Address of supplier :
403,Bhumi Landmark,plot No. 34 & 34A,Sec.-17,New Panvel (W) navi Mumbai 410216. Tel :27464151 ,telifax.: 27461
Address of Customer :
Less advance
Terms & Conditions: Declaration :
PAN No ACJPK3667L
TIN No 27580027953V
CST No 27580027953C
PAN No
TIN No
CST No
Service Tax
PO/WO ACL/81668/E-8TP/WO/102/2013
3115302.33118023
Total 3115302.33118023
Discount @
VAT under composition @
Service tax @ 14% 0.056 174456.930546093
0.005 15576.5116559011
Authorised Signatory
Contractor:- M/s Ganesh J. Kadav Date :- 19/01/2016
Client : -Asmeeta Infratech Ltd Work Order No. ACL/816
Site :- Textile Park - Bhiwandi Work Order Amt. Rs. 9874
BILL NO. 16th RA Work:- Construction of Fa
Anexture --I
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
work like raft, grillage, strip, foundations and footing of R.C.C. Columns and
steel stanchions, including bailing out water manually, centering,
formwork, compacting, finishing and curing etc. complete (Excluding steel
4 reinforcement) Cum 160
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
columns as per detailed designs and drawings or As directed by Engineer-
in-Charge., including centering, formwork, compacting, roughening the
surface if special finish is to be provided and curing etc. complete
5 (Excluding steel reinforcement) Cum 392
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
Beams and Lintels as per detailed drawings and designs or as directed by
Engineer-In-Charge., including centering formwork, compacting,
roughening the surface if special finish is to be provided and curing etc.
6 complete. (Excluding steel reinforcement) Cum 1252
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
slabs and landings of all thickness as per detailed drawings and designs,
including centering, formwork, compacting, roughening the surface if
special finish is to be provided and curing etc. complete (Excluding steel
7 reinforcement) Cum 1328
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
Chhajja as per detailed designs and drawings, including centering,
formwork, compacting, roughening the surface if special finish is to be
8 provided and curing etc. complete (Excluding steel reinforcement) Cum 41
Providing and casting in situ cement concrete M-20 of trap metal for C.C.
Coping as per detailed designs and drawings, including centering,
formwork, compacting, roughening the surface if special finish is to be
9 provided and curing etc. complete (Excluding steel reinforcement) Cum 21
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
waist slabs, steps and parapet as per detaled drawings for staircases,
including centering, formwork, compacting, roughening the surface if
special finish is to be provided and curing etc. complete (Excluding steel
10 reinforcement) Cum 60
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
Pardi including centering formwork, compacting, roughening the surface if
special finish is to be provided and curing. etc. complete (Excluding steel
11 reinforcement) Cum 168
Providing internal cement plaster 12mm tk.in a single coat in wet areas of
toilet & passaes ,in cement mortar 1:4 without neeru finish to concrete or
17 brick surface all lifts & levels up to satisfaction of EIC. Sqmt 2860
Providing and laying IPS floor 50 mm th with M20 concrete in floor with 3
19 mm glass strip panel of 1200 x 1200 top neat finish with cement sullry. Sqmt 4042
20 Providing & laying 100 mm high 12 mm thk, CM 1:4 finish skirting Rmt QRO
21 Spartek tile 300X300 mm in Floor Sqmt 414
Providing and fixing colour glazed tiles of 200 x 400 mm in size and 5 to 6
mm thick for dado and skirting in required positions on plaster of cement
mortar 1:4 including neat cement float, including filling joints with white
cement slurry, curing & cleaning etc. complete, as directed by Engineer-in-
22 charge sqmt 670
23 P/ L polished stone for treads and risers for steps and staircase . sqmt 412
23 Hold for Polishing Sqmt
Providing and laying polished Kotah stone slabs 600 x 600 x20 mm thick
on bed of 1:4 cement mortar including neat cement float, fill, as directed
24 by Engineer-in-charge sqmt 9520
Providing and laying polished Kotah stone slabs 600 x 100 x20 mm thick
on bed of 1:4 cement mortar including neat cement float, fill, as directed
25 by Engineer-in-charge sqmt 281
Hold for Polishing
Release
26 P/F black granite top for pantry & Urinal partition. Sqmt 12
Providing and applying Oil Bound Distemper of approved colour, shade &
quality in two coats over one coat of primer to new surface incl.
scaffolding, brushing & brooming down etc. complete, as directed by
33 Engineer-in-charge sqmt 9488
Providing and fixing w c squatting pan ( Indian type W.C. pan ) with 100mm
sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern with
manually controlled device (handle lever) conforming to IS : 7231,
Parryware/Hindware/Seabird/Orient (Coral) with all fittings and fixtures
complete including cutting and making good the walls and floors wherever
45 required.
White Vitreous china Orissa pattern W.C. pan.of size 580x440mm with
integral type foot rests Nos 52
46 One urinal basin with 5 litre white P.V.C. automatic flushing cistern Nos 24
Providing and fixing wash basin with C.I./M.S. brackets, 15 mm C.P. brass
pillar taps, Kingston/Gem/Techno/Parko, 32 mm C.P. brass waste of
standard pattern, including painting of fittings and brackets, cutting and
47 making good the walls wherever require :A] White Vitreous china
Wash basin size 630x450 mm with a pair of 15 mm C.P.brass pillar taps Nos 52
Providing and fixing 10 cm dia. UPVC Nahani Trap fixed with UPVC grating,
UPVC plug bend and piece of UPVC pipe upto plug bend, scaffolding etc.
48 complete. Nos 64
Providing and fixing ____ UPVC vent / waste water / waste water & soil
49 pipe
a) 32 mm. diameter waste water pipe Rmt 80
a) 75 mm. diameter waste water pipe Rmt 240
b) 90 mm. diameter waste water & soil pipe Rmt 600
c) 150 mm. diameter waste water & soil pipe Rmt 960
Providing and laying PVC waste pipes of SWR Prince make (10kg/cm2) in
line and level including all making chases in wall/floor necessary labour,
50 bends, tees, all fixtures complete and testing the pipes.
a) 40mm dia Rmt 68
b) 50mm dia Rmt 75
c) 110mm dia Rmt 440
Total Amt
Rate variation
Total Abs-I
Total Abs-II
Grand Total=I+II
Date :- 19/01/2016
Work Order No. ACL/81668/E-8(Contracts)TP/WO/102-A/2013
Work Order Amt. Rs. 98746950 /-
Work:- Construction of Factory Bldg Buildings A4,A5B3 & B7
Quantity Amount
Rate Previous Bill . This Bill . Total . Previous Bill . This Bill .
