Beruflich Dokumente
Kultur Dokumente
Ortiz.carlos8600@yahoo.com
Education
High School Diploma | May 2004 | Cypress Falls
Summary
Dependable and energetic industrial electrician.
Skillful mechanical technician with the knowledge of the use of power tools that are involved in an
industrial electricians duties.
More than 10 years in the gas and oil industry, chemical plant control panels and cabinets, remote
instrument enclosures buildings, motor control center buildings, drillers control cabin, control rooms,
variable frequency drive buildings, and SCR buildings.
Experience
Total Plant Management Group
Houston, TX
Installed and modified, lighting panels, automatic transfer switches, Emerson/ Puffer-Sweiven control
cabinets, marshalling panels, Ametek brand of uninterruptable power supply cabinets, reciprocals, light
switches, lighting dimmer, interior lights, exit lights, emergency lights, exterior lights, photocells, battery
room racks, Eaton brand transformers, Bebco brand air conditioning units, Eaton circuit breaker panels,
cable trays below the floor, threaded/cut aluminum and steel conduit on a Rigid threading machine and
penetrated the equipment by hydraulic knock out set or hole saw where conduit was necessary.
Pulled cable through conduit according to the NEC codebook and terminated it to the location on the
schematics drawing, pulled large cable on the cable trays to the uninterruptable power supply, transformers,
air conditioning units, automatic transfer switches, battery room and main power panels, including
termination of the cable.
Prepared buildings for test by running the temporary power by connection to the main power panel of the
shop, also ran fiber optics to test room for communication with the buildings to test and troubleshoot.
Worked on live/hot panels occasionally.
Worked directly with customers to install 150 alarm cables in 7 remote instrument enclosure buildings.
Led a team of 4 industrial electricians.
Key member of the safety team.
Puffer Sweiven
Stafford, TX
Industrial Electrician September 2014 February 2016 July 2017 October 2017
Laid out pans, panels, doors for drilling, shot studs, made cut outs and other modifications.
Installed wire ways, din rails, terminal blocks, ground bars, light switches, push buttons, fiber optic patch
panels, Delta V switches, CHARM cards, air conditioning boxes on the enclosure and circuit breakers.
Terminated the components on the pan, separating the A/C and D/C wiring, use snake skin or spiral wrap
when needed.
Set up testing by running the temporary power, communication fiber optic cable and CAT5 cable.
Houston, TX
Terminated and assembled motor control center cans, starters, meters, thermometers, heaters, pilot lights,
selector switches, flash guards, contactors, relays, variable frequency drives, transformers and capacitors.
Assembled the structure in an assembly line process, installing isolators on fiberglass between large copper
buss or bare, ground clips, bracing, divider pans, and seismic bracing.
Drilled and punched holes for lights, switches, manual handles on structures and doors.
CNC hole punched and cut large copper buss on Strip-It machine, insulating copper buss with an oven for
the structure line, punched insulated buss for interconnections between the phases.
Houston, TX
Assembled Pyle plugs, explosion proof plugs, junction boxes, modifying stainless and metal enclosures,
varying from small to medium size enclosures, explosion proof panels, installing lights, push buttons, reset
buttons, START and STOP switches.
Terminated cable to the Pyle plugs from 1 to 64 conductor cable for power or communication, occasionally
using potting compounds for water proofing the connectors.
Page 2
Assembled ladder service loops for National Oilwell Varco and TESCO oil derricks, ladder loops length
varying from 70ft to 130ft.
Pulled 4/O, 444,535, 646, 777 AWG cable through large rubber hoses for service loops, installed Kellums
grip for resistance, installed ROX BLOX for water proofing.
Key member of the safety team.
Electro-Tech Industries
Humble, TX
Customized and modified solar turbine control rooms, cut outs to walls and floors.
Moved motor control centers in to the buildings via crane and forklift.
Installed conduit pipe, smoke detectors, cable tray, indoor and outside lights.
Pulled cable for the control gear in control room, panels, motor control center cans, air conditioning, junction
boxes, lighting panel, and control gear, including the termination of the cable.
Key member of the safety team
IEC Systems
Terminated motor control center cans, generators, transformers, air conditioning units, drillers console,
lighting panels, plug boards.
Customized and modified motor control center buildings, variable frequency drive, installed generator
ground buss bar, and cable when it was moved inside the building.
Performed various Retrofits in the field service department.
Houston, TX Houma, LA
Terminated AC and DC variable speed drives, motors, distribution switch gears, power factor equipment,
transformers, motor control center cans, indoor lights, outdoor lights, smoke alarms, EXIT signs, ground
and power cable under the floor of the building through large wire ways for connection to the gear inside
the building.
Page 3
Assembled and customized back pans, installed push buttons, switches, lights for enclosures and gear
doors.
Installed and wired VSD buildings inside boats in Houma, LA
Key member of the safety committee.
N.S. Controls
Houston, TX
Gained extensive knowledge in analyzing and following schematic diagrams, blueprints, and other
specifications.
Terminated control panels, buttons, lights, switches, terminal blocks, fuse blocks, and PLC cartridges.
Assembled and customized control panels, small to large enclosures, laid out back pans for drilling.
Page 4