TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES

AYALA BLVD., ERMITA, MANILA


COLLEGE OF ENGINEERING
DEPARTMENT OF MECHANICAL ENGINEERING

DESIGN OF 75 TONS ICE PLANT


AND COLD STORAGE

SUBMITTED BY:
DE JESUS, LINIEL R.
BSME-5B
SUBMITTED TO:
ENGR. JORGE YASAY
PROFESSOR
ICE PLANT DESIGN
Design Data
Capacity of the Ice Plant 75 tons/day
Weight of the Ice 300 lbs/can
Temperature of Water 78.8 oF (26 oC)
Temperature of Brine 14 oF (-10 oC)
Dimension of Ice Can 11x22x44
Harvest Temperature 17 oF (-8.33 oC)
Building Temperature (Summer)
(Outside) 93.2 oF (32 oC)
(Inside) 89.6 oF (30 oC)

Number of Ice Can Required:


Freezing Time
No. of Ice Can, N = Production Rate x Wt.Of ICE BLOCK PER CAN
2,000 lb
(75 TONS OF ICE) ( )(48 hrs)
TON
N= 300 lb x 24 hrs

N = 1 000 Cans
Note: Arrangement of cans inside the brine tank will be 32 x 32 with the total ice can of 1024
cans. The 24 excess cans are for reserve and additional income.

Ntotal = 1 024 cans

Volume of the Freezing Tank


Volume of Brine
TOI 75
TR = = = 122.95 TOR
0.61 0.61
60ft3
VBRINE = TOR [1 TOR]
60ft3
VBRINE = 122.95 TOR [ ]
1 TOR

VBRINE = 7 377 3

Volume of Ice Cans


h
VIC = 6
[B1 + B2 + 4M]

where:
B1 = 11 x 22 = 242 in2
B2 = 9 x 20 = 180 in2
B1 + B2 242+180
M= = = 211 in2
2 2
44
VIC = [242 + 180 + 4 (211)]
6
1ft3
VIC = 9 284 in3 ( )
123 in3

VIC = 5.373 ft 3

For Total Volume of Ice cans,


VICT = 5.373 ft 3 1 024
VICT = 5 501.95 ft 3

Total Volume of Freezing Tank


VT = VICT + VBRINE
VT = 5 501.95 ft 3 + 7 377 ft 3
VT = 12 878.95 ft 3

Dimensions of the Freezing Tank

From,
L= 2C + (N-1) Ci + Nl + A
where:
C = Clearance between Walls = 6
Ci = Clearance between Cans = 4
N = No. of Cans
l = Length of the Side of the Can
A = Additional Space for Agitator
For L1:
L1 = 2(6) + (32-1)(4) + (32)(22) +20
L1 = 860 in = 71.67 ft
For L2:
L2 = 2(6) + (32-1)(4) + (32)(11)
L2 = 488 in = 40.6 ft
For H:
VTOTAL = L1L2H
VTOTAL 12 878.95 ft3
H= L1 L2
= 71.67 ft.
x 40.6 ft.
12 in
H = 4.43 ft ( 1 ft )

H = 53.16 in

For Checking:
Height of Freezing Tank > Height of Ice Can
53.16 in > 44 in DESIGN IS OKAY!

Illustration of Freezing tank with Ice can

32 x 32 Ice Can Arrangement


Insulations and Material Specifications to be used in the Freezing Tank
Thickness K H
Material
in mm W/m-K W/m2-K
Steel Plate 0.25 6.35 14.3 -- Side
Cork Board 15 381 0.043 -- Side
Concrete 6 152.4 0.72 -- Side
Wood; Oak 4 101.6 0.16 -- Top
Still Air -- -- -- 9.37
Brine
Solution -- -- -- 300
Steel Plate 0.25 6.35 14.3 -- Bottom
Cork Board 5 127 0.043 -- Bottom
Concrete 5 127 0.72 -- Bottom

Outside Dimension of the Freezing tank (insulations included)

Length
L = L1 + L(insulations)
L = 860 + 2(0.25 + 15 + 6); in
L = 902.5 in = 75.21 ft. = 22.92 m
Width
W = L2 + L(insulations)
W = 488 + 2(0.25+15+6); in
W = 530.5 in. = 44.21 ft. = 13.48 m
Height
H = H1 + Top Cover + Insulation
H = 53.16 + 4 + 7 + 6
H = 70.16 in. = 5.85 ft. = 1.78 m
LOAD CALCULATION