200 - -
- - - - -
- - - - -
289 80.54 - 80.54 23,276.06 -
454 82.70 - 82.70 37,545.80 -
- - - - -
230 373.46 -160.20 213.26 85,895.80 -36,846.00
559 172.99 31.91 204.90 96,701.41 17,837.69
499 78.43 33.43 111.86 39,136.57 16,681.57
621 164.94 - 164.94 102,427.74 -
- - - - -
437 - - - - -
1415 - - - - -
1783 4.00 - 4.00 7,132.00 -
2473 4.00 - 4.00 9,892.00 -
- - - - -
403 34.00 - 34.00 13,702.00 -
- - - -
- - - -
- - - - -
154 - - - - -
230 163.05 26.25 189.30 37,501.50 6,037.50
363 - - - - -
940 176.64 - 176.64 166,041.60 -
- - - - -
127 37.20 5.95 43.15 4,724.40 755.65
164 - - - - -
469 131.70 94.00 225.70 61,767.30 44,086.00
- - - - -
3680 2.00 - 2.00 7,360.00 -
- - - - -
909 2.00 - 2.00 1,818.00 -
- - - - -
230 - - - - -
- - - - -
10350 10.00 2.00 12.00 103,500.00 20,700.00
- - - - -
1570 98.80 - 98.80 155,116.00 -
- - - - -
- - - - -
- - - - -
140 94.00 - 94.00 13,160.00 -
200 6.00 - 6.00 1,200.00 -
111 - 672.63 672.63 - 74,661.69
650 128.08 21.68 149.76 83,252.00 14,093.72
690 - 149.76 149.76 - 103,336.23
64 1,200.00 -602.00 598.00 76,800.00 -38,527.70
2325 2.00 - 2.00 4,650.00 -
- - -
- - -
- - - - -
- - - - -
100 7.00 - 7.00 700.00 -
140 - - - - -
200 - - - - -
1500 15.00 - 15.00 22,500.00 -
42,543,133.57 952,725.53
4,446,652.56 350,818.21
-603,338.11 603,338.11
46,386,448.02 1,906,881.85
38,508,083.98 1,208,420.48
84,894,532.00 3,115,302.33
84894532
0
mount
Total Bill .
-
419,179.06
488,823.92
7,922.41
1,703,602.31
5,627,882.69
7,015,635.19
146,215.28
138,771.16
274,634.05
656,911.75
7,553,952.82
170,489.54
2,982,355.85
343,775.10
1,490,111.10
129,734.14
2,453,344.56
-
21,727.60
14,365.29
96,567.00
268,293.96
212,488.62
4,481,615.39
161,059.46
-
11,670.98
19,406.25
670,680.00
348,416.64
175,720.00
288,070.00
39,744.00
402,187.63
443,582.77
187,642.09
-
179,987.10
2,086,462.35
-
-
23,276.06
37,545.80
-
49,049.80
114,539.10
55,818.14
102,427.74
-
-
-
7,132.00
9,892.00
-
13,702.00
17,280.00
-
-
61,116.00
8,970.00
50,056.00
128,128.00
42,780.00
65,000.00
14,784.00
-
-
43,539.00
-
166,041.60
-
5,480.05
-
105,853.30
-
7,360.00
-
1,818.00
-
-
-
124,200.00
16,100.00
-
155,116.00
-
-
-
13,160.00
1,200.00
74,661.69
97,345.72
103,336.23
38,272.30
4,650.00
-
-
-
-
700.00
-
-
22,500.00
43,495,858.58
4,797,470.77
48,293,329.35
39,730,754.46
88,024,083.81
Contractor:- M/s Ganesh J. Kadav Date :- 09/11/2015
Client : -Asmeeta Infratech Ltd Work Order No. ACL/81
Site :- Textile Park - Bhiwandi Work Order Amt. Rs. 64
BILL NO. 16th RA Work:- Construction of F
Anexture --I
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
work like raft, grillage, strip, foundations and footing of R.C.C. Columns and
steel stanchions, including bailing out water manually, centering, formwork,
compacting, finishing and curing etc. complete (Excluding steel
4 reinforcement) Cum 160
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
columns as per detailed designs and drawings or As directed by Engineer-in-
Charge., including centering, formwork, compacting, roughening the surface
if special finish is to be provided and curing etc. complete (Excluding steel
5 reinforcement) Cum 392
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
Beams and Lintels as per detailed drawings and designs or as directed by
Engineer-In-Charge., including centering formwork, compacting, roughening
the surface if special finish is to be provided and curing etc. complete.
6 (Excluding steel reinforcement) Cum 1252
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
slabs and landings of all thickness as per detailed drawings and designs,
including centering, formwork, compacting, roughening the surface if special
finish is to be provided and curing etc. complete (Excluding steel
7 reinforcement) Cum 1328
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
Chhajja as per detailed designs and drawings, including centering, formwork,
compacting, roughening the surface if special finish is to be provided and
8 curing etc. complete (Excluding steel reinforcement) Cum 41
Providing and casting in situ cement concrete M-20 of trap metal for C.C.
Coping as per detailed designs and drawings, including centering, formwork,
compacting, roughening the surface if special finish is to be provided and
9 curing etc. complete (Excluding steel reinforcement) Cum 21
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
waist slabs, steps and parapet as per detaled drawings for staircases,
including centering, formwork, compacting, roughening the surface if special
finish is to be provided and curing etc. complete (Excluding steel
10 reinforcement) Cum 60
Providing and casting in situ cement concrete M-25 of trap metal for R.C.C.
