Sie sind auf Seite 1von 12

SHALLOW MANHOLE

Junction Ac

Reference
Number

Approved
Type

Drawing

Survey
S/N

Excavation
Start

End
Start - End

Excavation As-Buit

1 J88 J89 J88 - J89 MH 003 MH - 003


2 MH 004 MH - 004
3 MH 005 MH - 005
4 MH 006 MH - 006
5 MH 007 MH - 007
6 MH 008 MH - 008
7 MH 009 MH - 009
8 MH 010 MH - 010
9 MH 011 MH - 011
10 MH 012 MH - 012
MH 013 MH - 013
MH 014 MH - 014
Activity Description

Bitumen
Blinding

BituStik
Primer
Excavation Screeding

Shaft
Base
Inspection Screed RFIT Inspection
POTABLE WATER: THRUST BLOCKS

Junction Act

Reference
Number

Approved
Type

Drawing

Survey
S/N

Excavation
Start

End
Start - End

Excavation As-Buit

1 J88 J89 J88 - J89 HB 003 HB - 003


2 HB 004 HB - 004
3 HB 005 HB - 005
4 HB 006 HB - 006
5 HB 007 HB - 007
6 HB 008 HB - 008
7 HB 009 HB - 009
8 HB 010 HB - 010
9 HB 011 HB - 011
10 HB 012 HB - 012
HB 013 HB - 013
HB 014 HB - 014
Activity Description

Blinding Thrust Block Thrust Block


Excavation
Prepouring Post Concrete

Inspection Rebar/Shutter RFIT Inspection Primer RFIT Inspection


POTABLE WATER: THRUST BLOCKS

Junction Thrust Block Station

Reference

Reference

Approved
Drawing
Length
S/N

Survey
Start

Start

Start
End

End

End
1 J88 J89 J88 - J89 TEE01 HB46 TEE01 - HB46 0000 0003 3
2 J88 J89 J88 - J89 - 0001 0004 3
3 J88 J89 J88 - J89 - 0002 0005 3
4 J88 J89 J88 - J89 - 0003 0006 3
5 J88 J89 J88 - J89 - 0004 0007 3
6 J88 J89 J88 - J89 - 0005 0008 3
7 J88 J89 J88 - J89 - 0006 0009 3
8 J88 J89 J88 - J89 - 0007 0010 3
9 J88 J89 J88 - J89 - 0008 0011 3
10 J88 J89 J88 - J89 - 0009 0012 3
0010 0013 3
0011 0014 3
Activity Description

Excavation Bedding Piping Surround

Excavation As-Buit Inspection Bedding RFIT Inspection Primer RFIT Inspection Surround
Hydro Test
Surround Layer 1 Layer 2 Layer 3

RFIT Inspection Backfill RFIT Inspection Backfill RFIT Inspection Backfill


Layer 3 Layer 4

RFIT Inspection Backfill RFIT Inspection


Location: South Zone
Scope: Potable Water / Fire Water and Ductbank

Saturday S
SUPERVISOR EXCAVATORS 04 November 2017 05 No
W.HRS VOL ACTIVITY W.HRS
BREAKER #J1 0 - Ductbank 10
BUCKET #J2 6 29.00 Ductbank 10
JANSEY BUCKET #S1
BUCKET #S2
BREAKER #S3
SUB-TOTAL 1 29.00

BUCKET #S1 10 - FWL27 - Clearing for Bedding 10

SOTERO BUCKET #S2 10 3.60 PW L03 - Excavation 10

BREAKER #S3 10 3.60 PW L03 - Excavation 10

SUB-TOTAL 2 7.20
TOTAL 36.20
AVERAGE 7.24
PRODUCTIVITY CHART
(EXCAVATORS)

Sunday Monday Tues


05 November 2017 06 November 2017 07 Novemb
VOL ACTIVITY W.HRS VOL ACTIVITY W.HRS
47.40 Ductbank 10 28.87 Ductbank 10
47.40 Ductbank 0 - No Operator 10
10 28.87 Ductbank

94.80 28.87

1. PWL03 - Clearing for Bedding


- 2. PWL03 - Surround Pipe 10
3. PWL15 - Clearing for Bedding

11.89 1. FW L28 - Thrust Block


6.63 FW L30 - Thrust Block 10 10
2. Ductbank

11.89 1. FW L28 - Thrust Block


6.63 FW L30 - Thrust Block 10 10
2. Ductbank
13.26 23.78
108.06 52.65
21.61 13.16
Tuesday Wednesday Thursday
07 November 2017 08 November 2017 09 November 2
VOL ACTIVITY W.HRS VOL ACTIVITY W.HRS
31.87 Ductbank 10 Ductbank 10
31.87 Ductbank 10 Ductbank 10
10 Ductbank 10
10 Ductbank
10 Ductbank 10
63.74 -

1. PWL11 - Concreting Thrust Blocks


2. PWL15 - Clearing for bedding

11.56 FW L28 - Thrust Block

11.56 FW L28 - Thrust Block

23.12 -
86.86 -
17.37
Thursday
09 November 2017
VOL ACTIVITY
Ductbank
Ductbank
Ductbank

Ductbank
-

-
-

Das könnte Ihnen auch gefallen