Beruflich Dokumente
Kultur Dokumente
Soldier beam (a vertical steel or timber beam) is driven into the ground
before excavation
Laggings, which are horizontal timber planks, are placed between soldier
beams as the excavation proceeds
Wales and struts are installed when excavation reaches the desired
depth Foundation Analysis Methods (CE-6203)
TYPES OF BRACED CUT
Here, interlocking sheet piles are driven into the soil before excavation
Equivalent cohesion
Equivalent cohesion
First Strut
At level B,
At level C,
At level D,
Obtain the required section modulus of the sheet piles as