Sie sind auf Seite 1von 202

5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?

Appid=1493&Progid=547

SIDDHARTHINSTITUTEOFENGG&TECHNOLOGY
CivilEngg.

PartA:InstitutionalInformation

1NameandAddressoftheInstitution

SIDDHARTHINSTITUTEOFENGINEERING&TECHNOLOGY
SiddharthNagar,NarayanavanamRoad,Puttur

Chittoor(Dt),AndhraPradesh,Pin:517583

Website:www.sietk.org

2NameandAddressofAffiliatingUniversity

JAWAHARLALNEHRUTECHNOLOGICALUNIVERSITY,ANANTAPUR

SaradhaNagar,Ananthapuramu,AndhraPradesh

Pin:515002

Website:jntua.ac.in

3YearofestablishmentoftheInstitution:

2001

4TypeoftheInstitution:

University Autonomous

DeemedUniversity Affiliated

GovernmentAided

5OwnershipStatus:

CentralGovernment Trust

StateGovernment Society

GovernmentAided Section25Company

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 1/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Selffinancing AnyOther(PleaseSpecify)

6OtherAcademicInstitutionsoftheTrust/Society/Companyetc.,ifany:

NameofInstitutions YearofEstablishment ProgramsofStudy Location

SiddarthaInstituteofScienceandTechnology 2008 CIVIL,EEE,MECH,ECE&CSE Puttur

7Detailsofalltheprogramsbeingofferedbytheinstitutionunderconsideration:

Yearof Increasein Yearof YearofinitialAICTE Accreditaion Visit


S.No ProgramName Intake AccreditationStatus
Start Intake Increase approval Period Dates

1 CivilEngineering 2008 60 120 2014 2008 Applyingfirsttime

Granted provisional accreditation for two years for the period(specify


2 ComputerScience&Engineering 2001 60 180 2015 2001 20132015
period)

3 Electrical&ElectronicsEngineering 2002 60 120 2014 2002 Notaccredited(specifyvisitdates,year) 14/12/2012

Electronics & Communication Granted provisional accreditation for two years for the period(specify
4 2001 60 300 2013 2001 20132015
Engineering period)

Granted provisional accreditation for two years for the period(specify


5 MechanicalEngineering 2004 60 240 2015 2004 20132015
period)

6 MasterofBusinessAdministration 2006 60 180 2013 2006 Eligiblebutnotapplied

7 MasterofComputerApplications 2006 60 0 2015 2006 Eligiblebutnotapplied

8 CAD/CAM 2010 18 0 2015 2010 Eligiblebutnotapplied

9 ComputerScience&Engineering 2009 18 0 2015 2009 Eligiblebutnotapplied

10 ControlSystems 2012 18 0 2015 2012 Eligiblebutnotapplied

11 DigitalElectronics&Communication 2014 18 0 2015 2014 Noteligibleforaccreditation

12 EmbeddedSystems 2010 18 0 2015 2010 Eligiblebutnotapplied

13 PowerElectronics 2011 18 0 2015 2011 Eligiblebutnotapplied

14 StructuralEngineering. 2013 18 0 2015 2013 Noteligibleforaccreditation

15 ThermalEngineering 2012 18 0 2015 2012 Eligiblebutnotapplied

16 VLSI 2009 18 0 2015 2009 Eligiblebutnotapplied

8ProgramstobeconsideredforAccreditationvidethisapplication:

SNo Level Discipline Program

1 UnderGraduate Engineering&Technology CivilEngg.

2 UnderGraduate Engineering&Technology ComputerScience&Engg.

3 UnderGraduate Engineering&Technology Electrical&ElectronicsEngg.

4 UnderGraduate Engineering&Technology Electronics&CommunicationEngg.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 2/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
5 UnderGraduate Engineering&Technology MechanicalEngg.

9Totalnumberofemployeesintheinstitution:

Note
Fulltimeonrollwithprescribedpayscale.AnemployeeoncontractforaperiodofnotlessthantwoyearsANDdrawingconsolidatedsalarynotlessthanapplicablegrosssalaryshallonlybecountedasaregularemployee.

PrescribedpayscalesmeanspayscalesnotifiedbytheAICTE/CentralGovernment andimplementationasprescribedbytheStateGovernment.IncaseStateGovernmentprescribeslesserconsolidatedsalaryforaparticularcadrethen
samewillbeconsideredasreferencewhilecountingfacultyasaregularfaculty.

CAY CurrentAssessmentYear

CAYm1 CurrentAssessmentYearminus1

CAYm2 CurrentAssessmentYearminus2

A.Regular*Employees(FacultyandStaff):

20142015 20132014 20122013


Items
MIN MAX MIN MAX MIN MAX

FacultyinEngineering(Male) 147 151 127 136 103 111

FacultyinEngineering(Female) 39 46 33 36 26 33

FacultyinMaths,Science&Humanities(Male) 33 33 29 29 25 25

FacultyinMaths,Science&Humanities(FeMale) 23 23 19 19 15 15

Nonteachingstaff(Male) 63 63 73 73 90 99

Nonteachingstaff(FeMale) 14 14 16 16 15 17

B.Contractual*Employees(FacultyandStaff):
20142015 20132014 20122013
Items
MIN MAX MIN MAX MIN MAX

FacultyinEngineering(Male)

FacultyinEngineering(Female)

FacultyinMaths,Science&Humanities(Male)

FacultyinMaths,Science&Humanities(FeMale)

Nonteachingstaff(Male)

Nonteachingstaff(FeMale)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 3/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

10TotalnumberofEngineeringStudents:

EngineeringandTechnologyUG
Shift1 Shift2
EngineeringandTechnologyPG
Shift1 Shift2
Engineering and Technology
Shift1 Shift2
Polytechnic
Shift1 Shift2
MBA
Shift1 Shift2
MCA

Instructions
(Thedatamaybecategorizedintabularformseparatelyforundergraduate,postgraduateengineering,otherprogram,ifapplicable)Note:IncasetheInstitutionisrunningAICTEapprovedadditionalcoursessuchasMBA,MCAinthefirst
shift,engineeringcoursesinthesecondshift,PolytechnicinSecondshiftetc.,separatetableswiththerelevantheadingshallbeprepared.

PleasechecktheShiftfromtheabovechecklisttofillthedetails.ClickthebuttontocreatetableinwhichyouhavetofillthenumberofstudentsindifferentDisciplineandShifts.

EngineeringandTechnologyUGShift1

Items 20142015 20132014 20122013

Totalno.ofBoys 1687 1577 1344

Totalno.ofGirls 671 684 653

Total 2358 2261 1997

EngineeringandTechnologyPGShift1

Items 20142015 20132014 20122013

Totalno.ofBoys 86 110 88

Totalno.ofGirls 48 61 61

Total 134 171 149

EngineeringandTechnologyPolytechnicShift2

Items 20142015 20132014 20122013

Totalno.ofBoys 521 577 543

Totalno.ofGirls 33 36 26

Total 554 613 569

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 4/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

EngineeringandTechnologyMBAShift1

Items 20142015 20132014 20122013

Totalno.ofBoys 87 115 117

Totalno.ofGirls 38 57 54

Total 125 172 171

EngineeringandTechnologyMCAShift1

Items 20142015 20132014 20122013

Totalno.ofBoys 55 76 89

Totalno.ofGirls 23 40 44

Total 78 116 133

11VisionoftheInstitution:

Tobeoneamongthepremierinstitutionsofthecountryinproducingethicallystrongandtechnicallysoundengineersandmanagerstoservethenation.

12MissionoftheInstitution:

Tocreatesacredenvironmentforthestudentstoacquireknowledgethroughinnovativeandprofessionalapproachandutilizeitforthewelfareofthemankind.

13ContactInformationoftheHeadoftheInstitutionandNBAcoordinator,ifdesignated:

HeadoftheInstitution

Dr. K. Chandrasekhar Reddy,


Name
M.Tech.,Ph.D.

Designation Principal

MobileNo. 9396932888

EmailID principal.f6@jntua.ac.in

NBACoordinator,IfDesignated

Name V.Viswanadha,M.Tech.,(Ph.D)

Designation AssociateProfessor

MobileNo. 9966984105

EmailID vissuvnl@gmail.com

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 5/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

PARTB:CriteriaSummary

CriteraNo. Criteria TotalMarks InstituteMarks

1 VISION,MISSIONANDPROGRAMEDUCATIONALOBJECTIVES 60 60.00

2 PROGRAMCURRICULUMANDTEACHINGLEARNINGPROCESSES 120 120.00

3 COURSEOUTCOMESANDPROGRAMOUTCOMES 120 120.00

4 STUDENTSPERFORMANCE 150 120.61

5 FACULTYINFORMATIONANDCONTRIBUTIONS 200 186.29

6 FACILITIESANDTECHNICALSUPPORT 80 80.00

7 CONTINUOUSIMPROVEMENT 50 50.00

8 FIRSTYEARACADEMICS 50 43.84

9 STUDENTSUPPORTSYSTEMS 50 50.00

10 GOVERNANCE,INSTITUTIONALSUPPORTANDFINANCIALRESOURCES 120 120.00

Total 1000 951

PartB
1VISION,MISSIONANDPROGRAMEDUCATIONALOBJECTIVES(60) TotalMarks60.00
1.1StatetheVisionandMissionoftheDepartmentandInstitute(5) TotalMarks
InstituteMarks
(VisionstatementtypicallyindicatesaspirationsandMissionstatementstatesthebroadapproachtoachieveaspirations)

(HereInstituteVisionandMissionstatementshavebeenaskedtoensureconsistencywiththedepartmentVisionandMissionstatementstheassessmentoftheInstituteVisionandMissionwillbetakenupinCriterion10)

Tobeoneamongthepremierinstitutionsofthecountryinproducingethicallystrongandtechnicallysoundengineersandmanagersto
Visionoftheinstitute servethenation.

Tocreatesacredenvironmentforthestudentstoacquireknowledgethroughinnovativeandprofessionalapproachandutilizeitforthe
Missionoftheinstitute welfareofthemankind.

Throughtheexcellenceofitspeople,theDepartmentofCivilEngineeringwillberecognizedasaleaderofitsdisciplineina
VisionoftheDepartment
mannerthatexemplifiesthetraditionsoflearning,inventionandengagement.

M1:ThemissionoftheDepartmentofCivilEngineeringhasthreetenetsthatcenterontheprincipleofimprovinglivesand
livelihoods.M2:TocreateknowledgethroughresearchinthescienceandtechnologyofCivilEngineering.M3:Toshare
MissionoftheDepartment
knowledgethrougheducationalprogramsandthedisseminationofournewinventionsandtodeveloptheprofessional
potentialoffaculty,staffandstudents.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 6/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

1.2StatetheProgramEducationalObjectives(PEOs)(5) TotalMarks
InstituteMarks
(StatethePEOs(3to5)ofprogramseekingaccreditation)

TheProgramEducationalObjectivesofthedepartmentofCivilEngineeringare:

PEO1:CivilEngineeringGraduatesunderstandtheorigin,workingprinciplesandoutcomesofCivilEngineeringandalliedprojectsfrompartstowhole,interms

oftechnology,economy,socialandenvironmentalaspects.

PEO2:GraduatestakeuphighereducationandR&DinCivilEngineeringandalliedareasofscienceandtechnologyforthebenefitofindustryandsociety.

PEO3:Graduatesutilizeformalandinformallearningopportunitiestomaintainandenhancetechnical,personalandprofessionalgrowth,communicate

effectively,exhibitprofessionalleadership,teamworkandethicalvalues.

1.3IndicatewheretheVision,MissionandPEOsarepublishedanddisseminatedamongstakeholders(10) TotalMarks
InstituteMarks
(Describewhere(websites,curriculam,postersetc.)theVision,MissionandPEOsarepublishedanddetailtheprocesswhichensuresawarenessamonginternalandexternalstakeholderswitheffectiveprocessimplementation)

(InternalstakeholdersmayincludeManagement,GoverningBoardMembers,faculty,supportstaff,studentsetc.andexternalstakeholdersmayincludeemployers,industry,alumni,fundingagencies,etc.)

Thevariousinternalstakeholdersare

Students
Management
MembersoftheGoverningBody
Faculty
Supportingstaffetc.,


Theexternalstakeholdersare

Parents
Alumni
University
Employers
Industry
Fundingagenciesetc.


Vision,MissionandPEOsarecommunicatedtothestakeholdersbythefollowingways:

Totheinternalstakeholders:

TheVision,MissionandObjectivesaredisplayedatallprominentplacesinthecampussuchasPrincipaloffice,Administrativeoffice,HODoffices,allnoticeboards,ExaminationSection,PlacementCell,Library,Laboratories,Canteen,Hostelsetc.,
Printedinallmanuals(institutionalacademiccalendar,labmanuals,labobservations,labrecords,coursefilesetc.)andprojectbooks.
Thestatementsaredisplayedintheinstitutewebsite(www.sietk.org/siddharth_civil.html)
Thesestatementsarealsocommunicatedthroughprospectus,newsletters,institutemagazines,souvenirs,bannersetc.

Totheexternalstakeholders:

Thestatementsarecommunicatedthroughtheprospectus,newsletters,institutemagazines,souvenirs,postersetc.
Thestatementsaredisplayedintheinstitutewebsite(www.sietk.org/siddharth_civil.html)
Communicatedthroughelectronicandprintmedia,andmeetings.

1.4StatetheprocessfordefiningtheVisionandMissionoftheDepartment,andPEOsoftheprogram(25) TotalMarks
https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 7/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
1.4StatetheprocessfordefiningtheVisionandMissionoftheDepartment,andPEOsoftheprogram(25) TotalMarks
InstituteMarks
(ArticulatetheprocessfordefiningtheVisionandMissionofthedepartmentandPEOsoftheprogram)

ProcessofdefiningVisionandMissionoftheDepartment:

STEP1:Departmentcommittee(HODandseniorfaculties)collectstheinformationfromthestakeholdersregardingtheirdesiresandexpectationswhicharedireneedtothenationandsociety.

STEP2:Consideringtheaboveinformation,theroughdraftofVisionandMissionstatementshavebeenframedbythedepartmentcommitteeandthencirculatedamongthedepartmentfacultymembersforfurthersuggestions.

STEP3:TheVisionandMissionstatementsarefinalizedbythedepartmentcommitteeaftergettingapprovaloftheacademicadvisorycommittee.


ProcessofdefiningPEOsoftheprogram:

TheProgramEducationalObjectives(PEOs)areactuallythebroadstatementsoftheobjectivesforwhichtheProgramisbeingrun.Primarily,theseobjectivesshouldhelpinfulfillingthemissionofthedepartment.Secondly,thestudentswhoaregraduatingfromtheprogramareexpectedtoleadafruitfulandmeaningfullifeinthesocietyby
beingusefulinitsprogressivedevelopment.Thus,itisnecessarythattheseobjectivesshouldbeinconsonance,totheextentpossible,withthecurrentresearchscenariointherelevantfieldofengineeringandwiththeneedsoftherelevantindustry.Theresearchscenarioisjudgedbythefacultymembersthroughtheresearchpublications.
Theindustryneedsaregaugedthroughthefeedback,mostlyverbal,receivedintheTrainingandPlacementcellwheneverthecompaniescomeforcampusplacements.Inaddition,theindustryscenariohasaspecificrelationshipwiththeresearchhencefacultyiscompetenttoassesstheneedsofindustry.Moreover,thealumniwhohave
gonetotheindustryorhigherstudiesareabletoreflecttheobjectivesareadequate.

Fig1:THEFLOWCHARTOFPROCESSFORDEFININGTHEPEOs

1.5EstablishconsistencyofPEOswithMissionoftheDepartment(15) TotalMarks
InstituteMarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 8/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(Generatea"MissionoftheDepartmentPEOsmatrix"withjustificationandrationaleofthemapping)

Note:M1,M2,..MnaredistinctelementsofMissionstatement.

Entercorrelationlevels1,2or3asdefinedbelow:

1:Slight(Low)2:Moderate(Medium)3:Substantial(High)Ifthereisnocorrelation,put

Note:InthisdocumentwhereverthetermProcesshasbeenuseditsmeaningisprocessformulation,notificationandimplementation.

Knowledge Disseminationof Professional


PEOStatements throughresearch newinventions potential

(M1) (M2) (M3)

PEO1:CivilEngineeringGraduatesunderstandtheorigin,
workingprinciplesandoutcomesofCivilEngineeringand
3 1
alliedprojectsfrompartstowhole,intermsoftechnology,
economy,socialandenvironmentalaspects.

PEO2:GraduatestakeuphighereducationandR&DinCivil
Engineeringandalliedareasofscienceandtechnologyforthe 1 3
benefitofindustryandsociety.

PEO3:Graduatesutilizeformalandinformallearning
opportunitiestomaintainandenhancetechnical,personaland
1 3
professionalgrowth,communicateeffectively,exhibit
professionalleadership,teamworkandethicalvalues.



Note:M1,M2andM3aredistinctelementsofDepartmentmissionstatement.

Correlationlevels1,2or3aredefinedas

1:Slight(Low)

2:Moderate(Medium)

3:Substantial(High)

2PROGRAMCURRICULUMANDTEACHINGLEARNINGPROCESSES(120) TotalMarks120.00
2.1ProgramCurriculum(20) TotalMarks
2.1.1StatetheprocessusedtoidentifyextentofcomplianceoftheUniversitycurriculumforattainingtheProgramOutcomesandProgramSpecificOutcomesasmentionedinAnnexureI.Alsomentiontheidentified
InstituteMarks
curriculargaps,ifany(10)
(Statetheprocessdetailsalsomentionidentifiedcurriculargaps).
Note:IncaseallPOsarebeingdemonstrablymetthroughUniversityCurriculumthen2.1.2willnotbeapplicableandtheweightageof2.1.1willbe20.

Theinstitutionadheresthesyllabusdesignedbytheaffiliatinguniversity(JNTUAnantapur).Asmandatedbytheuniversity,theinstitutionissupposedtodeliverspecifictopics/unitsofthesyllabuswithinthespecifictimeframessoastoconductmidterm(Internal)examsandexternalexamsaspertheacademicschedulegivenbythe
university.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 9/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
TheAcademicSchedulepublishedbytheUniversityformsthebasisforplanningandimplementationofthecurriculum.
Theinterest,strengthandexpertiseofthefacultyaretakenintotheaccountwhilechoosing/assigningthesubjectsby/tothefaculty,wellinbeforethecommencementofthesemester.
Afterallotmentofthesubjects,thefacultypreparestheImplementationPlan/LessonPlan,CourseMaterialandTutorialQuestions.
ThesuitabilityoftheImplementationPlanandtheCourseMaterialagainstthesyllabusisverifiedbyIQACmembers(seniorfacultyand/orHOD)beforethecommencementofthesemester.
Dependingonthenumberoftutorial/practicalhoursrequiredforeachcourse,eachdepartmentpreparesthetimetableforeffectiveimplementationofthecurriculum.
TheImplementationPlan,CourseMaterial,etc.arereviewed,revisedeveryyearandwhenevernecessary.
IfthereisanyrevisioninthecurriculumprescribedbytheuniversityorwhilepreparingtheCourseinformationsheet,facultywillperformtheanalysisandidentifythegapstoattainthecourseoutcomesandprogramoutcomes.
Basedonthegapsidentified,appropriateactivitieslikefieldtrip,workshops,miniprojects,assignments,classroomteaching,guestlectures,andlabexperimentsareplanned.
Thefollowingtrainingprogramsareoffered,bytheTraining&Placementcell,tohelpthestudentstofacecompetitiveexaminationsaswellasplacementsconfidently:

QuantitativeAptitude&LogicalReasoning
FunctionalEnglish
GroupDiscussions
Interviewskills
Computerlanguages


Structureofthecoursefile


S.No. CONTENT

1 ProgramEducationObjectives(PEOs)

2 ProgramOutcomes(POs)

3 ProgramSpecificOutcomes(PSOs)

4 Syllabuscopy

5 MappingofPOsandPSOs
6 Academiccalendar

7 Coursetimetable

8 Lecturenotes

9 CopiesofPPTslides,ifany

Questionpapersoftutorials,Unittests,InternalExaminations(IE),UniversityExaminationsand
10
Assignments

11 SchemeofevaluationofIEandadditionaltests

12 KeyofIEquestionpaper

13 TwosampleanswerscriptseachofIE,assignmentsandunittests

14 Attendanceregister(s)

15 Resultsanalysis(aspergivenproforma)

Summaryofassessmentofcourseoutcomesthrough

a)Contentdelivery
16
b)Examinations,tests,assignments,etc.

c)Studentsfeedback



Curriculum:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 10/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
B.TechIYEAR(R13)


S.No Coursecode Subject Th Tu/Drg/Lab Credits

1. 13A52101 CommunicativeEnglish 2 3

2. 13A56101 EngineeringPhysics 2 3

3. 13A51101 EngineeringChemistry 2 3

4. 13A54101 MathematicsI 3 1 5

5. 13A12101 ProgramminginC&DataStructures 3 1 5

6. 13A01101 EngineeringMechanics 3 1 5

7. 13A03101 EngineeringDrawing 1 5 5

8. 13A12102 ProgramminginC&DataStructuresLab 3 4

EngineeringPhysics&EngineeringChemistry
9. 13A99102 3 4
Lab

10. 13A99103 Engineering&ITWorkshop 3 4

11. 13A52102 EnglishLanguageComm.SkillsLab 3 4

TotalCredits 45


Note:Th=TheoryTu=Tutorial,Drg=Drawing&Lab=Laboratory.


IIB.TechISemester(R13)


S.No. Coursecode Subject Theory Tu/Lab Credits

1. 13A54301 MathematicsII 3 1 3

2. 13A99301 Electrical&MechanicalTechnology 3 1 3

3. 13A01301 StrengthofMaterialsI 3 1 3

4. 13A01302 SurveyingI 3 1 3

5. 13A01303 FluidMechanics 3 1 3

6. 13A01304 BuildingMaterials&Construction 3 1 3

7. 13A01305 SurveyingLabI 3 2

8. 13A01306 StrengthofMaterialsLab 3 2

TotalCredits 22



IIB.TechIISemester(R13)


S.No. Coursecode Subject Theory Tu/Lab Credits

1. 13A54303 Probability&Statistics 3 1 3

2. 13A01401 StrengthofMaterialsII 3 1 3

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 11/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
3. 13A01402 Hydraulics&HydraulicMachinery 3 1 3

4. 13A01403 EnvironmentalScience 3 1 3

5. 13A01404 StructuralAnalysisI 3 1 3

6. 13A01405 SurveyingII 3 1 3

7. 13A01406 FluidMechanics&HydraulicMachineryLab 3 2

8. 13A01407 SurveyingLabII 3 2

TotalCredits 22



IIIB.TechISemester(R09)


S.No. Coursecode Subject Theory Lab Credits

1. 9AHS401 ManagerialEconomics&FinancialAnalysis 4 4

Design&Drawingofreinforcedconcrete
2. 9A01501 4 4
structures

3. 9A01502 ConcreteTechnology 4 4

4. 9A01503 WaterresourcesEngineeringI 4 4

5. 9A01504 StructuralAnalysisII 4 4

6. 9A01505 EngineeringGeology 4 4

7. 9A01506 EngineeringGeologyLab 3 2

8. 9AHS601 AdvanceEnglishcommunicationSkillsLab 3 2

TotalCredits 28



IIIB.TechIISemester(R09)

S.No. Coursecode Subject Theory Lab Credits

1. 9A01601 DesignandDrawingofSteelStructures 4 4

2. 9A01602 GeotechnicalEngineeringI 4 4

3. 9A01603 EnvironmentalEngineeringI 4 4

4. 9A01604 WaterResourcesEngineeringII 4 4

5. 9A01605 Estimation,CostingandValuation 4 4

6. 9A01606 TransportationEngineering 4 4

7. 9A01607 GeotechnicalEngineeringLab 3 2

8. 9A01608 EnvironmentalEngineeringLab 3 2

TotalCredits 28

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 12/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
IVB.TechISemester(R09)

S.No Coursecode Subject Theory Lab Credits

1. 9A01701 FiniteElementMethodsinCivilEngg. 4 4

2. 9A01702 BridgeEngineering 4 4

3. 9A01703 GeotechnicalEngineeringII 4 4

4. 9A01704 EnvironmentalEngineeringII 4 4

ElectiveI
9A01705
1.EarthquakeResistantDesign
5. 9A01706 4 4
2.AirPollution&Control
9A01707
3.Railways,DocksandHarborEngineering


ElectiveII
9A01708
1.WaterresourcesSystemPlanning&
Management
6. 4 4
9A01709 2.AdvancedStructuralAnalysis

3.ConstructionTechnologyandProject
Management
9A01710

7. 9A01711 CADLab 3 2

8. 9A01712 Concrete&HighwayMaterialsLab 3 2

TotalCredits 28



IVB.TechIISemester(R09)


S.No. Coursecode Subject Theory Lab Credits

1. 9A01801 AdvancedStructuralEngineering 4 4

2. 9A01802 DesignandDrawingofIrrigationStructures 4 4

ElectiveIII

9A01803 AdvancedFoundationEngineering
3. 4 4
9A01804 GroundImprovementTechniques

9A01805 RemoteSensing&GIS

ElectiveIV
9A01806
ExperimentalStressAnalysis
9A01807
4. Prestressedconcrete 4 4
9A01808
EnvironmentalImpact

AssessmentandManagement

5. 9A01809 Seminar 2 2

6. 9A01810 Project 10

TotalCredits 28

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 13/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


TotalCredits(R13regulation):180

TotalCredits(R09regulation):220

GapsIdentifiedinProgrammeCurriculumandCourse:

Theinstitutioninvitesrepresentativesoftheindustrytointeractwiththestudentsonaregularbasis.Requirementsoftheindustryareascertainedfromtherepresentativesoftheindustry,gapsareidentifiedandtheteaching&trainingstrategiesareformulatedaccordinglytofillthegaps.
Bycollectingfeedbacksfromthealumnistudents.
Thefacultyregularlyattendsforseminars,workshops,conferences,etc.organizedbyotherinstitutionsandresearchorganizations.Thathelpsthemtoidentifythetrendsinrespectiveareasandaccordinglyoperationalizethecurriculum.

i.)GapsinProgrammeCurriculum


S.No. IdentifiedGapsinProgramme

1 AutoCADD

2 PrinciplesofTownPlanning

3 ComputerProgrammingSkills(C++)

4 SoftSkills

5 QuantitativeAptitude

6 TechnicalDevelopments&CareerOpportunitiesTraining



DeliveryDetailsofGapsbasedonProgramme:

ResourcePerson Relevanceto
S.No. Gap Action YearSem %of
withdesignation POs,PSOs
Taken students

Training IIII, S.RamanaManagerof


1 AutoCADD 91 PO3,PO5
Classes IVI EngineerCADDCenter

IIII, P.Jyothi
2 PrinciplesofTownPlanning GuestLecture 89 PO6
IVI Asst.ExecutiveEngineer

IIII, B.SreeramBabu,Chief
3 SoftSkills GuestLecture 94 PO10,PO12
IVI TrainingOfficer

QuantitativeAptitude& Training IIII, S.ChanBasha,


4 95 PO2,PO12
Reasoning Classes IVI Asst.Professor

TechnicalDevelopments& IIII, Mr.SubbaRao


5 Seminar 94 PO6
CareerOpportunities IVI Asst.Professor



ii.)GapsinCourse

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 14/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
S.No. Yearand CourseName GapsIdentified
Semester

1 CommunicativeEnglish AdvancedSkills,VerbalEnglish

2 EngineeringMechanics AnalysisofTruss
IYear
3 EnvironmentalStudies ISO14000standards

4 EngineeringDrawing AuxiliaryProjections

Studythestressstraincharacteristicsofmildsteelrod
5 III StrengthofMaterialsLab
usingUTM

6 IIII StructuralAnalysisI Analysisoffixedarches

Design&DrawingofReinforced
ConcreteStructures
Designofmultistoriedbuilding
7 IIII
RejuvenationofGroundWaterTableThroughRain
WaterResourcesEngineeringI
WaterHarvesting

8 IIIII Design&DrawingofSteelStructures Designofoverheadtank

9 IVI FiniteElementMethods 3DProblems

2.1.2StatethedeliverydetailsofthecontentbeyondthesyllabusfortheattainmentofPOsandPSOs(10) InstituteMarks
(Providedetailsoftheadditionalcourse/learningmaterial/content/laboratoryexperiments/projectsetc.,arisingfromthegapsidentifiedin2.1.1inatabularformintheformatgivenbelow)

Note:PleasementionindetailwhethertheInstitutionhasgivensuchinputsandsuggestionstotheAffiliatingUniversityregardingcurriculargapsandpossibleadditionofnewcontent/addoncoursesinthecurriculum,tobridgethegapandtobetterattain
programoutcome(s).

