. New York: McGraw-Hill/Irwin.
update that information to reschedule work under Boric, J. (2011). Investing in Copper A Bullish Scenario for Copper. Retrieved on 30 March 2011 from http://dailyreckoning.
users approval). CONCLUSION com/investing-in-copper/
In this paper, strategy formulation of Mine Electrical Freeport McMoRan Copper & Gold Inc. (2011). 2010 Annual Report Form 10-K.
For KPI, it is important as the first step toward department was performed using operations Hariyadi, A. (2011). Personal interview by Rafiq Sulistyo, Tembagapura: 10 March 2011.

improvement process. Continuous improvement strategy model of Slack and Lewis (2008). The International Labor Organization (ILO), n.d., Act of the Republic of Indonesia Number 13 Year 2003 Concerning Manpower.
Retrieved on 11 May 2011 from http://www.ilo.org/dyn/natlex/docs/SERIAL/64764/56412/F861503702/idn64764.PDF
based on the weekly KPI will impact mainly need of new strategy itself was trigged by shifting
Levitt, J. (2009). Handbook of Maintenance Management. New York: Industrial Press.
to quality, speed and dependability. All those of mine focus from Grasberg open-pit centered to
MBA Tutorials. (2009). Quantitative Strategic Planning Matrix (QSPM). Retrieved on 11 May 2011 from http://www.mba-
will be traded-off with cost for KPI creation and underground mines. Business issue exploration tutorials.com/strategy/230-quantitative-strategic-planning-matrix-qspm.html
development. No definite impact on the flexibility. confirmed the three issues surfaced needed to PT Freeport Indonesia. (2009). Collective Labor Agreement 2009-2011.
be taking care of due to their impact to long-term PT Freeport Indonesia. (2009). Industrial Relations Guidebook 2009-2011.
Implementation Plan operations. The availability of adequate manpower PT Freeport Indonesia. (2008). Tour Companion 2009.

Detail implementation plan is given in Appendix 4. based on requirement forecast is important as the PT Freeport Indonesia (n.d.). Sekilas Tentang PT Freeport Indonesia, Retrieved on 3 March 2011 from http://www.ptfi.co.id/
about/default.asp.
Resources required during this phase are: main resource to perform daily tasks and achieve
Slack, N. & Lewis, M. (2008). Operations Strategy. New Jersey: Prentice Hall.
Cost to hire skilled contractors is very high, performance target. While for work request
Tradingstocks.me (5 January 2011). World Copper Consumption Supply and Demand in 2011. Retrieved on 30 March 2011
but it is expected that they can provide high management, a reliable, trusted and user-friendly from http://tradingstocks.me/world-copper-consumption-supply-and-demand-in-2011/
quality works. From two company references system is required to improve quality, speed and US Inflation Calculator (n.d.). The Inflation Calculator, Retrieved on 30 March 2011 from http://usinflationcalculator.com.
available, Mine Electrical has to pay between dependability of the works requested by customers. Wheelen, T.L., and Hunger, J.D. (2008). Strategic Management and Business Policy. New Jersey: Prentice Hall.
$901,047 to $1,414,217 in a year to fulfill about 43 Minimum error and processing time can also
current vacant positions. These contractors will increase job completion and avoid delay that
be given the task in power distribution in both might lead to loss sales opportunity at PTFI level.
areas that requires skilled, tough and speedy The existence of proper performance indicator is
crews to cope with the high expectation from mandatory for an organization to benchmark its
customers. performance to a certain standard that in the end
Manpower relocation from Grasberg to will make ways for improvement actions based on
underground requires minimum cost. Cost the KPI result.
incurred will be for underground-specific PPE
(caplamp, Savox, respirator). A small team The project though still has room for further study,
of staff planners is needed to manage the for example for skilled contractors database. More
relocation. than two samples will increase the competition and
Collaboration with MIS to develop Mine with appropriate bid process, Mine Electrical might
Electrical Online Call Center requires assigned get a better price offer. The paper limited the scope
person from department and a technical of decision on KPI only to whether creating new
expert, as the contact persons to MIS. Internal one or not. Theres opportunity in the future to
resources will be needed then, to run the assess options of what reference or standard that
system (call center officer), train the people can be used. In the future, during the transition

