Sie sind auf Seite 1von 2
PERTAMINA Cilacap Debottlenecking Project Java, Indonesia 4.0 INTRODUCTION * .ouaao4rSa25MANUALEINANCDUNTOC. SECT SAM June , 1997 FLUOR DANIEL ENGINEERS ‘& CONSTRUCTORS, LTD Contract 429400 DUE Unit 11 PERTAMINA, FLUOR DANIEL ENGINEERS Cilacap Debottienecking Project & CONSTRUCTORS, LTD Java, Indonesia Contract 428400 1.0 INTRODUCTION The existing Crude Distillation Unit in Fuel Oil Complex | (FOC |) was originally designed by SIPM and engineered by Fluor Daniel. The unit, which was commissioned by SIPM in 1976, was designed to process 13,550 tons per stream day (100,000 BPSD) of Arabian Light Crude, but historically has also processed Basrah Light and Iranian Light Crudes on a segregated feed basis. Additionally, for the original design the processing units were checked for their suitability for processing Arjuna crude at a throughput of 10,200 t/sd. During the Cilacap Debottlenecking Project, CDU | was debottlenecked to process 16,094 tons per stream day (118,000 BPSD) of any one of the following crudes: Arabian Light, Basrah Light and Iranian Light. Products include naphtha, kerosene, light gas oil, heavy gas oil, and long residue. CDU | provides all of the long residue feedstock for the entire Cilacap | Lube Oil Complex (LOC I/IV/ I). 1 Hou2o4r S25 ANUALSENALNCOLLITS SAM June, 1997 DUI Unit 14

Das könnte Ihnen auch gefallen