20142015

Action DateMonth %of RelevancetoPOs,


S.No Gap ResourcePersonwithDesignation
Taken Year students PSOs

Theory
1 Design&DrawingofSteelStructures:Designofoverheadtank 11/03/2015 B.MuraliKrishnaAsst.Prof. 85 PO3,PO6,PSO3
Classes

2 EnergysecurityThroughRenewablesources Workshop 28/02/2015 T.Harinarayana,Director,GERMI,Gujarat 100 PO3,PO7

3 RevitArchitecture Workshop 27/01/2015 VetrivelShanmugamHSSBIMSOLUTIONS 95 PO3,PO5,PSO3

4 3DStudentDesignChallenge Workshop 09/01/2015 VetrivelShanmugamHSSBIMSOLUTIONS 95 PO3,PO5,PSO3

5 AdvancedTechnologyInLandSurveyTraining Guestlecture 07/11/2014 Dinesh.C,Gangeyan.N 100 PO5,PO12

Theory
6 StructuralAnalysisI:Analysisoffixedarches 29/09/2014 N.KrishnaMurthyAsst.Prof. 92 PO2,PSO3
Classes

7 Sustainablewaterresourcesdevelopmentindroughtproneareas Guestlecture 15/09/2014 KamalnathsettyExecutiveEngineer(Retd.),I&CADDept.,Tirupati 95 PO6,PO7

RejunevationofGroundWaterTableThroughRainwaterHarvestingin SriP.V.SubbaRao,M.Tech.,SuperintendingEngineerDesign&controlNTRTeluguGanga
8 Guestlecture 14/08/2014 90 PO3,PO6,PSO3
Chittoor.Dist.,A.P. ProjectTirupati

Design&DrawingofReinforcedConcreteStructures:Designofmultistoried Theory
9 22/07/2014 C.PrabhakarReddyAsst.Prof 95 PO3,PO5,PO12
building Classes

20132014

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 15/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

DateMonth %of RelevancetoPOs,


S.No Gap ActionTaken ResourcePersonwithDesignation
Year students PSOs

3DStructure&DesigningusingSTAADPRO:NationallevelworkshoponTechnochamp2014ALCHERINGIIT
1 Workshop 12/03/2014 MandeepSingh,MahendraPalSinghIITGUWAHATI 80 PO3,PO5,PSO3
Guwahati

Theory
2 Design&DrawingofReinforcedConcreteStructures:Designofslabsinworkingstressmethod 21/02/2014 C.PrabhakarReddyAsst.Prof 85 PO2,PO3,PSO3
Classes

Theory
3 StrengthofMaterials:Elongationofbarsduetoownweight&elongationoftaperedsection 07/10/2013 K.P.VenugopalAsst.Prof 92 PO2
Classes

Theory
4 FiniteElementMethods:Analysisof3dimensionalproblemsinfiniteelementsanalysis 10/09/2013 B.MuraliKrishnaAsst.Prof 88 PO3,PO5,PSO3
Classes

Theory C.VenumadhavProf.&HODAudishankaracollege,
5 GreenBuildings 26/02/2013 90 PO2,PO6,PO7
Classes Gudur.

Theory
6 TrafficImpactStudies 22/07/2013 BalajiAssoc.ProfNBKR,VAKKADU 85 PO5,PO7,PO10
Classes

7 TotalStation Practicals 23/08/2013 LadderInstitute 80 PO3,PO5

8 AUTOCAD LAB 23/10/2013 CADDCENTRE 75 PO3,PSO3

20122013

Action DateMonth %of RelevancetoPOs,


S.No Gap ResourcePersonwithDesignation
Taken Year students PSOs

ConstructionTechnologyandProjectManagement:Cementand Mr.VasudevaMurthy,GCILUKFounder&MDofBuildBizzonlinePrivateltdToolsAcademyforcareer
1 Workshop 11/03/2013 97 PO5,PO6,PSO1
ConcreteTechnology excellence,Bengaluru

WREI:RejuvenationofGroundWaterTableThroughRainWater Guest
2 04/02/2013 P.V.SubbaRaoSuperintendingEngineer,Designs&QualityControl,NTRTeluguGangaProject,Tirupati 98 PO6,PO7
Harvesting lecture

Guest Dr.K.N.SatyanarayanaProfessor,BuildingTechnology&ConstructionmanagementDiv.,Dept.ofcivil
3 OpportunitiesinConstruction&InfrastructureinIndia 08/10/2012 100 PO5,PO6,PSO1
lecture engineeringIITMadras

Guest
4 AdvancesinFoundationEngineering 08/09/2012 SrinivasuluAsst.prof. 90 PO2,PO4,PSO1
lecture

Guest
5 AwarenessonGate,IES,PSUs 31/08/2012 P.JagadishDirector,JHAcademy 80 PO1,PO2,PO6
lecture

6 AdvancedTechnologyinTotalStation Workshop 10/08/2012 Dinesh.C,Gangeyan.N 100 PO5,PO9,PO12

2.2TeachingLearningProcesses(100) TotalMarks
2.2.1DescribeprocessesfollowedtoimprovequalityofTeaching&Learning(25) InstituteMarks
(Processesmayincludeadherencetoacademiccalendarandimprovinginstructionmethodsusingpedagogicalinitiativessuchasrealworldexamples,collaborativelearning,qualityoflaboratoryexperiencewithregardtoconductingexperiments,
recordingobservations,analysisofdataetc.encouragingbrightstudents,assistingweakstudentsetc.Theimplementationdetailsandimpactanalysisneedtobedocumented)

Everyyear,theacademiccalendarisscheduledbytheJNTUA.Basedontheuniversitycalendar,theinstitutionpreparesitsownacademiccalendarandteachingplanandalsofollowsvariousinstructionalmethods.

i.Institutionalacademiccalendar
Theinstitutionfollowstheuniversitycalendar,whichconsistsofdetailssuchas(1)durationofinstruction(2)scheduleofinternalexaminations(3)scheduleofexternalexaminations(4)holidays.
ThescheduleofUnitTestsispreparedbytheinstitution,isappendedtotheAcademicCalendarissuedbytheUniversity.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 16/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Variousdepartmentalactivitiesareplannedtobeorganizedbytherespectivedepartments,areincludedintheAcademicCalendarwellinbeforecommunicatingtothestudents.


ii)TeachingPlan

Theteachingplanispreparedtakingintotheaccountofthefollowingaspects:

Incaseoftheorysubjects,thesyllabusisprescribedbytheuniversityandadditionaltopicstobediscussedbasedonthespecificrequirements.
Incaseofpracticalsubjects,thenumberofexperimentsisprescribedbytheuniversityandtheadditionalexperimentsanddesignexperimentsaretobeconductedbasedonthespecificrequirements.

Prescribedsyllabushastobecompletedbeforeconductingtheunit,InternalandExternalexaminations.
Thenumberofinstructionalandtutorialhourswhichisrequiredforcompletingthesyllabusofeachsubjectbasedonthepreviousexperienceofthefaculty.
DiverseAssignments,forencouragingbrightstudents,advancedtopicassignmentsareimposed,givingawardstotoppersineachclassduringannualcelebrations.
Awards&Rewards,basedontheperformance,toppersareappreciatedduringannualcelebrations.
Counseling,intheviewofthestudentcareer,counselorsguideandmotivatethemtowardstheirsuccess.
TheImplementationPlan,Coursematerial,Assignments,Counsellingrecords,Attendanceregistersetc.arereviewed/revisedregularlyandwhenevernecessary.
Forassistingtheweakstudents,remedialclassesareconducedbasedontheirperformanceininternalandexternalexaminations,specialclassesarealsoconductedtoenhancetheperformancebygivingmorepracticeonimportantconcepts.


ClassTimeTable

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 17/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


RemedialClassTimeTable

Classificationofbrightstudentsandweakstudentsaredoneaftercompletionof1st midtermexaminations.Thestudentswhosecuredlessthan50%oftotalmarksandthestudentswithbacklogsaregroupedasweakstudentsandtherestofthestudentsaregroupedasbrightstudents.Fortheweakstudents,remedialclassesareplanned
accordingly.Thedetailedscheduleisasgivenbelow.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 18/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


iii)LearningProcess:Theinstitutionencouragesthefacultytoinvolvethestudentsactivelyintheprocessoflearning.Followingsupportstructuresareavailableforthefacultytodevelopvariouslearningskillsamongthestudents:

InteractiveLearning:

Besidestraditionalclassroomswithablackboard,everydepartmentisequippedwithanEclassroomwithLCDprojectorandinternetconnectivity.
Facultyregularlyusespresentationsandvideosasteachingtoolsandencouragesinteractivelearningamongthestudents.
Respectivedepartmentsorganizeguestlecturesandseminarsregularly.

CollaborativeLearning:

Facultiesfacilitatediscussionsonimportantconceptswithintheclassroomtoencouragecombinedlearning.
Departmentalassociationsarehighlyactiveintheinstitution.
Theseassociationsregularlyorganizeseminars,discussionsandcompetitionstoencouragecollaborativelearningamongthestudents.

IndependentLearning

TheCentralLibraryhasavastcollectionofbooks,journals&projectreports,etc.
Alibraryhourismadecompulsoryforallthestudentstoencouragethestudentstolearnindependently.
Internetfacilityisavailabletothestudentstolearnontheirown.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 19/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Further,theassignmentsalsoencouragethestudentstolearnontheirown.

AssociationActivities:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 20/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

2.2.2QualityofinternalsemesterQuestionpapers,AssignmentsandEvaluation(20) InstituteMarks
(Mentiontheinitiatives,implementationdetailsandanalysisoflearninglevelsrelatedtoqualityofsemesterquestionpapers,assignmentsandevaluation)

i)InternalsemesterQuestionPapers:

Forinternalexaminations,4setsofquestionpaperswithbothobjectiveanddescriptivearepreparedbyfacultyconcernedbasedonthepreviousuniversityquestionpapersamongtheseoneisselectedbythechiefsuperintendentbefore1hourcommencementoftheexamination.
Eachsetofdescriptivequestionpapercontains5questionsamongthese3shouldbeanswered,1st questioniscompulsorywhichhas5shortanswerquestions(each2marks)coveringentiresyllabusoftheinternalexaminationandlonganswerquestions(each10marks)givingimportancetoeveryunit.
EachquestionintheinternalpapersisdesignedbasedontheBloomstaxonomylevels(L1L6).

L1:Knowledge

L2:Comprehension

L3:Application

L4:Analysis

L5:Synthesis

L6:Evaluation

Eachquestionintheinternalpapersismarkedwiththecourseoutcomes.
EachsetofobjectivetypequestionsispreparedbygivingimportancetofundamentalsandonparwithcompetitiveexamslikeGATE/IES/UPSC/APPSCetc.
Additionalreviewsoninternalquestionpapersaredonebyseniorfacultymembers(subjectexperts).


Assignments

Afterthecompletionofeveryunitassignmentsaregiventothestudents.
Simpleassignmentsforweakstudents.
Diverseassignmentsforbrightstudents.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 21/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 22/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


EvaluationProcess:

Evaluationisentirelydonebasedonthestudentsperformanceintheinternalexaminationandassignments.
Evaluationprocessconsistsof
Conductingexamsandgivingassignments.
Evaluatingpapersbasedonstandardkey(schemeofevaluation).
Distributingtheanswersheetstothestudents.
Ifanydiscrepancyisfoundbythestudents,thennecessarycorrectionsaretobetakenbythefaculty.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 23/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Therefore,transparencyofevaluationisachieved.

2.2.3Qualityofstudentprojects(25) InstituteMarks
(Qualityoftheprojectismeasuredintermsofconsiderationtofactorsincluding,butnotlimitedto,environment,safety,ethics,cost,type(application,product,research,reviewetc.)andstandards.Processesrelatedtoprojectidentification,allotment,
continuousmonitoring,evaluationincludingdemonstrationofworkingprototypesandenhancingtherelevanceofprojects.MentionImplementationdetailsincludingdetailsofPOsandPSOsaddressedthroughtheprojectswithjustification)

ThequalityofprojectsismonitoredbytheInternalDepartmentCommittee(IDC)whichhasHOD,Projectcoordinator,seniorfacultiesinthedepartment.Ittakesresponsibilityofcomingoutwithinnovativeideasoftheprojectsandalsoensuresthatthereisnorepetitionofprojects.Italsoensures,projectsarecarefullydesignedsuchthat
theyencouragethestudentstogainexpertiseontechnologieswhichhavethedemandintheemploymentmarket.

ThecommitteeselectsthetopicsthatcancoverallCourseOutcomesaswellascertainexternalfactorssuchasenvironment,diverseapplications,safety,cost,andstandards.

ProjectProcess:

Step1:Projectbatchesareformedbasedonacademicpercentage(5studentsineachbatch).

Step2:Guideswillbeallocatedbasedonstudentsinterestandguidesareaofexpertise.

Step3:Theprojectareasareselectedbasedonstudentsareaofinterest.

Step4:TheProjecttopicsarecoveredwithmaximumcourseoutcomesintheircoursedurationaswellasvariousfactorssuchasenvironment,safety,ethics,cost,application,standards,etc.

Step5:Thestudentswilldotheprojectworkregularlywiththehelpofguides.

Step6:ThereviewswillfrequentlybeconductedwithIDCandguides.

Step7:Thestudentsareencouragedtodeveloptheprototypes.

Step8:Thestudentsalsoareencouragedtoparticipateinvariousnationallevelfestsandprojectexhibitions.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 24/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Step9:TopthreeprojectswillbeselectedbyIDCandawardedbytheDepartment.

Step10:MajorityoftheseprojectworksarecarriedthroughResearch&Developmentcell.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 25/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Processofprojectguideallotment&selection:


Projectreviewdetails:

SomeoftheProjectsarelistedbelow:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 26/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Project Matching Measured
Areasof Matchingwith
NameoftheStudents ProjectTitle Mappedcourses withthe
Specialization Supervisor(s) thestatedPOs aspects
statedPSOs

CAY(20142015)

N.VenkatNaveen
DesignandEstimationofRoofTop
P.BalaSubramanyam WaterHarvestingforGroundWater WaterResources EstimationCostingandValuation PO7,PO8,
Dr.S.SiddiRaju PSO2
B.PrathapKumar Recharge(AtSiddharthagroupof Engineering ,WaterResourceEngineering PO9
Institutes) Environmental
K.Nagarjuna Safety

S.MaheshBabu
Dr.K.Chandrasekhar PO3,
P.Ashok DesignandDrawingofReinforced Environmental
Environmental Reddy
IntegratedDesignofSmartVillage concreteStructures,Environmental PO6,PO7, PSO2
C.CharanKumarReddy Engineering Safety
Engineering
PO9
N.ShanmugaSundhar

P.Harijyothi
DesignandDrawingofReinforced Economical,
P.Deepkiran Environmental PO6,
InterlinkingofTanks Dr.S.SiddiRaju concreteStructures,Environmental PSO2 Environmental,
G.Suhasini Engineering PO7,PO9
Engineering,ConcreteTechnology Safety
D.AnishKumar

CAYm1(20132014)

C.Sasidhar

Mounika.A PlanningandDesignofearthdam
acrossKushasthaliandBuggaVagu WaterResources EstimationCostingandValuation,Geo PO1,PO7, Environmental,
C.Kesavulu Dr.S.SiddiRaju PSO2.
nearErramarajupalemvillagein Engineering TechnicalEngineering PO8,PO9 Safety
KasiNiraanjan KarvetinagaramMandal

Y.S.BhanuChandra

R.S.Surekha

Bharathi.D Economical,
DesignandEstimationofdrinking Environmental Dr.K.Chandrasekhar EstimationCostingandValuation PO3,
M.Harish PSO2 Environmental,
waterdistributionsystem,Nagaripeta Engineering Reddy EnvironmentalEngineering PO6,PO7
G.Jayaprasanth Safety

P.Venkateswarlu

A.Brahmini

G.Suresh EnvironmentalEngineering,
Alignmentandformationofouter Transportation Dr.K.Chandrasekhar PO6,PO7,
Balaji.M Transportation PSO2 Safety
ringroadatTirumala Engineering Reddy PO9
T.K.Manikanta Engineering

P.Renuka

CAYm2(20122013)

J.Rajeshwari
EstimationCostingandValuation,
S.KhajaNayabRasool Identification&EffectiveUseof PO7,
WaterResources WaterResourcesEngineering,RS&GIS
GroundWaterTableInTirupati Dr.S.SiddiRaju PSO2 Safety,
A.Chendu Engineering PO8,PO9
UrbanAreaUsingGISApplications
Economical
M.SarathKumar

N.Nirupa
PO3,
G.Saravana DesignandDrawingofReinforced Environmental,
DesignOfSuperPassageWithRCC WaterResources
S.AnandKumarVarma concreteStructures,Environmental PO6,PO7, PSO2
M.Dorababu Pier&PierCap Engineering Safety
Engineering,ConcreteTechnology

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 27/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
P.Gowtham PO9

D.Anusha DesignandDrawingofReinforced
concreteStructures,
N.V.Pragna StudyOfFlexuralEffectOnLaterally PO1,PO6, Environmental,
Dr.K.Chandrasekhar
UnsupportedBeams(AsPerIsCode StructuralEngineering DesignandDrawingofSteel PSO2
K.Y.Babitha Reddy PO7,PO9 Safety
800:2007) Structures,
P.ChandraKumar ConcreteTechnology

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 28/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

2.2.4Initiativerelatedtoindustryinteraction(15) InstituteMarks
(Givedetailsoftheindustryinvolvementintheprogramsuchasindustryattachedlaboratories,partialdeliveryofappropriatecoursesbyindustryexpertsetc.Mentiontheinitiatives,implementationdetailsandimpactanalysis)

Theinstitutionhasverygoodinteractionwiththevariousindustries.

ThevariousinnovativecentresareestablishedlikeMicrosoftinnovationcentre,IBMcentreofexcellence,IEGJKC,startupincubationcentre,skilldevelopmentcentreetc.

i)HSSBIMSolutionsPrivateLimited:

ForstudentscareerdevelopmenttheinstitutionundersignedMoUwithHSSBIMsolutionprivatelimited.
TheobjectiveoftheMoUistotrainthestudentonAutodeskcertificationprograms(AutoCAD,Autodesk@SimulationCFDMotion,etc.)tomeettheindustrialneedsforthecareerdevelopmentofthestudents.
TheyareprovidinglatestsoftwareversionofAutodeskEducationMasterSuite125licensesatfeeofcost
Throughitseducationcommunityportaladdresstechnologyaccessisprovidedforfacultiesandstudentswithfreestudentdemoversionlicense.

ii)MoUwithUnitechtransfer

UnitechtransferGmbHGermanCentreforAutomationandRobotics:

ForstudentscareerdevelopmenttheinstitutionundersignedanMoUwithUnitechtransferGmbHGermanCentreforAutomationandRobotics.
CompanyresponsibleforfollowingactivitiesinorganisationofInternship/ProjectandPlacementexecutionandallrelatedmatters.
ThemainactivityincludesremotetheoreticalandpracticaltrainingfromGermanandremotestudentassistance.
DesigningthetasksaccordingtothecurrentIndustryneedsforIndianstudentswhichcanbeexecutablewithin23monthsaccordingtothecurrentIndustryneedsforIndianstudents.
Providingthetechnicalinfrastructureattheinstitute:SoftwaretooperatefromIndia.
GermanexpertstosupporttheIndianuniversitiesduringthecompleteperiodoftaskexecution.

iii)MicrosoftInnovationCentre:

Ourinstitutionisoneamong45institutionsinIndiatohaveMicrosoftEdvantagePlatinumlevelstatusandalsotheMicrosoftInnovationCentre(MIC).
Thisinitiativehashelpedmorethan500studentstogetcertifiedonMicrosofttechnologies.
ManystudentsarehoningtheirskillsonMicrosofttechnologiesinMIC.
StudentsareevendevelopingprojectsandappsformobiledevicesinMIC.
Thisinitiativehascreatedavastawarenessoflatesttechnologiesamongthestudentsandthestaff.
TheinstitutionhasMicrosoftInnovationCentreestablishedwithinthecampustofostercriticalthinkingandinnovationamongthestudents.
StudentsareencouragedtoworkonMicrosofttechnologiesandcreatenewproductsandservicesusingthesame.
Hackathonprogramconductedon31st Jan2015bytheinstitutionandmorethan500appsareuploadedinonline.
MICistrainsourstudentsasperrequirementsofMNCs.

Thebenefitsofthecollaborationare:

Opportunitytoemergeasoneofthecompetententitiesintheacademiccirclesinvariousareasofinformationtechnologies.
Opportunitytoberecognizedbytheindustryandacademiccirclesasoneofthepreferredlocation/institutionforacquiringtrainingandskillslatesttechnologyandsoftwares.
OpportunitytostudentsandfacultymemberstoincreasetheirknowledgeandacquireskillsonbestinclauseIBMsoftware.
Opportunitytodesigninnovativecurriculumandonvariousindustryspecializationus9ingrelevantIBMsoftware
OpportunitytolearnfromthepractitionersintheindustryfromIBMorbusinesspartners.
OpportunityforstudentsandfacultymemberstoavailprofessionalandglobalcertificationonIBMsoftware
OpportunitytosetupajointandcobrandedLabonthecampuswithIBM,focusedonvariousspecialityareaslikeBigData,Analytics,Mobility,Security,SWEngg.etc.,
OpportunitytoconductindependentnoncommercialresearchbyfacultymembersasperguidelinesfromIBMtimetotime.
OpportunitytoreceivecoursewarefromIBMdesignedbyprofessionalsinIBMsoftwareLabs.
OpportunitytoconductvariousseminarandworkshopswithIBMintheinstitution
OpportunitytocomarketwithIBMtopromotePrograms.

iv)IEGJawaharKnowledgeCentre(IEGJKC):

JawaharknowledgecentreisaCareerDevelopmentandjoborientedprogramorganizedbyInstitutionofElectronicGovernance(IEG),Govt.ofA.P.ThemainobjectiveoftheJKCistoensurethecareeropportunitiesforstudents.
JKCisoneofthejobsourcesforthestudents,havingcollaborationwithourinstitution.MostofthetopleadingRecruitersarevisitingtheinstitutionforonCampusdrivesthroughJKC.
OurinstitutionhasthehighestnumberofregisteredstudentsinJKCinthedistrict,withStarcategoryStatus.

v)StartupIncubationcentre:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 29/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
TheStartupIncubationCentretoourinstitutionhasbeensanctionedbytheA.P.StateGovernment,asapartofSunriseStartupprogramsforstudentsonJan2015.
A.P.Stategovernmenthassanctionedtotal38incubationcentresinstate(5forChittoordistrict)throughthis.Amongthoseoneisourinstitution.
ItisaprivilegetoourinstitutiontorunincubationfunctionalityforthedevelopmentofstudentEntrepreneurs.
Studentcommitteehasbeenformedandapprovedbystartupvillage,Visakhapatnam.ThiscommitteeisworkingonincubatorfunctionalitiesundertheguidanceofCoordinatorandHeadoftheInstitution.

vi)SkillDevelopmentCentre:

Aimingtopromoteinnovationamongstudents,theAndhraPradeshgovernmentlaunched17skilldevelopmentcentresacrossthestatewherestudentsfromcollegesanduniversitieswouldtakepartindevelopingmobileappsandotherskills.
Itisproudthatamongthoseoneisourinstitutionthroughoutthestate.
Itisstartedwithabatchof48studentsinPhaseI.
Theydeveloped52AndroidAppsinthedurationof2weeks(512015to1712015).
TwostudentsofphaseIwereawardedtwoandroidmobilesbyourhonourableChiefMinisterfortheirappsdevelopment.
4studentshadgotplacementsinLogicshore,Vizag.
PhaseIIstartedinthesameyearwith50students,dividedinto10batcheswith150numbersofsessions.
InPhaseII,10projectshavebeendevelopedandthesamesubmittedasFinalyearprojects.
Amongthese10projects7aremobileapplicationsand3arewebapps.

Interactionwithindustry:

1.ThecollegehasenteredintoMoUswithleadingindustries,whicharebeingpursuedactively.

2.AnactiveEntrepreneurshipDevelopmentCellisheadedbyaseniorProfessortomouldthestudentstobecomeEntrepreneurs.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 30/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
ConductedProgramsbytheInnovativeCentres:

Resourceperson
S.No. Nameofthecentre Program Date(s) No.ofstudents/facultybenefited
(Mr/Dr/Mrs/Ms)

Twodayworkshopon3Dstudent 09102014to
1 HSSBIMSOLUTIONS DibyenduBiswas,Vetrivel 45
designchallenge 11102014

AwarenessofAutomationand GouthamM
2 Unitechtransfer 05012016to06012016 200
Robotics MD,Unitechtransfer.

AbdulFirozekhan,RameezAhmad
3 MicrosoftInnovationCentre HackathonProgram 31012015 40
Microsoftassociatepartners

Awarenesscamponstartupboot
4 K.AshokRaju,Chairman,SGEI 10022015 180
camp

AwarenesssessiononTechnology Ektachowdary,consultant,ISB,
5 05052015 50
StartupIncubationcentre entrepreneurprogram Akshyjalan,consultant,ISB

RipulKumar,CEO,KernCommunication/Anchalsood, 24082015to
Twodayworkshopondesign
6 StrategicDesigner&Analyst,ISB/Roliagarwal, 38
thinking 25082015
StrategicDesigner

05012015to
7 PhaseI Abrar,Trainer(throughvideoconference) 48
17012015
APSkillDevelopmentcentre
09022015to
8 PhaseII Abrar,Trainer(throughvideoconference) 50
04042015

9 IEGJKC Softskills D.Kishore,ProgramManager 22092015 153

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 31/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 32/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 33/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

SomeoftheIndustrialvisits:


20152016

STUDENTSDETAILS
DATEOF
S. NAMEOFTHE
INDUSTRY TOPIC TOTALNO. FACULTYNAMES
No. INDUSTRY
VISITED YEAR OF
STUDENTS

Dr.S.SiddiRaju
Professor,
1 13102015 SomasilaProject III 65

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 34/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
WaterSupply, Y.MuraliKrishna
Power&Irrigation
AssosiateProfessor

WaterSupply, Mr.M.Pavankumar
2 28092015 AraniarDam II 36
Power&Irrigation Assistantprofessor

Mr. M.Pavan kumar


MangampetMines Assistantprofessor
3 07082015 BaritesMines III 62
Mr.S.SaranRaj

Assistantprofessor

AnnamacharyaProject
(Cheyyeru)

Dept.OfGeology
Dr.S.SiddiRaju
Professor,
HistoricalFort&
4 12082015 III 75
Hydrology Mr.S.ArifHussain

Chandragiri Assistantprofessor

Fort

Kalyandam

20142015

RayalaseemaThermal G.Shanmukha Srinivas


1 13102014 CivilConstructions III 55
PowerPlant AssistantProfessor

Srisailam

Yaganti Y.MuraliKrishna
2 21082014 Spillways III 45
Mahanandhi AssosiateProfessor

Ballumcaves

ChandragiriFort HistoricalFort& Dr.S.SiddiRaju


3 01092014 III 45
SVGeologyDept Hydrology Professor

20132014

Dept.OfGeology

Srisailam
HistoricalFort& S.AnandKumarVarma
1 12072013 Yaganti III 59
Hydrology AssistantProfessor

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 35/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Mahanandhi

BallumCaves

20122013

ChandragiriFort
K.P.Venugopal
1 13082012 Dept.OfGeology HistoricalFort III 55
AssistantProfessor
Kalyandam


IndustrialVisitsphotographs:

2.2.5Initiativerelatedtoindustryinternship/summertraining(15) InstituteMarks
(Mentiontheinitiatives,implementationdetailsandimpactanalysis)

Theprimarygoaloftheinternshipistoallowstudentstoincorporateandemphasizethelessonslearnedintheclassroomsintoarealworldexperiencesetinaprofessionalpracticeorientedenvironment.
TheinternshipprogramisanexcellentcomplementstotheDepartmentsprogramforcontinuousimprovement.Thefacultyadvisorswillbenefitbydevelopingrelationswithemployersthatparticipateinprogram.
Inadditiontoofferingstudentstoopportunitytodemonstrateanddeveloptheirtechnicalskills,participationintheprogramallowsstudentstodevelopprofessionalskillssuchasteamwork,effectivecommunications,socialinteractionsandprofessionalnetworking,anunderstandingofbusinessprocedures,leadership,andcritical
thinking.
ThestudentsaremotivatedtoparticipateinthetrainingprogramssuchasInternships/SummerTrainingcoursesbyprovidingattendance.Thenthetrainedstudentswillgiveorientationprogramstootherstudents.
Theseinitiativeswillbenefitotherstudentswhodidntattendthecourse,togaintheknowledgeinthatcourse.
Intelligentstudentswillcomeforwardtoparticipateontheirowninterest.Theyareencouragedtoparticipateintheintercollegetechnicalsymposiums.
ISB(IndianSchoolofBusiness)InternshipProgram.AndstudentscangettheengineeringdegreeplusTEPcertificationfromISBaswell.
OurInstitutionissupportingtheB.TechstudentstojointheTechnologyEntrepreneurshipPrograminIndianSchoolofBusiness(ISB),Hyderabad.
TheTEPhasdevelopedatwoyearsemivirtualprogram,acombinationofonlineandofflinemodules.ForEngineeringCollegesISBwiththehelpofGlobalfacultyhasdesignedtheProgram.ISBpartnerswiththeselectedcollegestoenrollstudentsintotheTEP.Theengineeringcollegesareselectedbasedontheirinterest

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 36/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
tosupporttheprogram.


SomeoftheIndustryVisitsandinternships:

Studentscanvisittheindustriestogainpracticalknowledgeonadvancedtrendsintheindustry.Everyyear,studentsareencouragedtoparticipateintheindustrialvisitsandinternship.

Someoftheindustrialvisits/internships


Someoftheinternshipprograms


Nameofthe
S.No. Nameofthestudent Areaofthework Internshipduration
industry

HighwayDept.,
2Months
T.SREEKANTH BSCPL planningDept.,
1 (01062015to
B.Tech,IIIYear Infrastructurelimited SurveyDept.,
29072015)
Testingofmaterials.