- 42 - - 43 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Appendix 1. Strategic Factors Analysis Summary Matrix for Appendix 1

No. IFAS Weight Rating Value


Strength
1 Strong organization culture: safe production 0,1 4 0,4
2 Huge ore deposits and second-ranked producer in the 0,2 5 1
world
EFAS
3 Lower production cost among similar producer 0,15 4 0,6
Supportive
4 Skilled employees through competency-based 0,1 3 0,3
development 5
5 Thorough and complete Corporate Social 0,05 4 0,2
Responsibility programs 4
IFAS = 1.00
Weakness 3
EFAS = 0.55
1 Only one access road available from lowland to mine 0,05 3 0,15
2
2 Extreme weather condition and remote mining area 0,1 4 0,4
3 Only have maximum until 2041 to conduct production 0,1 4 0,4
1
activities
Growth
4 Limited availability of accommodation for new 0,05 3 0,15
employees IFAS
5 Conditions and obligations in the Contract of Work 0,1 4 0,4 Weak -5 -4 -3 -2 -1 1 2 3 4 5 Strong
Total 1 1,00 -1

-2
No. EFAS Weight Rating Value
Opportunity -3
1 High commodity prices (steady increase since 2009) 0,15 5 0,75
-4
2 High demand of copper especially from China, US and 0,15 5 0,75
India
-5
3 Estimated shortfall of copper supplies in 2011 and 2012 0,1 4 0,4
4 Looming inflation rate 0,1 3 0,3
Unsupportive
5 Technology breakthrough in mining support activities 0,05 3 0,15
and equipments

Threat
1 Indonesia's political, economical and social 0,1 4 0,4
uncertainties
2 Sporadic shootings terror to employees since July 2009 0,1 4 0,4
3 Fluctuated commodity prices highly influential to 0,05 4 0,2
financial results
4 Environmental issues 0,1 4 0,4
5 Major risks that affect operation directly including 0,1 4 0,4
natural disasters, accidents, unusual weather
conditions, interruption of energy supply, wall failures,
rock slides or structural collapse in mines
Total 1 0,55

- 44 - - 45 -
International Research Journal of Business Studies vol. IV no. 01 (2011) Rafiq Sulistyo et al. / Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining / 21 - 48

Appendix 2. Mine Electrical Manpower Forecast Appendix 3. Operations Strategy Matrix for Mine Electrical

Equipment/Group 2011 2011 2012e 2013e 2014e 2015e 2016e 2017e Resource Usage
(actual) (ideal)
N/S N/S N/S N/S N/S N/S N/S N/S
UNDERGROUND ELECTRICAL
HV Power Distribution - Maintenance 12 12 16 16 16 20 20 20
LV Power Distribution - Maintenance 16 16 16 16 16 16 16 16 Hiring skilled Complete and Proper measurement
Fixed Plant - Shops & Lamp Room 8 8 8 8 8 8 10 10 contractors to fill the consistent information provide data for future
Tram, Hoist & Paste Plant 28 32 32 32 32 32 32 32 temporary quality gap enhance preparation improvement
Dispatch, Communications & Instrumentation 27 28 28 28 28 30 30 30
and execution as per
Big Gossan Power Distribution 8 8 8 8 8 8 8 8
required
DMLZ Power Distribution 8 8 8 8 8 12 12 12 Quality
GBC Power Distribution 8 8 8 8 8 12 12 12 Using skilled labor Continuous
Expansion Mines Construction 8 8 8 12 12 12 12 12 from Grasberg development of
Axera 5 1 1 0 0 0 0 0 0 potential Papuan
Axera 7 14 14 16 15 15 15 15 15
Axera T08-290 3 3 3 3 3 3 3 2 *** *** ***
Axera T08-360 3 3 3 4 4 4 4 3 Experienced labor Reduce in data Accurate and routine
Cubex 4 4 4 4 4 2 2 4
(combined) to enable redundancy and feedback enable
Robolter 5 2 2 4 3 2 2 2 2
jobs to be completed increase duration of improvement made
Cabolter 7 3 3 3 3 3 3 3 3
Solo 7-15 2 2 3 3 5 7 7 7
faster approval/data flow faster in the following
period

