Sie sind auf Seite 1von 3

Project: B O R E HO L E N O.

: B H 8 0

Type of Bo ri ng : Ro ta ry Was h Bo rin g & Diamo nd Core D ril li ng Location:


Type of Ri g : YBM O .5 Date Started: 17th March 2015
Di ame te r o f Bori ng : 76mm Date Completed: 18th March 2015
Cas in g De ta il : NW Ca si ng s to 39 .00m Ground Level: 0.71m

Da t e D ept h of Gro un d Sa m p le & T e s t s St r a t a


& bori ng & wat er
m m
(T im e ) ( casi ng) b .g .l . De p t h Sa m p le Test L e g e n d De p t h R . L. Thickness De s c r ip t ion

0 17 Mar 0
15:00
1 1
2 .40 Very soft dark brown PEAT.
N=0
1.50-1.95 P1 R=0.10
2 2
2.40 -1.69
x x x
3 x x 3
N=0
3.00-3.45 P2 R=0.15 ME
x x
x x x Very soft brown SILT with some sand
4 4 .00 X VT1 3 .10 and decayed vegetal matter. 4
x x
x xx
N=0 x x
4.50-4.95 P3 R=0.20
5 x x x 5
x x
5.50 -4.79
6 6
6 .00-6 .50 UD1 R=0.50 CV

Very soft dark grey sandy CLAY with
7 7 .00 X VT2 3 .00 some decayed vegetal matter. 7

N=1
7.50-7.95 P4 R=0.25
8 8

8.50 -7.79
9 9
9 .00-9 .70 UD2 R=0.70 CI

10 10 .00 X VT3 Very soft grey CLAY with some sand 10


3 .00 and decayed vegetal matter.
N=1
10.50-10.95 P5 R=0.35
11 11
11.50 -10.79
12 Very soft grey CLAY with some decayed 12
12.00-12.50 UD3 R=0.50 CH 1 .50 vegetal matter.

13 13.00 -12.29 13
N=1
13.50-13.95 P6 R=0.40
14 14
Very soft grey CLAY with traces decayed
3 .00 vegetal matter.
15 15.45 N=1 15
17:25 (15.00) 2.10 15.00-15.45 P7 R=0.40 CH
18 Mar -do- 0.90
16 08:20 16.00 -15.29 16
N=2
16.50-16.95 P8 R=0.40
17 17

Very soft grey CLAY with some sand


18 7 .50 and decayed vegetal matter. 18
18.00-18.70 UD4 R=0.70 CI

19 19
N=2
20 19.50-19.95 P9 R=0.35 20
Small disturbed sample Re ma rks S ca le 1 : 100
Undisturbed sample
Standard penetration test Lo g ge d by : Daud Eb as
Water sample Che cke d by : Wo n g
Drill core sample Da te : 19 th Ma rch 2015
x Vane test
Field permeability test TIMUR DRILLING SDN. BHD. F ig . No .: S he e t 1 /3
Project: Proposed Development & Upgrading of The Pan Borneo Highway in The B O R E HO L E N O. : B H 8 0
State of Sarawak - Ph. 1 Sect. 3: Jln. Bakun Junction to Pujut Link Road
Type of Bo ri ng : Ro ta ry Was h Bo rin g & Diamo nd Core D ril li ng Location: Sg. Adong Bridge
Type of Ri g : YBM O .5 Date Started: 17th March 2015
Di ame te r o f Bori ng : 76mm Date Completed: 18th March 2015
Cas in g De ta il : NW Ca si ng s to 39 .00m Ground Level: 0.71m

Da t e D ept h of Gro un d Sa m p le & T e s t s St r a t a


& bori ng & wat er
m m
(T im e ) ( casi ng) b .g .l . De p t h Sa m p le Test L e g e n d De p t h R . L. Thickness De s c r ip t ion

20 20


21 21
21.00-21.70 UD5 R=0.70 CI
- Ditto - Very soft grey CLAY with some
(7.50) sand and decayed vegetal matter.
22 22

