Sie sind auf Seite 1von 6

PLTU 1 Jatim-Pacitan 2315MW Project

Date

Completed By
SEPCTI DEC PLN JASER

Signature

Date

Action conditions of FSSS Protection


PLTU 1 Jatim-Pacitan 2315MW Project

Boiler Fault reset(or)

Furnace purge(conditions meet ,time 2 min.) (and)

Results of FSSS protection action

Open condition of Oil gun feed valves(and,2valves)

Trip condition of Oil gun feed valves(or,2valves)

open condition of Oil gun return valves(and,2valves)


PLTU 1 Jatim-Pacitan 2315MW Project

Trip condition of Oil gun return valves(or,2valves)

Boiler sequence control

Boiler sequence start:

Boiler sequence stop:

Completed By
SEPCTI DEC PLN JASER

Signature

Date

Trip condition :(or)


PLTU 1 Jatim-Pacitan 2315MW Project

Start condition:(and)

Stop condition:(and)

Interlock open of Desuperheater control valve

Interlock close of Desuperheater control valve

Interlock open of Feed water control valve

Interlock close of Feed water control valve

Open of main steam valves (all conditions are met)

Close of main steam valves (all conditions are met)

Completed By
SEPCTI DEC PLN JASER

Signature
PLTU 1 Jatim-Pacitan 2315MW Project

Date

Trip condition :(or)

Start condition:(and)

Stop condition and

Completed By
SEPCTI DEC PLN JASER

Signature

Date
PLTU 1 Jatim-Pacitan 2315MW Project

Completed By
SEPCTI DEC PLN JASER

Signature

Date

No.

Completed By
SEPCTI DEC PLN JASER

Signature