2. On work breakdown structure relative to project, which of the following statements are false?
A. Work package
B. Minor deliverable
C. Major deliverable
D. Project
A. Cost
B. Time
C. People
D. Performance
A. Strike of labors
D. Not available
6. Project management is suitable for all except
A. Innovation
B. Repeatability
C. Speed
D. Performance
D. Not available
A. Normal
B. Binomial
C. Logarithmic
13. What is the first thing you do after you take a project?
B. Assign staff
C. Prepare WBS
C. Not available
16. Inter-discipline for ENGINEERING best fit the following?
A. Arrow
B. Line
C. Node
D. All
A. Low cost
B. Ease of construction
C. Recycling
A. Work package
B. Deliverable
C. Cost
D. Lowest sub-deliverable
B. Curing of concrete
D. Preparation of breakfast
22. The technique for establishing and maintaining priorities among the various jobs of a project is
known as
A. 1910
B. 1920
C. 1930
D. 1940
E. 1950
A. Line organization
C. Functional organization
D. Effective organization
25. One of the following is not acceptable reason of delay or non performance of the work
A. Frustration of object
B. Death of party
C. Destruction of deliverable
D. Strike of labors
26. Ministry of urban planning need to construct an exhibition center, location of this center should be
next to
A. Airport
B. Buses stations
D. In a remote area
A. Public housing
C. Urban planning
28. One of the following is not part of the project life cycle
A. Object
B. Planning
C. Execution
D. Deliverable closure
29. WBS is
D. Not available
30. What is the most important factor for project end state?
B. Budget achievement
C. Not available
C. Not available
D. Not available
33. What will be the consequences, if the contractor is failed to deliver a project
C. Insurance
D. Not available
34. If your boss allocates a new assignment, of which part of it you are not sure about
C. As for professional help on the part which you do not know about
D. Do the part that you know and learn about the part you do not know and do it
35. Which statement is true?
C. Not available
D. Not available
B. The scope
E. A & B
A. Direct
B. In direct
C. Both
D. Contingency costs
A. Law
B. Etiquette
C. Morals
D. Ethics
E. Communication
39. What is the most important thing in the WBS?
A. Cost
B. The project
C. Client
40. A biding manager, on closing date of the bid, he received a call from one of the bidding firms
asking him to extend the bidding period by one day as they couldnt finish the documents. Bob is to
41. Equipment with tags or labels that assuring the manufacturer has conducted the required test and
applies the standard
A. Labeled
B. Listed
C. Tagged
C. Not available
D. Not available
43. Which one of the below is not a pre-construction activity for project
A. True
B. False
45. A useful tool to visualize and clarify the possible cause of problem
A. Parite analysis
46. The delay time for a series of activities that would not affect, if occurred the during the project
timing called
A. Total slack
B. Critical slack
C. Float pad
D. Critical float
E. Only A & B
48. The forward pass review of the project management will indicate the following
C. Project duration
D. Only A & B
D. Only A & C
A. Project overlap
B. Function matrix
C. Cost account
A. Estimation
B. Assembly schedule
A. Initiation period
54. At which part of the project, following takes place: design change, scheduling and planning?
A. Execution part
55. The estimation cost of wooden forming work as per soil test is $25,000 and the manager want to
reduce the cost to $ 20,000, what shall he do?
C. A & B
A. Binding
B. Equipment ordering
C. Assembly schedule
60. Which one of the following is suitable in engineering manner? Decision shall be based on reason
than situation
A. Quantity thinking
B. Logical thinking
C. Interpersonal skills
D. Honesty
61. Before starting work at site, the major factor has to be checked is?
A. Access to site
C. Safety
A. Budgeting
A. Float
B. Critical path
C. Slack
D. Merging point
65. In what situation we can claim for a change order from the client
A. When client want to add something which is not available in initial scope
A. Before construction
B. During construction
C. After construction
69. What is the step from the below which is not related to project steps
A. Concepts
B. Initiation
C. Planning
D. Hand over
E. Scheduling
70. An engineer received new scope of work, which is not included at the original scope, what the
action he has to do?
A. Change scope
B. Change cost
C. Change time
D. Both A & B.
D. Not available
A. Educational
C. Engineering firm
A. Economical
B. Environmental
C. Social
D. All of the above
A. Migration
B. Mitigation
C. Not available
78. The following is not the major reason to implement the project
A. Marketing demand
B. More manpower
C. Product requirement
79. Required CPI value for a project is 1.02, where actual value is 0.95. What does it indicates?
A. It means that the project actual cost is more than the budgeted cost due to misuse of project
resources
GENERAL
1. In an automobile factory who is the best person to inspect
A. Petroleum engineer
B. Mechanical engineer
C. Chemical engineer
D. Civil engineer
A. 720 deg
4. Which engineering branch deals with laying of natural gas line in oil & gas construction?
A. Mechanical Engineering
A. Area
B. Moment of inertia
C. Intensity of water
D. Weight
6. Scale on drawing is 1:62500, what is the actual value for a distance measured on drawing of 7.25?
A. 7.15 miles
A. Pressure constant
B. Temperature constant
C. Volume constant
D. A & B
8. R134a refrigerant is environmental friendly and is commonly used, what is the molecular formula?
A. C2H2F4
9. If you leave an ON refrigerator with the doors open in a closed room for 2 days, what will happen?
C. Not available
A. Metal alloy
B. Polymers
C. Hard material
A. If shaped under heating and applying pressure the chemical properties will change and it will
permanently change into hard material
B. If heat and pressure will apply the chemical properties of material will not change
A. Chemical reaction
B. Electro-chemical reaction
C. Both
D. Decoration
A. Divide by 2.54
16. During pyrolysis or combustion the resultant compound formed by solid particles, vapors and
gases is called
A. Fire
B. Smoke
C. Radiation
A. Heavy material
B. Light material
C. Ductile material
D. Hard material
18. When you will obtain the maximum calorific value for fuel?
20. If you have a cup of water at 70 deg Celsius and 1 atmosphere, the liquid is
A. Saturated liquid
B. Saturated vapor
C. Condensate liquid
A. Potential energy
A. Cracks
B. Position of cracks
C. Length of cracks
24. If water to cement ratio used in a residential building higher, then what will be the effect on
building
E. No effect
A.
26. Number 34 in the following N34 E usually will be specified with
A. Temporary
B. Starting point
C. Traverse
D. Bearing