Pardi including centering formwork, compacting, roughening the surface if
special finish is to be provided and curing. etc. complete (Excluding steel
11 reinforcement) Cum 168
Providing internal cement plaster 12mm tk.in a single coat in wet areas of
toilet & passaes ,in cement mortar 1:4 without neeru finish to concrete or
17 brick surface all lifts & levels up to satisfaction of EIC. Sqmt 2860
Providing sand face plaster externally in two coats using approved screened
sand in all positions, including providing base coat of 12 mm thick in cement
mortar 1:4 mixing approved water proofing compound at the rate of 1
kilogramme / 50 kg of cement and curing for 14 days including preparing the
18 surface, watering and scaffolding etc. complete. Sqmt 10000
Double coat Ready mix Plaster Sqmt QBO
Providing and laying IPS floor 50 mm th with M20 concrete in floor with 3
19 mm glass strip panel of 1200 x 1200 top neat finish with cement sullry. Sqmt 4042
20 Providing & laying 100 mm high 12 mm thk, CM 1:4 finish skirting Rmt QRO
21 Spartek tile 300X300 mm in Floor Sqmt 414
Providing and fixing colour glazed tiles of 200 x 400 mm in size and 5 to 6
mm thick for dado and skirting in required positions on plaster of cement
mortar 1:4 including neat cement float, including filling joints with white
cement slurry, curing & cleaning etc. complete, as directed by Engineer-in-
22 charge sqmt 670
23 P/ L polished stone for treads and risers for steps and staircase . sqmt 412
Providing and laying polished Kotah stone slabs 600 x 600 x20 mm thick on
bed of 1:4 cement mortar including neat cement float, fill, as directed by
24 Engineer-in-charge sqmt 9520
Providing and laying polished Kotah stone slabs 600 x 100 x20 mm thick on
bed of 1:4 cement mortar including neat cement float, fill, as directed by
25 Engineer-in-charge sqmt 281
26 P/F black granite top for pantry & Urinal partition. Sqmt 12
Providing and applying Oil Bound Distemper of approved colour, shade &
quality in two coats over one coat of primer to new surface incl. scaffolding,
33 brushing & brooming down etc. complete, as directed by Engineer-in-charge sqmt 9488
Providing and fixing w c squatting pan ( Indian type W.C. pan ) with 100mm
sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern with
manually controlled device (handle lever) conforming to IS : 7231,
Parryware/Hindware/Seabird/Orient (Coral) with all fittings and fixtures
complete including cutting and making good the walls and floors wherever
45 required.
White Vitreous china Orissa pattern W.C. pan.of size 580x440mm with
integral type foot rests Nos 52
46 One urinal basin with 5 litre white P.V.C. automatic flushing cistern Nos 24
Providing and fixing wash basin with C.I./M.S. brackets, 15 mm C.P. brass
pillar taps, Kingston/Gem/Techno/Parko, 32 mm C.P. brass waste of standard
pattern, including painting of fittings and brackets, cutting and making good
47 the walls wherever require :A] White Vitreous china
Wash basin size 630x450 mm with a pair of 15 mm C.P.brass pillar taps Nos 52
Providing and fixing 10 cm dia. UPVC Nahani Trap fixed with UPVC grating,
UPVC plug bend and piece of UPVC pipe upto plug bend, scaffolding etc.
48 complete. Nos 64
49 Providing and fixing ____ UPVC vent / waste water / waste water & soil pipe
a) 32 mm. diameter waste water pipe Rmt 80
a) 75 mm. diameter waste water pipe Rmt 240
b) 90 mm. diameter waste water & soil pipe Rmt 600
c) 150 mm. diameter waste water & soil pipe Rmt 960
Providing and laying PVC waste pipes of SWR Prince make (10kg/cm2) in line
and level including all making chases in wall/floor necessary labour, bends,
50 tees, all fixtures complete and testing the pipes.
a) 40mm dia Rmt 68
b) 50mm dia Rmt 75
c) 110mm dia Rmt 440
Total Amt
Date :- 09/11/2015
Work Order No. ACL/81668/E-8(Contracts)TP/WO/102-A/2013
Work Order Amt. Rs. 64540089 /-
Work:- Construction of Factory Bldg Buildings A3,A10,A11 & B4
Quantity Amount
Rate
Previous Bill . This Bill . Total . Previous Bill . This Bill .
200 628.60 0.00 628.60 125,720.00 0.40
- - - -
- - - -
289 82.63 - 82.63 23,880.07 -
454 39.16 - 39.16 17,778.64 -
- - - -
230 169.80 - 169.80 39,054.00 -
559 204.31 - 204.31 114,209.29 -
499 285.82 - 285.82 142,624.18 -
621 148.60 - 148.60 92,280.60 -
- - - -
437 - - - -
1415 - - - -
1783 6.00 - 6.00 10,698.00 -
2473 6.00 - 6.00 14,838.00 -
- - - -
403 27.00 3.00 30.00 10,881.00 1,209.00
- - - -
240 58.00 20.00 78.00 13,920.00 4,800.00
400 - - - -
853 - - - -
- - - -
10186 6.00 - 6.00 61,116.00 -
- - -
- - -
- - - -
154 - - - -
230 87.70 - 87.70 20,171.00 -
363 - - - -
940 131.52 - 131.52 123,628.80 -
- - - -
127 59.96 - 59.96 7,614.92 -
164 - - -
469 36.50 - 36.50 17,118.50 -
- - - -
3680 1.00 2.00 3.00 3,680.00 7,360.00
- - - -
909 1.00 2.00 3.00 909.00 1,818.00
- - - -
230 - - - -
- - - -
10350 8.00 - 8.00 82,800.00 -
- - - -
1570 77.40 - 77.40 121,518.00 -
- - - -
- - - -
- - - -
140 - - -
200 - - -
111 - - -
650 145.00 72.50 217.50 94,250.00 47,125.00
690 77.07 25.69 102.76 53,178.30 17,726.10
64 621.64 1,650.61 2,272.25 39,784.96 105,638.86
2325 6.00 - 6.00 13,950.00 -
329 1,110.29 - 1,110.29 365,285.40 -
90 281.98 0.01 281.99 25,378.20 0.59
- - - -
- - - -
100 - - -
140 - - - -
200 - - - -
1500 5.00 5.00 - 7,500.00
95,000.00
38,508,083.98 1,208,420.48
mount
Total Bill .
