1. INTRODUCTION
The JICA Study Team is conducting JABODETABEK Urban Transport Policy Integration
Project in the Republic of Indonesia (hereinafter referred to as the Project) in close
cooperation with Coordinating Ministry of Economic Affairs, the Government of Indonesia.
Origin - destination trip information are required to understand the current pattern of trip
demand of the residents. The data will be utilized as a basis of the transportation demand
model building as well. The data will be included as a part of urban transportation database
and demand forecast will be conducted based on the updated database. The SITRAMP
urban transportation master plan will be revised with these updated transportation
information.
Page 1 of 4
JABODETABEK Urban Transport Policy Integration (JUTPI) TOR for Commuter Survey
2. SCOPE OF WORKS
(1) Objective
This survey will be conducted to understand the characteristics of commuting trips (e.g.
destination, mode, travel time, cost etc.) of workers and students in the household as well as
to collect the socio-economic information of the household and household members in the
study area.
The sampling ratio is set up at 3 percent within the above-mentioned study area with
population of approximately 24 million in total. Under estimation based on the
collected socio-economic data, the average household size in the study area is some
4.0 persons per household, thus the number of households in the region is estimated at
6 million households. The number of sample households, therefore, will be
approximately 180,000 households. (* This figure is quoted only as a rough indication.)
2) Survey Form
The Study Team will provide the survey form in English. The Local Consultant is
encouraged to discuss the contents of survey forms and it is his duty to translate the
survey forms into Bahasa Indonesia. The survey form includes the following items:
For Households
Survey Zone Code
Household size
Household Monthly Income
Vehicle ownership etc.
For Commuters
Address of Work/school place
Travel departure time
Mode of transport
Transfer point location for public mode of transport
Frequency
Travel time and cost
Occupation
Gender
Age etc.
* The detailed survey methods and form will be finalized after discussion with the nominated local.
Page 2 of 4
JABODETABEK Urban Transport Policy Integration (JUTPI) TOR for Commuter Survey
Page 3 of 4
JABODETABEK Urban Transport Policy Integration (JUTPI) TOR for Commuter Survey
survey will be obtained through the face-to-face interview with persons instead of
delivery/collection method.
The Local Consultant has to complete the field survey by the middle of March.
(5) Data Processing
Collected survey forms are verified by coders and editors. If necessary, the forms are
returned to the survey team and the surveyors visit the household again to collect appropriate
answers. Finalized survey forms are typed into a computer-based database.
The Local Consultant has to execute data validation on the entered data. Data processing
work including data cleaning should be completed by the end of July.
(6) Outputs
At the completion of the survey, the following materials should be submitted to the Study
Team.
- Survey report (including some preliminary analysis and any problems encountered)
- Results of processing of data and others
- Computer files of survey data
- Original survey forms that is collected by the surveyors
3. REPORTING
1) The Local Consultant should submit three (3) copies of the Final Report for the
survey and the original survey data.
2) The report size should be A4 and should be written in English.
3) The format of the database should be in MS Excel (xls) or MS Access (dbf)
format.
4) The Local Consultant should take pictures of survey situations and include them
into the final report.
4. SCHEDULE
The surveys are scheduled to commence in the beginning of January 2010 and to be
completed by the middle of March 2010. The data processing shall be completed by the end
of July 2010.
Page 4 of 4