Sie sind auf Seite 1von 2

TEST SCRIPT ID PM-02_08_Technical Completion of the workorder

TS15 PR8 / 020

1. SETUP DATA REQUIREMENTS

# DATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES


Work Order
PLANT
Order Status
Work order type
Components
Reqmnt Qty
UOM
Personnel number

2. TRANSACTIONAL STEPS

# BUSINESS Trans. SAP menu path INPUT DATA EXPECTED OUTPUT DATA OK /
PROCEDURES Code / System RESULTS ACTUAL RESULTS ERROR
STEPS

1 Overall IW42 Logistics>Plant Enter: Order Number


Completion Maintenance>Maintenance>Co 1200000xxx or click on the
Confirmation mpletion selection button and select
Confirmation>Entry>Overall from the list
Completion Confirmation
Enter
Default data for
Go To Time Confirmation Order/Operation
Final Confirmation tick if no s automatically
more work will be done generated

Select Technical Completion


Button: (tick appears)

If PM01 (Breakdown order)


ensure MalfEnd data is
entered (required for TECO)
1
# BUSINESS Trans. SAP menu path INPUT DATA EXPECTED OUTPUT DATA OK /
PROCEDURES Code / System RESULTS ACTUAL RESULTS ERROR
STEPS

Save
2 Reverse IW32 Logistics/ Plant Maintenance/ Enter: Order Number xxxx or
technical Maintenance Processing/ click on the selection button
completion Order/ Change and select from the list

Enter
Menu bar at top of page All fields
Order, functions, Complete, become
cancel TECO available

Save
3 Change Order IW32 Logistics/ Plant Maintenance/ Enter: Order Number xxxxxx
(Complete Maintenance Processing/ or click on the selection
technically) Order/ Change button and select from the
list

Enter

Click on the Complete Order


technically Icon (Black and technically
white Flag) or press completed
Check Date and Time

Enter
Save
order xxxxx
Repeat for all Work Order saved with
Types notification
xxxxxx

Das könnte Ihnen auch gefallen