125,720.40 125720 0
33,966.37 33966.37125 0
118,981.17 118981.17 0
529,259.27 529259.27175 0
1,211,962.62 1211964.174375 0
150,414.73 114338.448 0
250,685.39 205836.204 0
337,781.75 39.87 337781.745 -52748.01
158,729.05 145167.237 0
25,312.50 25312.5 0
486,000.00 486000 0
262,880.64 237378.24 0
238,955.63 225349.6875 0
465,965.00 279415 0
119,232.00 99360 0
- 0 0
- 0 0
23,880.07 23880.07 0
17,778.64 17778.64 0
- 0 0
39,054.00 39054 0
114,209.29 114209.29 0
142,624.18 142624.18 0
92,280.60 92280.6 0
- 0 0
- 0 0
- 0 0
10,698.00 10698 0
14,838.00 14838 0
- 0 0
12,090.00 10881 0
- 0 0
18,720.00 13920 0
- 0 0
- 0 0
- 0 0
61,116.00 61116 0
- 14950 0
- 0 0
93,855.00 93855 0
- 0 0
73,920.00 73920 0
42,780.00 42780 0
- 0 0
80,000.00 80000 0
18,304.00 18304 0
- 0 0
- 0 0
20,171.00 20171 0
- 0 0
123,628.80 123628.8 0
- 0 0
7,614.92 7614.92 0
- 0 0
17,118.50 17118.5 0
- 0 0
11,040.00 3680 0
- 0 0
2,727.00 909 0
- 0 0
- 0 0
- 0 0
82,800.00 82800 0
13,800.00 13800 0
- 0 0
121,518.00 121518 0
- 0 0
- 0 0
- 0 0
- 0 0
- 0
- 0 0
141,375.00 94250 0
70,904.40 53178.3 0
145,423.82 39784.96 0
13,950.00 13950 0
365,285.40 365285.395195 0
25,378.79 25378.2 0
- 0
- 0
- 0
- 0
- 0
7,500.00 0 0
95,000.00 95000 0
0
39,730,754.46 37836263.56964 -671820.410661
0
0
Contractor:- M/s Ganesh J. Kadav Date :- 09/11/2015
Client : -Asmeeta Infratech Ltd Work Order No. ACL/81668/E-8(Con
Site :- Textile Park - Bhiwandi
BILL NO. 16th RA Work Order Amt. Rs. 16,32,87,048.0
Work:- Construction of Factory Bldg
Steel Statement for A3, A4, A5,B4,B7 &A10 for Textile Park, Kalyan Bhiwandi
Total Steel
Average rate
Cement
Basic Rate 250
Average Rate 301.8835034
Rate Variation 51.883503401
Rate Variation 51.883503401
Cement Bags 32786.292581
Adjustment due to Cement Variation 1701067.7226
Steel
Basic Rate 32
Average Rate 42.356222447
Rate Variation 10.356222447
Rate Variation 10.356222447
Consumed Steel 298989.62325
Adjustment due to Steel Variation 3096403.0476
332111
Contracts)TP/WO/102-A/2013
9.00 /- (Excluding All Taxes )
ldg Buildings A3, A4 ,A5,A10,B3,B4 & B7
Quantity Rate Amount Vat 12.5% Unloading cTotal Rate Decla Contractor Cla
283
11760
Average Rate
Certify Rate Vat Unloading Certify TotAmount
14066967.393
42.356222447
Certify Rate Vat 12 Unloading Total certiAmount
3,550,150.00
301.88
Contractor:- M/s Ganesh J. Kadav Date :- 19/01/2016
Client : -Asmeeta Infratech Ltd Work Order No. ACL/81668/E-8(Contracts)TP/WO/102-A/2013
Site :- Textile Park - Bhiwandi Work Order Amt. Rs. 98746950 /-
BILL NO. 16th RA Work:- Construction of Factory Bldg Buildings A4,A5B3 & B7
Anexture --I
SUMMARY OF QUANTITIES
It No Item Description Unit Prious Present Total
A 3 PCC 1:3:6 for Floor Pcc Cum 107.00 1.99 108.99 4.45
4 Footing Cum 1.28 - 1.28
5 Column M25 Cum 163.96 6.74 170.70
6 Beam M25 Cum 583.81 - 583.81
7 Slab M25 Cum 732.11 3.36 735.47
8 Chajja Cum 13.61 1.62 15.23
9 Coping Cum 16.09 - 16.09
10 Stair case M25 Cum 28.82 -0.00 28.82
11 Pardi M25 Cum 61.55 2.85 64.40
Total Qty. Cum 1,708.23 16.55 1,724.78 6.55
Rmc Cum 2,306.50 2,306.50 6.50
B
13 230mm Brickwork Up to plinth work cum 38.23 0.77 39.00 1.90
14 230 mm thk Brick Masonry in superstructure Sqm 2,658.55 168.33 2,826.88 0.29
15 100 mm thk Brick Masonry in superstructure Sqm 469.85 39.44 509.30 0.28
17 12mm Internal single coat Plaster Sqm 322.72 - 322.72 0.17
18 Double coat plaster Sqm 4,853.78 173.56 5,027.35 0.25
Double coat plaster Ready mix Sqm - 0.22
19 IPS Sqm 21.18 28.54 49.72 0.45
20 tile skerting Rmt 156.14 - 156.14 0.32
21 Flooring Tiles Sqm 59.76 60.20 119.96 0.25
22 Dado tiles Sqm 250.74 70.95 321.70 0.19
23 Steps Sqm 77.18 83.43 160.61 0.32
24 Kotah flooring Sqm 4,634.79 72.79 4,707.58 0.32
25 Kotah Skerting Sqm 117.55 38.07 155.61 0.30
35 W p In WC Cum 41.14 - 41.14 2.40
36 W p In Terrace Sqm 2,454.66 - 2,454.66 0.50
45 WC pan fixing Nos 24.00 2.00 26.00 0.20
48 NT Fixing Nos 35.00 7.00 42.00 0.05
E-3 OHWT W.p. plaster Sqm 64.00 85.76 149.76 0.21
E-4 Lift pit wp plaster Sqm - 149.76 149.76 0.21
54 Chamber Nos - 12.00 12.00 2.00
55 Gully trap Nos - 7.00 7.00 0.50
56 Stone ware pipe Rmt - 98.80 98.80 0.05
27 Total No of Bags 0
Wastage on RMC 2%
Wastage on finishing work. 2% 0
G. Total No of Bags 0
31 Total No of Bags 0
32 Wastage on RMC 2%
33 Wastage on finishing work. 2% 0
34 G. Total No of Bags 0
RMC Ceme
H37-H39
Received
Difference
TP/WO/102-A/2013
484.90
11,295.61
14,992.25
74.09
811.31
142.60
54.86
1,256.84
-
22.37
49.34
29.75
60.48
50.75
1,487.60
46.68
98.74
1,227.33
5.20
2.10
31.45
31.45
24.00
3.50
4.94
5515.3910317
299.845
110.30782063
17706.05793
TP/WO/102-A/2013
3, ,A10,A11, B4 & SC
246.03
9,025.41
-
107.52
1,021.24
219.54
63.61
1,514.27
-
39.69
89.11
41.99
56.51
80.68
1,112.27
46.01
208.18
998.56
3.00
2.60
45.68
21.58
16.00
3.00
3.87
5694.8914865
113.89782973
15080.234651
32786.292581
0
14655.458415
5600
-9055.458415
pcc 2 2
2 2
1 9
1 2
Footing 1 9
col 1 9