Performance Objectives
Compressor 3 3 3 4 4 4 4 4 Speed
Main Fans 3 3 3 3 3 3 3 3 Labor from GRS more More skilled employee
Auxiliary Fans 6 6 6 6 6 8 8 8

Market Competitiveness
familiar with PTFI for faster job completion
Welding Machine 3 3 3 3 3 3 3 3 culture
Hi-Vac 1 1 1 1 1 1 1 1
Lighting Plants 1 1 1 1 1 1 1 1 *** *** **
Fixed Crane 3 3 4 4 4 4 4 4
Experienced labors Data kept properly Reliable feedback data
Rockbreakers 8 8 8 9 10 10 11 12
increase the possibility in online call center, enable correction made
Ore Chutes 6 6 6 7 7 7 9 10
Remote Control Loaders 5 5 5 6 6 6 6 6 Dependability of fulfilled promise minimize/eliminate faster in the following
MineGem Control Room 2 2 2 2 2 2 2 2 data lost. period
Trolley Maintenance 4 4 6 8 12 12 12 12 ** *** **
36 Ton Locomotive 9 9 9 15 15 15 15 18
43 Ton ore Locomotive 2 2 2 2 9 12 15 18 Adequate labor enable Work request No definite effect
Battery Locomotives 0 0 0 0 0 0 0 6 jobs to be rescheduled managed better,
Battery Stations 0 0 0 0 0 0 0 2 Flexibility or reassigned more planner able to see
Planners 4 11 12 13 13 14 15 15 flexibly the bigger picture
Parts Runners 12 8 8 9 9 10 10 11
VAT 30 36 38 40 42 45 47 49
** ** *
Subtotal Underground 257 271 285 304 319 343 354 373 High fee contractors Cost and time of Cost and time of
SURFACE ELECTRICAL balanced with internal development but development but worth
Power lines 24 24 22 18 16 12 6 6 Cost resources worth for long-run for future decision
Cable Repair 6 8 6 4 4 2 2 2
Surface Substation Mtce 4 4 4 4 4 4 4 4 ** * **
Fixed Facility Mtce 9 12 9 9 6 6 6 6
Capacity Supply Process Technology Development and
Dispatch technician 7 8 8 6 5 3 2 2
Rotation 14 16 12 12 8 8 6 6
Network Organization
Planners 5 5 5 4 4 3 2 2 Overall capacity Collaborative work Development of new
Shvl Electrical 27 32 32 25 25 15 13 5 strategy by using with MIS to develop KPI to measure service-
Parts Runner/ Facility Mtce 4 4 4 4 3 3 2 2 skilled contractors and online call center based works
VAT 14 17 16 13 12 9 7 6 relocate manpower
Subtotal Grasberg 114 130 118 99 87 65 50 41
from Grasberg to UG
Total Mine Electrical 371 401 403 403 406 408 404 414 Intensive development
Total Actual Non Staff 328 of Papuan employees
Shortage 43
Decision Areas
Delta from 14 19 15 24 11 19
previous year - UG
Delta from 12 19 12 22 15 9
previous year -
GRS

- 46 - - 47 -
International Research Journal of Business Studies vol. IV no. 01 (2011) C. Ruth Elisabeth Tobing / The Significant Contribution of Indonesian Human Capital to the Economic Growth / 49 - 57

Appendix 4. Detail Implementation Plan

July 1 July 21 August 11 September 1 September 21 ISSN: 2089-6271


Duration Person in
ID Task Name
(days) Charge
7/3 7/10 7/17 7/24 7/31 8/7 8/14 8/21 8/28 9/4 9/11 9/18 9/25 10/2
1 Hire Skilled Contractors 57 Agung H. Vol. 4 | No. 1
Search available skilled labor
2 20 Ferry E.
providers

The Significant Contribution of Indonesian


Review bids/proposals and Nano, Dadang,
3 5
determine winner Basuki, Rafiq
4 Create contracts 15 Contracts Dept.

