PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT Numerical relays


Feeder Protection
IDCT PMCC -4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 1 of 5


BGR ENERGY SYSTEMS LTD - POWER PROJECTS DIVISION Date: 10.6.17
EPC-BOP
Feeder No. & Name: 1F3 & INCOMER 1

1. Board Details

1 STATION NAME/BOARD Unit 3 & 4 / 4A BOARD


2 AREA/LOCATION IDMT PMCC
3 DRAWING NUMBER IC8/507
4 RATING

2. Name Plate

MAKE Schneider
Type P143
Sl.no 583632
Aux Supply 220V DC
Applicable Protections Refer Below

3. Power on Checks

Description of checks Results (Ok /Not Remarks


Ok)
Auxiliary Supply Polarity is correct OK
Self-Diagnosis is completed without any problems OK
CT terminal Connection with IED as per Terminal OK
Diagram
VT terminal Connection with IED as per Terminal OK
Diagram
Verification of Binary Inputs OK
Verification of Binary Out puts OK
Communications Connections & Configurations OK
Setting of the Local HMI OK
Verification of LEDs Configuration OK
Acceptance Criteria: Connections, Configurations & Settings shall be as per approved Drg.

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT Numerical relays


Feeder Protection
IDCT PMCC -4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 2 of 5


BGR ENERGY SYSTEMS LTD - POWER PROJECTS DIVISION Date: 10.6.17
EPC-BOP
Feeder No. & Name: 1F3 & INCOMER 1

4. Verification of required Functions in configuration (Protections, Condition Monitoring &


Measurements

Description of checks Results (Ok /Not Remarks


Ok)
Verification of Applicable Protection OK
Functions configuration
Verification of Condition monitoring function OK
(Trip circuit Supervision, Lock out etc)
Verification of Measurement Function OK

Acceptance Criteria: All the applicable functions shall work without trouble

5. SETTINGS

Verification of settings Results (Ok /Not Remarks


Ok)
Phase Over Current (50) OK
Phase over Current (51IDMT) OK
Earth Over Current (50) OK

Earth Over current (51N IDMT) OK

Under Voltage Protection (27) OK


Acceptance Criteria: Shall comply with approved settings

6. Instantaneous phase over current (50)

Settings: Current (A) = 2.8 X In Time Delay (T) =250ms; Curve= DT;
Function name Identification in Relay: 50 I>2

Ref. Phase Set Current (A) Injected Current (A) Tripping Time
(msec.)
R 10 x 0.28 2.8 325

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT Numerical relays


Feeder Protection
IDCT PMCC -4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 3 of 5


BGR ENERGY SYSTEMS LTD - POWER PROJECTS DIVISION Date: 10.6.17
EPC-BOP
Feeder No. & Name: 1F3 & INCOMER 1

Y 10 x 0.28 2.8 335

B 10 x 0.28 2.8 328

Acceptance Criteria: Shall comply with approved settings

7. Instantaneous Earth Fault (50N)


Settings:
Current (A) = 2.5 X In Time Delay (T) =250ms; Curve= DT

Function name Identification in Relay:-50N IE>2

Ref. Phase Set Current (A) Injected Current (A) Tripping Time (sec.)
R 10 x 0.28 2.8 309

Y 10 x 0.28 2.8 318

B 10 x 0.28 2.8 324

Acceptance Criteria: Shall trip instantaneously when value crosses set value. However
minor delay is acceptable

8. Instantaneous Earth Fault (50NS)


Settings:
Current (A) = 8.75 X In Time Delay (T) =250 ms; Curve= DT
Function name Identification in Relay: 50NS IN>2

Ref. Phase Set Current (A) Injected Current (A) Tripping Time
(msec.)
SEF 0.875 X 10 8.75 320

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT Numerical relays


Feeder Protection
IDCT PMCC -4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 4 of 5


BGR ENERGY SYSTEMS LTD - POWER PROJECTS DIVISION Date: 10.6.17
EPC-BOP
Feeder No. & Name: 1F3 & INCOMER 1

9. Phase Over Current (IDMT 51)


Settings: Current (A) = 0.940 X In Time Delay (TMS) = 275 ms; Curve= IEC Very inverse
Function name Identification in Relay:- 51 I>1
Ref. Phase Set Current (A) Injected Current (A) Tripping Time (sec.)
R 5 X 0.940 4.7 0.948

Y 5 X 0.920 4.7 0.952

B 5 X 0.920 4.7 0.954

10. Earth Over Current (IDMT 51N)


Settings: Current (A) = 0.170 X In Time Delay (TMS) =350 ms; Curve= IEC Very inverse
Function name Identification in Relay: 51N IE>1
Ref. Phase Set Current (A) Injected Current (A) Tripping Time (sec.)
R 5 X 0.170 0.85 1.182

Y 5 X 0.170 0.85 1.196

B 5 X 0.170 0.85 1.191

11. Earth Over Current (IDMT 51NS)


Settings: Current (A) = 0.540 X In ; Time Delay (TMS) =350 ms; Curve=IEC Very inverse
Function name Identification in Relay:- 51NS IN>1
Ref. Phase Set Current (A) Injected Current (A) Tripping Time (sec.)
SEF 5 X 0.540 2.65 1.202

Acceptance Criteria: Shall trip when the value crosses set value following the chosen curve
at approximately calculated time. However minor delay is acceptable.

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT Numerical relays


Feeder Protection
IDCT PMCC -4A

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 5 of 5


BGR ENERGY SYSTEMS LTD - POWER PROJECTS DIVISION Date: 10.6.17
EPC-BOP
Feeder No. & Name: 1F3 & INCOMER 1

10. Verification of other protections

Under Voltage Protection (27):-


Settings:
Function name Identification in Relay: V<1
Function operation (V<1) = DT
Measurement mode (V<) = Phase- Phase Operating mode (V<) = any phase
Voltage (V<) = 82.5 V Time Delay (tV<) =250msec.

Verification of Protection Result (Ok /Not Ok) Remarks


Function

U/ V Protection (27) OK

Acceptance Criteria: Function shall operate successfully

11. Conclusion

Test results are found satisfactory.

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. SURESH M Testing Engr.
BGRESL ELANGOVAN Sr.Engr.
OPGCL