For heat load of ice, QP


From,
Q P = Q1 + Q 2 + Q 3
where:
QP = the total amount of heat to be removed in making ice
Q1 = the amount of heat to be removed in water by sensible cooling
Q2 = the latent heat required to convert water to ice
Q3 = the amount of heat to be removed in ice by sensible cooling

For mass of water,


75 TONS 907.03 kg 1 DAY 1 hr
mH2 O = mice = DAY
x 1 TON x 24 hrs x 3600 s
kg
mH2 O = 0.787
s

hence,

For Q1 = mH2 O (t H2 O t f )
kg kJ
Q1= (0.787 s )(4.187 kgC)(26-0) C

Q1 = 85.674 kW

For Q2 = (mice )(hfice )


kJ
Q2 = (0.787/s)(335 kg)

Q 2 = 263.645 kW

For Q3 =(mH2 O )(Cpice )(t f t ice )


kg kJ
Q3= (0.787 s )(2.0935 kgC)(0-(-8.33)) C

Q 3 = 13.724 kW

thus,
Q p = 85.674kW + 263.645kW + 13.724 kW
Q p = 363.043 kW
Considering Heat Losses
For Q1 = Q2 (Considering the width and height)
A t
Q1 = 1 X1 X2 X3 1
+ + + +
ho k1 k2 k3 h1

1.78 (13.48)(31+8.33)
Q1 = 1 6.35x10^3 381x10^3 152.4x10^3 1
+ + + +
9.37 14.3 0.043 0.72 300

Q1 = 102.77 W
Q1 = Q2 = 0.10277 KW

For Q3 = Q4 (Considering the length and height)


A t
Q3 = 1 X1 X2 X3 1
+ + + +
ho k1 k2 k3 h1

1.78 (22.92)(31+8.33)
Q3 = 1 6.35x10^3 381x10^3 152.4x10^3 1
+ + + +
9.37 14.3 0.043 0.72 300

Q 3 = 174.74 W
Q3 = Q4 = 0.17474 KW

For Q5 (Considering the top cover portion)


A t
Q5 = 1 X1 1
+ +
ho k1 h1

13.48 (22.92)(31+8.33)
Q5 = 1 101.6x10^3 1
+ +
9.37 0.16 300

Q 5 = 16309.44
Q5 = 16.3094 KW
Therefore,
Total Qloss= Qst(from tanks material)
Qst= (0.10277 + 0.10277 + 0.17474 + 0.17474 + 16.3094)
Qst = 16.86 KW

Total Cooling Load


QIP = Total cooling load of Ice Plant
QIP = 1.1 (Qp + Qloss)
QIP = 1.1(363.043+ 16.86)
1 TOR
QIP = 379.903 kW x 3.517 kW

QIP = 108.02 TOR


Checking:
75
108.02 0.61

108.02 TOR 122.951TOR (The design Ok!)

Brine Agitator Capacity and Power:


Production Rate = 75 TOI DAILY
Q p = 103.225 Tons of Brine Agitator

65 gpm
Brine Agitator Capacity = TOR
(103.225 TOR)

Brine Agitator Capacity = 6 709.625 gpm

1 hp TONS
Brine Agitator Power = TONS (75 )
17.5 DAY
DAY

Brine Agitator Power = 4.29 hp


Thus,
Use 5 hp Motor for Each Brine Agitator.

Blower Power:
For Low Pressure Air Agitator, approximately 0.5 cfm of Free Air is supplied
at about 2 Psi per 300 lbs. per can.

0.5 cfm ft3


Vair = (1024 CANS) = 512
CAN min
lb in2 ft3
(2 )(144 2 )(512 )
in2 ft min
Air Power = ftlb = 4.47 hp
33,000
hpmin

Assuming Blower Efficiency = 80%

Blower Efficiency = Air Power / BPH


BPH = 4.47 hp. / 0.80 = 5.59 hp
Thus,
Use 6 hp Driving Motor for Blower of Freezing Tank.
COLD STORAGE DESIGN
Design Data
Product Bacon
Capacity of the Cold Storage 75 tons/day
Maximum Time Storage 15 days
Storage Room Temperature 25 oF (-3.88 oC)
Starting Temperature 44.15 oF (6.75 oC)
Freezing Temperature 27 oF ( -2.78 oC)

