Sie sind auf Seite 1von 2

MIH Warehouse project details: Dated: 05 Jan 2017

Work breakdown Structure:


Flooring
Ceiling
HVAC
White wash
Electric + Networking work

Activity Detail

Flooring
Resources Required:
Tiles (Rs. 47,500) Total area = 85.5 sqr mtr
Cement 20 bags (Rs. 10,400)
Dry bond 40 bags (Rs. 8,800)
Estimated Cost:
Rs. 54,200/-

Ceiling
Resources Required
Main Rafter 5 lengths
Tee (2 ft) 5 pieces Estimated Cost:
Fall ceiling 2x2 44 sheets
Binding wire 6 kg Rs. 36,000/-
Steel nail 2 kg

HVAC system
Resources Required

List attached (Annex 1)

Estimated Cost: Rs. 110,000/-


Whitewash
Resources Required

Paint filling 3 bucket (Rs. 5,400)


Plastic emulsion 8 gallon (Rs. 17,000)
Brush 3 qty (Rs. 1100) Estimated Cost:
Paint Roller 1 (Rs. 1000)
Matt enamel 1 gallon (Rs. 2400)
Rs. 27,900/-
Turpentine oil 1 gallon (Rs. 1000)
Electric work + Networking
Resources Required

Electric Sockets
Electric Cable
Networking Cable Estimated Cost:
Phone Cable
Networking switch
Unknown
Electric Ducts and pipes
Lights

Total Estimated Cost: Rs. 228,000/-


(Excluding electric work)

Prepared By
Danyal Ahmed
Exec- Secretary, MIH