Someofthesummertrainingprograms:


Year No.of
Academicyear Resourceperson(s)/Industry Date Topic
Sem students

RipulKumar,CEO,Kern
Communication/Anchalsood,Strategic 24082015to Designthinkingfor
201516 IVI Designer&Analyst,ISB/Roliagarwal, 40
25082015 Entrepreneurship
StrategicDesigner,ISB(IndianSchoolof
Business)

B.Srinivasulu 08062014to AutoCAD,


201415 IVI 20
Asst.Professor 17062014 ProEtools



Listoftrainedstudents:


AcademicYear201415:

S.No. RollNumber NameoftheStudent NameoftheInstitute NameoftheCourse Duration

1 12F61A0150 P.Srinivasulu CADDCENTRE AutoCAD,


6weeks
2 12F61A0152 P.Surenrdra CHENNAI RevitArchitecture

AutoCAD,
3 12F61A0143 M,SaiSrinivas
STAADPro 9weeks
4 12F61A0145 R.Sheshadri
CADDCENTRE RevitArchitecture

CHENNAI AutoCAD,
5 12F61A0155 TVenkataKesava. 6weeks
STAADPro

6 13F65A0104 SHarikrishna. RevitArchitecture 5weeks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 37/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
AutoCAD,
7 12F61A0147 V.S.Sireesha 6weeks
ECADTIRUPATI RevitArchitecture

8 13F65A0105 T.HimaSailaja RevitArchitecture 5weeks

AutoCAD,
CADDCENTRE
9 13F65A0106 B.ThulasiRam STAADPro 9weeks
CHENNAI
RevitArchitecture

CADDUNIVERSE AutoCAD,
10 12F61A0160 B.VishnuVardhan 9weeks
ANANTHAPUR STAADPro


AcademicYear201314:

S.No. RollNumber NameoftheStudent NameoftheInstitute NameoftheCourse Duration

1 11F61A0117 P.HariJyothi ENGINEERCADD AutoCAD,


6weeks
CENTRETIRUPATI RevitArchitecture
2 11F61A0126 S.MaheshBabu

3 11F61A0130 U.Manjunath AutoCAD,


CADDCENTRE
4 11F61A0153 N.VenkataNaveen STAADPro 7weeks
CHENNAI
5 11F61A0155 N.VishnuVardhan RevitArchitecture


AcademicYear201213:

S.No. RollNumber NameoftheStudent NameoftheInstitute NameoftheCourse Duration

1 10F61A0109 P.DevendraNaidu CADDCENTRE AutoCAD,


6weeks
2 10F61A0130 C.PraveenKumar CHENNAI RevitArchitecture

3 10F61A0137 C.Sasisdhar AutoCAD,


CADDCENTRE
STAADPro 6weeks
TIRUPATI
4 10F61A0138 H.S.Aslam
RevitArchitecture



Internshipcertificate:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 38/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

3COURSEOUTCOMESANDPROGRAMOUTCOMES(120) TotalMarks120.00

DefinetheProgramspecificoutcomes

PSO1 BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO2 ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteel
PSO3
structures.

3.1EstablishthecorrelationbetweenthecoursesandtheProgramOutcomes(POs)andProgramSpecificOutcomes(PSOs)(20) TotalMarks
ProgramOutcomesasmentionedinAnnexureIandProgramSpecificOutcomesasdefinedbytheProgram

3.1.1CourseOutcomes(COs)(SARshouldincludecourseoutcomesofonecoursefromeachsemesterofstudy,however,shouldbepreparedforallcoursesandmadeavailableasevidence,ifasked)(5) InstituteMarks

Note:NumberofOutcomesforaCourseisexpectedtobearound6.

CourseName: C213 CourseYear: 20142015

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 39/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Items 20142015

Abletoknowtheconceptofstressandstrainandtheir
C2 13.1
relationship(L1)

Abletodrawshearforceandbendingmomentdiagramsfor
C2 13.2
differenttypesofbeams(L2)

Abletocalculatethebendingandshearstressesofthebeam
C2 13.3
(L4)

C2 13.4 Abletocalculatethedeflectionofbeam(L4)

AbletoCalculatethedirectandbendingstressesoftthe
C2 13.5
structures(L4)

CourseName: C223 CourseYear: 20142015

Items 20142015

C2 23.1 Abletoanalyseandsolvepipeflowproblem(L4)

Abletodesignsubmergedbodiesbasedondragandlift
C2 23.2
characteristics(L6)

Toknowclearlyaboutpumps,characteristiccurvesand
C2 23.3
hydropowerplants(L1)

Toselectthesuitablepumpsandturbinesbasedonthe
C2 23.4
requirements(L2)

Toknowaboutcentrifugalpump,specificspeed,
C2 23.5 characteristics,geometicsimilarityandcavitationofturbines
(L1)

CourseName: C312 CourseYear: 20142015

Items 20142015

Abletoknowtheconstituentsofconcreteanddifferent
C3 12.1
methodsofdesign(L1)

Abletoanalysesinglyreinforced,doublyreinforcedT,Lbeams
C3 12.2
(L4)

Abletoknowthedesignproceduresforshear,torsion,bond
C3 12.3
andanchorage(L1)

Toanalysethecolumns,footingsandslabsbylimitstate
C3 12.4
method(L4)

Abilitytoanalysethebeamsforserviceabilitylimitsaccording
C3 12.5
tocodalprovisions(L4)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 40/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

CourseName: C321 CourseYear: 20142015

Items 20142015

Abilitytoanalyzetensionmembers,compressionmembers
C3 21.1 andabilitytodesignofsimpleboltedandweldedconnections
(L4)

Abilitytodesignsteelframesandconnectionsofbuildingina
C3 21.2
teamsetting(L6)

Familiaritywithprofessionalandethicalissuesandthe
C3 21.3
importanceoflifelonglearninginStructuralEngineering(L1)

Abilitytodesigngantrygirder,detailingofsimplebeams,
C3 21.4
compoundbeams,columnsincludinglacingandbattens(L6)

Abilitytodesignrooftrusses,plategirders,curtailmentof
C3 21.5
flangeplates,stiffeners,splicingandconnections(L6)

CourseName: C412 CourseYear: 20142015

Items 20142015

Abletoknowthebasicconceptsofhighwaybridgeloadings
C4 12.1
standards(L4)

C4 12.2 Abilitytodesignbridgebearings(L4)

C4 12.3 Toknowtheclearideaaboutpiersandabutments(L1)

Abilitytodesigndecktypeweldedplategirder,bridgeofsingle
C4 12.4
lineB.G.(L6)

AbilitytodesigncompositebridgesconsistingofRCCslabs
C4 12.5
oversteelgirders(L6)

CourseName: C421 CourseYear: 20142015

Items 20142015

Abletodesigntheadvancedstructureslikeflat,slab,intzwater
C4 21.1 tank,circularandrectangularwatertankrestingontheground
(L6)

Abletoanalyzethecantileverretainingwallwithhorizontal
C4 21.2
backfill(L4)

Abilitytodesignthegridfloor,waistslabanddifferenttypesof
C4 21.3
staircases,cinemabalcony(L6)

Tounderstandthedesignconceptsofsimpledoglegged
C4 21.4
staircase(L1)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 41/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C4 21.5 AbletodrawRCCdetailingforadvancedstructures(L2)

3.1.2COPOmatricesofcoursesselectedin3.1.1(Sixmatricestobementionedonepersemesterfrom3rdto8thsemester)(5) InstituteMarks
Note:Entercorrelationlevels1,2or3asdefinedbelow:
1:Slight(Low)2:Moderate(Medium)3:Substantial(High)Ifthereisnocorrelation,put

1.coursename:C213

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C213.1 2 2 3

C213.2 3 3 3 3

C213.3 2 2 3 2 3

C213.4 3 2

C213.5 3 3 3

Average 2 2 1 0 0 0 1 0 0 0 0 3

2.coursename:C223

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C223.1 3 3 2 3 3

C223.2 3 3 2 3

C223.3 3 3

C223.4 3 2

C223.5 2 2 3

Average 2 2 1 0 1 0 0 1 0 0 1 2

3.coursename:C312

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C312.1 2 2 3 1

C312.2 2 2 3 1 1

C312.3 2 2 3 1

C312.4 2 2 3 1

C312.5 2 2 2 1 1

Average 2 2 3 0 0 0 0 0 0 0 0 1

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 42/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

4.coursename:C321

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C321.1 3 3 3 2

C321.2 3 3 3

C321.3 2 3

C321.4 3 3 3

C321.5 3 3 3 2

Average 2 2 2 0 0 0 0 0 0 0 0 1

5.coursename:C412

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C412.1 3 3 3 2

C412.2 3 2

C412.3 2 2 2 2

C412.4 3 3 3 3

C412.5 2 2 3 3

Average 2 2 3 0 0 0 0 0 0 0 0 2

6.coursename:C421

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C421.1 2 2 3 2

C421.2 3 3 3 3

C421.3 3 3 3 2

C421.4 2 2 2 2

C421.5 2 2 2 3

Average 2 2 3 0 0 0 0 0 0 0 0 2

1.CourseName:C213

Course PSO1 PSO2 PSO3

C213.1

C213.2 2 2

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 43/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C213.3 2 2

C213.4 2 2

C213.5 2 3

Average 0 1 1

2.CourseName:C223

Course PSO1 PSO2 PSO3

C223.1

C223.2

C223.3

C223.4

C223.5

Average 0 0 0

3.CourseName:C312

Course PSO1 PSO2 PSO3

C312.1

C312.2 2 2

C312.3 2 2

C312.4 2 2

C312.5 2 2

Average 0 1 1

4.CourseName:C321

Course PSO1 PSO2 PSO3

C321.1 2

C321.2 2

C321.3 2

C321.4 2

C321.5 2

Average 0 0 2

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 44/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

5.CourseName:C412

Course PSO1 PSO2 PSO3

C412.1 3

C412.2 3

C412.3 3

C412.4 3

C412.5 3

Average 3 0 0

6.CourseName:C421

Course PSO1 PSO2 PSO3

C421.1 2

C421.2 3

C421.3 2

C421.4 2

C421.5 2

Average 0 0 2

3.1.3AProgramlevelCoursePOmatrixofallcoursesINCLUDINGfirstyearcourses(10) InstituteMarks
BeforeproceedingpleaseclickonEdittofetchthedata.Note:Entercorrelationlevels1,2or3asdefinedbelow:
1:Slight(Low)2:Moderate(Medium)3:Substantial(High)Ifthereisnocorrelation,put

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C101 1 2 1 2 2 2 2

C102 2 1 3 3 1 2 3

C103 2 2 2 3 1

C104 2 2 1

C105 2 2 3 2 2 2

C106 2 3 2 2 2 2 2

C107 2 3 2 2 2

C108 2 2 3 2 2 2

C109 2 2 2 2 2 3 2

C110 1 2 2 2 2 2

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 45/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C111 2 2 2 2

C211 2 2 2 2 2

C212 2 2 1

C213 3 3 3 3 3 3

C214 2 2 2 2 2

C215 2 3 2 1 2 2 1

C216 1 2 2 2 2

C217 3 2 3 2 2 3

C218 3 2 3 3 3 3

C221 1 2 2 1

C222 2 2 2 2 1 2

C223 3 3 3 2 3 3 3 3

C224 2 2 1 2 2

C225 2 3 2 1 1 2 2

C226 2 2 2 2 1 2

C227 3 3 2 3 3 3

C228 3 2 2 2 3 3

C311 3 3

C312 1 2 3 1 1 1

C313 2 2 3 3 2 2 2

C314 2 2 2 2 2 2 2 2

C315 2 3 2 2 2 3

C316 2 2 2 2 2 2 2

C317 3 2 3 3 3 2

C318 2 3 2

C321 1 2 3 1 1 1

C322 2 3 2 2 2 2

C323 2 2 3 2 2 2 3 2

C324 3 2 3 2 2 1 1 2

C325 2 2 2 2 2 1 2 2

C326 2 2 3 2 2 2

C327 2 3 2 3 3 3

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 46/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C328 3 2 2 3 3 2

C411 2 3 3 2 2 2

C412 2 3 3 2

C413 2 2 2 1 2 2 2

C414 2 2 3 1 2 2 2 2 2

C415 2 2 3 2 2 1 2

C416 2 2 2 1 2 2 1

C417 2 2 2 3 3 3

C418 3 3 3 3 3 3

C421 2 2 3 2

C422 2 2 3 2 2

C423 3 2 2 3 2 2 3 2

C424 3 3 2 1 2 1 2

C425 3 3 3 3 3 3 1

C426 3 3 3 3 2 3 1 1 1

3.1.3BProgramlevelCoursePSOmatrixofallcoursesINCLUDINGfirstyearcourses

Course PSO1 PSO2 PSO3

C101

C102

C103

C104

C105

C106

C107

C108

C109

C110

C111

C211

C212

C213 2

C214

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 47/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C215

C216 2

C217

C218

C221

C222

C223 1

C224

C225

C226

C227

C228

C311

C312 2 2

C313 3

C314

C315

C316 1

C317 2

C318

C321 2 2

C322

C323

C324 1

C325

C326 1

C327

C328

C411

C412 3

C413

C414

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 48/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C415

C416

C417 3

C418 2

C421 2

C422 3

C423

C424

C425 3 3 3

C426 3 3 3

3.2AttainmentofCourseOutcomes(50) TotalMarks
3.2.1DescribetheassessmentprocessesusedtogatherthedatauponwhichtheevaluationofCourseOutcomeisbased(10) InstituteMarks
(Examplesofdatacollectionprocessesmayinclude,butarenotlimitedto,specificexam/tutorialquestions,assignments,laboratorytests,projectevaluation,studentportfolios(Aportfolioisacollectionofartifactsthatdemonstrateskills,personal
characteristicsandaccomplishmentscreatedbythestudentduringstudyperiod),internallydevelopedassessmentexams,projectpresentations,oralexamsetc.)

Theinstitutefollowstheassessmentprocessfortheevolutionofcourseoutcome.

EvaluationProcess:
Theevaluationprocessincludes

(a)InternalExams

(b)UniversityExams

TheinstitutefollowstheevaluationprocessprescribedbytheUniversityforInternalandExternalExams.

InternalExamination:
AspertheUniversityexaminationpattern,twomidtermtestsareconductedforeachsubject.

TheInternalExaminationfor30marksincludesbothobjectivequestionsfor10marksandDescriptivequestionsfor20marks.


Responsible
S.No. Activity Remarks
person

1.Willbecompletedwithin3daysoftheexamcompletion.
EvaluationofInternal Individual
1 2.Distributetheanswersheetsinclassandclarifies,incaseof
Examination faculty
grievances

Submissionofmarks
Individual
2 foreachquestion& Withinaweekfromthedateoflastexam.
faculty
totaltoHOD

Consolidationofallsubjects
Studentswillverifytheirmarksandreportanygrievanceswithin3
3 marks&displayonthenotice Coordinator
daysfromthedateofdisplay.
board

1.Ensurethemarksenteredinregisterandsubmittedaresame.
Verification&
4 HOD

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 49/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Analysis 2.AnalyzetheCOattainmentsandidentifythemeasuresfor
improvement

SubmitSemestercoursesmarks
5 HOD Consolidateallcoursesandsubmitsonesetforeachclass
toPrincipal

Principalverifythemarksof
6 studentsandsubmittedtoExam Principal SubmissionofInternalmarkstotheExaminationbranch
branch

Chiefof
Communicatemarks Asperuniversityscheduledtheinternalmarksarepostedto
7 Examination
toUniversity controllerofexaminationbranch
Evaluations


SampleCopyofQuestionWiseMarkSplitSheet

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 50/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Sampleinternalmarkspage:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 51/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 52/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

ExternalExamination:
TheExternalExaminationofeachcourseisfor70marks.


ScheduleofExaminations

ThescheduleofinternalandexternalexaminationsisclearlymentionedintheacademicschedulepublishedbytheUniversity/institutionandthesameiscommunicatedtoallthestudentsandthefacultyatthebeginningofeachsemester.


MandatoryAssessment:

Universitypostsresultsontheuniversitywebsite.ResultsAnalysisisreviewedbyheadofthedepartmentandPrincipalimmediatelyafterresultsaredeclaredandareasforimprovementareidentified.
Counselorsadvisethestudentsbasedonindividualperformance.


Sampleuniversityresultpage:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 53/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

3.2.2RecordtheattainmentofCourseOutcomeofallcourseswithrespecttosetattainmentlevels(40) InstituteMarks
ProgramshallhavesetCourseOutcomeattainmentlevelsforallcourses.

(Theattainmentlevelsshallbesetconsideringaverageperformancelevelsintheuniversityexaminationoranyhighervaluesetastargetfortheassessmentyears.Attainmentlevelistobemeasuredintermsofstudentperformanceininternal
assessmentswithrespecttotheCourseOutcomesofacourseinadditiontotheperformanceintheUniversityexamination)
EvaluationofinternalandexternalexaminationmarksforsettingCourseattainmentlevelsforallcourses:

Evaluationofmarksfrombothinternalandexternalexaminations

Semesters Internal External Totalmarks

SemesterI 30 70 100
AcademicYear
SemesterII 30 70 100


MeasurementofCourseattainmentlevelsforUniversityExaminations:

AttainmentLevel1:50%ofstudentsscoring60%marksintheUniversityfinalexamination.

AttainmentLevel2:60%ofstudentsscoring60%marksintheUniversityfinalexamination.

AttainmentLevel3:70%ofstudentsscoring60%marksintheUniversityfinalexamination.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 54/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


CourseattainmentlevelsforIIYearISemesterUniversityExamination:201415

%ofStudentsScoredmorethan
COURSE Attainmentlevel
60%

C211 53.1 1

C212 53.1 1

C213 53.1 1

C214 56.3 1

C215 43.8 0

C216 51.6 1

C217 100 3

C218 100 3



MeasurementofCourseattainmentlevelsforInternalExaminations:

AttainmentLevel1:50%studentsscoringmorethan60%marksoutofthemaximummarks.

AttainmentLevel2:60%studentsscoringmorethan60%marksoutofthemaximummarks.

AttainmentLevel3:70%studentsscoringmorethan60%marksoutofthemaximummarks.


CourseattainmentlevelsforIIYearISemesterInternalExamination:201415

%ofStudentsScoredmore
COURSE Attainmentlevel
than60%

C211 57.2 1

C212 66.5 2

C213 65.5 2

C214 61.8 2

C215 61.8 2

C216 60.9 2

C217 100 3

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 55/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C218 100 3



Overallcourseattainmentforallcourses:

ACADEMICYEAR:201415

COURSE InternalAttainment(30%) ExternalAttainment(70%) AttainmentLevel

C211 1 1 1

C212 2 1 1.3

C213 2 1 1.3

C214 2 1 1.3

C215 2 0 0.6

C216 2 1 1.3

C217 3 3 3

C218 3 3 3

C221 1 0 0.3

C222 2 2 2

C223 0 1 0.7

C224 1 1 1

C225 1 0 0.3

C226 2 1 1.3

C227 3 3 3

C228 3 3 3

C311 2 1 1.3

C312 2 2 2

C313 2 0 0.6

C314 3 2 2.3

C315 2 1 1.3

C316 2 2 2

C317 3 3 3

C318 3 3 3

C321 1 1 1

C322 2 0 0.6

C323 3 1 1.6

C324 0 0 0

C325 2 1 1.3

C326 2 1 1.3

C327 3 3 3

C328 3 3 3

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 56/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C411 3 1 1.6

C412 3 3 3

C413 2 0 0.6

C414 3 2 2.3

C415 3 2 2.3

C416 3 1 1.6

C417 3 3 3

C418 3 3 3

C421 3 1 1.6

C422 1 2 1.7

C423 3 0 0.9

C424 3 1 1.6

C425 3 3 3

C426 3 3 3

COattainment
2.26 1.54 1.75
average


CourseAttainment:

Forexample:WaterResourcesEngineeringI(C314)

AttainmentthroughUniversityExamination:Moderatei.e.2

AttainmentthroughInternalAssessment:Substantiali.e.3

Considering70%weightagetoUniversityexaminationand30%weightagetoInternalassessment,theattainmentcalculationswillbe(70%ofUniversitylevel)+(30%ofInternallevel)

i.e.70%of2+30%of3=1.4+0.9=2.3

3.3AttainmentofProgramOutcomesandProgramSpecificOutcomes(50) TotalMarks
3.3.1DescribetheassessmenttoolsandprocessesusedformeasuringtheattainmentofeachoftheProgramOutcomesandProgramSpecificOutcomes(10) InstituteMarks
(DescribetheassessmenttoolsandprocessesusedtogetherthedatauponwhichtheevaluationofeachoftheProgramOutcomesandProgramSpecificOutcomesisbasedindicatingthefrequencywithwhichtheseprocessesarecarriedout.Describe
theassessmentprocessesthatdemonstratethedegreetowhichtheProgramOutcomesandProgramSpecificOutcomesareattainedanddocumenttheattainmentlevels)
ThedepartmentassesstheprogramtomeetalltheProgramOutcomesandProgramSpecificOutcomesthroughwellqualifiedandexperiencefaculty,bytheoryclasseswithaddontopics,labexperiments,assignments,unittests,miniprojects,mainprojects,seminarsandfeedbackofStudentatthetimeofexit.


Assessmenttooldescription Frequencyofassessment

Internalexaminations Twiceinasemester

Universityexaminations Onceinasemester

Studentexitfeedback
Onceinayear
(IndirectAttainment)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 57/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
3.3.2ProvideresultsofevaluationofPO&PSO(40) InstituteMarks
ProgramshallsetProgramOutcomeattainmentlevelsforallPOs&PSOs.

(Theattainmentlevelsbydirect(studentperformance)andindirect(surveys)aretobepresentedthroughProgramlevelCoursePO&PSOmatrixasindicated).

POAttainment
Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C211 2 2 1 1 2 2

C212 2 2 2 2 1

C213 2 2 2 1 1 2

C214 2 3 2 1 1 1

C215 2 2 1 2 2 2

C216 2 2 2 2 2

C217 3 3 3 3 3 3

C218 3 3 3 3 3 3

C221 2 2 2 3

C222 2 2 3 3 2 2

C223 1 1 1 2 1 1 1

C224 2 1 1 2 1

C225 1 1 1 2

C226 2 2 1 2 2 2

C227 3 3 3 3 3 3

C228 3 3 3 3 3 3

C311 3 2

C312 2 2 3 2 2 2

C313 2 2 2 2 1 1 2

C314 3 2 3 3 3 2 3 3

C315 1 2 3 2 2

C316 2 1 2 2 2 2 3

C317 3 3 3 3 3 3

C318 2 3 2

C321 1 2 2 1 1

C322 1 1

C323 2 2 3 2 1 2 2 2

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 58/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C324 2

C325 2 1 2 3 2 2 1 2

C326 2 2 2 2 1 2

C327 3 3 3 3 3 3

C328 3 3 3 3 3 3

C411 2 2 2 2 2 3

C412 3 3 3 3

C413 2 2 3 2 2 1 2

C414 3 2 3 2 2 3 3 2 3

C415 3 3 2 3 3 3 3

C416 2 3 3 2 3 3

C417 3 3 3 3 3 3

C418 3 3 3 3 3 3

C421 3 2 2 2

C422 2 2 2 2 2

C423 2 2 2 2 2 2 2

C424 3 3 2 1 3 2 2

C425 3 3 3 3 3 3 3 3

C426 3 3 3 3 3 3 3 3 1 3 3

COAttainmentLevel

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

COAttainment 2.12 1.98 1.46 1.54 1.76 1.54 0.90 0.23 0.49 0.52 0.52 2.19

DirectAttainment 2.15 1.98 1.33 1.43 1.70 1.43 0.63 0.04 0.11 0.15 0.15 2.24

InDirectAttainment 2 2 2 2 2 2 2 1 2 2 2 2

PSOAttainment
Course PSO1 PSO2 PSO3

C211

C212

C213

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 59/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C214

C215

C216 2

C217 2

C218 3

C221

C222

C223

C224

C225

C226

C227

C228

C311

C312 2 2

C313 1

C314

C315

C316

C317 2

C318

C321 2 2

C322

C323

C324 1

C325

C326

C327 3

C328 3

C411 1

C412 3

C413

C414

C415

C416

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 60/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

C417 3

C418 3

C421 2

C422

C423

C424

C425 3 3 3

C426 3 3 3

COAttainmentLevel

Course PSO1 PSO2 PSO3

COAttainment 0.58 0.8 0.78

DirectAttainment 0.22 0.5 0.48

InDirectAttainment 2 2 2

4STUDENTSPERFORMANCE(150) TotalMarks120.61

InstituteMarks
Table4.1

Item(Informationtobeprovidedcumulativelyforalltheshiftswithexplicitheadings,whereverapplicable) 20142015 20132014 20122013 20112012 20102011 20092010

Sanctionedintakeoftheprogram(N) 120 60 60 60 60 60

Totalnumberofstudentsadmittedinfirstyearminusnumberofstudentsmigratedtootherprograms/institutionsplusNo.ofstudentsmigratedtothisprogram(N1) 90 59 60 56 58 49

Numberofstudentsadmittedin2ndyearinthesamebatchvialateralentry(N2) 6 12 12 13 12 6

Separatedivisionstudents,Ifapplicable(N3) 0 0 0 0 0 0

Totalnumberofstudentsadmittedintheprogramme(N1+N2+N3) 96 71 72 69 70 55

Table4.2

Numberofstudentswhohavesuccessfullygraduatedwithoutbacklogsinanysemester/yearofstudy(WithoutBacklogmeansnocompartmentorfailuresin
TotalNoofstudentsadmittedintheprogram(N1+ anysemester/yearofstudy)
Yearofentry
N2+N3)
Iyear IIyear IIIyear IVyear

20142015 96 43 0 0 0

20132014 71 35 41 0 0

20122013 72 34 42 41 0

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 61/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

20112012(LYG) 69 38 47 44 44

20102011(LYGm1) 70 36 44 41 40

20092010(LYGm2) 55 36 38 36 35

Table4.3

Numberofstudentswhohavesuccessfullygraduated
Yearofentry TotalNoofstudentsadmittedintheprogram(N1+N2+N3)
Iyear IIyear IIIyear IVyear

20142015 96 88 0 0 0

20132014 71 59 65 0 0

20122013 72 58 62 59 0

20112012(LYG) 69 54 67 66 55

20102011(LYGm1) 70 57 65 65 54

20092010(LYGm2) 55 48 54 54 46

4.1EnrolmentRatio(20) TotalMarks

InstituteMarks

N(FromTable4.1) N1(FromTable4.1) EnrollmentRatio[(N1/N)*100]

20142015 120 90 75.00

20132014 60 59 98.33

20122013 60 60 100.00

Average[(ER1+ER2+ER3)/3]:91.11

Assessment:18.00

4.2SuccessRateinthestipulatedperiodoftheprogram(40) TotalMarks

4.2.1Successratewithoutbacklogsinanysemester/yearofstudy(25) InstituteMarks
SI=(Numberofstudentswhohavegraduatedfromtheprogramwithoutbacklog)/(Numberofstudentsadmittedinthefirstyearofthatbatchandadmittedin2ndyearvialateralentryandseparatedivision,ifapplicable)
AverageSI=MeanofSuccessIndex(SI)forpastthreebatches

Successratewithoutbacklogsinanyyearofstudy=25AverageSI

LatestYearofGraduation,LYG LatestYearofGraduationminus1,LYGm1 LatestYearofGraduationminus2LYGm2


Item
(20112012) (20102011) (20092010)

X
NumberofstudentsadmittedinthecorrespondingFirstyear+admittedin2ndyearvialateralentryand 69.00 70.00 55.00
seperateddivision,ifapplicable

Y 44.00 40.00 35.00


https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 62/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Numberofstudentswhohavegraduatedwithoutbacklogsinthestipulatedperiod

SuccessIndex[SI=Y/X] 0.64 0.57 0.64

AverageSI[(SI1+SI2+SI3)/3]:0.62

Assessment[25*AverageSI]:15.50

4.2.2Sucessrateinstipulatedperiod(15) InstituteMarks
SI=(Numberofstudentswhograduatedfromtheprograminthestipulatedperiodofcourseduration)/(Numberofstudentsadmittedinthefirstyearofthatbatchandadmittedin2ndyearvialateralentryandseparateddivision,ifapplicable)
AverageSI=meanofSuccessIndex(SI)forpastthreebatches
Successrate=15AverageSI

LatestYearofGraduation,LYG LatestYearofGraduationminus1,LYGm1 LatestYearofGraduationminus2LYGm2


Item
(20112012) (20102011) (20092010)

X
NumberofstudentsadmittedinthecorrespondingFirstyear+admittedin2ndyearvialateralentryand 69.00 70.00 55.00
seperateddivision,ifapplicable

Y
55.00 54.00 46.00
Numberofstudentswhohavegraduatedinthestipulatedperiod

SuccessIndex[SI=Y/X] 0.80 0.77 0.84

AverageSI[(SI1+SI2+SI3)/3]:0.80

Assessment[15*AverageSI]:12.05

4.3AcademicPerformanceinThirdYear(15) TotalMarks
InstituteMarks
AcademicPerformance=1.5*AverageAPI(AcademicPerformanceIndex)

API=((Meanof3rdYearGradePointAverageofallsuccessfulStudentsona10pointscale)or(MeanofthepercentageofmarksofallsuccessfulstudentsinThirdYear/10))x(numberofsuccessfulstudents/numberofstudentsappearedinthe
examination)
Successfulstudentsarethosewhoarepermittedtoproceedtothefinalyear.

AcademicPerformance 20122013 20112012 20102011

MeanofCGPAormeanpercentageofallsuccessfulstudents(X) 7.20 7.08 6.98

Totalnumberofsuccessfulstudents(Y) 59.00 66.00 65.00

Totalnumberofstudentsappearedintheexamination(Z) 62.00 67.00 65.00

API[X*(Y/Z)]: 6.85 6.97 6.98

AverageAPI[(AP1+AP2+AP3)/3]:6.93

Assessment[1.5*AverageAPI]:10.40

4.4AcademicPerformanceinSecondYear(15) TotalMarks

InstituteMarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 63/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
AcademicPerformanceLevel=1.5*AverageAPI(AcademicPerformanceIndex)

API=((Meanof2ndYearGradePointAverageofallsuccessfulStudentsona10pointscale)or(MeanofthepercentageofmarksofallsuccessfulstudentsinSecondYear/10))x(numberofsuccessfulstudents/numberofstudentsappearedinthe
examination)
SuccessfulstudentsarethosewhoarepermittedtoproceedtotheThirdyear.