beam 2 2
beam 2 2
13.8415
16
29.8415
62.13
13864.5
Contractor:- M/s Ganesh J. Kadav
Client : -Asmeeta Infratech Ltd
Site :- Textile Park - Bhiwandi
BILL NO. 17th.RA
SUMMARY OF QUANTITY
A4 A5
Sr. No. Descriptions
Unit Cumulative Cumulative
1.00 Excavation
a All kinds of soil, murum& soft rock ... Cum - -139.27
2.00 Soling Cum - 4.46
3.00 Pcc Cum - 1.00
4.00 M-25 of trap metal for R.C.C. footing of R.C.C. Columns Cum - -
5.00 Col Cum 6.74 -
6.00 Beam Cum 11.44 0.01
7.00 slab Cum - -
8.00 Chajja Cum - 0.75
9.00 Coping Cum - 0.26
10.00 R.C.C. waist slabs, steps and parapet, Cum - 0.00
11.00 Pardi Cum - -
12.00 Steel Kg 17.00 -0.00
Providing Second Class Burnt Brick masonry . Up to
13.00 plinth work cum - -
14.00 230 mm bricks Sqmt 155.62 4.37
15.00 100 mmbricks Sqmt - 13.38
16.00 Gypsum plaster Sqmt - 306.66
17.00 Single coat Plaster Sqmt - -0.01
18.00 Double coat Plaster Sqmt - 59.89
26.00 P/F black granite top for pantry & Urinal partition. - 3.11
35.00 waterproofing in W.C. and bath including brick bat coba CUM - -
water proofing treatment of 112 mm average thickness
36.00 with 10 yrs guarantee SQMT - -0.00
- -
Providing and fixiing ----- mm. dia. Screw down bib tap
40.00 fo brass of approved quality and make, etc. complete. - -
a) 15 mm. Diameter. Nos - -
- - - - - - -
- 6.74 - - - - -
- 11.45 4.46 1.34 - - -
3.36 3.36 - 1.35 - - -
0.87 1.62 - - - - -
0.26 0.53 0.27 0.00 - 1.62 -
- 0.00 - 5.27 - - -
3.95 3.95 2.29 2.20 - - -
- 17.00 - 1,397.29 - - -
111.78 111.78 - - - - -
20.69 20.69 - - - - -
322.85 322.85 - - - - -
- - - - - - -
- - - - - - -
40.27 40.27 - - - - -
41.35 41.35 - - - - -
- - - - - - -
106.63 132.55 - - - - -
102.45 134.36 - - - - -
55.93 89.36 - - - - -
82.47 82.47 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
2.00 2.00 - - - - -
2.00 2.00 - - - - -
- - - - - - -
17.00 17.00 - - 3.00 - -
- - - - - - -
36.00 36.00 - - 20.00 - -
- - - - - - -
- - - - - - -
- - - - - - -
4.00 4.00 - - - - -
6.00 6.00 - - - - -
4.00 4.00 - - - - -
13.00 14.00 - - - - -
6.00 6.00 - - - - -
13.00 13.00 - - - - -
21.00 22.00 - - - - -
- - - - - - -
- - - - - - -
89.05 144.45 - - - - -
- - - - - - -
88.32 88.32 - - - - -
- - - - - - -
18.90 24.85 - - - - -
- - - - - - -
106.60 210.80 - - - - -
- - - - - - -
6.00 6.00 - - - - -
4.00 3.00 - - - - -
40.80 40.80 - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- 94.00 - - - - -
- 6.00 - - - - -
672.63 672.63 - - - - -
- - - - - - -
77.45
-
15.72
-
-
5.80
1.35
-
1.89
5.27
4.49
1,397.29
34.64
103.49
-
35.52
89.74
1,140.34
52.83
29.39
126.91
228.07
32.14
57.76
27.30
8.10
11.70
0.75
83.85
17.28
2,137.17
1,989.43
4,199.39
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3.00
-
20.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.00
2.00
-
-
-
-
-
-
-
-
46.81
25.69
2,272.25
6.00
-
281.99
-
-
-
-
-
-
Contractor:- M/s Ganesh J. Kadav
Client : -Asmeeta Infratech Ltd
Site :- Textile Park - Bhiwandi
BILL NO. 16th.RA
SUMMARY OF QUANTITY A4 A5 B7 A3
Total
Sr. No. Descriptions Unit Cumulative Cumulative Cumulative Cumulative
1 Excavation
a All kinds of soil, murum& soft rock ... Cum - 69.44 69.44 138.88 -
2 Soling Cum 43.72 291.62 335.34 14.00
3 Pcc Cum 1.27 21.72 86.00 108.99 3.85
M-25 of trap metal for R.C.C. footing of R.C.C. Columns Cum - 0.64 0.64 1.28 -
4
5 Col Cum 36.94 53.37 80.40 170.70 58.24
6 Beam Cum 114.14 191.07 278.59 583.81 249.12
7 slab Cum 156.81 251.71 326.95 735.47 322.94
8 Chajja Cum 1.75 6.74 6.74 15.23 5.99
9 Coping Cum - 8.15 7.94 16.09 4.93
10 R.C.C. waist slabs, steps and parapet, Cum 4.17 12.22 12.43 28.82 8.10
11 Pardi Cum 10.82 28.66 24.93 64.40 29.40
12 Steel Kg 30,967.62 58,232.53 75,015.57 164,215.72 70,312.17
Providing Second Class Burnt Brick masonry . Up to cum - 15.57 23.42 39.00 -
13 plinth work
14 230 mm bricks Sqmt 375.88 1,239.59 1,211.41 2,826.88 1,017.55
15 100 mmbricks Sqmt - 243.03 266.26 509.30 176.87
16 Gypsum plaster Sqmt - 2,614.23 2,614.23 5,228.46 18.47
17 Single coat Plaster Sqmt - 161.36 161.36 322.72 -
18 Double coat Plaster Sqmt - 2,513.67 2,513.67 5,027.35 107.03
waterproofing in W.C. and bath including brick bat coba CUM - 20.45 20.69 41.14 -
35
water proofing treatment of 112 mm average thickness SQMT - 1,226.07 1,228.59 2,454.66 -
36 with 10 yrs guarantee
- - - - -
Providing and laying on walls/ ceiling with screwed
sockets, joints & necessary galvanized iron fitting, - - - - -
37 etc. complete
b) 20mm dia. - 40.27 40.27 80.54 -
c) 25mm dia. - 41.35 41.35 82.70 -
Providing and laying on walls/ ceiling / floors with - - - - -
38 necessary galvanized iron fitting, etc. complete
a) 15mm dia. Rmt - 106.63 106.63 213.26 -
b) 32mm dia. Rmt - 102.45 102.45 204.90 -
c) 40mm dia. Rmt - 55.93 55.93 111.86 -
d) 50mm dia. Rmt - 82.47 82.47 164.94 -
Supply & installation of gun metal ball valve Indian make
(Sai) & ISI approved of following dia. With all necessary - - - - -
39 fittings complete.