Specific Heat Before Freezing 0.50
(2.934 )

Specific Heat After Freezing 0.30
(1.256 )

Latent Heat of Fusion 9 (20.94 )

Standard Dimensions for the Box and Pallet


Dimension of Box: 13 x 12 x 9 (L x W x H)
330.2 x 304.8 x 228.6 mm
Dimension of Pallet: 53 x 37 x 6 (L x W x H)
1 346.2 x 939.8 x 152.4 mm

Number of Racks and Pallet


lbs
2000
pallet
Box per pallet = lbs
26.5
box

= 75.5 76 box per pallet

lbs
75 tons ( 2000 )
ton
No. of Box = kg lbs
(12 )(2.205 )
box kg

No. of Box = 5 568.93 boxes 5 570 boxes

5 570 boxes
No. of Pallet = box
76
pallet

No. of Box = 73.29 74 pallets

Note: The dimensions of the box and pallet are standard size from various manufacturers
catalogue. The pallet is a 2-way open pallet.
Storage Room Dimension
Cold Storage inside spacing
Pallet to pallet vertical distance 2m
Pallet to north wall distance 1.5 m
Pallet to south wall distance 1.5 m
Pallet to east wall distance 0.25 m
Pallet to west wall distance 0.25 m
Distance between pallets (horizontal) 0.30 m
Space for fork lift 2m

Note: The pallets arrangement is 9 x 8 with a total of 72 pallets. The excess two pallets are reserve pallets.

Cold Storage outside Dimensions (Based on the pallets arrangement or distribution)

Length of the Room


LROOM = (No. of pallets within the Length X Length of Pallets) + Clearances
= (9 x 53/12) + (5 x 2) + (0.5 x 9)
LROOM = 54.25 ft = 16.54 m

Width of the Room


WROOM = (No. of pallets within the Width X Width of Pallets) + Clearances
= (8 x 37/12) + 1+5 + (0.5 x 4) + (5 x 3)
WROOM = 47.67 ft = 14.53 m

Height of the Room


HROOM = (Height of Box X No. of Box Layer) +Height of Pallet+ Clearance
= (9/12 x 7) +6/12+ 8
HROOM = 13.75 ft = 4.191 m
LOAD CALCULATION
For Mass of Bacon
75 907.03 1 1
= ( )( )( )( )
1 24 3600

= 0.787

Product load calculations,


From,
= 1 + 2 + 3
where:
= the total amount of heat to be removed from the product
1 = the amount of heat given off by the product in cooling from its entering
temperature to its freezing
2 = the amount of heat given off by the product in solidifying or freezing
3 = the amount of heat given off by the product in cooling from its freezing
temperature to its final storage temperature

For 1 ,

1 = (0.787 ) (2.934 ) (6.75- -2.78)

1 = 22.01 kW

For 2 ,

2 = (0.787
) (20.94 )

2 = 16.48 Kw

For 3 ,

3 = (0.787 ) (1.256 ) 2.78 3.88)

3 = 1.09 kW
Thus,
= (22.01+16.48+1.09) kW
= 39.58 kW
Considering Heat Losses on Walls, Floor and Ceiling

Thermal Conductivity of Materials Used in Cold Storage Walls


Thickness Thermal Conductivity Thermal Conductance
Materials
m (K) W/m.K (C) W/m2.K
Cork Board 0.0508 0.043 -
Air - - 9.37
Concrete Mortar Or
0.0508 0.72 -
Plaster
Sand Aggre.(100mm) - - 7.95
Steel Plate 6.35 X 10-3 14.3 -

Wall Area = L x H = 16.54 x 4.19 = 69.30 m3


A t
Q L = 1 t1 t2 t3 1
+ + + +
Cair k1 k2 k3 C1

69.30 (31(3.88))
Q Lwall = 1 0.0508 0.0508 6.35x103 1
+ + + +
9.37 0.043 .72 14.3 7.95

Q Lwall = 1 627.84 W
Q Lwall = 1.62874Kw

Floor and Ceiling


Thickness Thermal Conductivity Thermal Conductance
Materials
m (K) W/m.K (C) W/m2.K

Expanded Polystyrene 0.0508 0.029 -

Concrete Mortar Or
0.0508 0.72 -
Plaster
Sand Aggre.(100mm) - - 7.95
Steel Plate 6.35 X 10-3 14.3 -