N=2
22.50-22.95 P10 R=0.40
23 23

23.50 -22.79
x x x
24 N=2 x x 24
24.00-24.45 P11 R=0.35 MH
x x
x x x Soft grey SILT with traces of decayed
25 x x 3 .00 25
vegetal matter.
x x x
N=3
25.50-25.95 P12 R=0.40 x x
26 x x x 26
x x
26.50 -25.79
x x x
27 N=0 x x Very soft grey SILT with traces of 27
27.00-27.45 P13 R=0.40 MH 1 .50
x x decayed vegetal matter.
x x x
28 28.00 -27.29 28

N=1
28.50-28.95 P14 R=0.40
29 29

30 N=2 Very soft grey CLAY with traces of 30


30.00-30.45 P15 R=0.40 CH 4 .50 decayed vegetal matter.

31 31

N=2
31.50-31.95 P16 R=0.40
32 32
32.50 -31.79
33 N=2 33
33.00-33.45 P17 R=0.40 CH

34 Soft grey CLAY with some sand and 34


3 .00
decayed vegetal matter.
N=2
34.50-34.95 P18 R=0.40
35 35
35.50 -34.79
36 36
N=4
36.00-36.45 P19 R=0.35 CL
2 .20 Firm grey sandy CLAY.
37 37

37.70 -36.99
38 38


Hard dark grey CLAY with traces of fine
3 .80 sand lamination.
39 N=31 39
39.00-39.45 P20 R=0.30
40 40
Small disturbed sample Re ma rks S ca le 1 : 100
Undisturbed sample
Standard penetration test Lo g ge d by : Daud Eb as
Water sample Che cke d by : Wo n g
Drill core sample Da te : 19 th Ma rch 2015
x Vane test
Field permeability test TIMUR DRILLING SDN. BHD. F ig . No .: S he e t 2 /3
Project: Proposed Development & Upgrading of The Pan Borneo Highway in The B O R E HO L E N O. : B H 8 0
State of Sarawak - Ph. 1 Sect. 3: Jln. Bakun Junction to Pujut Link Road
Type of Bo ri ng : Ro ta ry Was h Bo rin g & Diamo nd Core D ril li ng Location: Sg. Adong Bridge
Type of Ri g : YBM O .5 Date Started: 17th March 2015
Di ame te r o f Bori ng : 76mm Date Completed: 18th March 2015
Cas in g De ta il : NW Ca si ng s to 39 .00m Ground Level: 0.71m

Da t e D ept h of Gro un d Sa m p le & T e s t s St r a t a


& bori ng & wat er
m m
(T im e ) ( casi ng) b .g .l . De p t h Sa m p le Test L e g e n d De p t h R . L. Thickness De s c r ip t ion

40 40
- Ditto - Hard dark grey CLAY with
(3.80) traces of fine sand lamination.
41 41
41.50 -40.79
42 N=50/0.145m 42
42.00-42.295 P21 R=0.07

43 43
N=50/0.18m
43.50-43.83 P22 R=0.16
44 44

45 N=50/0.175m 45
45.00-45.325 P23 R=0.12

46 Completely to highly weathered dark 46


9 .63 grey MUDSTONE with traces of fine
N=50/0.14m sand lamination.
46.50-46.79 P24 R=0.12
47 47

48 N=50/0.145m 48
48.00-48.295 P25 R=0.14

49 49
N*=50/0.14m
49.50-49.64 P26 R=0.09
50 50

51.13
51 17:40 (39.00) 14.30 51.00-51.13 N*=50/0.13m 51
P27 R=0.07 51.13 -50.42
End of Drilling
W1
52 52

53 53

54 54

55 55

56 56

57 57

58 58

59 59

60 60
Small disturbed sample Re ma rks S ca le 1 : 100
Undisturbed sample
Standard penetration test Lo g ge d by : Daud Eb as
Water sample Che cke d by : Wo n g
Drill core sample Da te : 19 th Ma rch 2015
x Vane test
Field permeability test TIMUR DRILLING SDN. BHD. F ig . No .: S he e t 3 /3

Das könnte Ihnen auch gefallen