a) 15mm Dia Nos. - - - - -
b) 32mm Dia Nos. - - - - -
c) 40mm Dia Nos. - 2.00 2.00 4.00 -
d) 50mm Dia Nos. - 2.00 2.00 4.00 -
Providing and fixiing ----- mm. dia. Screw down bib tap fo - - - - -
brass of approved quality and make, etc. complete.
40
a) 15 mm. Diameter. Nos - 17.00 17.00 34.00 -
Providing and fixing---- mm. dia. Screw down wheeled
stop tap of steel with chromium plating of approved - - - - -
41 quality Etc. complete.
a) 15 mm Diameter Nos - 36.00 36.00 72.00 -
c) 25 mm Diameter Nos - - - - -
d) 32 mm. Diameter Nos - - - - -
Providing and fixing fittings and accessories such as ball - - - - -
42 cock, overflow pipe with plug. etc. complete.
FOR ONE BUILDING Nos - 2.00 4.00 6.00 -
Providing and fixing---- mm. dia. Screw down wheeled - - 6.00 6.00 -
flush cock of steel 25mm dia. Etc. complete.
43
P/F Europion type white glazed earthenware wc pan - 4.00 4.00 8.00 -
44 with plastic sheet cover etc complete.
45 White Vitreous china Orissa pattern W.C. pan. Nos - 13.00 13.00 26.00 -
One urinal basin with 5 litre white P.V.C. automatic Nos - 6.00 6.00 12.00 -
46 flushing cistern
Wash basin size 630x450 mm with a pair of 15 mm Nos - 13.00 13.00 26.00 -
47 C.P.brass pillar taps
48 10 cm dia. UPVC Nahani Trap Nos - 21.00 21.00 42.00 -
49 UPVC vent / waste water / waste water & soil pipe - - - - -
a) 32 mm. diameter waste water pipe Rmt - - - - -
a) 75 mm. diameter waste water pipe Rmt - 100.25 89.05 189.30 -
b) 90 mm. diameter waste water & soil pipe Rmt - - - - -
c) 150 mm. diameter waste water & soil pipe Rmt - 88.32 88.32 176.64 -
50 Providing and laying PVC waste pipes - - - - -
a) 40mm dia Rmt - 24.25 18.90 43.15 -
b) 50mm dia Rmt - - - - -
c) 110mm dia Rmt - 119.10 106.60 225.70 -
Providing and fixing stainless steel kitchen sink
508mm x 432mm (overall size) - 1.00 1.00 2.00 -
51
52 Providing & fixing 15mm dia. J spout Sink cock. - 1.00 1.00 2.00 -
Providing & fixing in position UPVC, Ultra Voilet Nos - - - - -
53 stabilised ____ 90mm outer diameter cowl dome
Providing and constructing Brick Masonry Inspection - 6.00 6.00 12.00 -
54 chamber ____
Providing and fixing 15 X 10 cm of approved quality salt
glazed stoneware gully trap in cement concrete 1:4:8 , Nos - 3.00 4.00 7.00 -
55 testing etc. complete.
Providing and laying salt glazed stoneware pipe of 150 Rmt - 58.00 40.80 98.80 -
56 mm dia. Including fittings etc. complete
A Extra Items - - - - -
1 Providing & rebarring reinforcement bar. - - - - -
1a 8mm Nos - - - - -
1b 12mm Nos - 94.00 - 94.00 -
1c 16mm Nos - 6.00 - 6.00 -
2 Back filling inplot area in layar Cum - - 672.63 672.63 -
Water proof plaster - - - -
3 OHWT SQMT - 64.08 85.68 149.76 -
4 Lift pit SQMT - 25.69 25.14 50.83 -
5 Providing form finish ceiling SQMT - 598.00 - 598.00 -
6 Provinding & fixing 600mm dia CI man hole cover Nos - 2.00 - 2.00 -
1 Vetrified tile flooring Sqmt - - - - -
2 Laying, cutting & fixing 100mm high skerting. Rmt - - - - -
B Additional work - - - - -
2 Rebarring & grouting work - - - - -
8mm Nos - 7.00 - 7.00 -
12mm Nos - - - - -
16mm Nos - - - - -
A' Col Breaking Nos - 15.00 - 15.00 5.00
A10 A11 B4 S. Cabin
Total
Cumulative Cumulative Cumulative Cumulative
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
2.00 4.00 - - 6.00
2.00 4.00 - - 6.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
72.50 72.50 72.50 - 217.50
25.69 51.38 25.69 - 102.76
278.46 - 1,993.79 - 2,272.25
2.00 4.00 - - 6.00
1,110.29 - - - 1,110.29
281.99 - - - 281.99
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 5.00
Contractor:- M/s Ganesh J. Kadav
Client : -Asmeeta Infratech Ltd
Site :- Textile Park - Bhiwandi
BILL NO. 16th.RA
SUMMARY OF QUANTITY
A4
Sr. No. Descriptions Unit Previous
This bill Cumulative
bill
1 Excavation
a All kinds of soil, murum& soft rock ... Cum - -