AcademicPerformance 20132014 20122013 20112012

MeanofCGPAormeanpercentageofallsuccessfulstudents(X) 7.10 7.00 7.02

Totalnumberofsuccessfulstudents(Y) 65.00 62.00 67.00

Totalnumberofstudentsappearedintheexamination(Z) 71.00 70.00 67.00

API[X*(Y/Z)] 6.50 6.20 7.02

AverageAPI[(AP1+AP2+AP3)/3]:6.57

Assessment[1.5*AverageAPI]:9.86

4.5Placement,HigherStudiesandEntrepreneurship(40) TotalMarks

InstituteMarks

Item 20122013 20112012 20102011

TotalNoofFinalYearStudents(N) 59.00 66.00 65.00

Noofstudentsplacedinthecompaniesorgovermentsector(X) 38.00 33.00 30.00

Noofstudentsadmittedtohigherstudieswithvalidqualifyingscores(GATEorequivalentStateorNationalLeveltests,GRE,GMATetc.)(Y) 10.00 19.00 17.00

Noofstudentsturnedenterpreneurinengineering/technology(Z) 7.00 6.00 5.00

PlacementIndex[(X+Y+Z)/N]: 0.93 0.88 0.80

AveragePlacement[(P1+P2+P3)/3]:0.87

Assessment[40*AveragePlacement]:34.80

4.6ProfessionalActivities(20) TotalMarks
4.6.1Professionalsocities/chaptersandorganizingengineeringevents(5) InstituteMarks
(TheDepartmentshallproviderelevantdetails)

WehaveISTEStudents/FacultychapterandmembershipinvariousotherprofessionalsocietieslikeIEEE,IRED,IAENG,ISOC,IAHS,IAH,IWWA,IWRS...etc.

S.NO. ProfessionalSocieties/Chapters Totalregistered Validity

1 ISTE(Students) 86 June2018

2 ISTE(Faculty) 4 LifeTime

3 IEEE(Faculty) 1 Dec2016
4 IRED(Faculty) 14 LifeTime

5 IAENG(Faculty) 15 LifeTime

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 64/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
6 ISOC (Faculty) 15 LifeTime

7 IAHS (Faculty) 1 LifeTime

8 IAH (Faculty) 1 LifeTime

9 IWRS (Faculty) 1 LifeTime

10 IWWA (Faculty) 1 LifeTime




Sl. Date(s)of
AcademicYear Nameoftheworkshop/TrainingProgram ResourcePersons
No. Organized

1 Cement&ConcreteTechnology P.VasudevaMurthy 23rd &24th Sep2015


201516
RejunavationofGroundWaterTablethrough
2 P.V.SubbaRao 14th Aug2015
RainwaterHarvestinginChittoorDistrict

`1 ANationalLevelTechnicalSymposium(2k15) SIETK 14th Mar2015

Dr.T.Harinarayana(GERMI
2 EnergySecurityThroughRenewableSources 28th Feb2015
Director),Dr.SagarAgrwat

Mr.DibyenduBiswas,
3 201415 3DStudentDesignChallenge 09th Oct2014
Mr.Vetrivel

Sustainablewaterresourcesdevelopmentindrought
4 Mr.Kamalnathsetty 15th Sep2014
proneareas

5 AdvancedTechnologyInLandSurveyTraining Mr.Dinesh.C,Mr.Gangeyan.N 07th &08th Oct2014

1 5th NationalLevelTechnicalSymposium(2k14) SIETK 12th Apr2014


201314
NationallevelworkshopTechnochamp2014 Mr.Mandeepsingh, 12th &13th March
2
ALCHERINGAIITGUWAHATI Mr.Mahendrapalsingh 2014

1 ANationalLevelTechnicalSymposium(2k13) SIETK 16th Mar2013


201213
2 LatestTrendsinCivilEngineering Mr.Elumalai 13th March2012

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 65/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 66/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
4.6.2Publicationoftechnicalmagazines,newsletters,etc.(5) InstituteMarks

(TheDepartmentshalllistthepublicationsmentionedearlieralongwiththenamesoftheeditors,publishers,etc.)

WepublishNewsletterquarterlyandmagazinetwiceinayear.

Nameofthe Nameofthe
S. TechnicalMagazine/ Technical
IssueNo.&Month Name(s)oftheEditor(s) Publisher
No. NewsLetter Magazine/News
Letter (s)

AY(201516)

Volume4,Issue1&Aug 1.G.ShanmukhaSrinivas CivilEngineering


1 NewsLetter DISHA
2015 2.V.S.Meganathan Dept.

1.Y.MuraliKrishna
SIET/Civil/TM001/Oct
2 TechnicalMagazine CIVILINFOSIET 2.G.ShanmukhaSrinivas SIETK
2015
3.V.S.Meganathan

CAY(201415)

Volume3,Issue1&Aug 1.Y.MuraliKrishna CivilEngineering


1 NewsLetter DISHA
2014 2.V.S.Meganathan Dept.

Volume3,Issue2&Nov 1.V.S.Meganathan CivilEngineering


2 NewsLetter DISHA
2014 2.M.PavanKumar Dept.

Volume3,Issue3&Feb 1.J.SathyanarayanaReddy CivilEngineering


3 NewsLetter DISHA
2015 2.V.S.Meganathan Dept.

Volume3,Issue4 1.Y.MuraliKrishna CivilEngineering


4 NewsLetter DISHA
&April2015 2.G.ShanmukhaSrinivas Dept.

1.Y.MuraliKrishna
SIET/Civil/TM001/Oct
5 TechnicalMagazine CIVILINFOSIET 2.G.ShanmukhaSrinivas SIETK
2014
3.V.S.Meganathan

1.Y.MuraliKrishna
SIET/Civil/TM
6 TechnicalMagazine CIVILINFOSIET 2.G.ShanmukhaSrinivas SIETK
002/March2015
3.V.S.Meganathan

CAYm1(201314)

Volume2,Issue1&Aug 1.K.P.Venugopal CivilEngineering


1 NewsLetter DISHA
2013 2.K.PrakashChandra Dept.

Volume2,Issue2&Nov 1.N.KrishnaMurthy CivilEngineering


2 NewsLetter DISHA
2013 2.C.PrabhakarReddy Dept.

Volume2,Issue3&April 1.J.SathyanarayanaReddy CivilEngineering


3 NewsLetter DISHA
2014 2.C.PrabhakarReddy Dept.

1.J.SathyanarayanaReddy
SIET/Civil/TM001/Oct
4 TechnicalMagazine CIVILINFOSIET 2.C.PrabhakarReddy SIETK
2013
3.K.P.Venugopal

SIET/Civil/TM002/March 1.Y.MuraliKrishna
2014
5 TechnicalMagazine CIVILINFOSIET 2.G.ShanmukhaSrinivas SIETK

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 67/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
3.V.S.Meganathan

CAYm2(201213)

1.S.AnandKumarVarma CivilEngineering
1 NewsLetter DISHA Issue1&Aug2012
2.N.KrishnaMurthy Dept.

2 1.J.SathyanarayanaReddy CivilEngineering
NewsLetter DISHA Issue2&Nov2012
Dept.
2.K.PrakashChandra

1.J.SathyanarayanaReddy CivilEngineering
3 NewsLetter DISHA Issue3&May2013
2.K.PrakashChandra Dept.

1.Dr.S.SiddiRaju
SIET/Civil/TM001/Oct
4 TechnicalMagazine CIVILINFOSIET 2.N.KrishnaMurthy SIETK
2012
3.K.PrakashChandra

SIET/Civil/TM 1.Y.MuraliKrishna
5 TechnicalMagazine CIVILINFOSIET SIETK
002/March2013 2.S.AnandKumarVarma


AsamplecopyofNewsLetter(Aug2014):

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 68/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

4.6.3Participationininterinstituteeventsbystudentsoftheprogramofstudy(10) InstituteMarks
(TheDepartmentshallprovideatableindicatingthosepublications,whichreceivedawardsintheevents/conferencesorganizedbyotherinstitutes.)

UniversityRanks&GoldMedals:

S.No. Regd.No. NameoftheStudents AcademicYear %ofMarks Rank

1 10F61A0137 Mr.C.Sasidhar 20102014 86 1st

2 08F61A0127 Mr.T.NagaSai 20082012 80.27 1st

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 69/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Mr.C.SasidharreceivinggoldmedalfromHonorablevicechancellor


PrathibhaAwardsbyAPstateGovt.:


S.No. Regd.No. NameoftheStudents AcademicYear Branch/Specialization %ofMarks

M.Tech.
1 13F61A0212 D.Sukanya 20132015 81.78
(StructuralEngineering)

2 11F61A0126 S.MaheshBabu 20142015 B.Tech 80.62

3 11F61A0129 B.Manikanta 20142015 B.Tech 76.19

4 10F61A0137 C.Sasidhar 20102014 B.Tech 86

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 70/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

StudentsreceivingPrathibhaAwardsfromHonbleChiefMinister,A.P.

10outof48underJNTUAin201415

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 71/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Participationininterinstituteeventsbystudentsoftheprogramofstudy:


Events/Conferences CAY(201415) CAYm1(201314) CAYm2(201213) Total

Workshops 02 03 19 24

Symposium 10 15 22 47



S.
NameoftheStudent Event Date OrganizedBy Prizes(I/II/III)/Awards
No.

CAY:201415

T.VenkataKesava
1 Symposium 30th ,31st&1st Nov2014 SreeVidhyanekethanCollege,Tirupathi 1st Prize
(12F61A0155)

G.Nandini
2 TechnoHunt 18th&19th Apr2014 SVU,Tirupathi 1st Prize
(12F61A0134)

G.Nandini
3 Quiz 15th Mar2014 JNTUA,Anantapur 2nd Prize
(12F61A0134)

U.Manjunath
4 Symposium 13th Mar2014 RGMCollege,Nandhyala 1st Prize
(12F61A0127)

G.Mounika
5 Quiz 30th ,31st&1st Nov2014 SreeVidhyanekethanCollege,Tirupathi 2nd Prize
(12F61A0131)

G.Nandini
6 Symposium 18th&19th Apr2014 SVU,Tirupathi 2nd Prize
(12F61A0134)

G.Nandini
7 Quiz 15th Mar2014 JNTUA,Anantapur CertificateAwarded
(12F61A0134)

G.Nandini
8 Symposium 18th&19th Apr2014 SVU,Tirupati CertificateAwarded
(12F61A0134)

G.Nandini
9 Symposium 15th Mar2014 JNTUA,Anantapur CertificateAwarded
(12F61A0134)

B.VishnuVardhanaNaidu
10 Quiz 30th ,31st&1st Nov2014 SVCE,Tirupati CertificateAwarded
(12F61A0160)

D.PradeepNaidu
11 Quiz 30th ,31st&1st Nov2014 SVCE,Tirupati CertificateAwarded
(12F61A0135)

M.MukeshNaik
12 Quiz 30th ,31st&1st Nov2014 SVCE,Tirupati CertificateAwarded
(12F61A0132)

M.SaiSrinivas
13 Quiz 30th ,31st&1st Nov2014 SVCE,Tirupati CertificateAwarded
(12F61A0143)

U.Manjunath
14 Workshop 30th ,31st&1st Nov2014 SreeVidhyanekethanCollege,Tirupathi CertificateAwarded
(12F61A0127)

U.Manjunath
th th
https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 72/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
15 Symposium 18th&19th Apr2014 SVU,Tirupathi CertificateAwarded
(12F61A0127)

G.Nandini
16 Quiz 30th ,31st&1st Nov2014 SreeVidhyanekethanCollege,Tirupathi CertificateAwarded
(12F61A0134)

G.Nandini
17 Symposium 30th ,31st&1st Nov2014 SreeVidhyanekethanCollege,Tirupathi CertificateAwarded
(12F61A0134)

CAYm1:201314

A.Brahmini
1 Symposium 8th&9th Mar2013 GoldenValley 1st Prize
(10F61A0105)

D.Bharathi
2 Symposium 8th&9th Mar2013 GoldenValley 1st Prize
(11F65A0104)

M.Harish
3 Symposium 10th Apr2013 SVCET,Chittoor 1st Prize
(10F61A0113)

S.Kartheek
4 Symposium 10th Apr2013 SVCET,Chittoor 1st Prize
(10F61A0117)

S.Kavitha
6 Symposium 11th May2013 SVCET,Chittoor 2nd Prize
(10F61A0119)

S.Dhanya
7 Symposium 11th May2013 SVCET,Chittoor 2nd Prize
(10F61A0110)

U.Manjunath
8 Symposium 2nd Mar2013 N.B.K.R. 3rd Prize
(12F61A0127)

U.Manjunath
9 Symposium 16th Feb2013 N.B.K.R. 3rd Prize
(12F61A0127)

B.Kavitha
10 Workshop 19th Mar2013 IITMadras CertificateAwarded
(10F61A0118)

M.Harish
11 Symposium 8th&9th Mar2013 SVCET,Chittoor CertificateAwarded
(10F61A0113)

P.DevendraNaidu
12 Symposium 8th&9th Mar2013 SVCET,Chittoor CertificateAwarded
(10F61A0109)

P.Mounika
13 Symposium 8th&9th Mar2013 SVCET,Chittoor CertificateAwarded
(11F61A0108)

P.Mounika
14 Symposium 8th&9th Mar2013 SVCET,Chittoor CertificateAwarded
(11F61A0108)

D.Bharathi
15 Workshop 4th&5th Feb2013 SVCE,Tirupathi CertificateAwarded
(11F65A0104)

Ch.Praveen
16 Workshop 9th&10th Dec2013 SVCE,Tirupathi CertificateAwarded
(10F61A0130)

U.Manjunath
17 Symposium 15th Mar2014 JNTU,Anantapur CertificateAwarded
(12F61A0127)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 73/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
U.Manjunath
18 Symposium 13th Mar2014 RGM,Kurnool CertificateAwarded
(12F61A0127)

K.Lavanya
19 Symposium 26thFeb2013 SIST,Puttur CertificateAwarded
(11F61A0122)

CAYm2:201213

S.KhajaNayabRasool
1 Symposium 20th Mar2012 SVIST,Madanapalle 1st Prize
(09F61A0134)

S.KhajaNayabRasool
2 Symposium 11th Mar2012 AITS,Tirupathi 2nd Prize
(09F61A0134)

S.KhajaNayabRasool
3 Symposium 22ndMar2012 SVNE,Tirupathi 1st Prize
(09F61A0134)

N.SarathKumar
4 Symposium 20th Mar2012 SVIST,Madanapalle 1st Prize
(09F61A0130)

M.P.Rajan
5 Symposium 22th Mar2012 AITS,Tirupathi 2nd Prize
(09F61A0125)

M.P.Rajan
6 Symposium 21st Mar2012 KKC,Puttur 1st Prize
(09F61A0125)

S.KhajaNayabRasool
7 Symposium 29thJan2012 SVIST,Madanapalle 1st Prize
(09F61A0134)

M.P.Rajan
8 Symposium 09th&10th Mar2012 SVU,Tirupathi 1st Prize
(09F61A0125)

CSasidhar
9 Symposium 10th Mar2012 SIST,Puttur 1st Prize
(10F61A0137)

KYBabhitha
10 Symposium 25th Jan2012 KMM,Tirupathi 2nd Prize
(10F65A0103)

T.UmaMaheshwari
11 Symposium 25th Jan2012 KMM,Tirupathi 1st Prize
(09F61A0142)

K.Kavya
12 Symposium 21st&22nd 2011 VishvodayaTechnicalAcademy 2nd Prize
(08F61A0116)

KSailaja
13 PosterPresentation 28th Sep2011 SVCET,Tirupathi 3rd Prize
(09F61A0129)

YNimeelika
14 Symposium 28th Sep2011 SVCET,Tirupathi CertificateAwarded
(08F61A0130)

YNimeelika
15 Symposium 21st&22nd 2011 VishvodayaTechnicalAcademy 2nd Prize
(08F61A0130)

YNimeelika
16 Symposium 21st&22nd 2011 VishvodayaTechnicalAcademy CertificateAwarded
(08F61A0130)

U.Manjunath
17 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 74/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(11F61A0130)

K.Lavanya
18 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0122)

N.Bhargavi
19 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0108)

G.MaheshKumar
20 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0127)

G.MaheshKumar
21 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0127)

B.Madhu
22 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0125)

L.Mallikarjuna
23 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0128)

P.DilipKumar
24 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0113)

N.Bhargavi
25 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0108)

V.Madhupriya
26 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0124)

K.Lavanya
27 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0122)

S.MaheshBabu
28 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0126)

T.Reddaiah
29 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0142)

S.MukeshKumar
30 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0132)

PBalasubramanyam
31 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0105)

BAvinash
32 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0103)

PHarijyothi
33 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0117)

UManjunath
34 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0130)

PAshok
35 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0102)

KKavya
36 Symposium 9th&10th Jan2012 KSRM,Kadapa CertificateAwarded

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 75/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(08F61A0116)

YNimeelika
37 Symposium 9th&10th Jan2012 KSRM,Kadapa CertificateAwarded
(08F61A0130)

PSKarthik
38 Symposium 18th&19th Feb2012 SVNE,Tirupathi CertificateAwarded
(10F61A0117)

39 PNarendhraReddy Symposium 9th&10th Mar2012 SVU,Tirupathi CertificateAwarded

PSKarthik
40 Symposium 9th&10th Mar2012 SVU,Tirupathi CertificateAwarded
(10F61A0117)

C.H.Praveen
41 Symposium 10th Mar2012 SIST,Puttur CertificateAwarded
(10F61A0130)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 76/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

5FACULTYINFORMATIONANDCONTRIBUTIONS(200) TotalMarks186.29

InstituteMarks
Note:PleaseprovidecumulativeinformationforalltheshiftsforthreeassessmentyearsinbelowformatinAnnexureII.

20122013

Distributionofteachingload(%) AcademicResearch
Qualification
Allthe Faculty
Degree Dateof UG Sponsored
Designations receiving Consultancy
Nameofthefaculty (starting Current joining Fromother Fromthis Research Research
Yearof sincejoining 1st Serving Ph.Dduring Ph.D andProduct Specialization
member offrom University Designation the programme programme PG Paper (Funded
Graduation the Year 100%in the Guidance Development
highest Institution tothis toother Publications Research)
Instituition programme assessment
degree) programme programme
year

GeoHydrology
Dr.S.SiddiRaju PhD S.V.University 1994 Professor Professor 27/06/2011 0.00 100 0.00 0.00 0.00 No 0 8 0 0 andWater
Resources

Water
Dr.K.Chandrasekhar
PhD S.V.University 2011 Professor Professor 01/07/2011 0.00 100 0.00 0.00 0.00 No 0 2 0 0 Resource
Reddy
Engineering

ME/M Associate Associate Structural


N.KrishnaMurthy JNTUH 2003 18/04/2011 0.00 100 0.00 0.00 0.00 No 0 4 0 0
Tech Professor Professor Engineering

J.Satyanarayana ME/M Osmania Associate Associate Structural


1973 02/07/2011 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Reddy Tech University Professor Professor Engineering

ME/M Bharathiyar Associate Associate Structural


C.PrabhakarReddy 2000 06/07/2011 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech University Professor Professor Engineering

ME/M Assistant Assistant Geotechnical


K.PrakashChandra S.V.University 2005 01/07/2011 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Professor Engineering

TNTech
ME/M Univ., Assistant Assistant Transportation
Y.MuraliKrishna 2005 18/06/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Cookeville, Professor Professor Engineering
USA

S.AnandKumar ME/M Sathyabhama Assistant Assistant Environmental


2008 01/07/2009 0.00 100 0.00 0.00 0.00 No 0 4 0 0
Varma Tech University Professor Professor Engineering

Water
ME/M NIT Assistant Assistant
N.Cheeralaiah 2003 04/07/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0 Resource
Tech Warangal Professor Professor
Engineering

ME/M IIT Assistant Assistant Transportation


K.P.Venugopal 2006 04/07/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Bombay Professor Professor Engineering

ME/M Assistant Assistant Structural


K.Penchalaiah S.V.University 2012 07/12/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Professor Engineering

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 77/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Assistant Assistant
R.Nagarjuna M.Sc. S.V.University 2008 04/07/2011 0.00 0 50.00 0.00 0.00 No 0 0 0 0 Mathematics
Professor Professor

ME/M Assistant Assistant


B.Ramesh JNTUA 2012 01/07/2012 0.00 0 50.00 0.00 0.00 No 0 0 0 0 EPS
Tech Professor Professor

Dr.P.Subramanyachari PhD S.V.University 2007 Professor Professor 30/08/2009 0.00 0 50.00 0.00 0.00 No 0 0 0 0 MBA

Assistant Assistant
S.Kishore M.Sc. S.V.University 2007 29/06/2009 0.00 0 50.00 0.00 0.00 No 0 0 0 0 English
Professor Professor

20132014

Distributionofteachingload(%) AcademicResearch
Qualification
Allthe Faculty
Degree Dateof UG Sponsored
Designations receiving Consultancy
Nameofthe (starting Current joining Fromother Fromthis Research Research
Yearof sincejoining 1st Serving Ph.Dduring Ph.D andProduct Specialization
facultymember offrom University Designation the programme programme PG Paper (Funded
Graduation the Year 100%in the Guidance Development
highest Institution tothis toother Publications Research)
Instituition programme assessment
degree) programme programme
year

GeoHydrology
Dr.S.SiddiRaju PhD S.V.University 1994 Professor Professor 27/06/2011 0.00 100 0.00 0.00 0.00 No 0 0 0 0 andWater
Resources

Water
Dr.K.Chandrasekhar
PhD S.V.University 2011 Professor Professor 01/07/2011 0.00 100 0.00 0.00 0.00 No 0 8 0 0 Resource
Reddy
Engineering

ME/M Associate Associate Structural


N.KrishnaMurthy JNTUH 2003 18/04/2011 0.00 100 0.00 0.00 40.00 No 0 1 0 0
Tech Professor Professor Engineering

J.Satyanarayana ME/M Osmania Associate Associate Structural


1973 02/07/2011 0.00 100 0.00 0.00 58.00 No 0 0 0 0
Reddy Tech University Professor Professor Engineering

ME/M Bharathiyar Associate Associate Structural


C.PrabhakarReddy 2000 06/07/2011 0.00 100 0.00 0.00 25.00 No 0 0 0 0
Tech University Professor Professor Engineering

Assistant
ME/M Associate Professor, Geotechnical
K.PrakashChandra S.V.University 2005 01/07/2011 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Associate Engineering
Professor

TNTech Assistant
ME/M Univ., Associate Professor, Transportation
Y.MuraliKrishna 2005 18/06/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Cookeville, Professor Associate Engineering
USA Professor

S.AnandKumar ME/M Sathyabhama Assistant Assistant Environmental


2008 01/07/2009 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Varma Tech University Professor Professor Engineering

Water

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 78/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
N.Cheeralaiah ME/M NIT 2003 Assistant Assistant 04/07/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0 Resource
Tech Warangal Professor Professor Engineering

ME/M IIT Assistant Assistant Transportation


K.P.Venugopal 2006 04/07/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Bombay Professor Professor Engineering

ME/M Assistant Assistant Structural


K.Penchalaiah S.V.University 2012 07/12/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Professor Engineering

ME/M Assistant Assistant Structural


M.Leelakar JNTUK 2013 01/05/2013 0.00 100 0.00 0.00 27.00 No 0 0 0 0
Tech Professor Professor Engineering

ME/M AnnaUniv., Assistant Assistant Structural


S.Prabhavathi 2010 07/05/2013 0.00 100 0.00 0.00 25.00 No 0 0 0 0
Tech Coimbatore Professor Professor Engineering

Dr.P.MadhuMohan Associate Associate


PhD S.V.University 2015 03/06/2013 0.00 0 50.00 0.00 0.00 No 0 10 0 0 Mathematics
Reddy Professor Professor

ME/M Assistant Assistant Power


E.Chudamani JNTUA 2012 01/12/2012 0.00 0 50.00 0.00 0.00 No 0 1 0 0
Tech Professor Professor Electronics

Assistant Assistant
S.Kishore M.Sc. S.V.University 2007 29/06/2009 0.00 0 50.00 0.00 0.00 No 0 0 0 0 English
Professor Professor

Assistant Assistant
R.JyothsnaDevi Other JNTUA 2008 29/06/2009 0.00 0 50.00 0.00 0.00 No 0 0 0 0 MBA
Professor Professor

20142015

Distributionofteachingload(%) AcademicResearch
Qualification
Allthe Faculty
Degree Dateof UG Sponsored
Designations receiving Consultancy
Nameofthefaculty (starting Current joining Fromother Fromthis Research Research
Yearof sincejoining 1st Serving Ph.Dduring Ph.D andProduct Specialization
member offrom University Designation the programme programme PG Paper (Funded
Graduation the Year 100%in the Guidance Development
highest Institution tothis toother Publications Research)
Instituition programme assessment
degree) programme programme
year

Geo
Hydrologyand
Dr.S.SiddiRaju PhD S.V.University 1994 Professor Professor 27/06/2011 0.00 100 0.00 0.00 0.00 No 0 13 0 0
Water
Resources

Water
Dr.K.Chandrasekhar
PhD S.V.University 2011 Professor Professor 01/07/2011 0.00 100 0.00 0.00 0.00 No 0 13 0 0 Resource
Reddy
Engineering

ME/M Associate Associate Structural


N.KrishnaMurthy JNTUH 2003 18/04/2011 0.00 100 0.00 0.00 40.00 No 0 0 0 0
Tech Professor Professor Engineering

J.Satyanarayana ME/M Osmania Associate Associate Structural


1973 02/07/2011 0.00 100 0.00 0.00 58.00 No 0 0 0 0
Reddy Tech University Professor Professor Engineering

ME/M Bharathiyar
2000 Associate Associate Structural

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 79/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
C.PrabhakarReddy Tech University Professor Professor 06/07/2011 0.00 100 0.00 0.00 25.00 No 0 0 0 0 Engineering

Assistant
ME/M Associate Professor, Geotechnical
K.PrakashChandra S.V.University 2005 01/07/2011 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Associate Engineering
Professor

TNTech Assistant
ME/M Univ., Associate Professor, Transportation
Y.MuraliKrishna 2005 18/06/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Cookeville, Professor Associate Engineering
USA Professor

Water
ME/M NIT Assistant Assistant
N.Cheeralaiah 2003 04/07/2012 0.00 100 0.00 30.00 0.00 No 0 0 0 0 Resource
Tech Warangal Professor Professor
Engineering

ME/M IIT Assistant Assistant Transportation


K.P.Venugopal 2006 04/07/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Bombay Professor Professor Engineering

ME/M Assistant Assistant Structural


K.Penchalaiah S.V.University 2012 07/12/2012 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Professor Engineering

ME/M Assistant Assistant Structural


M.Leelakar JNTUK 2013 01/05/2013 0.00 100 0.00 0.00 40.00 No 0 0 0 0
Tech Professor Professor Engineering

Water
G.Shanmukha ME/M Assistant Assistant
S.V.University 2014 01/07/2014 0.00 100 0.00 0.00 0.00 No 0 0 0 0 Resource
Srinivas Tech Professor Professor
Engineering

ME/M VNIT, Assistant Assistant Transportation


V.S.Meganathan 2014 02/07/2014 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Nagpur Professor Professor Engineering

ME/M Assistant Assistant Structural


M.PavanKumar S.V.University 2014 26/09/2014 0.00 100 0.00 0.00 40.00 No 0 1 0 0
Tech Professor Professor Engineering

ME/M Assistant Assistant Structural


S.ArifHussain JNTUA 2014 29/12/2014 0.00 100 0.00 0.00 0.00 No 0 0 0 0
Tech Professor Professor Engineering

Dr.P.MadhuMohan Associate Associate


PhD S.V.University 2015 03/06/2013 0.00 0 50.00 0.00 0.00 No 0 10 0 0 Mathematics
Reddy Professor Professor

Associate Associate
Dr.S.Kishore PhD S.V.University 2013 01/10/2013 0.00 0 50.00 0.00 0.00 No 0 0 0 0 MBA
Professor Professor

Assistant Assistant
S.Kishore M.Sc. S.V.University 2007 29/06/2009 0.00 0 50.00 0.00 0.00 No 0 0 0 0 English
Professor Professor

ME/M Assistant Assistant Power


E.Chudamani JNTUA 2012 01/12/2012 0.00 0 50.00 0.00 0.00 No 0 1 0 0
Tech Professor Professor Electronics

5.1StudentFacultyRatio(20) TotalMarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 80/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
InstituteMarks
S:Fratio=N/FN=No.ofstudents=3*Xwherexis(approvedintake+20%lateralentryintake+separatedivision,ifany)
F=No.offaculty=(a+bc)foreveryassessmentyear

a:TotalnumberoffulltimeregularFacultyservingfullyto2nd,3rdand4thyearofthethisprogram
b:TotalnumberoffulltimeequivalentregularFaculty(consideringfractionalload)servingthisprogramfromotherProgram(s)
c:TotalnumberoffulltimeequivalentregularFaculty(consideringfractionalload)ofthisprogramservingotherprogram(s)
RegularFacultymeans:

Fulltimeonrollwithprescribedpayscale.AnemployeeoncontractforaperiodofmorethantwoyearsANDdrawingconsolidatedsalarymorethanapplicablegrosssalaryshallonlybecountedasaregularemployee.
PrescribedpayscalesmeanspayscalesnotifiedbytheAICTE/CentralGovernmentandimplementationasprescribedbytheStateGovernment.IncaseStateGovernmentprescribeslesserconsolidatedsalaryforaparticularcadrethensamewillbe
consideredasreferencewhilecountingfacultyasaregularfaculty.

Markstobegivenproportionallyfromamaximumof20toaminimumof10foraverageSFRbetween15:1to20:1,andzeroforaverageSFRhigherthan20:1.

