Sie sind auf Seite 1von 4

Assignment Description & Assessment Criteria

Assignments:
Description of Assignments Student Learning Outcome Addressed
Assignment 1
Consider the Structure Enclosed as Annexure -1. Demonstrate and apply knowledge
Presentation on the following aspects related to
and understanding of Total Quality
the structure have to be delivered:
Management and problems
1. WBS of the civil works
associated with implementing TQM
2. Quality Plan for Substructure
in modern day organizations as a
3. Quality Plan for Concrete work in
cost benefit tool during the life cycle
superstructure
of a Project.
4. Quality plan for steel work and other building
works Understand the causes of Accidents
5. Safety Management of the project- you are and take preventive actions by
required to assess the safety risks associated demonstrating/apply the Basic
with the project and come up with the safety Principles of HSE in Construction
management plan. and importance of HSE Policy and
6. Environment Management of the project Plan.
You will have to assess the environmental
aspect associated with the project and present
the environmental management plan.

Assignment 2
Select any project that you were a part of during Demonstrate knowledge and
your internship. Based on the assessment of the
understanding of contribution of key
quality management systems present in the
theorists to quality development
project make the presentation highlighting the
within an organization.
following aspects:
Project Introduction with details of the Demonstrate and apply knowledge
project and the civil works associated. and understanding of Total Quality
Rating of the Quality, Safety and the Management and problems
environment management systems based associated with implementing TQM
on the system effectiveness in modern day organizations as a
Strategy for enhancement of effectiveness cost benefit tool during the life cycle
of the Quality, Safety and Environment of a Project.
Management Systems.
Understand the causes of Accidents
and take preventive actions by
demonstrating/apply the Basic
Principles of HSE in Construction
and importance of HSE Policy and
Plan.
Management of HSE aspects and
organization and cost benefits in
construction organisations. ISO
9001-2008: Key issues and cost
benefits for construction related
organizations.

Assignment 3
The following presentations on different Management of HSE aspects and
standards need to be made:
organization and cost benefits in
1. ISO:9001
construction organisations. ISO
2. ISO:14001
9001-2008: Key issues and cost
3. OSHAS:18001/ ISO:45001
benefits for construction related
4. TQM articles
organizations.
5. Factories act and Building and other
construction workers Act
Assessment Criteria
Assignment 1
Marks Presentation Quality Detail covered
allocated on
Criteria Logical sequence(1 mark) , Visual Extent of detailing (1 marks),
Impact & delivery ( 1 mark) Correctness of facts presented (1
marks) , Q&A (1 mark)
Assignment 2
Marks Presentation Effectiveness rating Effectiveness of the Strategy
allocated on Quality of Quality, Safety suggested.
and Environment
Management
Systems
Criteria Logical Quality of reasoning Use of theoretical concepts for
sequence(2 for the rating allocated strategy ( 2 marks), Practicability of
mark) , ( 2 marks) strategy adoption (2 marks) , Q&A( 1
Visual mark)
Impact &
delivery (1
mark)
Assignment 3
Marks Presentation Quality Detail covered
allocated on
Criteria Visual Impact & delivery ( 1 mark) Extent of detailing (2 marks), Whether
associated real life example has been
quoted. (1 marks) , Q&A( 1 mark)
Assessment for the quiz is based on the correctness of the response to the question.
General Instructions:
1. No retest is envisaged for the Quiz, as that has to be administered on LMS during the
tutorial hour. Students shall take the test in the computer lab if its free during the
tutorial hour or in any free slot in which the computer lab is available on the same day.
2. Presence of the entire group is mandatory on the date when the presentation is
scheduled. Exemption from being present can only be given based on permission of the
instructor. In case any group member is absent without permission he/she shall be
granted zero marks for that assignment.
3. Each assignment comprises of different parts, which shall be allocated to the groups
based on the draw of lots. The CRs are supposed to keep the record of the projects
allocated to each group. In case groups are not ready with their requisite
presentation they shall be awarded zero.
4. The projects taken for assignment 2 and 3 shall not be repeated by any group
within a section.
Annexure-I
Project for Assignment 1

This is a generic layout of a thermal power plant. The project for the Assignment is Simhadri Thermal Power Plant of NTPC Ltd. Apart from the two
articles uploaded on the LMS, students are expected to find out about the structures their significance and typical features of Simhadri Plant for their
presentations pertaining to Assignment 1.

Das könnte Ihnen auch gefallen