2 Soling Cum 28.58 - 28.58
3 Pcc Cum 1.27 - 1.27
Providing and fixiing ----- mm. dia. Screw down bib tap fo
40 brass of approved quality and make, etc. complete. -
a) 15 mm. Diameter. Nos -
- -
40.27 - 40.27 - 40.27 40.27 - - -
41.35 - 41.35 - 41.35 41.35 - - -
- - - - -
80.71 25.92 106.63 106.63 106.63 - -
70.54 31.91 102.45 102.45 102.45 - -
22.50 33.43 55.93 55.93 55.93 - -
82.47 - 82.47 82.47 82.47 - -
- - - - -
- - - - -
- - - - -
2.00 - 2.00 2.00 2.00 - -
2.00 - 2.00 2.00 2.00 - -
- - - - -
17.00 - 17.00 17.00 17.00 - -
- - - - -
36.00 - 36.00 36.00 36.00 - -
- - - - -
- - - - -
- - - - -
2.00 - 2.00 4.00 4.00 - -
- - - 6.00 6.00 - - -
- - - - - - - -
- - -
26.09 - 26.09 56.54 - 56.54 - - -
- - - 39.16 - 39.16 - - -
- - - - - -
49.36 - 49.36 120.44 - 120.44 - -
54.51 - 54.51 149.80 - 149.80 - -
114.42 - 114.42 171.40 - 171.40 - -
50.80 - 50.80 97.80 - 97.80 - -
- - - - - -
- - - - - -
- - - - - -
2.00 - 2.00 4.00 - 4.00 - -
2.00 - 2.00 4.00 - 4.00 - -
- - - - - -
10.00 - 10.00 17.00 3.00 20.00 - -
- - - - - -
26.00 - 26.00 32.00 20.00 52.00 - -
- - - - - -
- - - - - -
- - - - - -
2.00 - 2.00 4.00 - 4.00 - -
- - - - - - - -
- - - - - - - - -
- - - 356.71
3.36 - 3.36 480.92
3.42 - 3.42 164.29
- - 95.58
35.99 - 35.99 6,385.21
- - - 1,293.38
42.37 - 42.37 9,480.96
42.37 - 42.37 696.89
78.02 - 78.02 11,084.42
-
- - 137.92
- - 29.39
- - 289.25
- - 622.28
- - 415.93
- - 8,227.43
- - 308.97
- - 14.31
- - 385.56
- - 192.96
- - 7.05
- - 301.61
- - 138.24
- - 12,503.70
- - 10,308.07
- - 20,517.16
- -
- - 127.88
-
- - 163.17
- - 121.86
- -
- 383.06
- 409.21
- 397.68
- 313.54
- -
- -
- -
- 10.00
- 10.00
- -
- 64.00
- -
- 150.00
- -
- -
- -
- 12.00
- - 6.00
- - 23.00
- - 41.00
- - 24.00
- - 58.00
- - 94.00
- -
- -
- - 277.00
- -
- - 308.16
- -
- - 103.11
- -
- - 262.20
- - 5.00
- - 5.00
- - -
- - 20.00
- - 13.00
- - 176.20
- -
- -
- -
- 94.00
- 6.00
- - 672.63
-
- 367.26
- - 153.59
- - 2,870.25
- - 8.00
- - 1,110.29
- - 281.99
- -
- -
- 7.00
- -
- -
- - 20.00
Finishing work
A4 A5 B7 A3
Item No Descriptions Unit
Qty Qty Qty Qty
1a Excavation Cum 69.44 69.44
2 Soling Cum 28.58 43.72 291.62 14.00
3 PCC Cum 1.27 21.72 86.00 3.85
13 BBM up to plinth Cum 15.57 23.42
14 BBM 9" Sqmt 375.88 1,239.59 1,211.41 1,017.55
15 BBM 4" Sqmt 243.03 266.26 176.87
16 Gypsum Sqmt 2,614.23 2,614.23 18.47
17 Plaster single coat Sqmt 161.36 161.36
18 Plaster double coat Sqmt 2,513.67 2,513.67 107.03
19 IPS Sqmt 24.86 24.86
20 Skerting in tiles Rmt - -
21 Tiles in flooring Sqmt 59.76 60.20
22 Tiles in dado Sqmt 161.37 160.32
23 Kotah (Trade & Risers) Sqmt 77.18 83.43
24 Kotah flooring Sqmt 2,353.79 2,353.79
25 Kotah skerting Sqmt 77.81 77.81
26 Granite Sqmt 3.11 3.11
27 Al. sliding window Sqmt 111.78 111.78
28 Al fixed glass window/Louvers Sqmt 55.08 54.90
29 Door frame Cum 1.45 1.45
30 Door shutter Sqmt 57.71 57.52
Cement Jalli Sqmt 17.28 17.28
32 Cement paint Sqmt 2,513.67 2,513.67
33 OBD Sqmt 2,614.23 2,604.39
34 White wash Sqmt 3,760.32 3,745.36 3,776.35
Water proofing
35 Water proof WC & Bath Cum 20.45 20.69
36 Water proof terrace Sqmt 1,226.07 1,228.59
Sanitory work
37 A) B class pipe
b) 20mm dia. Rmt 40.27 40.27
c) 25mm dia. Rmt 41.35 41.35
38 galvanized iron fitting, etc. complete
a) 15mm dia. Rmt 106.63 106.63
b) 32mm dia. Rmt 102.45 102.45
c) 40mm dia. Rmt 55.93 55.93
d) 50mm dia. Rmt 82.47 82.47
39 gun metal ball valve Indian make (Sai)
a) 15mm Dia Nos
b) 32mm Dia Nos
c) 40mm Dia Nos 2.00 2.00
d) 50mm Dia Nos 2.00 2.00
40 Screw down bib tap fo brass of approved quality
a) 15 mm. Diameter. Nos 17.00 17.00
41 Screw down wheeled stop tap of steel with chromium
a) 15 mm Diameter Nos 36.00 36.00
c) 25 mm Diameter Nos
d) 32 mm. Diameter Nos
42 ball cock, overflow pipe with plug. etc. complete.
