Beruflich Dokumente
Kultur Dokumente
@ GM_UPJB
Iwan Agung Firstantara was born in Jogjakarta, on October 1969. He
graduated from Gajah Mada University with a major in Mechanical
Engineering in 1993, and Master of Management also in the same
University.
Iwan is a General Manager of PT PLN (Persero) Unit Pembangkitan
Jawa Bali, one of PLNs Strategic Business Unit that respondsible for
the Operation & Maintenance of 14 Power Generation Unit across
Java-Bali Interconecting System (making it the biggest total asset
compared to IP, PJB &IPP)
Macro Economic Perspective
1 Facts of Indonesias Economic Situation
Indonesia?
#HelloJakarta #Monas
#Istiqlalmosque
Images taken from http:// globe-walls .com/
Biggest Country
in South East Asia
17.000 islands
3.1 million sq. km of sea
1.9 million sq. km of land
247 million inhabitants (2012)
#RajaAmpat #Beach
#BeautifulIndonesia Images taken from http://listofimages/
Biggest Economy
in South East Asia
#Jakarta@Night #Pancoran
#Patung Dirgantara Images taken from http://wallpapersus
GDP
37,54
Capita
33,53
30,66
(million rupiah)
27,03
23,88
21,36
17,29
14,82
12,48
10,48
9,33
8,56
7,86
6,78
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012* 2013**
Source : BPS
X-M -2 %
GDP
of 2013
Stat Discrepancy 5%
Investment 32 %
Government 9%
Consumption 54 %
Source : BPS
Emerging middle class in
Indonesia
Source : BI (2013)
Indonesias Energy Outlook
Energy Current Trends & Challenge
Intensity
in Some Country
Source : BP Statistical Review of World Energy 2011 & World Economic Outlook Database April 2011, IMF
Energy Consumption
Capita
(BOE / Capita)
3,46
3,34
2,98
2,56
2,58
2,48
2,47
2,41
2,43
2,28
2,32
2,27
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Source : BPS
Electricity
Consumption
(in TWh) 65
60
55 55
50 51
48
46 47 46
42 41 44 44
40
39
36 37 36 36
34 33 34
31
27 28
25
23
21
17 18
15
12 13
11 11
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
PLN divided its customer into 5 segments: (1) Business, (2) Industry, Source : EMR
(3) Household, (4) Social, (5) Government
S i n c e 2 0 07
Household has outreach the electricity
consumption among other PLNs
customer segments
#JakartaView #BunderanHI
#MonumenSelamatDatang Images taken from http://globeimages.net/
Energy demand
has been increasing faster than economic
development and population growth
76
73
67
66
65
62
63
57
43
28
16
8
1980 1985 1990 2000 2005 2006 2007 2008 2009 2010 2011 2012
23 22 24 24 21 21 22 19 24 25 23 21
13 15 15 19 17 19 23 27 23 23 24 27
60 57 57 53 57 55 51 50 49 48 47 48
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Oil Coal Gas Hydropower Geothermal Biofuel
Source :CDI-EMR
Demand of electricity is expected to grow fast
Driven by three main things:
1. Electrification program
To support government program to accelerate electrification ratio
2. Economic growth
To support manufacturing and service companies to produce products
and services
3. Captive taking over
Meet large consumer demand, to take over captive and to meet large
customer demand
#LabuanCFSPP
#FTP-1 #2x300MW
Electricity Supply Chain
PLN P3B as System Owner
and Market Operator
P3B as Transmission Provider
Power Generation (PLN or IPP) Distribution
#RembangCFSPP #FTP-1
#SubcriticalPulverized
Issue#1
FTP Phase 1 :
42 Coal-Fired Steam Power Plants of PLNs Project
10 power plants with capacity of 6.900 MW in Java-Bali
32 power plants with 2.252 MW outside Java-Bali
FTP Phase 2 :
93 power plants (Hydro, Geothermal, & Coal-Fired Power Plant)
21 power plants of PLNs Project
72 power plants of Partnership Project
#TjAwar-awarCFSPP
#CoalHandling #StackerReclaimer
Issue#1
#PalabuanRatuProject
#Construction #FTP-1
Issue#1
Even though
The FTP has improved the
company's internal cash flows
and meet the 9% of electricity
demand growth.
Fuel Mix
2008 2019
3% 2%
9% 16%
36% 6%
17%
18% 58%
35%
Fuel Coal Gas Hydro Geo Fuel Coal Gas Hydro Geo
Indonesias electricity
is still rely on coal-based power plants
Contribute approximately 58% of the total electricity generated
Environment
Efficiency
Issue#3
Improve efficiency
#MuaraKarang #CCPP
How Technology Solve Electricity Issues
Deal with Capacity and Efficiency matters
37 Improve
100
Restore
35 75
Rehabilitation
SI ME SI SE SI ME SI
Recondition
Annual Inspection 50
33
25
1 2 3 4 5 6 7 8
Lifetime
(Years)
How to deal with Capacity & Efficiency matters?
Capacity: Efficiency:
Coal Mixing Tiny-oil Burner
Coal Drying Heat Balance modelling
#PalabuanRatu #Construction
#FastTrackProgram
Coal mixing
the process of blending two different types
of coal (low & medium range coal) to obtain
a desired efficiency/ load profile.
Coal layering
The process of placing the med range coal
at specific boiler burner layer to obtain a
desired efficiency/ load profile.
Heating value
Low Range Coal = + 4.200 kCal/kg
Medium Range Coal = + 4.900 kal/kg
Coal drying
The process of heating the coal
feed to get a dry coal feed and
increase coal quality
Tech challenge
Heat Rate Comparison in 2013
(in kCal/kWh))
2.732
2.403
TJB IMY
(Non-FTP) (FTP)
Challenge#2
Turbine
efficiency
improvement
There has been no
significant breakthrough
on turbine efficiency
improvement
Heat Balance
Modelling
Challenge on:
Accuration
HR Competency
Alternative model
PBR (Performance Based Regulation) is given by the Government to Source :World Bank Team
determine PLN Allowed Revenue.
Epilogue
Efficiency improvement in Power Generation represent the
largest opportunities in reducing subsidies, where
thermofluid takes the most improtant role.
#Sunset #Fisherman
#BeautifulIndonesia Images taken from natgeo
An institution
to bridge the
interest
between
business
(power
generation)
and
universities has
not yet
established.
Images taken from http://austinareaphoto.com /
Thankyou
Presented by:
Iwan Agung Firstantara
Mail : iwanagungf@gmail.com
Twitter : GM_UPJB