1. Purpose
1-1 This procedure aims at describing the methods used for Project Planning & Control.
2. Scope
2-1 This procedure applies generally to all ND Projects.
3. Definitions/Abbreviations
4. Responsibilities
4.1 The PM is responsible for Project Planning, Scheduling, Forecasting, Monitoring & Acceptance ensuring quality
and project delivery time according to the customer requirements.
4-2 The project manager is responsible for reporting to NDs GM-Projects & Executive Director.
5. Operation
5.1.2 If WO requires any Civil jobs (Trenching) then apply for Baldiyah Permit.
5.1.4 Prepare survey Report, PIP if required and DBOQ forward to Client.