Year X N(3*X) F[(a+bc)/100] SFR(N/F)

20142015 216.00 16.70 12.93

20132014 216.00 15.00 14.40

20122013 216.00 13.00 16.62

AverageSFRforthreeassessmentyears:14.65

AssessmentSFR:20.00

5.2FacultyCadreProportion(25) TotalMarks

InstituteMarks
ThereferenceFacultycadreproportionis1(F1):2(F2):6(F3)

F1:NumberofProfessorsrequired=1/9xNumberofFacultyrequiredtocomplywith15:1StudentFacultyratiobasedonno.ofstudents(N)asper5.1
F2:NumberofAssociateProfessorsrequired=2/9xNumberofFacultyrequiredtocomplywith15:1StudentFacultyratiobasedonno.ofstudents(N)asper5.1
F3:NumberofAssistantProfessorsrequired=6/9xNumberofFacultyrequiredtocomplywith15:1StudentFacultyratiobasedonno.ofstudents(N)asper5.1

Professors AssociateProfessors AssistantProfessors


Year Required Required Required
Available Available Available
F1 F2 F3

20142015 1.60 2.00 3.20 7.00 9.60 10.00

20132014 1.60 2.00 3.20 6.00 9.60 9.00

20122013 1.60 3.00 3.20 3.00 9.60 9.00

AverageNumbers 1.60 2.33 3.20 5.33 9.60 9.33

CadreRatioMarks[(AF1/RF1)+[(AF2/RF2)*0.6]+[(AF3/RF3)*0.4]]*12.5:35.55
https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 81/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

5.3FacultyQualification(25) TotalMarks

InstituteMarks
FQ=2.5x[(10X+6Y)/F)]
whereXisno.ofregularfacultywithPh.D.,
Yisno.ofregularfacultywithM.Tech.,
Fisno.ofregularfacultyrequiredtocomply1:15FacultyStudentratio(no.offacultyandno.ofstudentsrequiredaretobecalculatedasper5.1)

X Y F FQ=2.5x[(10X+6Y)/F)]

20142015 4 14 14.40 21.53

20132014 3 12 14.40 17.71

20122013 3 10 14.40 15.62

AverageAssessment:18.29

5.4FacultyRetention(25) TotalMarks
InstituteMarks

Description 20122013 20132014 20142015

NoofFacultyRetained 10 14 15

TotalNoOfFaculty 15 17 19

%ofFacultyRetained 67 82 79

Average:75.99

AssessmentMarks:20.00

5.5InnovationsbytheFacultyinTeachingandLearning(20) TotalMarks

InstituteMarks


InnovationsbytheFacultyinteachingandlearningarefollows:

a.InstructiondeliveryandInstructionalmethods:

Thefacultyusesthechalkandboardtoteachthecurriculumintheclassroom.
ThecoursesalsoaredeliveredusingtheLCDProjectors.
ThemembersoftheFacultyusetheelearningresourcesfromNationalProgrammeonTechnologyEnhanced(NPTEL).
Demonstrationwiththeworkingmodels,charts,componentsetc.,intheclassroomforbetterunderstanding.
Opencourseware,webinarsfromnationalandinternationalorganizationsarepresentedtothestudents.
AnimationvideoswhichexplainintheEclassroomfortheeffectiveteaching.
Conductingtheseminars,groupdiscussions,quizetc.,intheclassrooms.
Eachfacultyteachesthecontentbeyondthesyllabusonadvancedtopicsofthesubject.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 82/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Guestlecturers,workshops,seminarsbytheeminentpeoplefromIndustry,AcademicandResearchInstitutionsarearrangedbytheDepartment.
Symposiumsandconferencesareorganizedtosharetheirinnovativeideaswithothers.

b.PrintedLabmanualsandlabobservationbooks:

Labmanualswithsamplereadingsareavailableinthelaboratoriesforthestudentsreference.
Allthelabmanualsarerevisedandupdatedeveryyearandwheneversyllabusisrevised.
Theprintedobservationsareprovidedtothestudentswithalltheexperiments.
Conducting2or3design/additionalexperimentsinadditiontotheuniversitycurriculumtofillthegapandimprovetheirpracticalknowledge.
Thestudentsareencouragedtodotheminiprojectsinthelaboratory.
Charts,labinformationpostersareplacedineachlabforreference.

c.LecturenotesandQuestionbank:

Thelecturenotesandpowerpointpresentationsofeachcoursearepreparedbythefaculty.
Theprintedobjectiveanddescriptivequestionsarecirculatedtothestudents.
LecturenotesandQuestionbankofeachcourseareavailableinthecollegewebsiteforpeerreviewofstudentsaswellasthefacultywhoishandlingthenewcourse.

d.IndustrialVisits:

Industrialvisitsarefrequentlyconductedtoenhancerealtimeexposureoftechnology.
OurstudentshaverecentlyvisitedKalyaniDamTirupathi,CheyyurDam,AraniarprojectinPichatur,RayalaseemaThermalPowerPlant(RTPP)Kadapa,MangampetaMining,SrisailamDam(Leftbank)etc.

e.Assessment:
MandatoryAssessment

AspertheUniversityexaminationpattern,twomidtermtestandonefinalexaminationareconductedforeachsubject.
MidtermtestsareevaluatedbytheinternalfacultyandfinalexaminationisevaluatedbytheUniversity.
Inthecaseofapracticalcourse,studentsareevaluatedonanongoingbasisinternallyandthenafinalexternalexamination.

AdditionalAssessment

Informalquiz,assignments,seminarsetc.,attheendofeachunittoensureproperunderstandingoftheconceptsbythestudents.
Additionalunittests,sliptestsareconductedaftercompletionofeachunit.

f.Evaluation:
FormativeEvaluation

Inthecaseoftheorysubjects,cumulativeevaluationisbasedontheclasstests,unittests,assignmentsandseminarsthatareconductedsoonaftercompletionofspecificnumberofunitsofthesyllabus.
Inthecaseofpracticalsubjects,thestudentsarecontinuouslyevaluated.Soonafterperforminganexperiment,thestudentshavetopreparetherecordofobservationsandsubmitthesameforreviewbyconcernedfaculty,beforeattendingthenextlaboratorysession.
Internalevaluationofprojectworkisdoneperiodicallybyconductingreviews.

SummativeEvaluation

Theinstitutionhasapolicyofannouncingtheresultsofmidtermexaminationswithintwodaysafterthelastexam.
AllthefacultiesstrictlyadheretothispolicyandthesameisensuredbytheHODsandthePrincipalbyconductingperiodicalreviews.
Evaluationofendsemesterexaminations(theoryandpracticalsubjects)isconductedbytheUniversity.
Evaluationofprojectworkisalsodonebytheuniversity.

5.6FacultyasparticipantsinFacultydevelopment/trainingactivities/STTPs(15) TotalMarks

InstituteMarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 83/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Max5PerFaculty
Nameofthefaculty
20142015 20132014 20122013

Dr.S.SiddiRaju 5.00 5.00 5.00

Dr.K.ChandrasekharReddy 5.00 5.00 5.00

N.KrishnaMurthy 5.00 3.00 3.00

JSathyanarayanaReddy 5.00 0.00 0.00

C.PrabhakarReddy 5.00 3.00 3.00

K.PrakashChandra 0.00 0.00 3.00

Y.MuraliKrishna 5.00 5.00 0.00

S.AnandKumarVarma 0.00 0.00 5.00

N.Cheeralaiah 5.00 0.00 0.00

K.Penchalaiah 0.00 3.00 0.00

K.P.Venugopal 5.00 0.00 0.00

M.Leelakar 0.00 3.00 0.00

G.ShanmukhaSrinivas 5.00 0.00 0.00

V.S.Meganathan 5.00 0.00 0.00

M.PavanKumar 5.00 0.00 0.00

S.ArifHussain 5.00 0.00 0.00

Sum 60.00 27.00 24.00

RF=NumberofFacultyrequiredtocomplywith15:1Student
14.40 14.40 14.40
FacultyRatioasper5.1

Assessment[3*(Sum/0.5RF)] 25.00 11.25 10.00

Averageassessmentover3years:15.42

5.7ResearchandDevelopment(30) TotalMarks

5.7.1AcademicResearch(10) InstituteMarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 84/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Academicresearchincludesresearchpaperpublications,Ph.D.guidance,andfacultyreceivingPh.D.duringtheassessmentperiod.
Numberofqualitypublicationsinrefereed/SCIJournals,citations,Books/BookChaptersetc.(6)
Ph.D.guided/Ph.D.awardedduringtheassessmentperiodwhileworkingintheinstitute(4)
Allrelevantdetailsshallbementioned.
a.No.ofQualityPublications:
InstitutionR&Distakingcareofthepublicationofqualitypapersinreferredjournals.Itprovidesthefacilitieslikeinternet,computing,informationregardingInternationalconferencesandjournalpublications.Institutionprovidesthepublicationfees,travellingallowancesandOD.

Thepublicationofourfacultyinpeerreviewedjournals.

AcademicYear
NameoftheFaculty
201415 201314 201213

Dr.S.SiddiRaju 13 8

Dr.K.ChandrasekharReddy 13 8 2

Dr.N.KrishnaMurthy 1 4

S.AnandKumarVarma 4

M.PavanKumar 1



b.BooksPublished:
Detailsof
S.No. NameoftheFaculty Year TitleofBook ISBNNumber
publishers

WaterResourcesAssessment CreativeSpace
1 Dr.S.SiddiRaju 201314 139781494480448
andManagement Publications

HydroGeologyand
Geochemicalaspectsof LambertAcademic
2 Dr.S.SiddiRaju 201213 9783659464171
Pullampeta,kadapaDist., Publications
A.P.

PerformanceofHighSchool Discovery
3 Dr.S.SiddiRaju 201112 9789350561126
ChildreninPhysicalSciences PublishingHouse


c.Ph.D.awardedduringassessmentperiodwhileworkingintheinstitute:

NameoftheFaculty AreaofResearch Status

Dr.N.KrishnaMurthy StructuralEngineering Completed(2015)

5.7.2SponsoredResearch(5) InstituteMarks

20142015

ProjectTitle Duration FundingAgency Amount

DevelopmentofBenchscaleprocessforBioRemovalandDegradationofReactiveDyeEffluentsforPotentialIndustrialApplication 3Years UGC 1500000.00

Professionalskilldevelopmentprogrammescheduledcaste/tribalsubplansunderNRDMSprogramme 1Year UGC 1400000.00

TotalAmount(X):2900000.00

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 85/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

20132014

ProjectTitle Duration FundingAgency Amount

0.00

TotalAmount(Y):0.00

20122013

ProjectTitle Duration FundingAgency Amount

0.00

TotalAmount(Z):0.00

CumulativeAmount(X+Y+Z)=2900000.00

5.7.3DevelopmentActivities(10) InstituteMarks
Providedetails:

ProductDevelopment
Researchlaboratories
Instructionalmaterials
Workingmodels/charts/monogramsetc.

ProductDevelopment:

Thedepartmentencouragesstudentsandstafftodeveloptheproducts.

Researchlaboratories:

ThereisaseparateR&DCellwhichcaterstheneedsofthestudentsandfacultyintermsofresourcesandcomputingfacilities.
R&Dcellconsistsofworkingmodels,projectmodulesandprojectbooks.
Facilitieslikeprintingreprography,scanningetc.,areavailable.
MicrosoftandIBMinnovationcentersareestablishedintheinstitutiontodevelopsoftwareapplications.

Instructionalmaterials:

Alllabmanualsaredevelopedbyourfaculty.
Booksandprintedmaterialrelatedtoadvancedtopicsmadeavailable.
InformationregardingtheConstructionTechnology,MSProjectandAutoCADsoftwareusageisavailableinhardandsoftcopyform.

Workingmodels/charts/monogramsetc.:

Alltheprojectworkingmodelspreservedforreferenceinprojectlab.
Ineverylabthetechnicalinformationchartsandmodelsaredisplayedwhicharepreparedbyourstaffandstudents.
Subjectrelatedinformationchartsareplacedonwalls.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 86/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

5.7.4Consultancy(fromIndustry)(5) InstituteMarks
(ProvidealistwithProjectTitle,FundingAgency,AmountandDuration)Fundingamount(Cumulativeduringassessmentyears)

20142015

ProjectTitle Duration FundingAgency Amount

BuildingPlanning,Design&Estimation 1Year JayaEducationalSociety 250000.00

QualityControl(QC) 1Year JayaEducationalSociety 250000.00

20132014

ProjectTitle Duration FundingAgency Amount

20122013

ProjectTitle Duration FundingAgency Amount

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 87/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

CumulativeAmount(X+Y+Z)=

5.8FacultyPerformanceAppraisalandDevelopmentSystem(FPADS)(30) TotalMarks
InstituteMarks

Awelldefinedsystemforfacultyappraisalforalltheassessmentyears(10):

Wehavewelldefinedsystemforfacultyappraisalswiththepersonal,academic,experience,trainingandevaluation,andresearchetc.


Itsimplementationandeffectiveness(20):

AttheendofeachacademicyearfacultyappraisalisassessedbytheHODandforwardedtotheprincipal.Theprincipalfurtherassesthedetailsandrecommendthefacultybasedontheirperformancetothemanagement.


SIDDHARTHINSTITUTEOFENGINEERING&TECHNOLOGY

AnnualSelfAssessmentforthePerformanceBasedAppraisalSystems(PBAS)

AcademicYear___________________________

PARTAGENERALINFORMATION

1.Name(inblockletters):
2.Department:
3.CurrentDesignation&GradePay:
4.DateoflastPromotion:
5.Whetheracquiredanydegreeorfreshacademicqualificationsduringtheyear:


PARTBACADEMICPERFORMANCEINDICATORS

CATEGORY:I.TEACHINGLEARNINGANDEVALUATIONACTIVITIES

(i)Lectures,Seminars,Practicals,ContactHours

Noofclasses %ofclasses/practicalstaken
S.No Course Level(UG/PG) Noofclassespercourseallotted
attended asperdocumentedrecord

ClassesTaken(Max250for100%performance&proportionatescoreupto80%performance,bellowwhichnoscoremaybegiven)

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto250)


(ii)Reading/Instructionalmaterialconsultedandadditionalknowledgeresourcesprovidedtostudents

S.No Course lecturenoes Questionbank AdditionalResource

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 88/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


APIscoreonpreparationandimpartingofknowledge/instructionaspercurriculum&syllabusenrichmentbyprovidingadditional
resourcetostudents(maxscore:50)

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto50)


(iii)UseofparticipatoryandinnovativeteachingLearningmethodologies,Updatingofsubjectcontent,courseimprovementetc.

SNo ShortDescription


UseofparticipatoryandinnovativeteachingLearningmethodologies,Updatingofsubjectcontent,courseimprovementetc.

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto100)


(iv)ExamDutiesAssignedandPerformed

Extenttowhichcarried
S.No TypeOfExaminationDuties DutiesAssigned
out(%)

Examinationduties(Invigilationquestionpapersetting,evaluation/assessmentofanswerscripts)asperallotment

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto100)


CATEGORY:IICOCURRICULAR,EXTENSION,PROFESSIONALDEVELOPMENTRELATEDACTIVITIES

Pleasementionyourcontributiontoanyofthefollowing:

S.No TypeOfActivity AverageHrs./Week

(i)Extension,Cocurricular&fieldbasedActivities

Studentrelatedcocurricular,extensionandfieldbasedactivities

TotalAPI
Score Byfaculty Byscreeningcommittee

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 89/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(Marks

limited
to100)


Yearly/Semesterwise
(ii)Contributiontocorporatelifeandmanagementoftheinstitution
responsibilities


Contributiontocorporatelifeandmanagementofthedepartment&institutethroughparticipationinacademicand
administrativecommitteesandresponsibilities

TotalAPI
Byfaculty Byscreeningcommittee
Score

(Marks
limitedto
100)

(iii)ProfessionalDevelopmentActivities


Participationinseminars,conferences,shorttermtrainingcoursesetc.

TotalAPI
Byfaculty Byscreeningcommittee
Score

(Marks
limitedto
50)

TotalAPIscoreforCATEGORY:II

TotalAPI
Score Byfaculty Byscreeningcommittee

(Marks
limitedto
250)


CATEGORY:III.RESEARCH,PUBLICATIONSANDACADEMICCONTRIBUTIONS

A)Publishedpapersinjournals

ISSN/ISBN Whetherpeerreviewed. Whetheryouarethe


S.No Tilewithpagenos. Journal Noofcoauthors
No impactfactor,ifany mainauthor


Byscreening
TotalAPIScore Byfaculty
committee
(Markslimitedto50)


B(i))Articles/chapters/labmanuals/bookspublished

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 90/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Tilewithpage BookTitle, Whetherpeer
S.No editor& ISSN/ISBNNo Noofcoauthors
nos. reviewed.
publisher

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto30)


(ii))paperinconferenceproceedings

Detailsofconference Noofco Whetheryouarethe


S.No Tilewithpagenos. ISSN/ISBNNo
publication authors mainauthor

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto20)


IIIC)OngoingandcompletedResearchProjectsandconsultancies

(C)projects/Consultancies

Grant/Amount
S.No Tile Agency Period Status
Mobilized(Rslakh)

TotalscoreAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto50)


(D)ProjectGuidance

S.No Numberallotted Thesissubmitted Degreeawarded

UG

PG

Ph.D

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto50)


(E)(i)Trainingcourses,TeachingLearningEvaluationtechnologyprogrammes,FacultyDevelopmentProgrammes

S.No Programme Duration Organizedby

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 91/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

TotalscoreAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto10)
(ii)Paperspresentedinconferences,Seminars,Workshops,Symposia

Titleof Whetherinternational
S.No Tileofthepaperpresented conference/ Organizedby /national/state/regional/college/university
Seminar level

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto20)

(iii)Invitedlecturesandchairmanshipsatnational/internationalconference/seminaretc.

Titleof Whether
Tileoflecture/Academic conference/
S.No Organizedby international
session
Seminaretc /national

TotalAPIScore Byfaculty Byscreeningcommittee

(Markslimitedto10)
TotalAPIScore

Byscreening
TotalAPIScore Byfaculty
committee
(Markslimitedto50)


IV.SUMMARYOFAPISCORES

Criteria MaximumAPIScore MinimumAPIScore AttainedAPIScore

Teaching,Learningand
I
Evaluationrelatedactivities

Cocurricular,Extension,
II
Professionaldevelopmentetc

ResearchandAcademic
III
Contribution


PARTCOTHERRELEVANTINFORMATION

Pleasegivethedetailsofanyothercredentials,significantcontributions,awardsreceivedetc.notmentionedearlier

SNo Details(MentionYear,valueetc.,whererelevant)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 92/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


LISTOFENCLOSUERS:(Pleaseattach,copiesofcertificates,sanctionorders,papersetc)

14

25

36


Icertifythattheinformationprovidediscorrectasperrecordsavailablewiththecollegeand/ordocumentsenclosedalongwiththedulyfilledPBASproforma.


Signatureofthefaculty


HODcomments


Principalcomments


SignatureoftheHODSignatureofthePRINCIPAL

5.9Visiting/Adjunct/EmeritusFacultyetc.(10) TotalMarks

InstituteMarks
Wehavetheprovisionofinvitingtheexpertsfromindustry,academicinstitutions,scientistandeminentpersonalitiesinthefieldoftechnologytoimprovetechnicalknowledgeonadvancedtopics,teachingskills,researchandpersonalitydevelopmentofourfacultyandstudents.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 93/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Thefollowingthelectures/interactionsareorganizedbythedepartment.

No.ofHours TotalNo.ofHours
NameoftheAdjunctFaculty Designation Organization TopicGiven Date(s)
Organized OrganizedperYear

AY:20152016

OpportunitiesinConstruction&
Dr.K.N.Satyanarayana Professor IITMadras 4 07102015
InfrastructureinIndia

Dr.K.MallikarjunaRao Professor&HOD S.V.U.,Tirupati 5 BulkUtilizationofFlyash 15092015

Prof.P.RamJagadeesh Professor IITDelhi 3 ImportanceofGATE,PSUs 27082015

RejunevationofGroundWaterTable
NTRTeluguGanga
Sri.P.V.SubhaRao SuperintendingEngineer 5 throughRainwaterHarvestingin 14082015
Project,Tirupati
ChittoorDist.,A.P.

PullaReddyEngineering 50
Dr.T.ChandraSekharReddy Professor 5 ConstructionTechniques 02082015
College,Kurnool

Dr.SrinivasuluReddy Professor KSRM,Kadapa 4 AdvancesinFoundationEngineering 05092015

ToolsAcademyfor
Founder&MDofBuild
Mr.P.VasudevaMurthy CareerExcellence, 10 Cement&ConcreteTechnology 23&24092015
Bizzonlinepvtltd.
Bengaluru

Mr.P.Jagadish ExpertLecturer JHAcademy 4 AwarenessonGate,IES,PSUs 26082015

Mr.N.Gangeyan CEO LadderInstitute,Chennai 10 AdvanceTechnologyinTotalStation 22&23102015

CAY:20142015

Dr.T.Harinarayana Director GERMI,Gujarat EnergySecuritythroughRenewable


6 28022015
Resources
Dr.SagarAgrwat Sr.Scientist GERMI,Gujarat

ExecutiveEngineer SustainableWaterResources
Mr.KamalnathanShetty I&CADDept.Tirupati 5 15092014
(Retted.) DevelopmentinDroughtProneAreas

HSSBIMSolutions ApplicationsofRevitArchitecture,
Mr.VetrivelShanmugam Manager 5 09012015
Pvt.Ltd.,Chennai ArchiCAD,inCivilEngineering

Mr.C.Dinesh Trainer/Instructor LadderInstitute,Chennai


ContouringbyTotalStation
8 7&8112014
AdvancedSurveying
Mr.N.Gangeyan CEO LadderInstitute,Chennai
53
RoleofMineralAdmixtureson
Mr.VijayaSekharReddy HOD SKIT,Srikalahasthi 5 14032015
Concrete

HSSBIMSolutions 27,28&2901
Mr.DibyenduBiswas DesignEngineer 10 RevitArchitecture
Pvt.Ltd.,Chennai 2015

Prof.NarendraPrasad Professor S.V.U.,Tirupati 5 LowCostConcreteTechnology 15102014

I&CAD,Govt.ofA.P.,
Mr.Elumalai Asst.Exe.Engineer 4 InterlinkingofTanks 22082014
Puttur

CivilEngineeringPracticesforCivil
Dr.V.RangaRao Professor&Principal CheeralaEngg.College 5 30072014
Engineers

CAYm1:20132014

Mr.MandeepSingh StructuralEngineer ProIndiaGroup StructuralAnalysis&Designusing


10 12&13032014
STAADPro.
Mr.MahendraPalSingh AssistantEngineer ProIndiaGroup

AudishankaraCollege,
Prof.C.Venumadhav Professor&HOD 5 GreenBuildings 26022014
Gudur

DevelopmentinRoadTransportation
Mr.ChengalReddy DVM APSRTC,Tirupathi 5 07022014
inIndia

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 94/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
AssociateProfessor& Analysis&StabilityofReinforced
Mr.O.EswarReddy SVEC,Rangampet 5 29012014
HOD EarthStructures 52

Dr.M.Srimurali Professor S.V.U.,Tirupati 6 EnvironmentalImpactsonStructures 06012014

Dr.I.V.RamanaReddy Professor S.V.U.,Tirupati 5 EarthquakeResistantStructures 11102013

Mr.Balaji AssociateProfessor NBKR,Vakkadu 5 TrafficImpactStudies 28092013

GlobalEngineering ApplicationsofRS&GISinCivil
Mr.MaruthiMohanReddy AssociateProfessor 5 19082013
College,Kadapa Engineering

Dr.B.Kotaiah Professor SVCET,Chittoor 6 ConcreteMixDesign 15092013

CAYm2:20122013

ToolsAcademyfor Cement&ConcreteTechnology
Founder&MDofBuild
Mr.P.VasudevaMurthy CareerExcellence, 10 (Constructionsite&Industry 10&11032013
Bizzonlinepvtltd.
Bengaluru Oriented)

RejunevationofGroundWaterTable
NTRTeluguGanga
Sri.P.V.SubhaRao SuperintendingEngineer 5 throughRainwaterHarvestingin 04022013
Project,Tirupati
ChittoorDist.,A.P.

OpportunitiesinConstruction&
Dr.K.N.Satyanarayana Professor IITMadras 4 08102012
InfrastructureinIndia

Dr.SrinivasuluReddy Professor KSRM,Kadapa 4 AdvancesinFoundationEngineering 08092012

Mr.P.Jagadish ExpertLecturer JHAcademy 4 AwarenessonGate,IES,PSUs 31082012 52

Mr.N.Gangeyan CEO LadderInstitute,Chennai


10 AdvanceTechnologyinTotalStation 10&11082012
Mr.C.Dinesh Trainer/Instructor LadderInstitute,Chennai

RoleofMineralAdmixtureson
Mr.VijayaSekharReddy HOD SKIT,Srikalahasthi 5 10012013
Concrete

I&CAD,Govt.ofA.P.,
Mr.Elumalai Asst.Exe.Engineer 5 InterlinkingofTanks 14022013
Puttur

Professor, DesignofReinforcedConcrete
Dr.I.V.RamanaReddy S.V.University 5 28022013
Dept.ofCivilEngineering Structures

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 95/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

6FACILITIESANDTECHNICALSUPPORT(80) TotalMarks80.00

6.1Adequateandwellequippedlaboratories,andtechnicalmanpower(30) TotalMarks
InstituteMarks

Weekly TechnicalManpowerSupport
Numberof
utilization
students Nameof
Sr. Nameofthe status(allthe
perset NameoftheImportantEquipment the
No Laboratory coursesfor Designation Qualification
up(Batch Technical
whichthelabis
Size) staff
utilized)

SurveyingLab
I& K. Lab Diploma
1 3 1.Theodolite2.Totalstation 4sessions
SurveyingLab Murugesan Technician (Civil)
II

1.TorsionTestApparatus2.UniversalTesting
Strengthof Lab
2 3 Machine3.SpringTestingMachine4.Impact 8Sessions C.Rajesh ITI
MaterialLab Technician
TestingMachine5.Hardnesstestingmachine

Fluid 1.Venturimeter2.OrificeMeter3.Centrifugal
Mechanics Pump4.MultiStageCentrifugalPump5.
Lab
3 AndHydraulic 3 ReciprocatingPump6.PipeFriction 12Sessions M.Lokaiah ITI
Technician
Machinery Apparatus7.ImpactofJetOnVanes
Lab Apparatus

Engineering Lab B.Tech


4 1 1.Streakplate2.clynometercompass 2sessions D.Bharathi
GeologyLab Technician (Civil)

Concrete
Technology& 1.Aggregatecrushingtest2.Losangles Lab B.Tech
5 4 4sessions S.Sameer
Highway Abrasiontest3.Reboundhammer Technician (Civil)
MaterialsLab

Geotechnical 1.Casagrandesapparatusforliquidlimit,
C. Lab
6 Engineering 3 plasticlimit.2.Corecutter3.Sand 2sessions B.Tech(Civil)
JyothiBabu Technician
Lab Replacement

Environmental
Lab B.Tech
7 Engineering 1 1.pHmeter2.Turbiditymeter 2sessions A.Naresh
Technician (Civil)
Lab

1.EquippedWith36I32GProcessorMake
SystemsInstalledWithWindowsXP,Modeling
J.Suresh& Lab
8 CADLab 1 AndAnalysis2.Softwares,WithDVDWriter 8Sessions B.Tech
V.Mamatha Technician
anUSBDrivePeripherals,Printer,Scanner,
Internet,etc.

6.2Additionalfacilitiescreatedforimprovingthequalityoflearningexperienceinlaboratories(25) TotalMarks

InstituteMarks

Sr. Areasinwhichstudentsareexpectedtohave Relevanceto

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 96/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
No FacilityName Details Reason(s)forcreatingfacility Utilization enhancedlearning POs/PSOs

Tostudythecompressivestrengthofcubes 69StudentsfromIII
1 Compressivetesting(ConcreteTechnologyLab) CTMCapacity20Tones ConcreteTechnology PO2,PO3&PSO2
byusingFlyAsh B.Tech

Efficiencytestonreciprocatingpump(FluidMechanicsAnd Singlestagereciprocatingpump Tostudytheperformanceofreciprocating 97StudentsfromII


2 FluidMechanicsAndHydraulic PO1,PO2
HydraulicMachineryLab) electricalmotor pump B.Tech

Tostudythedesign&analysisofdifferent 61StudentsfromIV
3 Designofstructures(CADLab) STAADPROV8i CAD PO3,PO2&PSO3
structures B.Tech

6.3Laboratories:Maintenanceandoverallambiance(10) TotalMarks

InstituteMarks
Themaintenanceandambiancemeasuresinthelaboratoriesare:

Calibrationofequipmentatthebeginningofeverysemester.
Alllaboratoryequipmentarekeptinconditionbeforethecommencementofthesemester.
Laboratoryequipmentareservicedandmaintainedeveryweek.
Maintenancebookisavailableineachlaboratory
Readinessoflaboratorymanuals&plans.
Maintainingthestudentslogbooks.
Listofexperiments,equipmentdetailsandsafetymeasuresaredisplayedineachLaboratory.
LaboratoryEquipmentsareverifiedasinStockRegisterswithLabIncharge,HODeveryacademicyear.
Computersystemsaredailycleanedandareservicedasandwhenrequired.
Maintaininglicenseisverifiedandupdated.
Faultyequipmentisrepairedbytheserviceagents.
Laboratoriesareregularlycleaned.
Alllaboratoriesarehavinggoodventilation.
Alllaboratoriesarefurnishedwithfurniture.
Alllaboratoriesarespaciousandtidy.
Alllaboratoriesarehavingluminouslighting.
Alltheequipmentsarewellorganizedineachandeverylaboratory.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 97/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 98/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

6.4Projectlaboratories(5) TotalMarks

InstituteMarks
Mentionfacilities&Utilization

TheDepartmenthasseparateprojectlaboratorywiththelatestequipmentandsystems,somanylivemodelswhicharedonebythestudents.Italsocontainsotherfacilitiessuchasinternet,reprographic,scanning,printer,stationaryetc.Allthepreviousprojectreportsareavailableforreadyreference.TheProjecthoursareallocatedinthe
regulartimetable.Thestudentsarealsoallowedtodotheirprojectsbeyondtheworkinghours.

Theprojectcoordinatorconductsasessionduringtheirthirdyearintheprojectlaboratoryandexplainsabouttheprojectworkwhichtheywilldointheirfinalyear.Duringthesessiontheygettheguidelinestogroupformationwithidealsizeandcomplementarypersonalcapabilitiesasgroupmembers.Thevariousareasoftheproject,
technology,recenttrends,andpossiblesampleproblemstatementsperprojectarenarratedtothestudents.


