PREPARED BY APPROVED
TYPE OF ACTIVITY:
CATEGORY OF ACTIVITY:
SL.NO SEQUNCE OF JOB POTENTIAL HAZARDS. RECOMMENDED OFSAFE JOB WHAT COULD CORRECTIVE
BASIC PROCEDURS. GO WRONG?. ACTION.
STEPS.
1. Deployment of 1. Physical injury, lack of 1. All the workers should 1. Leads 1. Conduc
1. work men. awareness undergo the induction to t job
2. Unaware about work program. body related
location and unfit workers 2. TBT conduct on daily basis injury. safety
3. Medically/physically unfit 3. Ensure workers are fit trainin
4. Drug & alcohol through medical test by gs
certified doctor. 2. Do not
4. Inspect and provide bypass
recommended job ppes. site
5. All workers have valid gate safety
pass. rules
6. Aware about company rules
and regulation.
PREPARED BY APPROVED
3. Glass fixing at 1.Cut injury due to sharp edges. 1. Wear cotton hand gloves to
height and in 2.Sprain in body due to lifting of avoid cut injury..
ground floor. overload material 2. . Do not carry more than 20
(max height 10 3.Fall of material kgs weight manually.
meter) 4.Fall of person 3. Worker doing work in proper
5. Slip, trip and fall. manner
6. Failure of scissor / boom lift. 4. Good communication
7.Topple of boom / scissor lift between workers
8.overload of boom / scissor lift over 5. Material shifted by tested PP
reaching rope from bottom to top on
9..Overhead line / cables. mobile scaffold/Boom/scissor
10.Overreaching lift.
6. Always use toe guard on
scaffold while working on
scaffold.
7. Always carry tools in toolbox .
8. . Use full body safety harness
more than 1.8 meter height.
9. .Obstacle free access to be
provided
10. .Check scissor / boom lift on
daily basis through approved
DRL checklist
11. . Always work with scissor /
boom lift on level and hard
surface.
JSA DATE REVIEWED
PREPARED BY APPROVED
4. Electric panel 1. Electric shock during the 1. Ensure work permit before
operation handling of the electrical start of any work activity.
panel. 2. Using of rubber coated hand
2. Sharp edge gloves during panel operation
3. Improper earthing 3. All sharp edges will be
4. Electrical spark/ fire hazards rounded off or protected.
5. Improper insulation 4. Use rubber mate in front of
6. Presence of water and electrical panel
moisture 5. Provide the 30mA ELCB for all
electrical connection
6. Only authorized person will
operate the panel
7. Always connected double
earthling in all electrical
panel.
8. All electrical connection
should be properly
connected.
9. Always fire extinguisher near
JSA DATE REVIEWED
PREPARED BY APPROVED
PREPARED BY APPROVED