REWORK REWORK REWORK REWORK REWORK Defect Check Test DO Planning Check Test DO Preparation Check Test DO Execution Check DOTestResultsCheck DO Management Workbench Workbench Workbench Workbench Standards Standards Standards Standards Workbench Standards Tools Tools Tools Tools Tools
Test Requirements/ Defect Audit Trail-
Reviewing Test - Tracking status of a defect Test Plan - Test Case Running the Test - - Piloting automation Results- throughout its life cycle (New, - What is the QC process for Traceability Matrix - - Recording raw/actual results - Comparing Actual against Assigned, Postponed, this project? - Make Test Coverage visible Expected Results Investigated, Resolved, Validated, - What will the deliverables be - Updating test cases - Linking the test cases back to the - Measuring "Passed" Test Failed, or Closed) from testing? test requirements they are covering - Clearly established roles for who Coverage - Estimations & Milestones - Assists in test case design status can alter a defect's status - Identifying Defects - What types of testing will be reporting - Traceability of a defect back to - Maintaining Test cases and done? (i.e. function-based, automation the gerenating test case and integration, systems-level) covered test requirement - What is the strategy/ Test Environment approach for each of the areas Data issues - Reporting Test Defect Tracking of the QC process? - Identify sources for data Status- Standards- - Identify strategies for - Defect Type Category or problem Test Requirements Gernerating & Maintaining data - Use of measurements with in type classification metrics Hierarchy - - Plotting planned/actual/ - Area of problem occurence - Gathering all info to generate Test Environment executed tests against - Severity: impact on the system - Priority: order in which to address Test Requirements Architecture issues - schedule - Persons assigned - Organized in a measurable - Extrapolating Trends - Managing databases - Test case / Test Requirement format - Reporting Test Coverage - Designing, Procuring, Installing, - Estimated/Actual hours - Sources identified (Test Requirements) Administering - Test Coverage established - Reporting Test Stability - Configuring: processing schedules, - Verified & Signed off by communications, hardware (Defects) Defect Summary Project Team - Assessing schedule impacts, - Consideration of interface with risks, and maintenance costs Reporting- automated tools. -DEFECTS BY PRIORITY Risk Analysis Test Environment REPORT: defect numbers tallied by Priority (on Test Requirements) - Training issues - -DEFECTS BY SEVERITY: d e f e c t - Identifying risk factors numbers tallied by Severity - Identify subject matter experts - Probability of faults - Lining up training -MEAN TIME TO RESOLVE: The - Consequence of failures average time between discovery -Assessed as part of the Test of a defect and its resolution to be Requirements Hierarchy Test Case Design- incorporated into a new build or fix - Test Design Specs, or what to track -MEAN TIME TO CLOSE: The - Black & White box techniques average time between discovery - Case Scenarios of a defect and its close after - Mapping out data & workflows retesting. -Create reference sheets