Facilitiesandtheirutilizationintheprojectlaboratory

S.No. NameoftheFacility Specifications Utilization

1 AutoCAD2010 18.1Version Todesigndifferentplansofbuilding


2 STAADpro V8i Todesignandanalysisofbuildingstructures


3 Curingtank 3.6x1x0.6m Curingofconcretecubesandbeams

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 99/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
HPLaserJet
4 Printer&Scanner, Toprintandscanningofprojectdocuments
M126

5 Internet 110Mbps Touploadanddownloaddata

PROJECTLAB

6.5Safetymeasuresinlaboratories(10) TotalMarks

InstituteMarks

Sr.No LaboratoryName SafetyMeasures

Whitedress Shoes Safetyinstructionsaredisplayed


1 SurveyingLabI&SurveyingLabII
Fireextinguishers FirstAidBox Sufficientwidthofexit

Apron Shoes Rubbermats Safetyinstructionsare


2 StrengthofmaterialsLab displayed Fireextinguishers FirstAidBox Sufficient
widthofexit

Apron Shoes Rubbermats properpipingsystemto


waterflow. Wellcasingofmoving/rotatingmachinery..
3 FluidMechanicsandHydraulicMachineryLab Insulatedelectricalwiringsystem Safetyinstructionsare
displayed Fireextinguishers FirstAidBox Sufficient
widthofexit

Apron Shoes Safetyinstructionsaredisplayed Fire


4 EngineeringGeologyLab
extinguishers FirstAidBox Sufficientwidthofexit

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 100/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
5 ConcreteTechnology&HighwayMaterialsLab Apron Shoes Handglosses Safetyinstructionsare
displayed Fireextinguishers FirstAidBox Sufficient
widthofexit TwoNumberofexits

Apron Shoes Safetyinstructionsaredisplayed Fire


6 GeotechnicalEngineeringLab
extinguishers FirstAidBox Sufficientwidthofexit

Apron Shoes Safetyinstructionsaredisplayed Fire


7 EnvironmentalEngineeringLab
extinguishers FirstAidBox Sufficientwidthofexit

UPSBackup Antivirussoftware Insulatedelectrical


8 CADLab wiringsystem. Safetyinstructionsaredisplayed Fire
extinguishers Sufficientwidthofexit

7CONTINUOUSIMPROVEMENT(50) TotalMarks50.00

7.1ActionstakenbasedontheresultsofevaluationofeachofthePOs&PSOs(20) TotalMarks
InstituteMarks
IdentifytheareasofweaknessesintheprogrambasedontheanalysisofevaluationofPOs&PSOsattainmentlevels.MeasuresidentifiedandimplementedtoimprovePOs&PSOsattainmentlevelsfortheassessmentyears

POsAttainmentLevelsandActionsforImprovement(20142015)

POs TargetLevel AttainmentLevel Observations

PO1:EngineeringKnowledge

1.ET&MT:LackinginDCMotors.2.BMC:Unabletounderstandthemanufacturingprocessesofmaterialslike
bricks,limeandcementetc.3.H&HM:Lackofknowledgeonfunctioningofventurimeterandorificemeter.4.
WREII:Lackofknowledgeondrainagegalleries5.CT:Studentsarelackingknowledgeonpretensioningand
PO1 3 2.20
posttensioningofconcrete.6.SAII:Studentsarelackingaboutredundantforcesanddeflectionwherethey
occurandhowtheywilloccur.7.SAI:Unabletounderstandtheconceptsofinfluencelines.8.DDSS:Lackof
knowledgeonbeamdesignrequirementsasperI.S.coderecommendations.

Action1:WorkshopsonoperationofDCMotors.Action2:Industrialvisitstothemanufacturingunitsofcement,limeandbricks.Action3:NPTELvideosonfunctioningofVenturimeterandorificemeter.Action4:Visitingdamstoshowdrainagegalleries.
Action5:Workshopsbyexpertsfromindustryonpretensioningandposttensioningofconcrete.Action6:Demonstrationwithmodelsandfieldtrips.Action7:Guestlecturesoninfluencelines.Action8:Morepracticingsessionsondesignanddrawingof
steelstructuresasperIScoderecommendations.

PO2:ProblemAnalysis

1.H&HM:Lackofknowledgeonfunctioningofpeltonwheelturbine.2.SAI:Lackofknowledgeonfixedbeams.
PO2 3 2.20 3.EG:Unabletounderstandthescienceofminerals.4.WREII:Lackofknowledgeonogeespillway.5.ECV:
Lackofknowledgeontendersandcontracts.

Action1:NPTELvideosonfunctioningofPeltonwheelturbine.Action2:SeminarsonfixedbeamsAction3:Fieldvisitstoseemineralsoccurnaturallyandunderstandpracticallyaboutmineralogy.Action4:Visitingtodamsandshowingdirectlyallthe
featuresofOgeespillway.Action5:Seminarsontendersandcontractstopicbyasiteengineer.

PO3:Design/developmentofSolutions

1.MII:Laplace&Ztransformaredistincttothedesignofexperiment,notinterpretationofdataandno
synthesisofinformationtogivevalidproblems,Butitisusedasabasicsubjectforknowledgebasedresearch.
PO3 3 2.08 2.FM:Unabletounderstandweirsandnotches.3.H&HM:LackofknowledgeonfunctioningofVenturimeter
andorificemeter.4.SAII:Studentsarelackingabouttypesofframes,jointsandlackoffundamentalsin
structures.5.WREII:Lackofknowledgeondiversionheadworks.

Action1:GuestlecturesonLaplace&ztransformtopic.Action2:NPTELvideosonweirsandnotches.Action3:NPTELvideosonfunctioningVenturimeterandorificemeter.Action4:Demowithmodelsandfieldtrips.Action5:Fieldtripstodamsand
canals.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 101/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
PO4:ConductInvestigationsofComplexProblems

1.MII:Unabletounderstandmatrices.2.FM:Unabletounderstandweirsandnotches.3.H&HM:Lackof
PO4 3 2.08 knowledgeonfunctioningofventurimeterandorificemeter.4.SURVEYINGII:Lackofknowledgeinoperating
totalstation.5.GTEI:Unabletounderstandtheconsolidationprocedure.

Action1:Guestlecturesonfundamentalprocedureonmatrices.Action2:NPTELvideosonweirsandnotches.Action3:NPTELvideosonfunctioningventurimeterandorificemeter.Action4:Workshopsonoperatingtotalstation.Action5:Guestlectureson
consolidationprocedure.

PO5:ModernToolUsage

1.SurveyingI:Lackingknowledgeontheodolitesurveying.2.ES:Lackofknowledgeonindustrialairpollution.
PO5 3 2.18 3.CT:Lackofknowledgeonthemanufacturingprocessofcement.4.GTEI:Unabletounderstandpermeability.
5.WREII:Lackofknowledgeoncrossdrainageworks.

Action1:WorkshopsonRepetitionandReiterationmethodsofTheodolitesurveying.Action2:Visitstolocalpollutedindustrialsite.Action3:Visitstothecementmanufacturingunit.Action4:Guestlecturesonpermeabilitybyexperts.Action5:Sitevisitsto
drainageworksanddemonstratepractically.

PO6:TheEngineerandSociety

1.SURVEYINGI:Unabletounderstandtheconceptsofsimplecurvesandcompoundcurves.2.ES:Unableto
understandthesoilerosionanddeforestation.3.CT:Lackofknowledgeinworkabilityofconcrete.4.DDSS:
PO6 3 2.10
LackofknowledgeinbeamdesignrequirementsasperI.S.coderecommendations.5.TE:Lackofknowledge
onhighwaygeometricdesign.

Action1:Guestlecturesonsettingsimplecurvesandcompoundcurves.Action2:Seminarsonsoilerosionanddeforestation.Action3:Workshopsonworkabilityofconcrete.Action4:MorelecturesondesignanddrawingofsteelstructuresasperIScode
recommendations.Action5:Workshopsonhighwaygeometricdesign.

PO7:EnvironmentandSustainability

1.SM1:Lackofknowledgeondeflectionofbeams.2.WREII:Lackofknowledgeontypesofdams.3.DDSS:
PO7 3 2.33
Unabletounderstandthedesignofplategirder.

Action1:Guestlecturesondeflectionofbeamsbyexpert.Action2:Fieldvisitstovariousdamlocations.Action3:Guestlecturesandseminarsonplategirder.

PO8:Ethics

1.SMI:Unabletounderstandstressandstraintopic.2.HHM:Lackofknowledgeinturbines.3.SAI:Lackof
PO8 1.50 1.00
knowledgeinmomentdistributionmethod.

Action1:Guestlecturesforsorting,mergingandstrings.Action2:Workshopsonhydraulicturbines.Action3:Remedialclassesonmomentdistributionmethod.

PO9:IndividualandTeamWork

PO9 3 2.40 LackofknowledgeonIndividual&Teamwork.

Action:Individual&GroupAssignments.

PO10:Communication

PO10 3 1.80 1.PoorinCommunicationSkills

Action1:GroupDiscussions,DebatesandSeminars.

PO11:ProjectManagementandFinance

PO11 3 1.80 1.HHM:Lackofknowledgeinchannelflow.2.WREII:Lackofknowledgeinseepage.

Action1:Guestlecturesonchannelflow.Action2:Seminarsonseepage.

PO12:LifelongLearning

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 102/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

PO12 3 2.19 1.ET&MT:Lackofknowledgeonsinglephasetransformers.2.SurveyingI:Unabletounderstandplanetable


surveying.3.ES:Lackofknowledgeinecosystem.4.DDSS:Lackofknowledgeonbeamdesignrequirementsas
perI.S.coderecommendations.5.GTEI:Unabletounderstandcompactionprocess.

Action1:Visitstopowerstations.Action2:Guestlecturesonplanetablesurveying.Action3:PPTonecosystems.Action4:MorelecturesondesignanddrawingofsteelstructuresasperIScoderecommendations.Action5:Workshopsoncompaction.

POsAttainmentLevelsandActionsforImprovement(20132014)

POs TargetLevel AttainmentLevel Observations

PO1:EngineeringKnowledge

1.ET&MT:LackinginDCMotors.2.FM:Unabletounderstandweirsandnotches.3.ES:Lackofknowledgeon
PO1 2.5 2.10 industrialairpollution.4.CT:Studentsarelackingknowledgeonpretensioningandposttensioningofconcrete.
5.GTEI:Unabletounderstandcompactionprocess.

Action1:WorkshopsonoperationofDCMotors.Action2:NPTELvideosonweirsandnotches.Action3:Visitingtolocalpollutedindustrialsite.Action4:Workshopsbyexpertsfromindustryonpretensioningandposttensioningofconcrete.Action5:
Workshopsoncompaction.

PO2:ProblemAnalysis

1.SURVEYING:Lackofknowledgeinoperatingtotalstation.2.P&S:Lackofstatisticsfundamentals.3.SAII:
PO2 2.5 2.08 Studentsarelackingaboutredundantforcesanddeflectionwheretheyoccurandhowtheywilloccur.4.WREII:
Lackofknowledgeonogeespillway.5:AP&C:Lackofknowledgeinpollutants.

Action1:Workshopsonoperatingtotalstation.Action2:RemedialclassesinstatisticsfundamentalsAction3:Demonstrationmodelstoovercometheproblemsandgoingtofieldtripsshowingtheproblemspractically.Action4:Visitingdamsandshowing
directlyallthefeaturesofOgeespillway.Action5:Seminarsonairpollutants

PO3:Design/developmentofSolutions

1.FM:Unabletounderstandweirsandnotches.2.H&HM:Lackofknowledgeonfunctioningofventurimeter
andorificemeter.3.SAI:Unabletounderstandtheconceptsofinfluencelines.4.SAII:Studentsarelacking
PO3 2.5 2.00
abouttypesofframes,jointsandlackoffundamentalsinstructures.5.WREII:Lackofknowledgeondiversion
headworks

Action1:NPTELvideosonweirsandnotches.Action2:NPTELvideosonfunctioningventurimeterandorificemeter.Action3:Guestlecturesoninfluencelinesbyexperts.Action4:Demomodelstoovercometheproblemandgoingfieldtripsshowing
practically.Action5:Fieldtripstodamsandcanals.

PO4:ConductInvestigationsofComplexProblems

1.BMC:Unabletounderstandthemanufacturingprocessesofmaterialslikebricks,limeandcementetc.2.
HHM:Lackofknowledgeinchannelflow3.DDSS:LackofknowledgeonbeamdesignrequirementsasperI.S.
PO4 2.5 2.03
coderecommendations.4.GTEI:Unabletounderstandtheconsolidationprocedure.5.EEII:Lackof
knowledgeinsolidwastemanagement.

Action1:Industrialvisitstothemanufacturingunitsofcement,limeandbricks.Action2:Guestlecturesonchannelflow.Action3:MorelecturesondesignanddrawingofsteelstructuresasperIScoderecommendations.Action4:Guestlectureson
consolidationprocedure.Action5:Guestlecturesonsolidwastemanagement.

PO5:ModernToolUsage

1.BPD:Lackofknowledgeincommercialbuildingdrawing.2.EG:Unabletounderstandthescienceof
PO5 2.50 2.08 minerals.3.WREII:Lackofknowledgeondrainagegalleries.4.EEI:Lackofknowledgeinsewage.5.GTEII:
Unabletounderstandshallowfoundations.

Action1:MorePracticingofDrawingsclearlyusingAutoCADD,tellingdrawingineasyprocedure.Action2:Fieldvisitstoseemineralsoccurnaturallyandunderstandpracticallyaboutmineralogy.Action3:Visitingdamsbyshowingdrainagegalleries.
Action4:Seminarsonsewage.Action5:Seminarsonfoundations.

PO6:TheEngineerandSociety

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 103/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
1.DDRCS:Unabletounderstandlimitstatedesignofconcretestructureforshear,torsion.2.WRE1:Lackof
PO6 2.50 2.05 knowledgeinhydrology.3.GTEI:Unabletounderstandcompactionprocess.4.WREII:Lackofknowledgeon
diversionheadworks.5.TE:Lackofknowledgeonhighwaygeometricdesign.

Action1:LecturesonlimitstatedesignofconcretestructuresforshearandtorsionusingI.S.codalprovision.Action2:Guestlecturesonhydrology.Action3:Workshopsoncompaction.Action4:Fieldtripstodamsandcanals.Action5:Workshopson
highwaygeometricdesign.

PO7:EnvironmentandSustainability

1.SMI:Lackofknowledgeondeflectionofbeams.2.ECV:Unabletounderstandrateanalysis.3.GIS:Lackof
PO7 2.50 2.25
knowledgeinphotogrammetry.

Action1:Guestlecturesondeflectionofbeamsbyexpert.Action2:Guestlecturesonrateanalysisthroughexperts.Action3:Guestlecturesonphotogrammetry.

PO8:Ethics

1.SMI:Unabletounderstandstressandstraintopics.2.HHM:Lackofknowledgeinturbines.3.SAI:Lackof
PO8 1.50 1.00
knowledgeinmomentdistributionmethod.

Action1:Guestlecturesforsorting,mergingandstrings.Action2:Workshopsonhydraulicturbines.Action3:Remedialclassonmomentdistributionmethod.

PO9:IndividualandTeamWork

PO9 2.5 2.32 LackofknowledgeonIndividual&Teamwork.

Action:Individual&GroupAssignments.

PO10:Communication

PO10 2.5 1.78 1.EEII:Lackofknowledgeindisposalofsolid.

Action1:Seminarsondisposalofsolid.

PO11:ProjectManagementandFinance

PO11 2.5 1.78 1.HHM:Lackofknowledgeinchannelflow.

Action1:Guestlecturesonchannelflow.

PO12:LifelongLearning

1.ETMT:Lackofknowledgeonsinglephasetransformers.2.SAI:Unabletounderstandtheconceptsof
influencelines.3.SAII:Studentsarelackingabouttypesofframes,jointsandlackoffundamentalsin
PO12 2.5 2.12 structures.4.DDSS:LackofknowledgeonbeamdesignrequirementsasperI.S.coderecommendations.5.
WREII:Lackofknowledgeondiversionheadworks.6.SurveyingI:Unabletounderstandplanetable
surveying.7.ES:Lackofknowledgeinecosystems.8.GTEI:Unabletounderstandcompactionprocess.

Action1:Visitstopowerstation.Action2:Guestlecturesoninfluencelinesbyexperts.Action3:Demowithmodelstoovercometheproblemandgoingfieldtrips.Action4:Morepracticingondesignanddrawingofsteelstructures.Action5:Fieldtripsto
damsandcanals.Action6:Guestlecturesonplanetablesurveying.Action7:PPTonecosystems.Action8:Workshopsoncompaction.

POsAttainmentLevelsandActionsforImprovement(20122013)

POs TargetLevel AttainmentLevel Observations

PO1:EngineeringKnowledge

1.SMI:Unabletounderstandstressandstraintopic.2.BMC:Unabletounderstandthemanufacturing
processesofmaterialslikebrickslimeandcementetc.3.ES:Lackofknowledgeonindustrialairpollution.4.
PO1 2.30 2.05
GTEI:Unabletounderstandtheconsolidationprocedure.5.TE:Lackofknowledgeonhighwaygeometric
design.6.EEII:Lackofknowledgeindisposalofsolid.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 104/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Action1:Guestlecturesondeflectionofbeamsbyexpert.Action2:Industrialvisitstothemanufacturingunitsofcement,limeandbricks.Action3:Visitstolocalpollutedindustrialsite.Action4:Guestlecturesonconsolidationprocedure.Action5:
Workshopsonhighwaygeometricdesign.Action6:Seminarsondisposalofsolid.

PO2:ProblemAnalysis

1.SURVEYING:Lackofknowledgeinoperatingtotalstation.2.SAI:Lackofknowledgeonfixedbeams.3.
PO2 2.30 2.08
WREII:LackofknowledgeonOgeespillway.4..GTEII:Unabletounderstandshallowfoundations.

Action1:Organizingworkshopsonoperatingtotalstation.Action2:Seminarsonfixedbeams.Action3:VisitingdamsandshowingdirectlyallthefeaturesofOgeespillway.Action4:Seminarsonfoundations.

PO3:Design/developmentofSolutions

1.FM:Unabletounderstandweirsandnotches.2.H&HM:Lackofknowledgeonfunctioningofventurimeter
PO3 2.30 2.00 andorificemeter3.SAII:Studentsarelackingaboutredundantforcesanddeflectionwheretheyoccurandhow
theywilloccur.4.WREII:LackofknowledgeonOgeespillway.

Action1:NPTELvideosonweirsandnotchesAction2:NPTELvideosonfunctioningventurimeterandorificemeter.Action3:Demonstrationmodelstoovercometheproblemsandgoingtofieldtripsshowingtheproblemspractically.Action4:Visitingdam
andshowingdirectlyallthefeaturesofOgeespillway.

PO4:ConductInvestigationsofComplexProblems

1.MII:Unabletounderstandmatrices.2.ET&MT:LackinginDCMotors.3.SURVEYING:Lackofknowledgein
operatingtheodolite.4.H&HM:Lackofknowledgeonfunctioningofpeltonwheelturbine.5.CT:Studentsare
PO4 2.30 2.00
lackingknowledgeonpretensioningandposttensioningofconcrete.6.EG:Unabletounderstandthescience
ofminerals.7.DDSS:LackofknowledgeonbeamdesignrequirementsasperI.S.coderecommendations.

Action1:Guestlecturesonfundamentalprocedureonmatrices.Action2:WorkshopsonoperationofDCMotors.Action3:Workshopsonoperatingtheodolite.Action4:NPTELvideosonfunctioningofpeltonwheelturbine.Action5:Workshopsconducted
byexpertsfromindustrytoimproveonpretensioningandposttensioningofconcrete.Action6:Fieldvisitstoseemineralsoccurnaturallyandunderstandpracticallyaboutmineralogy.Action7:Morelecturesondesignanddrawingofsteelstructures.

PO5:ModernToolUsage

1.SAII:Studentsarelackingaboutredundantforcesanddeflectionwheretheyoccurandhowtheywilloccur.
PO5 2.30 2.03
2.GTEI:Unabletounderstandpermeability.

Action1:Demonstrationwithmodelstoovercometheproblemsandgoingtofieldtripsshowingtheproblemspractically.Action2:Guestlecturesonpermeabilitybyexperts.

PO6:TheEngineerandSociety

1.BM&C:Unabletounderstandthemanufacturingprocessesofmaterialslikebricks,limeandcementetc.2.
PO6 2.30 2.00
EEI:Lackofknowledgeinsewage.3.GTEII:Unabletounderstandshallowfoundations.

Action1:Industrialvisitstothemanufacturingunitsofcement,limeandbricks.Action2:Seminarsonsewage.Action3:Seminarsonfoundations.

PO7:EnvironmentandSustainability

PO7 2.30 2.15 1.ES:Unabletounderstandthesoilerosionanddeforestation.2.ECV:Unabletounderstandrateanalysis.

Action1:Seminarsonsoilerosionanddeforestation.Action2:Guestlecturesonrateanalysisbyexperts.

PO8:Ethics

PO8 1.30 1.00 1.SMI:Unabletounderstandstressandstraintopic.

Action1:Guestlecturesforsorting,mergingandstrings.

PO9:IndividualandTeamWork

PO9 2.30 2.26 LackofknowledgeonIndividual&Teamwork.

Action1:Individual&GroupAssignments.

PO10:Communication

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 105/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
PO10 2.30 1.75 1.ECV:Unabletounderstandrateanalysis.

Action1:Guestlecturesonrateanalysisbyexperts.

PO11:ProjectManagementandFinance

PO11 2.30 1.75 1.WREII:Lackofknowledgeinseepage.

Action1:Seminarsonseepage.

PO12:LifelongLearning

1.SMI:Unabletounderstandstressandstraintopic.2.ES:Lackofknowledgeinecosystems.3.GTEI:Unable
PO12 2.30 2.08
tounderstandcompactionprocess.4.TE:Lackofknowledgeonhighwaygeometricdesign.

Action1:Guestlecturesforsorting,mergingandstrings.Action2:PPTonecosystems.Action3:OrganizingworkshopsoncompactionAction4:Workshopsonhighwaygeometricdesign.

PSOsAttainmentLevelsandActionsforImprovement(20142015)

PSOs TargetLevel AttainmentLevel Observations

PSO1:BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO1 2.80 2.40 WREII:Lackofknowledgeincanalregulatordesign.

Action:Seminarsoncanalregulatorsdesign.

PSO2:ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

PSO2 2.80 2.24 DDRCS:unabletounderstandlimitstatedesignofconcretestructureforshear,torsion.

Action:Morepracticingondesignanddrawingofreinforcedstructures.

PSO3:STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteelstructures.

PSO3 2.80 2.36 DDSS:LackofknowledgeonbeamdesignrequirementsasperI.S.coderecommendations.

Action:GuestlecturesgivenbytheExperts&Morepracticingondesignanddrawingofsteelstructures.

PSOsAttainmentLevelsandActionsforImprovement(20132014)

PSOs TargetLevel AttainmentLevel Observations

PSO1:BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO1 2.50 2.35 WREII:Lackofknowledgeindiversionheadtanksdesign.

Action:Seminarsondiversionheadtanks.

PSO2:ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

PSO2 2.50 2.20 DDRCS:unabletounderstandlimitstatedesignofconcretestructureforshear,torsion.

Action:Morelecturesondesignanddrawingofreinforcedstructures.

PSO3:STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteelstructures.

PSO3 2.50 2.30 CTPM:LackofknowledgeinPERT&CPMdiagram.

Action:GuestlecturesonPERT&CPM.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 106/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

PSOsAttainmentLevelsandActionsforImprovement(20122013)

PSOs TargetLevel AttainmentLevel Observations

PSO1:BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO1 2.20 2.15 WREII:Lackofknowledgeinseepage.

Action:Seminarsonseepage.

PSO2:ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

PSO2 2.20 2.10 EG:Lackofknowledgegrouting.

Action:Seminarsongrouting.

PSO3:STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteelstructures.

PSO3 2.20 2.16 ECV:Lackofknowledgeinrateanalysis.

Action:Organizingworkshopsonrateanalysisforvariousmaterials.

7.2AcademicAuditandactionstakenthereofduringtheperiodofAssessment(10) TotalMarks
InstituteMarks

TheprogressofacademicactivitiesismonitoredandauditedcontinuouslybytheHODandprincipal.Thenecessarysuggestionsandmeasuresaregivenforthebetterprogressandimprovement.

ExternalAudits

1.JNTUaffiliationinspection
2.NAACinspection
FREQUENCY/ MENTIONFORMNUMBEROR
S.NO. ITEMTOBEAUDITED BYWHOM
DURINGYEAR NAME

JNTUAaffiliation
1. JNTUAcoordinators Onceinayear PermanentAffiliation
inspection

NAAC NAAC/WH/CertA&A/EC(9th SC)/


2. NAACinspection July2015
COMMITEE 16.1/2015



AdvicesfromJNTUACoordinators:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 107/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


Correctivemeasures:

1.Additionalfacultyrecruited,atpresentfacultystudentratioismaintainedas1:15.
2.Atpresentmorethan50%offacultiesareratifiedbytheUniversity(JNTUA).
3.Correctivemeasuresaretakenoninstructedfacultytoevaluateinternalmarksstrictly.
4.SalariesofstaffarebeingpaidthroughUnionbankofIndia,PuttursinceDecember2013.
5.AtpresentallthestaffmembersarehavingAadharandPANnumbers.


AdvicesfromNAACCommittee:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 108/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Correctivemeasures:

1.Collegeisgivingtrainingonsoftskillsforthestudentsfromfirstyearonwards.Sincemostofthestudentsareruralbackground.
2.CollegestrivingmobilizethefundsfromvariousagencieslikeAICTE,DST&UGC.
3.ThedepartmentishavingMOUwithcontrolconceptsandtogivetrainingandcarryoutprojectsonPLC&Automation.


InternalAudits

1.Coursefiles,laboratorymanualsandlessonplans.

2.Attendanceregisters.

3.Curriculumdeliveryprogress.

4.Internalexams.

5.Universityresults.

6.Seminars,workshops,andindustrialvisits.

7.Studentscounseling.

8.LaboratoryAudit

9.LibraryAudit

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 109/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

ITEMTOBE FREQUENCY/ MENTIONFORMNUMBER


S.NO. BYWHOM
AUDITED DURINGYEAR ORNAME

Coursefiles,laboratory
Departmental
1. manualsandlesson Onceinasemester AuditForm1
coordinators,HOD
plans

2. Attendanceregisters HOD&principal Weekly&monthly AuditForm2

Curriculumdelivery
3. HOD monthly AuditForm3
progress

4. Internalexams SubjectFaculty&HOD TwiceinaSemester AuditForm4

Resultcoordinator,
5. Universityresults OnceinaSemester AuditForm5
HOD&Principal

Activities,seminars,
coordinator,HOD&
6. workshopsand Monthlyonce AuditForm6
Principal
industrialvisits

Staff,coordinator&
7. Studentscounseling Twiceinamonth AuditForm7
HOD

8. LaboratoryAudit labInchargesandHOD OnceinaSemester AuditForm8

Departmentalcommittee
9. LibraryAudit Yearlyonce AuditForm9
membersandHOD



1.Verificationofcoursefiles,laboratorymanualsandlessonplans:

Audit:

Allthecoursefiles,laboratorymanualsandlessonplansarepreparedbeforecommencementofthesemesterbyrespectivesubjectfaculty.
AllthesefilesareverifiedandapprovedbytheHOD.

Action:

Ifanyofthefacultymembersareunabletocompletethefiles,thenecessaryactionistakenandreauditingwillbedone.


Samplecopyoflaboratorymanual

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 110/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Samplecopyoflessonplan

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 111/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


2.VerificationofStudentsattendanceregisters:

Audit:

StudentsattendanceregistersareverifiedweeklybytheHODandmonthlybytheprincipal.

Action:

Studentswhogotlessthan75%attendancearecounseledandinformedtotheparentsthroughletters.
Studentswithpoor(<65%)attendancearecounseledandinformedtotheparentsthroughletterandphone.
Inspecialcases,theparentsarecalledandintimatedpersonallyabouttheirwardattendance.

SamplecopyofPostalletters

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 112/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


3.Monitoringofthecurriculumdeliveryprogress:

Audit:

ThecurriculumdeliveryprogressismonitoredbytheHODeverymonth.

Action:

Ifanysubjectislagginginthecoverageofsyllabusasperthelessonplan,therespectivefacultywillbepersonallycalledandgivensuggestionsbytheHOD.Theyarealsoadvisedtotakeextraclassestocompletethesyllabuswithinthetime.

Samplecopyofcurriculumdeliveryprogress

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 113/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 114/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

4.Reviewofinternalmarks:

Audit:

AftertheIst internalexaminations,theanswerssheetsareevaluatedaccordingtotheschemeofevaluation.
TherespectivesubjectfacultywillsubmitthemarkstotheHODandalsosortoutthestudentswhogotlessthan50%ofmarks.

Action:

Basedonthestudentsperformance,thestudentsaredividedintotwocategories:SMALLperformersandHIGHperformers.FortheSMALLperformers,remedialclassesareconductedandsimpleassignmentsaregiven.FortheHIGHperformers,areencouragedwithseminarsanddiverseassignments.
Theremedialclassesareconductedbeyondtheregulartimingsbypreparingspecialtimetable,forthestudentswhohaveperformedpoorintheIst midexaminations.
Ithelpstoenhancetheknowledgeofpoorperformedstudents.

Samplecopyofinternalmarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 115/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 116/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


RemedialclassesTimetable

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 117/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


5.Reviewofuniversityresults:

Audit:

Aftertheannouncementofuniversityresults,arereviewedbytheHODandprincipal.

Action:

Inanysubject,ifthepasspercentageispoor,theHODpersonallydiscusseswithfacultyconcernedandtakesnecessaryaction.
TheInstitutiontopperisencouragedbygivinglaptopsandthedepartmenttoppersareencouragedbygivingprizes.
Thesemestertoppersareencouragedbygivingmeritcertificates.

Samplecopyofuniversityresults

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 118/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

6.Monitoringthedepartmentalactivities,seminars,workshopsandindustrialvisits:

Audit:

ThedataoftheStudentswhohaveparticipatedinseminars,workshops,symposiumsinsideandoutsidethecampus,isrecorded.
Theindustrialvisitsareplannedinordertoprovideexposureonrealtimeindustryworkingenvironment.