FOR ONE BUILDING Nos 2.00 4.00
43 Providing and fixing Screw down wheelNos 6.00 6.00
44 P/F Europion type white glazed eartheNos 4.00 4.00
45 White Vitreous china Orissa pattern W.Nos 13.00 13.00
46 One urinal basin with 5 litre Nos 6.00 6.00
47 Wash Basin Nos 13.00 13.00
48 Nahani Trap Nos 21.00 21.00
49 Providing and fixing ____ UPVC vent / waste water / waste water & soil pipe
a) 32 mm. diameter waste water pipe Rmt
a) 75 mm. diameter waste water pipe Rmt 100.25 89.05
b) 90 mm. diameter waste water & soilRmt
c) 150 mm. diameter waste water & soiRmt 88.32 88.32
50 Providing and laying PVC waste pipes
40mm Pvc Pipe Rmt 24.25 18.90
75mm Pvc Pipe Rmt
110mm Pvc Pipe Rmt 119.10 106.60
51 Kitchen sink Nos 1.00 1.00
52 J spout sink cock Nos 1.00 1.00
53 Cowl dome 90mm dia Nos 9.00 -
54 Inspection chamber Nos 6.00 6.00
55 Gully trap Nos 3.00 4.00
56 Stone were pipe Rmt 58.00 40.80
A Extra items
1 Providing & rebarring reinforcement bar.
1a 8mm Nos
1b 12mm Nos 94.00
1c 16mm Nos 6.00
2 Back filling inplot area in layar Cum - 672.63
Water proof plaster
3 OHWT Sqmt 64.08 85.68
4 Lift pit Sqmt 25.69 25.14
5 Providing form finish ceiling Sqmt 598.00 -
6 Provinding & fixing 600mm dia CI man Sqmt 2.00 -
1 Vetrified tile flooring Nos - -
2 Laying, cutting & fixing 100mm high skerting. - -
B Additional work - -
2 Rebarring & grouting work Nos - -
8mm Nos 7.00 -
12mm Nos - -
16mm Nos - -
A' Col Breaking 15.00 - 5.00
A10 A11 B4 SC
Qty Qty Qty Qty
58.93 81.45 77.45
30.79 31.09 37.76 3.36
11.28 20.68 16.07 3.42
22.10 6.91 27.57
1,248.77 161.60 1,094.42 35.99
450.18 7.92 149.11
1,777.00 594.93 1,819.73 42.37
97.22 97.22 137.35 42.37
2,676.19 569.10 2,626.74 78.02
17.61 35.37 35.22
- - 29.39
42.38 84.00 42.92
44.53 118.70 137.35
79.39 128.89 47.04
55.22 1,198.16 2,266.48
14.19 81.09 58.08
2.70 5.40 -
51.84 110.16 -
27.18 55.80 -
0.97 1.27 1.92
37.31 74.46 74.62
34.56 34.56 34.56
2,173.43 2,676.19 2,626.74
1,298.03 3,791.41 -
1,858.13 3,568.81 3,808.18
26.09 56.54
- 39.16
49.36 120.44
54.51 149.80
114.42 171.40
50.80 97.80
2.00 4.00
2.00 4.00
10.00 20.00
26.00 52.00
2.00 4.00
5.00 10.00
5.00 10.00
4.00 8.00
12.00 20.00
18.00 34.00
30.80 56.90
43.84 87.68
19.03 40.93
12.30 24.20
1.00 2.00
1.00 2.00
- -
2.00 6.00
2.00 4.00
25.80 51.60
- -
RCC work
Qty.
Sr No. Descriptions
Unit A4 A5 B7
1 RCC WORK Cum
2 Footing Cum 0.64 0.64
3 Col
4 Col. Up to plinth Cum 0.24 2.80
5 Col. Up to 1st slab Cum 19.22 10.80 35.89
6 Col. Up to Terrace slab Cum 17.72 36.14 35.89
7 Col. Above terrace slab parapet Cum 3.15 3.15
8 LMR Cum 1.07 1.08
9 OHWT Cum 1.97 1.58
10 Total 36.94 53.37 80.40
11 BEAM Cum
12 Plinth beam Cum 33.98
13 GF Lintel beam Cum 10.03 21.93 20.05
14 1st F Lintel beam Cum - 15.35 15.35
15 G F Window lintel beam Cum 1.42 1.76 1.76
16 1st F Window lintel beam - 2.11 2.11
17 1st slab Beam Cum 99.88 43.00 97.14
18 Terrace slab beam Cum - 98.40 99.63
19 LMR beam Cum - 1.55 1.61
20 Fire F Cum - 0.91 0.91
21 Stair case GF Cum 2.82 3.22 3.22
22 Stair case 1st F Cum 2.84 2.84
23 Total 114.14 191.07 278.59
24 SLAB Cum
25 1st slab Cum 154.53 77.32 154.74
26 Terrace slab Cum - 157.02 156.41
27 LMR slab Cum - 3.60 2.61
28 OHWT top & bottom Cum - 7.86 7.86
29 St Landing G floor Cum 2.28 2.28 1.14
30 St Landing 1st floor Cum 2.28 2.84
31 F Fiting Cum 1.35 1.35
32 Lift pit Cum
33 Total 156.81 251.71 326.95
34 CHAJJA Cum
35 G Floor Cum 1.75 2.56 2.56
36 1st Floor Cum 3.80 3.80
37 Terrace Floor Cum 0.38 0.38
38 Total 1.75 6.74 6.74
39 COPING Cum
40 Coping G Floor Cum 1.63 1.52
41 Coping 1st Floor Cum 1.91 1.81
42 Parapet coping Cum 3.15 3.15
43 Band GF Cum 1.19 1.19
44 Band 1st F Cum 0.26 0.26
45 Total - 8.15 7.94
46 Stair case
47 STAIR CASE WAIST SLAB GF Cum 4.17 4.05 4.05
48 STAIR CASE WAIST SLAB 1st F Cum 4.05 4.05
49 F Fiting Cum 4.12 4.32
50 Total 4.17 12.22 12.43
51 PARDI Cum
52 Lift up to 1st slab Cum 10.82 10.83 4.53
53 Stair case up to 1st slab Cum 0.78 0.78
54 Lift 1st slab to terrace Cum 10.83 10.54
55 Stair case 1st slab to terrace Cum 0.93 0.93
56 Water tank above terrace Cum 4.20 7.05
57 FF ST Cum 1.10 1.10
58 Total 10.82 28.66 24.93
Qty.
A3 A10 A11 B4 SC
154.74 71.01
157.10 152.06 2.33
2.61 4.38 4.38
3.93 11.38 11.38
2.28 5.87 -
2.28 5.87 2.70 -
2.70 - 2.32
1.13 2.26
322.94 254.38 4.96 18.08 2.33
2.66 0.41 -
2.96 4.35 0.14
0.36 0.83 0.67
5.99 5.59 - 0.82 -
4.05 5.25
4.05 6.93
8.31 8.57 8.43
8.10 20.50 8.57 8.43 -
10.83 9.48
0.78 1.60 2.20
10.83 18.49
0.92 1.77
6.04 6.23 6.30
2.20 2.20
29.40 39.77 2.20 8.49 -
Name of Contractor:-M/s Ganesh J Kadav
REINFORCEMENT BAR
Diawise wt.
Sr No. Descriptions Unit
8 MM 10 MM 12 MM 16 MM