Auckland Airport at a glance

22km from the


CBD or ~25
mins via tunnel
19.3m annual Associates
passengers
Queenstown (24.99%)
$1.3b investment
Cairns and Mackay (24.55%)
property
1,500 hectares of
freehold land

Diverse parking
offering

89 retail stores across


Two hotels
international and domestic

2017 Investor day 6


Putting recent growth in context; growth has been remarkably
resilient over 50 years

50 year passenger growth trend Work begins on:

10.0 New domestic jet facility


Arrivals expansion
9.0 Second runway
New International
international terminal Pier B opens
8.0 terminal opened expansion

7.0 Refurbished
Auckland Airport domestic International
officially opened terminal terminal nearly
Passengers (m)

6.0 30 year vision


doubled in size
launched
5.0

7.9% 5.7%
4.0
Pier B
Domestic extension
3.0 terminal begins
International Domestic refresh
51 year 51 year
2.0 CAGR CAGR

1.0

0.0

International pax (excl. transits) Domestic pax Linear (International pax (excl. transits)) Linear (Domestic pax)

Note: Graph based on data for 1966, 1976, 1986 and then annual data from 1996 - 2017
2017 Investor day 14
Phase 3 International departures expansion

Key benefits:
~35,000 sqm of new and
New farewell
refurbished floor space area
Doubled capacity for departure
processing including customs
Void
clearance and security infill New truck dock &
screening emigration
New decompression area Refurbished
airside dwell and
Enhanced airside dwell space New raised retail
floor
Increased retail space
New
Transformed customer journey Mezz

Significantly enhanced
departure experience New roof New roof
A platform for future expansion plant room

2017 Investor day 44


Transport
Transport Nth Park & Ride
Key benefits:
Key benefits: Nixon Rd Bypass
Improving land transport is a key
priority
Improving land transport
for Auckland Airportis a key Altitude Drive
priority for Auckland Airport Tom Pearce HOV
Requires a multi-mode solution GBMD HOV
Requires a multi-mode solution Central connector
Working with Auckland Transport
and
Working
NZTA to with Auckland
improve Transport
traffic flows
and NZTA to improve
across the wider network traffic flows
Laurence Stevens HOV
across the wider network Laurence Stevens HOV

Projects:
Projects:
Nixon Road upgrade Terminal loop
Nixon Road upgrade
Northern Park and Ride
expansion
Northern Park and Ride Domestic forecourt
expansion
New High Occupancy Vehicle
(HOV)
New lanes
High Occupancy Vehicle
(HOV) lanes
Improved public transport access
toImproved public
the domestic transport access
terminal
to the domestic terminal
Pedestrian bridge over George
Bolt
Pedestrian
Memorialbridge
Drive over George
Bolt Memorial Drive
New one-way terminal loop road
New one-way terminal loop road

2017 Investor day 47


International departures upgrade phasing

Proposed phasing:
Expanded Duty Free and
Q2 FY18 Western precinct

Q3 FY18 Remaining Destination offer

Q4 FY18 Standalone store

Q1 FY19 Specialty & Luxury High Street

Additional retail storage H1 FY19 Food & Beverage area


to facilitate new click and
collect model

2017 Investor day 60