Action:

InactiveStudentsaremotivatedbyexplainingtheimportanceoftheprogramsandprovidedwithnecessarysuggestionsandguidelines.

Samplecopyofactives

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 119/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 120/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 121/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 122/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

7.StudentsCounseling:

Audit:

Everystudentiscounseledbytherespectivecounselors.
Thefacultymembersarethecounselorswhoconstantlymonitoralltheactivitiesandacademicsofthestudents.

Action:

ThecounselingbooksareverifiedbycounselingcoordinatorandtheHOD.

Samplecopyofcounselingbook

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 123/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 124/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

IncludeExternalauditslikeAFRC,NBA,NAAC,andJNTU.

8.LaboratoryAudit

Audit:

LaboratoryauditonceinasemesterbythelabInchargesandHOD.
TheLabinchargesandLabassistantsarecheckstheequipmentandcomponentsattheendingofthesemester.

Action:

Ifanyequipmentorcomponentsareinshortageinthelab,thecommitteechecksthelistandrecommendspurchasingthecomponentsandequipment.
Ifanyequipmentisdamagedornotworkingproperlythatsystemmustbeservicedbythelabassistantsorserviceagencies.

SamplecopyofLaboratoryAudit

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 125/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

9.LibraryAudit

Audit:

LibraryauditcanbedoneonceinayearbythedepartmentalcommitteemembersandHOD.
Thedepartmentalcommitteemembersarechecksthebooksandstudentratio.

Action:

Ifanybookislessthanthestudentratiothenthedepartmentalcommitteeisrecommendtopurchasethatbook.
Anystaffmembersarerecommendedfornewauthorbooks,thedepartmentcommitteeandHODcheckthelist,ifitisnecessarythentheyrecommendstopurchase.

SamplecopyofLibraryAudit

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 126/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

7.3ImprovementinPlacement,HigherStudiesandEntrepreneurship(10) TotalMarks
InstituteMarks
Assessmentisbasedonimprovementin:

Placement:number,qualityplacement,coreindustry,paypackagesetc.
Higherstudies:performanceinGATE,GRE,GMAT,CATetc.,andadmissionsinpremierinstitutions
Entrepreneurs


PLACEMENT

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 127/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Theinstitutionhas100%careerandplacementassistance,highlyqualifiedandexperiencedfacultyandtrainers,verygoodinfrastructureforcareerguidance,trainingandplacement.TheinstitutionhasaseparateTrainingandPlacement(T&P)Cellwithqualifiedtrainersfromvariousfieldsofexpertise.Departmenthasaplacement
coordinatortoassistT&PCell.TheT&PCellhasConferencehall,GDrooms,interviewcabins,Panelcubicles,SkillDevelopmentCentre,SeminarHalls,ClassroomsequippedwithLCDProjectorsandAudioSystems.TheT&PCellfocusesonSoftSkills,FunctionalEnglish,Quantitative,aptitude,LogicalReasoningGroupdiscussion,
JAM,PersonalEffectiveness,Interviewfacingskills,ComputerlanguagesC,C++,JavaandDotNet.

CONSOLIDATEDDATA

Batch Averagesalary
TotalNo.of TotalNo.of %ofstudents
S.NO. perannum
(YearofAdmission) students studentsplaced placed
(INR)

1 20122013 59 38 65% 180,000

2 20112012 66 33 50% 173,000

3 20102011 65 30 46% 151,200



HIGHERSTUDIES

Theinfrastructuralfacilitiesandtrainingofferedbytheinstitutionishighlyusefultothestudentsinpertaininghigherstudies,withregardtomouldtheircareer.OurstudentsareencouragedtoattemptGATE,GRE,TOFEL,CATandPGCETthatmakesthemtogetadmissionsinvariousprestigiousinstitutions.

HIGHERSTUDIESDATA

Batch
S.NO. (Yearof No.ofstudentsforHigherEducation
Admission)

1 20122013 10

2 20112012 19

3 20102011 17



ENTREPRENEURS

EntrepreneurshipDevelopmentCellaimstoimproveandgenerateacultureofinnovationanddevelopmentofentrepreneurialspiritamongstthestudentsandbuddingentrepreneurstostarttheirownenterprise.Ithastrainingandincubationcenter,SDCactivities,seminars,workshops,guestlecturersetc.Tomakeentrepreneurs,the
resourcespersonsfromindustriesandbankingareinvitedtoconductworkshopsonentrepreneurship.


ENTREPRENEURSDATA

S. BATCH No.ofStudent

NO. (YearofAdmission) Entrepreneurs

1 20122013 7

2 20112012 6

3 20102011 5

7.4Improvementinthequalityofstudentsadmittedtotheprogram(10) TotalMarks

InstituteMarks
Assessmentisbasedonimprovementintermsofranks/scoreinqualifyingstatelevel/nationallevelentrancestests,percentagemarksinPhysics,ChemistryandMathematicsin12thStandardandpercentagemarksofthelateralentrystudents.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 128/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Item CAY CAYm1 CAYm2

Noofstudentsadmitted 0 0 0
NationalLevelEntranceExamination
OpeningScore/Rank 0 0 0

ClosingScore/Rank 0 0 0

State/University/LevelEntranceExamination/Others Noofstudentsadmitted 90 59 60

OpeningScore/Rank 29848 32848 3220


Engineering,AgricultureandMedicalCommonEntranceTest
(EAMCET) ClosingScore/Rank 188710 193739 180679

NameoftheEntranceExaminationforLateralEntryorlateral Noofstudentsadmitted 12 12 13
entrydetails 415 1115 286
OpeningScore/Rank

EngineeringCommonEntranceTest(ECET) ClosingScore/Rank 6141 6227 3277

AverageCBSE/Anyotherboardresultofadmitted 75 74 72
students(Physics,Chemistry&Maths)

8FIRSTYEARACADEMICS(50) TotalMarks43.84

8.1FirstYearStudentFacultyRatio(FYSFR)(5) TotalMarks

InstituteMarks
FacultyRatio(FYSFR)(5)Assessment=(515)/AverageFYSFR(LimitedtoMax.5)
DataforfirstyearcoursestocalculatetheFYSFR

NumberofFacultymembers(consideringfractionalload)
Year NumberOfStudents(approvedintakestrength)N FYSFR(N/F)
F

20122013 600 40 15

20132014 720 48 15

20142015 840 56 15

AverageFYSFR:15.00

Assessment[(5*15)/AverageFYSFR]:5.00

8.2QualificationofFacultyTeachingFirstYearCommonCourses(5) TotalMarks
InstituteMarks
Assessmentofqualification=(5x+3y)/RF
x=NumberofRegularFacultywithPh.D,
y=NumberofRegularFacultywithPostgraduatequalification
RF=NumberoffacultymembersrequiredasperSFRof15:1,Facultydefinitionasdefinedin5.1

Year x(NumberOfRegularFacultywithPh.D) y(NumberOfRegularFacultywithPostgraduateQualification) RF(NumberOfFacultyMembersrequiredasperSFRof15:1 AssessmentOfFacultyQualification[(5x+3y)/RF]

20122013 6 34 40 3.00

20132014 10 38 48 3.00

20142015 12 44 56 3.00

AverageAssessment:3.00

8.3FirstYearAcademicPerformance(10) TotalMarks
https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 129/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
8.3FirstYearAcademicPerformance(10) TotalMarks

InstituteMarks
AcademicPerformance=((Meanof1stYearGradePointAverageofallsuccessfulStudentsona10pointscale)or(MeanofthepercentageofmarksinFirstYearofallsuccessfulstudents/10))x(numberofsuccessfulstudents/numberofstudents
appearedintheexamination)

Successfulstudentsarethosewhoarepermittedtoproceedtothesecondyear.

AcademicPerformance

MeanofCGPAormeanpercentageofallsuccessfulstudents(X) 5.98 6.10 5.76

TotalNumberofsuccessfulstudents(Y) 88.00 59.00 58.00

TotalNumberofstudentsappearedintheexamination(Z) 90.00 59.00 60.00

API[X*(Y/Z)] 5.85 6.10 5.57

AverageAPI[(AP1+AP2+AP3)/3]:5.84

Assessment[1.5*AverageAPI]:5.84

8.4AttainmentofCourseOutcomesoffirstyearcourses(10) TotalMarks

8.4.1DescribetheassessmentprocessesusedtogatherthedatauponwhichtheevaluationofCourseOutcomesoffirstyearisdone(5) InstituteMarks
(Examplesofdatacollectionprocessesmayinclude,butarenotlimitedto,specificexamquestions,laboratorytests,internallydevelopedassessmentexams,oralexamsassignments,presentations,tutorialsheetsetc.)
TheinstitutefollowstheassessmentprocessfortheevaluationofCourseOutcomes

EvaluationProcess:

Theevaluationprocessincludes:

(a)InternalExams

(b)UniversityExams


TheinstitutefollowstheevaluationprocessprescribedbytheUniversityforInternalandExternalExams.

InternalExamination:

AspertheUniversityexaminationpattern,threemidtermtestsareconductedforeachsubject.

TheInternalExaminationfor30marksincludesbothobjectiveexaminationfor10marksandDescriptiveexaminationfor20marks.

S.No. Activity Responsibleperson Remarks

1.Willbecompletedwithin3daysoftheexamcompletion.
Evaluationof
1 Individualfaculty 2.Distributetheanswersheetsinclassandclarifies,incase
InternalExamination
ofgrievances.

Submissionofmarks

2 foreachquestion& Individualfaculty Withinaweekfromthedateoflastexam.

totaltoHOD

Consolidationofallsubjectsmarks& Studentswillverifythemarksandreportanygrievances
3 Coordinator
displayonthenoticeboard within3daysfromthedateofdisplay.

1Ensurethemarksenteredinregisterandsubmittedare
Verification& same.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 130/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
4 Analysis HOD 2.AnalyzetheCOattainmentsandidentifythemeasures
forimprovement.

SubmitSemester

5 coursesmarksto HOD Consolidateallcoursesandsubmitsonesetforeachclass.

Principal

Principalreviews

anddisplaythe
6 Principal Submissionofinternalmarkstotheexaminationbranch.
markstostudentsat

Exambranch

Chiefof
Communicatemarks Aspertheuniversityscheduletheinternalmarksareposted
7 Examination
toUniversity tothechiefofexaminationbranch.
Evaluations


SampleInternalMarksPage

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 131/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 132/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

ExternalExamination:

TheExternalExaminationofeachcourseisfor70marks.


ScheduleofExaminations

ThescheduleofinternalandexternalexaminationsisclearlymentionedintheacademicschedulepublishedbytheUniversity/institutionandthesameiscommunicatedtoallthestudentsandthefacultyatthebeginningofeachsemester.


MandatoryAssessment:

Universitypostsresultsontheuniversitywebsite.ResultsAnalysisisreviewedbyHOD&Principalimmediatelyafterresultsaredeclaredandareasforimprovementareidentified.
Counselorsadvisethestudentsbasedonindividualperformance.
Resultsarecommunicatedtoparentsbypost.

Sampleuniversityresultpage:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 133/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

8.4.2RecordtheattainmentofCourseOutcomesofallfirstyearcourses(5) InstituteMarks
Programshallhavesetattainmentlevelsforallfirstyearcourses.

(Theattainmentlevelsshallbesetconsideringaverageperformancelevelsintheuniversityexaminationoranyhighervaluesetastargetfortheassessmentyears.Attainmentlevelistobemeasuredintermsofstudentperformanceininternal
assessmentswithrespecttheCOsofasubjectplustheperformanceintheUniversityexamination)

EvaluationofinternalandexternalexaminationmarksforsettingCourseattainmentlevelsforallcourses:


Evaluationofmarksfrombothinternalandexternalexaminations

Semesters Internal External Totalmarks

AcademicYear NonSemester 30 70 100



MeasurementofCourseattainmentlevelsforUniversityExaminations:


AttainmentLevel1:50%ofstudentsscoringpassmarksintheUniversityfinalexamination.

AttainmentLevel2:60%ofstudentsscoringpassmarksintheUniversityfinalexamination.

AttainmentLevel3:70%ofstudentsscoringpassmarksintheUniversityfinalexamination.


COURSETITLES:FollowingarethecoursetitlesalongwithcoursecodeusedinPOs

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 134/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Note:1.C101,C102indicativeCoursesforfirstyear.Firstnumericdigitindicatesyearofstudyandremainingtwodigitsindicatecoursenumbers.

S.NO. COURSECODE COURSENAME

1 C101 CommunicativeEnglish

2 C102 Engineering.Physics

3 C103 Engineering.Chemistry

4 C104 MathematicsI

5 C105 ProgramminginC&DataStructures

6 C106 EngineeringMechanics

7 C107 EngineeringDrawing

8 C108 ComputerProgramminglab

9 C109 Engineeringphysics&chemistryLab

10 C110 Engineering&ITworkshop

11 C111 EnglishLanguageCommunicationSkillsLab



CourseattainmentlevelsforIYearUniversityExamination:201415

PercentageofStudentsScoredmore
COURSE Attainmentlevel
than60%

C101 62.5 2

C102 53.4 1

C103 52.3 1

C104 51.1 1

C105 52.9 1

C106 51.1 1

C107 51.1 1

C108 100 3

C109 100 3

C110 100 3

C111 100 3



MeasurementofCourseattainmentlevelsforInternalExaminations:

AttainmentLevel1:50%studentsscoringmorethan60%marksoutofthemaximummarks.

AttainmentLevel2:60%studentsscoringmorethan60%marksoutofthemaximummarks.

AttainmentLevel3:70%studentsscoringmorethan60%marksoutofthemaximummarks.


CourseattainmentlevelsforIYearInternalExamination:201415

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 135/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
PercentageofStudents
COURSE Attainmentlevel
Scoredmorethan60%

C101 63.3 2

C102 52.7 1

C103 51.5 1

C104 51.1 1

C105 56.7 1

C106 51.5 1

C107 51.6 1

C108 100 3

C109 100 3

C110 100 3

C111 100 3



Overallcourseattainmentforallfirstyearcourses:

ACADEMICYEAR:201415

InternalAttainment External Attainment


COURSE
(30%) Attainment(70%) level

C101 2 2 2

C102 1 1 1

C103 1 1 1

C104 1 1 1

C105 1 1 1

C106 1 1 1

C107 1 1 1

C108 3 3 3

C109 3 3 3

C110 3 3 3

C111 3 3 3

Average 1.82 1.82 1.82

COattainment 0.6 1.3 2.0


CourseAttainment:

Forexample:MathematicsI(C104)

AttainmentthroughUniversityExamination:Moderatei.e.2

AttainmentthroughInternalAssessment:Substantiali.e.3

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 136/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Considering70%weightagetoUniversityexaminationand30%weightagetoInternalassessment,theattainmentcalculationswillbe(70%ofUniversitylevel)+(30%ofInternallevel)i.e.70%of2+30%of3=1.4+0.9=2.3

8.5AttainmentofProgramOutcomesfromfirstyearcourses(20) TotalMarks

8.5.1IndicateresultsofevaluationofezchrelevantPOand/orPSO,ifapplicable(15) InstituteMarks
(DescribetheassessmentprocessesthatdemonstratethedegreetowhichtheProgramOutcomesareattainedthroughfirstyearcoursesanddocumenttheattainmentlevels.Alsoincludeinformationonassessmentprocessesusedtogatherthedata
uponwhichtheevaluationofeachProgramOutcomeisbasedindicatingthefrequencywithwhichtheseprocessesarecarriedout)

POsAttainment:

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

C101 3 3 2 3 3 3 2

C102 1 1 2 2 1 1 2

C103 1 1 2 2 2

C104 1 1 1

C105 2 2 2 1 2 2

C106 1 1 1 1

C107 2 2 2 2 2

C108 3 3 3 3 3 3

C109 3 3 3 3 3 3 3

C110 3 3 3 3 3 3

C111 3 3 3 3

COAttainmentLevel

Course PO1 PO2 PO3 PO4 PO5 PO6 PO7 PO8 PO9 PO10 PO11 PO12

DirectAttainment 1.82 2.09 0.91 1.27 0.91 0.91 0.82 0.27 1 0.55 0 1.64

InDirectAttainment 2 2 2 2 2 2 2 1 2 1 0 2

COAttainment 1.86 2.07 1.13 1.42 1.13 1.13 1.06 0.42 1.2 0.64 0 1.71

PSOsAttainment:

Course PSO1 PSO2 PSO3

Select Select Select

8.5.2ActionstakenbasedontheresultsofevaluationofrelevantPOs(5) InstituteMarks
(Theattainmentlevelsbydirect(studentperformance)aretobepresentedthroughProgramlevelCoursePOmatrixasindicated)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 137/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

POsAttainmentLevelsandActionsforImprovement(20142015)

POs TargetLevel AttainmentLevel Observations

PO1:EngineeringKnowledge

1.AttainedlowachievementinEngineeringPhysics,EngineeringChemistry,Engineeringmechanics.2.Attained
PO1 3 2
lowachievementinMathematicsI.

Action1:Conductingseminarsoncomplextopicswithstudents.Action2:MorepracticingsessionsonMathematicsI.

PO2:ProblemAnalysis

PO2 3 2.09 AttainedlowachievementinEngineeringPhysics,EngineeringChemistry,Engineeringmechanics.

Action1:Givingareviewonthebasicsofengineeringsciences.Action2:Givingassignmentsonapplicationsoftheconcepttopic.

PO3:Design/developmentofSolutions

PO3 3 2.5 AttainedlowachievementEngineeringMechanics.

Action1:Conductingworkshops.Action2:Preparingtheprojectworkbystudents.

PO4:ConductInvestigationsofComplexProblems

PO4 3 1.75 1.AttainedlowachievementinMathematicsI.2.AttainedlowachievementinEngineeringMechanics.

Action1:Morepracticingsessions.Action2:Givingprojectstoapplythetheoreticalknowledge.

PO5:ModernToolUsage

PO5 3 2 AttainedlowachievementinEngineeringPhysics&EngineeringMechanics.

Action1:Conductingnewexperimentsinphysicsrelatedtotheoreticalknowledge.

PO6:TheEngineerandSociety

PO6 3 2 AttainedlowachievementinEngineeringphysics.

Action1:Explainingtomorepracticalexamples.

PO7:EnvironmentandSustainability

PO7 3 1.8 AttainedlowachievementinEngineeringMechanics.

Action1:GivinglecturesonhowEngineeringMechanicshelpsondevelopingtheenvironment.

PO8:Ethics

PO8 3 3 Attainedthetargetlevel.

Action:MoreseminarsandworkshopsonEthicalvalues.

PO9:IndividualandTeamWork

PO9 3 2.75 AttainedlowachievementinprogrammesolvingInc&datastructures.

Action1:GivingteamworktowriteCprogrammes.

PO10:Communication

PO10 3 3 Attainedthetargetlevel.

Action:Morepracticeonlistening,speaking,readingandwriting.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 138/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
PO11:ProjectManagementandFinance

PO11 0 0 ThisPOisnotapplicableforfirstyearcourses.

Action:

PO12:LifelongLearning

PO12 3 2.57 Attainedlowachievementprogrammesolving,CommunicativeEnglish,EngineeringPhysics.

Action1:GivingseminarsontheimportanceonClanguage,communicativeEnglish,engineeringphysics.

POsAttainmentLevelsandActionsforImprovement(20132014)

POs TargetLevel AttainmentLevel Observations

PO1:EngineeringKnowledge

PO1 2.5 1.9 1.AttainedlowachievementinEngineeringmechanics.2.AttainedlowachievementinMathematicsI.

Action1:Conductingseminarsoncomplextopicswithstudents.Action2:MorepracticingsessionsonMathematicsI.

PO2:ProblemAnalysis

PO2 2.5 1.9 AttainedlowachievementinEngineeringmechanics,EngineeringChemistry,EngineeringPhysics.

Action1:Givingareviewonthebasicsofengineeringsciences.Action2:Givingassignmentsonapplicationsoftheconcepttopic.

PO3:Design/developmentofSolutions

PO3 2.5 1.8 AttainedlowachievementEngineeringMechanics.

Action1:Conductingworkshopsonengineeringmechanics.Action2:Preparetheprojectworkbystudents.

PO4:ConductInvestigationsofComplexProblems

PO4 2.5 1.62 1.AttainedlowachievementinMathematicsI.2.AttainedlowachievementinEngineeringMechanics.

Action1:Morepracticingsessions.Action2:Givingprojectstoapplythetheoreticalknowledge.

PO5:ModernToolUsage

PO5 2.5 1.8 AttainedlowachievementinEngineeringPhysics&EngineeringDrawing.

Action1:UsageofICTtoolsandgivingseminartopicsonengineeringphysics.

PO6:TheEngineerandSociety

PO6 2.5 2 AttainedlowachievementinEngineeringMechanics.

Action1:MorepracticingsessionsandExplainingtomorepracticalexamples.

PO7:EnvironmentandSustainability

PO7 2.5 1.8 AttainedlowachievementinEngineeringMechanics.

Action1:Givingseminarsonengineeringmechanics.

PO8:Ethics

PO8 2.5 2.5 Attainedthetargetlevel.

Action1:Bygivinglecturesonethicalvalues.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 139/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
PO9:IndividualandTeamWork

PO9 2.5 2.5 Attainedthetargetlevel.

Action:

PO10:Communication

PO10 2.5 2.5 Attainedthetargetlevel.

Action1:GroupdiscussionsoncommunicativeEnglish.

PO11:ProjectManagementandFinance

PO11 0 0 Notapplicable.

Action:

PO12:LifelongLearning

PO12 2.5 2.42 AttainedlowachievementEngineeringPhysics.

Action1:GivingseminarsontheimportanceofEngineeringPhysics.

POsAttainmentLevelsandActionsforImprovement(20122013)

POs TargetLevel AttainmentLevel Observations

PO1:EngineeringKnowledge

PO1 2 1.9 1.AttainedlowachievementinEngineeringmechanics.2.AttainedlowachievementinMathematicsI.

Action1:Conductingseminarsoncomplextopicswithstudents.Action2:MorepracticingsessionsonMathematicsI.

PO2:ProblemAnalysis

1.AttainedlowachievementinEngineeringPhysics,EngineeringChemistry,Engineeringmechanics.2.Attained
PO2 2 1.9
lowachievementinMathematicsI.

Action1:Givingareviewonthebasicsofengineeringsciences.Action2:Givingassignmentsonapplicationsoftheconcepttopic.

PO3:Design/developmentofSolutions

PO3 2 1.8 AttainedlowachievementEngineeringMechanics.

Action1:Preparingtheprojectworkbythestudents.

PO4:ConductInvestigationsofComplexProblems

PO4 2 1.62 1.AttainedlowachievementinMathematicsI.2.AttainedlowachievementinEngineeringMechanics.

Action1:ConductingmathematicalQuizforrememberingformulae.Action1:Practicingmoreexercises.

PO5:ModernToolUsage

PO5 2 1.8 AttainedlowachievementinEngineeringMechanics.

Action1:ConductingworkshopsandseminarsonICTtoolsusage.

PO6:TheEngineerandSociety

PO6 2 2 AttainedlowachievementinEngineeringMechanics,EngineeringChemistry.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 140/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Action1:Involvingthestudentsinseminarsandworkshops.

PO7:EnvironmentandSustainability

PO7 2 1.8 AttainedlowachievementinEngineeringMechanics.

Action1:Givingseminarsonengineeringmechanics.Action2:Givingseminaronsustainabledevelopment.

PO8:Ethics

PO8 2 2 Attainedthetargetlevel.

Action1:Bygivinglecturesonethicalvalues.

PO9:IndividualandTeamWork

PO9 2 2 Attainedthetargetlevel.

Action1:ConductingGroupdiscussionsonvariousEngineeringsciences.

PO10:Communication

PO10 2 2 Attainedthetargetlevel.

Action1:Groupdiscussions,DebatesandOralpresentations.

PO11:ProjectManagementandFinance

PO11 0 0 NotApplicable.

Action:

PO12:LifelongLearning

PO12 2 2.20 Attainedthetargetlevel.

Action1:Givingmoreseminars.

PSOsAttainmentLevelsandActionsforImprovement(20142015)

PSOs TargetLevel AttainmentLevel Observations

PSO1:BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO1

PSO2:ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

PSO2

PSO3:STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteelstructures.

PSO3

PSOsAttainmentLevelsandActionsforImprovement(20132014)
https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 141/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
PSOsAttainmentLevelsandActionsforImprovement(20132014)

PSOs TargetLevel AttainmentLevel Observations

PSO1:BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO1

PSO2:ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

PSO2

PSO3:STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteelstructures.

PSO3

PSOsAttainmentLevelsandActionsforImprovement(20122013)

PSOs TargetLevel AttainmentLevel Observations

PSO1:BridgeDesign:Abletodesignandvalidatethevariousstructuralelementsofbridgesofdifferentdimensions.

PSO1

PSO2:ApplicationofConcreteTechnology:Analyzethecauses,preventiveandcorrectivemeasuresofcracksinbuildings.

PSO2

PSO3:STAADPro.andRivetingsoftwareusage:ExpertiseinSTAADProandRevitsoftwareforthedesignofconcreteandsteelstructures.

PSO3

9STUDENTSUPPORTSYSTEMS(50) TotalMarks50.00

9.1Mentoringsystemtohelpatindividuallevel(5) TotalMarks

InstituteMarks
Typeofmentoring:Professionalguidance/careeradvancement/courseworkspecific/laboratoryspecific/allrounddevelopment.Numberoffacultymentors:Numberofstudentspermentor:Frequencyofmeeting:
(Theinstitutionmayreportthedetailsofthementoringsystemthathasbeendevelopedforthestudentsforvariouspurposesandalsostatetheefficacyofsuchsystem)

StudentsMentoringSystem

TheprincipalobjectiveofintroducingtheStudentMentoringSystemistoguidetheacademic,careeradvancement,cocurricularandextracurricularperformancesofthestudentandaccordinglymouldthestudentstoutilizealltheresourcesavailableintheinstitutionforholisticdevelopmentofthestudents.

Thesystemencompassescontinuousmonitoringthestudentsperformance,identifyingthestrengths,shortcomings,behaviorandattitude,andofferingamiablesupportandspecificsuggestionstodevelopthestudentsinallaspects.Thesystemalsoaimsatimplantinggoodhabits,behaviorandhumanvaluesamongthestudents.


Themembersincounselingcommitteefromeachdepartmentarelistedbelow.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 142/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
CounselingCommittee:


Sr.No. NameoftheFaculty Designation Department

1 J.Suneetha Coordinator CSE

2 Y.MuraliKrishna Member Civil

3 N.RameshRaju Member EEE

4 S.Suresh Member MECH

5 P.G.S.Mythili Member ECE

6 V.Sreedhar Member BS&H

7 C.Priyadarhini Member MBA

8 P.Karthikeyan Member MCA


Table9.1:CounselingCommittee


Mentoring(counseling)systemconsistsof:

Everyclasshasonecounselinghourperweektofacilitateaquick1:1interactionbetweenthefacultyandthestudent.
Therearearound200counselorsintheinstitution.
Thereisonecounselorforevery20students.
Everyweekduringthecounselinghour/whenevernecessarythestudentsgetcounseled.
Priorto1:1sessionwiththestudent,thefacultyascertainsthedetailsofattendance,performanceinexaminations/tests.
Detailsofattendanceandperformancearediscussedduringthe1:1interaction,suggestions/comments,ifany,arenotedintheStudentRecordbookandfirstweekofeverymonthattendancereportissenttotheparentswhosewardshavelessthan75%attendance.
Thosewhogotbelow65%attendance,counselorsintimatetoparentsthroughphonealso.
Thestudentsalsoarecounseledoncareerguidance,higherstudiesandentrepreneurship.
Goodandtopperformersarefurtherencouragedtoaimatuniversityranks,higherstudiesandjobsatmultinationalcompanies.
Ifsomestudentsareidentifiedasslowlearners,remedialclassesarearrangedfortheminconsultationwiththeHeadoftheDepartment.
Thestudentsareencouragedtoparticipateinvariouscocurricularandextracurricularactivitiesorganizedbytheindividualdepartmentsandinstitution.Theimportanceofparticipatinginsuchactivitiesforpersonalandprofessionaldevelopmentisemphasizedduringthecounselingsessions.
Inaddition,thetraining&placementcellconductscareercounselingsessionsforthestudentsaspartofthetrainingprogrammers.


SamplestudentsallotmentperCounselor(IIB.TechCIVIL):

TotalNo.of
Sr.No. CounselorName StudentRollNos.
Students

1 G.ShanmukhaSrinivas 13F61A010113F61A0120 20

2 Y.MuraliKrishna 13F61A012113F61A0140 20

3 M.PavanKumar 13F61A014114F65A0101 20

4 S.ArifHussain 14F65A010214F65A0112 11


Table9.2:Studentsallotmentpercounselor


SamplestudentcounsellingbookforProfessionalguidance/careeradvancement/courseworkspecific/laboratorySpecific:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 143/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.1:Samplestudentcounsellingbook(IICIVIL)

Fig9.2:PointsofCounselling&Mentoring

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 144/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.3:StudentsAwards,Results,Attedancedetails,Professionalguidance


Mentoringthestudentbycounselors:

Fig9.4:CounselingtheStudents


Sampleattendancelettersendingtotheparents:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 145/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.5:AttendanceLetter

EvidenceofSuccess

Asthestudentsprogressintheiracademics,thementorshavealwaysobservedtheimprovementintermsoftheirattitude,personaldisposition,academicperformance,andlanguageandcommunicationskills.

Manystudentsareimprovedintheirperformanceconsistentlyasaresultofmentoring.Morespecifically,manystudentshavebeenimprovedverywellintheirthirdandfinalyearsofstudy.Theinstitutionspasspercentagehasalwaysbeenmorethantheuniversityaverageandhigherthanthatofotherinstitutionsinandaroundthetown.

ThetoppersintherespectiveclasseshavealwaysbeenencouragedtosetuptheirpreparationwhichresultsinconsistentlygettinguniversityranksandrecentlywegotGoldmedalsfortheacademicyears201112&20132014.

Inspiteofdifficultemploymentinmarketconditions,thestudentsoftheinstitutiongotanumberofjobopportunitiesinplacements.