Floor Area = Ceiling Area = L x W = 16.54 x 14.53 = 240.33 m2


240.33 (31(3.88))
Q LFandC = 0.0508 0.0508 1 6.3510^3
+ + +
0.029 .72 7.95 14.3

Q LFandC = 4 302.11 W
Q LFandC = 4.30211 kW
Therefore,
Q L = Q Lwall (4) + Q LfandC (2)
Q L = 1.62874 (4) + 4.30211(2)
Q L = 15.12 kW

Total Refrigeration Load


Q CS = 1.1(Q P + Q L )
Q CS = 1.1(39.58 + 15.12)
1 TOR
QCS = 60.17 kW x 3.517 kW

QCS = 17.11 TOR

Compressor:
Q IP , Cooling Load of Ice Plant 379.903 kW
Q , Refrigeration Load of Cold Storage 60.17 kW
Refrigerant Ammonia
Storage Evaporating Temperature -6C
Ice Evaporating Temperature -10C
Condenser Temperature 43C

From Table 1 Ammonia:


kJ
h1 = hg @ 10C = 1450.22 kg
kJ
h3 = hg @ 6C = 1455
kg
kJ
h5 = h6 = hf @ 43C = 405.416 kg
kJ
h7 = h8 = hf @ 6C = 172.371 kg

From Chart:
kJ
h2 = 1460
kg
kJ
h4 = 1691 kg

Total Work of Compressor


WCT = WC1 + WC2
WC1 = m1 (h2 + h1 )
QIP
m1 = h
1 h8
379.903 kW
m1 = kJ kJ
1450.22 172.371
kg kg

kg
m1 = 0.297
s
kg kJ kJ
WC1 = 0.297 s
(1460 kg 1450.22 kg
)

WC1 = 2.91 kW

WC2 = m4 (h4 h3 )
m4 = m3 + m2
QCS
m3 = h
3 h6

60.17 kW
m3 = kJ kJ
1455 405.416
kg kg

kg
m3 = 0.057
s

m2 = ?

Energy Balance
EIN = EOUT
m2 h6 + m1 h2 = m1 h7 + m2 h3
m1 (h7 h2 )
m2 = h6 h3
kg kJ kJ
0.297 (172.371 1460 )
s kg kg
m2 = kJ kJ
405.416 1455
kg kg

kg
m2 = 0.364 s
kg kg
m4 = .057 s
+ 0.364 s
kg
m4 = 0.421 s

kg kJ kJ
WC2 = 0.421 (1691 1455 )
s kg kg

WC2 = 99.356 kW

WCT = 2.91 + 99.356


WCT = 102.266 kW
102.266 (1hp)
WCT = = 137.09 hp
0.746 kW

137.09 hp
Actual Power For Each Compressor = 2

Motor Hp = 68.55 or 69 Hp
Condenser:
Condenser Temperature 40C
Entering Water Temperature 28C
Leaving Water Temperature 33C
kg
m4 = 0.421 s

Heat Rejected by Condenser; Q R


Q R = m4 (h4 h5 )
kg kJ kJ
Q R = 0.421 s
(1691 kg 405.416 kg
)

Q R = 541.231 kW

Mass Flow Rate of Cooling Water; MW


Q R = mw Cpw t
kJ
541.231 kW = mw (4.187 ) (33 28)C
kgC
kg
mw = 25.853 s

Condenser Liquid Receiver:


Volume of Liquid Receiver; VLR
gal
VLR = (TONS OF REF. )(0.50 )
TON OF REF.
gal m3
VLR = (108.02 TOR) (0.50 TON OF REF.)(0.003785 gal)

VLR = 0.204 m3

Diameter and Length of Liquid Receiver; D AND L


L
VLR = (4)(D)2 (L) ; ASSUME D = 3.5

0.204 m3 = (4)(D)2 (3.5D)

D= 0.420 m AND L= 1.47 m

Evaporator:
Ice Evaporator Temperature -12C
Brine Temperature -9.44C

Required Surface Area of Evaporator; AIE


Q P = UO AIe (Lmtd)
QP
AIE = U
O (Lmtd)

379.903 KW
AIE = Kw
0.596 (9.44+12)
m2

AIE = 248.993 m2

Hoisting winch/overhead travelling crane:


5 Ice Cans / Lift
Weight of Ice + Can 315 lbs
m
VF , Hoist Velocity 0.15 S

Height of Lift 2m
T, Time of Lift 10 secs

From Design of Machine Elements by Faires


Design Factor, N 7 for Small Hoist
Min. Drum Diameter, DS 30DR
Wire Ropes (Regular Lay) 6x19 IPS
Weight of Rope , WR 1.6DR
Length of Rope, LR 5m

Total Load, W
W = 315(5) = 1575 lbs
Ft
WR = 1.6DR 2 (LR ) = 1.6DR 2 (5 m) (3.28 M )= 26.24DR 2

F=Ma
(WR +W)(A)
FT WR W = G
m
(VF VO ) (0.15 0)
S
A= =
T 10s
m ft
A= 0.015 s2 (3.28 m)
ft
A = 0.0492 S2

Ft =?
ft
(26.24 DR 2 +2,075 lbs)(0.0492 2)
FT 26.24 DR 2 1575 lbs = ft
s
32.174 2
s

FT = 26.28 DR 2 + 1577.41
Static Approach
AM (DW )(EW )
FB = DS

Where:
Fb, Equivalent Bending Load
Am, Area of Metal = 0.4 DR 2
Dw, Diameter of Wire = 0.067 DR
Ew, Modulus of Elasticity = 3x107 Psi
Ds, Drum of Sheave Diameter = 30 DR

(0.4DR 2 )(0.067DR )(3x107 )


FB = 30DR

FB = 26,800DR 2

FU FB
N=
FT

Where:
N = 7 (Design Factor)
Fu Breaking Strength = 42 Dr2
Ft - Rope Tensile Force

lb
42Dr 2 (2,000 )26,800Dr 2
ton
7=
Ft

Ft = 8,171.43Dr 2

Rope Diameter, DR
26.28 DR 2 + 1577.41 = 8,171.43DR 2
8,145.15DR 2 = 1577.41
1
DR = 0.50 In Or 2 In.

Hoist Power
DS = 30DR = 30(0.5) = 15in.
(DS )(NS )
V=
12
(15)(NS )
(0.15)(3.28) =
12(60)

NS = 7.517 Rpm
D
Hoist Power = 2(NS )(FT )( 2S )

FT = 8,171.43(0.5)2 = 2,042.86 Lbs


15 In
2(7.517 Rpm)(2,042.86 Lbs)( )
2
Hoist Power = FtLbs
33,000 (12in)
HpMin

Hoist Power = 1.827 hp


Therefore, Use 2hp Hoist Motor Power.

COOLING TOWER:
Temperature of Entering Water 33C
Temperature of Leaving Water 28C
Condition of Entering Air 26C, 65% Rh
Condition of Leaving Air 32C, 98% Rh
Temperature of Make-Up Water 27C
Barometric Pressure 101.325 kpa

Amount Of Cooling Water, MW


MW = (MW )Condenser
Kg
MW = 77.44 S

Air Properties: Using Psychometric Chart


@ 26C, 65% Rh
kJ
H3 = 61 kg ; w3 = 0.0136

@ 32C, 98% Rh
kJ
H4 = 108 kg ; w4 = 0.0297

Mass of Air, MA
Heat Balance on the Cooling Water,
M1 = M2 = MW And M3 = M4 = MA
(MW )(CPW )(T1 T2 ) + (MW5 )(CPW )(T5 ) = (MA )(H4 H3 )
[(MA )(H4 H3 )][(MW )(CPW )(T1 T2 )]
MW 5 =
(CPW )(T5 )

[(MA )(10861)][(77.44 )(4.187)(3328)]


MW 5 = (4.187)(27+273)

MW5 = 0.0374mA 1.2907


Mass Balance by Water,
MW5 + MW1 + MA w3 = MW2 + MA w4
MW5 = MA (Hr4 Hr3 ) = MA (0.0297 0.0136)
MW5 = 0.0161MA

Therefore;
0.0374mA 1.2907 = 0.0161MA
Kg
MA = 60.5962 S
Of Water

Mass of Make-Up Water, MW


MW5 = 0.0161(60.5962 )
Kg
MW5 = 0.9756 S
Of Water

Volume Flow Rate of Air, VA


@ 26C, 65% Rh, PSat = 3.363 kpa
Pv = Rh(PSat ) = 0.65(3.363kpa) = 2.186 kpa
PV = mrt
Kg Kj
MA RA TA 60.5962 (0.287085 )(26+273)K
S KgK
VA = PT PV
= Kn
(101.3252.186) 2
m