5 Prepare work documents & PPE 5


Rafiq, Andy,
Rudi
Human Capital to the Economic Growth
6 Mobilize contractors to jobsite 2 Andy, Rudi
Conduct mandatory safety Andy, Rudi,
7 10
induction and trainings QMS
Relocate Manpower from GRS to
8 27 Rafiq S.
U/G
Rafiq, Basuki,
9 Prepare list of manpower 15
Sijabat, Rudi C. Ruth Elisabeth Tobing
Cross-check data and determine Rafiq, Dadang,
10 10 Prasetiya Mulya Business School, Jakarta - Indonesia
to locations Jarmanto, Andy
11 Prepare administrative data 5 Andy, Rudi
12 Send men to trainings 10 Andy, QMS
13 Prepare PPE 5 Sudjarwo, Andy ARTICLE INFO ABSTRACT
Irpan, Sudjar-
14 Start mobilization 2 wo, Siswanto,
Received: January 12, 2011 This study examines the contribution of human capital to Indonesias
Mulyadin
Final revision: March 15, 2011
Collaborate with MIS to Develope productivity. The result of this study reveals a significant contribution of
15 67 Rafiq S; Gary S.
Online Call Center Keywords: human capital as shown in the model which is using highest weighted
Gain approfal from Mine Mainte- human capital, of primary and secondary level of education. The most significant result
16 3 Agung, Gary education,
nance and MIS Management found in the model using secondary level as the highest weighted
time series regression
17 Kick-off meeting 1 Rafiq MIS of human capital. In contrast, there is no significant contribution of
Analyze business process, work human capital using proportional weighted between education levels.
18 group, task catagory, approval 20 Rafiq, Gary
flow This suggests that improvement in knowledge, adoption of technology
Review analysis and fine tune all and skill in the primary and secondary education meet the demand
19 20 MIS of industries in Indonesia. This study uses a time series regression to
process
Program the application and analyze data 1985-2010.
20 23 MIS
conduct test run
Rafiq, Andy, 2011 IRJBS, All rights reserved.
21 Pilot test for limited users 10
Rudi Corresponding author:
Conduct internal socialization ruth.elisabeth@pmbs.ac.id
22 10 Andy, Rudi
and training
23 Conduct external socialization 10 Rafiq, Gary
Launch the Mine Electrical
24 2
Online Call Center

I
25 Develop New KPI for Service Works 91 Opex Team
Discussion and presentation to
26
upper management
10 Agung n the past decade, the development of human It was a contrast; Compared with the condition in
gain approval from Mine Mainte- capital has been a great concern in development 1960s, the welfare of Indonesian people was above
27 3 Agung, OpEx
nance management
planning in developing countries. Related that of the South Korean. At that time South Korea
OpEx, Rafiq,
28 Form task force 3 to that, it is relevant to mention the significant was equal to the Philippines in terms of GDP per
Rizal

29
Further study of available stan-
10 Task force economic growth of South Korea which is often capita, population size, industrial structure and
dard for reference
called as Korean miracle (Chung, 2009). In the export commodities.
Start working on the proposed
30 20 Task force
KPI 1960-1988 period, the average increase in South
Task force, Koreans income per capita was 6.2% per year. The key success of South Korea as studied by Pyo
31 Socialize to Mine Electrical team 5
Rafiq
Task force, It is not surprising that in 2010, the country was (1995) and Lucas (1997) is intensive investment
32 Conduct trial 15
Rizal categorized as a developed country and ranked of human capital. The finding is supported by Lim
Integrate new KPI to online KPI
33 25 Task force, MIS 12th in the worlds HDI ranking. (1996) who found that the impressive economic
calculation

- 48 - - 49 -

Das könnte Ihnen auch gefallen