M3
VA = 52.4666 S
Of Air

28+33 Kg
T= 2
= 30.5C; DW = 996.283 m3
Kg
MW (77.44 )(1 Gal)(60 s)
S
VW = DW
= Kg
(996.283 3)(0.003785 m3 )(1 min)
m

VW = 1232.1625 Gpm

1232.1625 Gpm M2
Cooling Tower Area = Gpm X (3.28)2 Ft2
3 2
Ft

Cooling Tower Area = 38.1768 m2

Using Cooling Tower Length of 5m,


Area 38.1768 m2
Width = Length = 5m
= 7.6354 m
Number of Nozzles Required
Using 10 gpm Capacity per Nozzle
VW 1232.1625 Gpm
No. Of Nozzles = Capacity = = 123.2163 Nozzles, say, 124 Nozzles
10
Nozzle

Nozzle Arrangement
No. of Rows = 4 Rows
No. of Nozzle/Row = 31 Nozzles/Row

FAN:
Wheel Diameter 60 in. (5ft.)
Static Pressure 15 in. H2O
Total Head
HTA = HVA
V2
HTA = W + 2g
m3
Q 52.4666 m
S
Velocity Of Air = = m2
= 28.7475
A ( )(5ft)2 ( ) S
4 3.282 Ft2
m 2
V2 (28.7475 )
S
2g
= m = 41.3265 m of air
2(9.81 2)
S
Ft M 1000kg
(15 In.H2 O)( )( )( )
12 In. 3.28 Ft M3 H2 O
W
= Kg = 317.58 m
1.2 3
M

HTA = 358.91 m of air


Fan Power
Kg N
HTA (MA ) 358.91 M (60.5962 )(9.81 )
S Kg
Fan Power = FC
= W = 213.3536 Kw
1,000
Kw

1 Hp
Fan Power = 213.3536 Kw X 0.746kw

= .

DAY TANK:
Suction Pressure 60 kpa
Allowance for Fittings and Friction Loss 5m

Elevation of Tank
Kn
(60 2)(1000N)(1kg)
m
Elevation = Kg + 5m
(1000 3)(1kN)(9.81N)
m

Elevation = 11.12 m
Volume Of Day Tank, VT
VT= Make Up Water + Raw Water For Ice Production +
Water Consumption Of Employees

For Ice Production:


TONS 2,000 Lb 1kg m3 m3
V1 = 120 Day
X TON X 2.205 Lb X 1,000kg = 108.8435 Day

For Make-Up Water:


Kg m3 3,600s 24 Hrs. m3
V2 = 0.9756 S
X 1,000kg
X 1hr X 1Day = 84.2918 Day

For Employees Consumption and Other Uses:


m3
V3 = 20 Day

VT = V1 + V2 + V3
m3
VT = (108.8435 + 84.2918 + 20)
Day

m3
VT = 213.1353 day

Dimensions of Tank
Use H = 8m

VT = 4 (D)2 (H)
m3
213.1353 Day = 4 (D)2 (8m)

D = 5.8242 m

Thickness of Day Tanks Cylinder, T


P(D)
t=
2(SS )(E)P

Welding Efficiency, E =0.80


Kg 9.81N Kn
P = D(H) = 1000 M3 X8mx Kg
X 1000N = 78.48 Kpa

Su = For Mild Steel


6.8948mpa
Su = 50,000 Psi ( 1 Psi
) = 344.74 Mpa

Fm = 0.92 ; Fs = 0.25
SS = SU (FM )(FS )
SS = 344.74 (0.92)(0.25) = 79.29 Mpa
Kn 1000mm
78.48 2(5.8242 m)( )
M 1m
t= 3 Kn Kn
2(79.29X10 2)(0.80)78.48 2
M M

t =3.6052 mm
USE, t = In.

Refrigerant: Ammonia

43oC

-6oC

-10oC
FLOOR PLAN

1. Cooling Tower 9. Main Office


2. Day Tank 10. Engineering Office
3. Condenser 11. Thaw Tank
4. Compressor 12. Dump and Refill
5. Liquid Receiver 13. Ice Storage
6. Freezing Tank 14. Control Board
7. Cold Storage 15. Loading Platform
8. Tool Room