Samplelistofstudentswhoareimprovedintheiracademicperformanceduetoeffectivecounselingmechanism:

PassPercentage

Sr.No. RollNo. StudentName IIYear


IYear
I II

1 13F61A0120 D.Mahesh 61 62 62

2 13F61A0157 D.Vijay 76 77 78

3 13F61A0123 K.Mounica 75 76 72

4 13F61A0129 I.Pravallika 70 70 69


Table9.3:AnalysisofIIB.TechCivilPasspercentages


Samplelistofstudentswhoareimprovedattendanceinclassworkduetoeffectivecounselingmechanism:

AttendancePercentage

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 146/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Sr.No. RollNo. StudentName IIYear IIIYear

I II I II

1 12F61A0101 M.Amulu 97 79 92 86

2 12F61A0131 G.Mounika 89 69 79 79

3 12F61A0140 D.RenukaDevi 99 79 89 90

4 12F61A0155 T.VenkataKesava 89 84 90 87

5 13F65A0108(LE) P.PadmaPriya 94 85 81 85


Table9.4:AnalysisofIIIB.TechCivilAttendancepercentage

9.2Feedbackanalysisandreward/correctivemeasurestaken,ifany(10) TotalMarks

InstituteMarks
Feedbackcollectedforallcourses:YES/NOSpecifythefeedbackcollectionprocessAveragePercentageofstudentswhoparticipateSpecifythefeedbackanalysisprocessBasisofreward/correctivemeasures,ifanyIndicesusedformeasuringquality
ofteaching&learningandsummaryoftheindexvaluesforallcourses/teachersNumberofcorrectiveactionstaken.

A)Feedbackcollectedforallcourses:YES

B)FeedbackCollectionProcess:

ThefeedbackiscollectedbytheInternalQualityAssuranceCell(IQAC).
Theinstitutionhasestablishedasystemofcollectingfeedbackfromthestudentsinallcoursestwiceinasemester.Generally,after10daysofthebeginningandattheendofeverysemester.
Thefeedbackhasbeencollectedthroughtheonlinesystembyadefinedinbuiltfeedbacksoftwarewherestudentscanrespondtowardsthestructuredquestionnaireregardingthekeyelementsi.e.communication,numberofexamplesquoted,behaviourinclass,teachingmethodologyandsoon.
Maximumnumberofstudentsisparticipatedingivingfeedback(98%to100%).
ThemembersinIQACcommitteefromeachdepartmentarelistedbelow.


IQACCommittee:

Sr.No. NameoftheFaculty Destination Department

1 Dr.K.ChandrasekharReddy(Principal) Coordinator Admin

2 Dr.S.SiddiRaju Member CIVIL

3 N.RameshRaju Member EEE

4 Dr.S.SunilKumarReddy Member MECH

5 Dr.M.JanardhanRaju Member ECE

6 P.Nirupama Member CSE

7 B.HariKrishna Member BS&H

8 C.P.Gopi Member MBA

9 S.Choudaiah Member MCA


Table9.5:IQACCommittee

OnlineFeedbackformatonFaculty:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 147/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.6:Onlinefeedbackformat

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 148/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

C)Feedbackanalysis:

Oncefeedbackiscollecteditwillbeundertheprocessofthefacultyperformancethroughsomestandardstatisticaltoolapplications.
ThecollectedfeedbackisanalysedbytheIQACandadetailedreportissubmittedtotheprincipal.


Analysisofonlinefeedbackformat:

Fig9.7:Onlinefeedbackanalysisreport

Rewards/CorrectiveMeasures:

ThefacultyiscalledtohaveadiscussionaboutfeedbackwiththeHODandPrincipalforthebettermentintheirperformance.
Thebestperformedfacultymembersareencouragedwithappreciation.
Membersofthefaculty,whoseperformanceispoor,areadvisedbasedontheirweakareasbyHODandPrincipal.
ThefacultymembersareencouragedtoparticipateinvariousWorkshops/Seminars/Conferences/TrainingPrograms/FDPstoenhancetheirskills.
Theinstitutionorganizesfacultydevelopmentprogrammesregularlyforimprovingtheirknowledgeandteachingskills.
ThefacultywhoperformsextremelywellisrequestedtoconductFacultyDevelopmentProgrammesandparticipateinResearch&Developmentwork.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 149/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Feedbacksummarysheet:

Fig9.8:FeedbackSummarySheet

9.3Feedbackonfacilities(5) TotalMarks

InstituteMarks
Assessmentisbasedonstudentfeedbackcollection,analysisandcorrectiveactiontaken.

A)Feedbackcollectionprocess:

TheinstitutionhasaseparatesystemcalledIQACtocollectfeedbackfromthestudentsonvariousfacilitiesavailableintheinstitution.
Feedbackiscollectedinthemiddleoftheacademicyear.
ThestudentsareencouragedtogivefeedbackonfacilitiessuchasCollegeInfrastructure,Departmentsresources,Laboratories,Library,ComputingandInternet,Sports,Placement&Training,Hostels,Transport,Canteen,safety,medicalandsoon.
Thefollowingformatisusedtocollectfeedbackfromthestudents.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 150/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Feedbackformatonfacilities:

Fig9.9:Feedbackformatonfacilities

OnlineFeedbackformatonLaboratory:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 151/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.10:OnlineFeedbackformatonLaboratory


B).Feedbackanalysis:

Aftercollectingthefeedback,percentageoffeedbackoneachfacilityiscalculated.
Primarilythefacilitieswhichhasgotpoorfeedbackareidentified(i.e.percentageoffairismore).
Subsequentlyotherfacilitieswhichalsoneedimprovementareidentified.


Feedbackanalysisformat:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 152/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.11:Feedbackanalysisformat

OnlineFeedbackanalysisformat:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 153/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig9.12:SampleanalysisFeedbackformatforLaboratory


C)Correctiveactions:

Afteranalysingthefeedback,thefirstpriorityisgiventoimprovethefacilitywhichhasgotpoorfeedback.
Allthereliablesuggestionsareconsideredforimplementation.
Subsequentlycorrectivemeasuresforotherfacilitiesarealsotaken.

Someofthecorrectiveactionstakenare:

Sr.No. Year CorrectivemeasuresonFacilities

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 154/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
1.Additionalcanteenisconstructed.

2.A/Cbuseswithaudio&videosystemsareprovidedforalltheroutes.

3.Additionalseminarhallisestablished.

1 201516 4.Additionalplayground(volleyball,Basketballcourts)isprovided.

5.CCTVcamerasareextendedtoalltheareas.

6.ATMfacilityisprovided.

7.A/Cauditoriumwithaudio&videosystemisconstructed.

1.Busfacilitiesareextendedtonewroutes.

2.Dinningseatsofthecanteenarereplacedwithchairs.

2 201415 3.Vehicleparkingfacilityisprovided.

4.Someofthelaboratoriesaremodernized.

5.No.ofvolumesareincreasedinthelibraryandNPTELvideosareaddedintheDigitallibrary.

1.Starteddigitallibrary.

3 201314 2.EclassroomsareprovidedforeachDepartment.

3.ROsystemisestablishedforpurificationofdrinkingwater.

1.Placementcellismodernized.

4 201213 2.Someofthelaboratoriesareenhancedwithadditionalequipments.

3.Additionalroomsareconstructedforthehostels.


Table9.6:CorrectiveactionsonFacility


Samplecorrectivemeasurestakentoimprovethelaboratoriesare:

Sr.No. Year Correctivemeasures

1.GeotechnicalEngineeringLaboratoryisequippedwithCBR,ConsolidationandTri
AxialSheartest.

2.IntroducedTotalStationinSurveyingIILab.

1 201516 3.Revisedlabmanualsareprovidedforeachstudentinadvance.

4.Additionalexperimentsarealsoconductedinlabsessions.

5.CCTVcamerasareextendedtoallthelaboratories.

6.Laboratoryrevisionsessionsareplannedtoconductforstudentabsentees.

1.CT&Highwaylabismoderated.

2.ThenumberofexperimentstobeconductedinthelaboratorymeetstheJNTUA
2 201415 curriculum.

3.Impartingguidelinesforimplementinginnovativeideas.

4.Thesafetymeasurestobetakenforthestudentsduringlabsessionsareinstructed.

1.Dresscodeforsafetymeasuresisimplementedforallstudentsduringlabhours.

2.Reducedthesizeofstudentsperbatchtofour.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 155/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
3 201314 3.Laboratoryexperimentsaredemonstratedbythefacultycompletelybeforethe
commencementoflab.

1.Alllaboratoriesbeinginstalled.

4 201213 2.Regularlyconductingvivavoceinthelaboratorysessions.

3.Thelabexperimentsareplannedtocompletewithinthestipulatedtime.

Table9.7:CorrectivemeasurestakentoimproveLaboratories

9.4SelfLearning(5) TotalMarks

InstituteMarks
(Theinstitutionneedstospecifythefacilities,materialsandscopeforselflearning/learningbeyondsyllabus,Webinars,Podcast,MOOCsetc.andevaluatetheireffectiveness)

Theinstitutionencouragesthestudentsinvariouswaysofselflearningtomakethemgainknowledgeinandoutofthecurriculum.

Thefollowingresourcesareavailableintheinstitution.

A).GeneralFacilities:

Digitallibraryfacility(NPTEL,EBooks,National&InternationalJournals).
Availabilityofcoursematerialinlibrary.
Languagelabfacility.
AvailabilityofvideolecturesinCDform.LCDprojectorsforpresentation.
SkillDevelopmentCentre(SDC).
MicrosoftInnovationCentre(MIC).
IBMCentreofExcellency.


ListofNPTELvideos:

Sr.No. Department Total

1 CIVIL 640

2 ME 599

3 EEE 822

4 ECE 816

5 CSE 635

TOTAL 3512


Table9.8:NPTELvideos


ListofNational&InternationalJournals:

Sr.No. Department Nationaljournals InternationalJournals

1 CIVIL 8 9

2 ME 7 13

3 EEE 7 14

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 156/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
4 ECE 11 23

5 CSE 11 10


Table9.9:National&InternationalJournals


FacilitiesforSelfLearning:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 157/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

B)Webbasedlearningfacilities:

Theinternetisanopeninformationsysteminwhichvarioussourcesofinformationandmaterialsareavailablesuchastexts,images,audios,videosandsoon.
Thesequencesoftheinformationcanbelinkedtogetherthatleadstotheselflearning.
Theinternetoffersnewpossibilitiestostructure,represent,adaptandintegratevariouslearningcontentsandmaterials.
Thestudentscanutilizetheinternetfacilitiesinthecollegehours&beyondthecollegehours.
WiFiisenabledinthecampus.
Eclassroomisavailableforeverydepartment.
StudentscollectedthematerialsthroughtheEMail.

FacilitiesforWebbasedLearning

C)Motivation:

Thecounsellorguidesthestudentstocoverthegapbetweentheuniversitycurriculumandindustryrequirementsbyutilizingtheavailableresources.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 158/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Thestudentsaremotivatedtocomeupwithinnovativeideastoinventnewproducts.
Thecounsellorguidesthestudentstobecomefamiliarwithadvancedlevelcoursesandselflearningmethodsthatmakethemboosttheirconfidencelevelsthroughthefollowingsteps.
Thestudentsareencouragedtoparticipateinseminars/workshops/conferences.

SampleStudentProjectsPrototypeModel:

9.5CareerGuidance,Training,Placement(10) TotalMarks

InstituteMarks
(Theinstitutionmayspecifythefacility,itsmanagementanditseffectivenessforcareerguidanceincludingcounselingforhigherstudies,campusplacementsupport,industryinteractionfortraining/internship/placement,etc.)

Theinstitutionhas100%careerguidanceandplacementassistancewithhighlyqualifiedandexperiencedfacultyandtrainers.
TheinstitutionhasaseparateTrainingandPlacement(T&P)Cellwithqualifiedtrainersfromvariousfieldsofexpertise.
Theyalsoemphasizeonacademicexcellence,softskillsandpersonalitydevelopmentsothatthestudentsareabletobecomeleaderstohandleanytoughsituationsoftheircareer.
TheinstitutionhascounsellorstogivetheguidanceoncareerwiththehelpofT&PCell.
EachdepartmenthasaplacementcoordinatortoassistT&PCell.
TheT&PCellhasConferencehall,GDrooms,interviewcabins,Panelcubicles,SkillDevelopmentCentre,SeminarHalls,ClassroomsequippedwithLCDProjectorsandAudioSystems.
Thestudentsareencouragedtotakeinternshipsandvisitvariousindustries.
TheinstitutionguidesonGATE,PGECET,GRE,TOEFL,etc.forgettingadmissionintohigherstudies.

T&PCommittee:

FacilitiesforTraining&Placements:

Sr.No. Particulars No.ofRooms

1 SeminarHalls 2

2 Conferencehall 2

3 Interviewcabins 4

4 Panelcubicles 4

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 159/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
5 SkillDevelopmentCentre 1

6 EClassroomswithLCDProjectorsandAudioSystems. 7

7 GDrooms 1


Table9.10:No.offacilitiesinTraining&Placements


T&PCellInternalTrainersandSkillareas:

Sr.No. Nameofthetrainers Skillareas

1 G.Pushpadrisekhar .Net

2 V.Mohanapriya C,C++,Java

3 S.Venkatesh Softskills

4 K.Vasundhara English

5 P.Lakshmikeerthi Softskills

6 A.Suresh Java,Oracle

7 T.Ashok English

8 K.Lokesh Aptitude

9 D.Harssan English

10 Dr.E.Sudhakar Aptitude

11 Dr.C.SureshBabu Aptitude

12 E.KarthikeyanSharma English

Table9.11:InternalTrainers


T&PCellExternalTrainersandSkillareas:

Sr.No. Nameofthetrainer Skillareas Designation Company

1 R.Swetha SoftSkills Teamleader OraclePvtLtd,Bangalore

2 B.Damotharan C,C++,Oracle SoftwareDeveloper Infosys,Pune

3 B.SreeramBabu English,Softskills Chieftrainingofficer FreeLancer


Table9.12:ExternalTrainers


TheT&PCellfocusesonthefollowingareas

SoftSkills
FunctionalEnglish
Quantitativeaptitude
LogicalReasoning
Groupdiscussion
JAM
PersonalEffectiveness
Interviewfacingskills
ComputerlanguagesC,C++,Java,DotNetforECE,CSE,EEE&MCAstudents
CAD/CAMforCivilandMechanicalEngineeringstudents

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 160/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

PlacementcommitteeandInternalTrainersforHigherstudies:

Sr.No. Department NameoftheStaff Designation

1 T&P S.Venkatesh Coordinator

2 CIVIL V.S.Meganathan Member

3 MECH K.Hemamahesh Member

4 EEE C.R.Hemavathi Member

5 ECE D.Madhu Member

6 CSE G.Prasadbabu Member


Table9.13:InternalTrainersforhigherstudies


i)Listofsuccessfulstudentsinhigherstudies:

StudentsQualified
Department Batch
GATE GRE/TOFEL PGECET

201216 10

Civil 201115 19

201014 1 16

201216 3 8

MECH 201115 2 10

201014 1 2 9

201216 1 5

EEE 201115 1 6

201014 1 1 1

201216 2 10 8

ECE 201115 1 5 4

201014 1 11 8

201216 10 15

CSE 201115 6 14

201014 1 13



Table9.14:Successfulstudentsinhigherstudies


ii)Studentsplaceddetails.

Batch

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 161/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Sr.No Department 201216 201115 201014

1 ECE 200 185 110

2 CSE 78 82 91

3 EEE 35 42 48

4 MECH 85 45 47

5 CIVIL 38 33 30


Table9.15:Studentsplacementdetails

PlacedStudents&ExternalTrainer:


iii)Listofindustriesvisited:

Nameoftheindustryfor
Academicyear Year Date(s) Areasofexposure
visit/Internship

CIVIL

II 1.Araniardam 28915 Waterresourcesengineering

1.Mangampetmines
III 07815 Geologyandwaterresources
2.Annamacharyaproject(cheyyeru)
201516
1.Dept.ofGeology
Geology,structuralandwater
III 2.Chandragirifort 12815
resourcesengineering
3.Kalyanidam

1.Srisailam

2.Yaganti Structuralandwaterresources
III 21812
3.Mahanandhi engineering
201213
4.Ballumcaves

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 162/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
1.Chandragirifort Geologyandstructural
III 01912
engineering
2.S.V.Geologydept.

Table9.16:Listofindustriesvisited

9.6EntrepreneurshipCell(5) TotalMarks

InstituteMarks
(Theinstitutionmaydescribethefacility,itsmanagementanditseffectivenessinencouragingentrepreneurshipandincubation)(Successstoriesforeachoftheassessmentyearsaretobementioned)

TheinstitutionhasestablishedEntrepreneurshipDevelopmentCell(EDC)toencouragethestudentstobecomeentrepreneurs.TheEDCprovidesthefollowingsupporttothestudentcommunity:

TheEDCorganisestheprojectexhibition,creationofnewideas,tocopeupbusinesscompetition,industrialvisit,awarenesscamp,seminarsandworkshops,etc.,whichhelpthestudentstobecomeentrepreneurs.
TheEDCguidesandassiststheprospectiveentrepreneursonvariousaspectssuchaspreparingprojectproposals,obtainingprojectapprovals,gettingloansandfacilitiesfromagenciesofsupportsystem,acquiringinformationaboutrecenttechnology,etc.
TheEDCinspiresthestudentsbymakingthemawareoftopentrepreneursandtheirachievements.
TheEDCorganizescontinuousinteractionwithindustrypeopleinordertoacquiretheknowledgeofestablishingthenewcompany.
TheinstitutioninculcatesEntrepreneurskillsamongthestudentsbyhostingTechnologyEntrepreneurProgrammeoncampusincollaborationwithISB,Hyderabad.
ThestartupIncubationCentretoourinstitutionhasbeensanctionedbytheA.P.Stategovernment,asapartofSunriseStartupprogramsforstudentsonJan2015.ItisaprivilegetoourinstitutiontorunincubationfunctionalityforthedevelopmentofstudentEntrepreneurs.Studentcommitteehasbeenformedandapprovedby
startupvillage,Visakhapatnam.ThiscommitteeisworkingonincubatorfunctionalitiesundertheguidanceofCoordinatorandtheHeadoftheInstitution.
ThemembersinEDCcommitteefromeachdepartmentarelistedbelow.


EntrepreneurshipDevelopmentCellCommittee

Sr.No. Nameofthestaff Designation Nameofthestudent Department

1 Dr.S.Kishore Coordinator K.Lokesh MBA

2 G.ShanmukhaSrinivas Member K.JeevanReddy CIVIL

3 G.Seshadri Member M.Harshadhussan EEE

4 M.Lavakumar Member C.H.Ashokbabu MECH

5 V.NarasimhaRao Member V.Anusha ECE

6 B.ChandraMouli Member P.Sivakumar CSE

7 E.Karthik Member T.Naveen


8 Dr.B.Ayyappa Member G.Kirankumar BS&H

9 R.E.Hariharan Member K.Kumaraswamy MCA


Table9.17:EDCCommittee


EDCCommitteeroom:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 163/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 164/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
EntrepreneurshipFacilities:

i)ListofActivitiesOrganized

Sr.No. Event Date(s) ResourcePerson Collaboration

1.Mrs.AnchalSood,StrategicDesigner&Analyst,ISB,Hyderabad
24082015&
1 TwodayworkshoponDesignThinking 2.Mr.RipulKumar,CEO,KernCommunication ISB,Hyderabad
25082015
3.Mrs.RoliAgarwal,Freelancer,ISB,Hyderabad

1.EktaChowdhary,Consultant,ISB
2 OnedayAwarenesssessiononTechnologyEntrepreneurshipProgramme 05052015 ISB,Hyderabad
2.Mr.AkshayJalan,ISB.

Smt.K.RamaDevi
3 OnedayworkshoponWomenEntrepreneurs:ChallengesandStrategies 07032015 EDC,SIETK,Puttur
PresidentofALEAP.

05122014
SponsoredbyEntrepreneurshipDevelopmentInstituteof
4 3DayEntrepreneurshipAwarenessCamp(EAC) to Dr.K.Lakshminarayna,Director,ASSSDC.
India,Ahmedabad,Gujarat,India
07122014


5 GuestLectureonTechnologyandManagementforEntrepreneurshipDevelopment 19102012 Mr.K.Kandaswami,MD,M/s.AnandhaFabrication(Cbe)Pvt.Ltd.,
EDC,SIETK,Puttur

6 ProjectExhibitionIDEAEXHIBIT2012 04092012 Inhouseprogram EDC,SIETK,Puttur

7 EntrepreneurshipAwarenessCamp 10122011 ChiefManagingDirector,Lanco,SriKalahasthi EDC,SIETK,Puttur

8 WorkshoponAnEntrepreneurshipAJourney 17022011 Mr.K.Ramanachary,Coordinator,EDC,S.V.University,Tirupati EDC,SIETK,Puttur

9 SeminaronHowtobeanEstablishedEntrepreneur 17022011 Mr.SanthoshKumar,BranchManager,SBI,Puttur EDC,SIETK,Puttur


Table9.18:EDCOrganizedEvents

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 165/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
EDCProgrammes:

9.7CocurricularandExtracurricularActivities(10) TotalMarks

InstituteMarks

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 166/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(Theinstitutionmayspecifythecocurricularandextracurricularactivities)(QuantifyactivitiessuchasNCC,NSSetc.)

Cocurricularandextracurricularactivitiesaredulyimplementedforthestudents.Theinstitutionhastheauditorium,seminarhalls,eclassrooms,skilldevelopmentcentre,MIC,IBM,Incubationcentre,R&D,library,spaciousplaygroundwithallfacilities,culturalclubs,Enviroclub,NSSunitetc.,inordertomakethestudentsperfectin
cocurricular&extracurricularactivities.


ThemembersofCoCurricular&ExtraCurricularcommitteefromeachdepartmentarelistedbelow.

CoCurricular&ExtraCurricularCommittee:


Sr.No. Nameofthefaculty Designation Nameofthestudent Department

1 G.Seshadri Coordinator P.Vasu EEE

2 M.PavanKumar Member U.Manjunath CIVIL

3 A.Asha Member G.Balavenkatasivasai. MECH

4 M.RajeswaraRao Member
C.V.Jaswanth ECE
5 T.Manivannan Member

6 R.G.Kumar Member
B.AnilKumarReddy CSE
7 B.Ravindranaik Member

8 S.Kishore Member D.Naveen


BS&H
9 P.Usha Member Shaikshafiulla

10 S.Balamurali Member A.Rajesh MBA

11 P.Karthikeyan Member C.Narendra MCA


Table9.19:Cocurricular&ExtracurricularCommittee


Cocurricular&ExtraCurricularFacility:

Sports,Seminarhalls,NSS,EnviroClub,Auditorium,WomanEmpowermentCell,CulturalClubetc.


A)CocurricularActivities:

TheSIDDHARTHQUESTisconductedtoencouragethestudentstoparticipateinPaperpresentation,TechnicalQuiz,etc.
Thestudentsareencouragedtogiveseminarsonlatesttrendsbeyondthesyllabus.
TheWorkshopsareorganizedontheemergingtechnologies.
Encouragethestudenttodevelopminiprojectsontheemergingtechnologiesandmakethempreparesomeprototypemodels.
ThetrainingisprovidedonSoftSkills,Technicalskills&Verbal&NonVerbalreasoning.
TheEDCbeingpartofthecocurricularactivitiesencouragesthestudentstobecomeemployers.
Encouragestudentstodevelopthecreativity,lateralthinkingandcommunication/peoplemanagementskillsthroughgoalsettingexercises,groupdiscussions,mockinterviewsandpresentations.


CocurricularAchievements:

No.ofParticipants
Sr.No. Branch CocurricularActivities
201415 201314 201213

1 CIVIL Paperpresentation 17 19 41
Technicalposter
2 MECHANICAL 82 16 11
Presentation
3 EEE Puzzles 40 29 18

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 167/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
4 ECE Technicalquiz 99 41 26
Projectexpo
5 CSE Shortfilm 124 90 102


Table9.20:CoCurricularAchievements


SamplecopyofCoCurricularAchievements:

Prizes(I/II/III)/
Sr.No. NameoftheStudent Event Date OrganizedBy
Awards

AY:201415

T.VenkataKesava SreeVidhyanekethanCollege,
1 Symposium 30th ,31st &1st Nov2014 1st Prize
(12F61A0155) Tirupathi

G.Nandini
2 TechnoHunt 18th &19th Apr2014 SVU,Tirupathi 1st Prize
(12F61A0134)

G.Nandini
3 Quiz 15th Mar2014 JNTUA,Anantapur 2nd Prize
(12F61A0134)

U.Manjunath
4 Symposium 13th Mar2014 RGMCollege,Nandhyala 1st Prize
(12F61A0127)

G.Mounika 30th ,31st &1st Nov SreeVidhyanekethanCollege,


5 Quiz 2nd Prize
(12F61A0131) 2014 Tirupathi

G.Nandini
6 Symposium 18th &19th Apr2014 SVU,Tirupathi 2nd Prize
(12F61A0134)

G.Nandini
7 Quiz 15th Mar2014 JNTUA,Anantapur CertificateAwarded
(12F61A0134)

G.Nandini
8 Symposium 18th &19th Apr2014 SVU,Tirupati CertificateAwarded
(12F61A0134)

G.Nandini
9 Symposium 15th Mar2014 JNTUA,Anantapur CertificateAwarded
(12F61A0134)

B.VishnuVardhanaNaidu 30th ,31st &1st Nov


10 Quiz SVCE,Tirupati CertificateAwarded
2014
(12F61A0160)

D.PradeepNaidu 30th ,31st &1st Nov


11 Quiz SVCE,Tirupati CertificateAwarded
(12F61A0135) 2014

M.MukeshNaik 30th ,31st &1st Nov


12 Quiz SVCE,Tirupati CertificateAwarded
2014
(12F61A0132)

M.SaiSrinivas 30th ,31st &1st Nov


13 Quiz SVCE,Tirupati CertificateAwarded
(12F61A0143) 2014

U.Manjunath 30th ,31st &1st Nov SreeVidhyanekethanCollege,


14 Workshop CertificateAwarded
2014 Tirupathi
(12F61A0127)

U.Manjunath
15 Symposium 18th &19th Apr2014 SVU,Tirupathi CertificateAwarded

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 168/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(12F61A0127)

G.Nandini 30th ,31st &1st Nov SreeVidhyanekethanCollege,


16 Quiz CertificateAwarded
2014 Tirupathi
(12F61A0134)

G.Nandini 30th ,31st &1st Nov SreeVidhyanekethanCollege,


17 Symposium CertificateAwarded
(12F61A0134) 2014 Tirupathi

AY:201314

A.Brahmini
1 Symposium 8th &9th Mar2013 GoldenValley 1st Prize
(10F61A0105)

D.Bharathi
2 Symposium 8th &9th Mar2013 GoldenValley 1st Prize
(11F65A0104)

M.Harish
3 Symposium 10th Apr2013 SVCET,Chittoor 1st Prize
(10F61A0113)

S.Kartheek
4 Symposium 10th Apr2013 SVCET,Chittoor 1st Prize
(10F61A0117)

S.Kavitha
6 Symposium 11th May2013 SVCET,Chittoor 2nd Prize
(10F61A0119)

S.Dhanya
7 Symposium 11th May2013 SVCET,Chittoor 2nd Prize
(10F61A0110)

U.Manjunath
8 Symposium 2nd Mar2013 N.B.K.R. 3rd Prize
(12F61A0127)

U.Manjunath
9 Symposium 16th Feb2013 N.B.K.R. 3rd Prize
(12F61A0127)

B.Kavitha
10 Workshop 19th Mar2013 IITMadras CertificateAwarded
(10F61A0118)

M.Harish
11 Symposium 8th &9th Mar2013 SVCET,Chittoor CertificateAwarded
(10F61A0113)

P.DevendraNaidu
12 Symposium 8th &9th Mar2013 SVCET,Chittoor CertificateAwarded
(10F61A0109)

P.Mounika
13 Symposium 8th &9th Mar2013 SVCET,Chittoor CertificateAwarded
(11F61A0108)

P.Mounika
14 Symposium 8th &9th Mar2013 SVCET,Chittoor CertificateAwarded
(11F61A0108)

D.Bharathi
15 Workshop 4th &5th Feb2013 SVCE,Tirupathi CertificateAwarded
(11F65A0104)

Ch.Praveen
16 Workshop 9th &10th Dec2013 SVCE,Tirupathi CertificateAwarded
(10F61A0130)

U.Manjunath
17 Symposium 15th Mar2014 JNTU,Anantapur CertificateAwarded
(12F61A0127)

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 169/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
U.Manjunath
18 Symposium 13th Mar2014 RGM,Kurnool CertificateAwarded
(12F61A0127)

K.Lavanya
19 Symposium 26thFeb2013 SIST,Puttur CertificateAwarded
(11F61A0122)

AY:201213

S.KhajaNayabRasool
1 Symposium 20th Mar2012 SVIST,Madanapalle 1st Prize
(09F61A0134)

S.KhajaNayabRasool
2 Symposium 11th Mar2012 AITS,Tirupathi 2nd Prize
(09F61A0134)

S.KhajaNayabRasool
3 Symposium 22nd Mar2012 SVNE,Tirupathi 1st Prize
(09F61A0134)

N.SarathKumar
4 Symposium 20th Mar2012 SVIST,Madanapalle 1st Prize
(09F61A0130)

M.P.Rajan
5 Symposium 22th Mar2012 AITS,Tirupathi 2nd Prize
(09F61A0125)

M.P.Rajan
6 Symposium 21st Mar2012 KKC,Puttur 1st Prize
(09F61A0125)

S.KhajaNayabRasool
7 Symposium 29thJan2012 SVIST,Madanapalle 1st Prize
(09F61A0134)

M.P.Rajan
8 Symposium 09th &10th Mar2012 SVU,Tirupathi 1st Prize
(09F61A0125)

C.Sasidhar
9 Symposium 10th Mar2012 SIST,Puttur 1st Prize
(10F61A0137)

KYBabhitha
10 Symposium 25th Jan2012 KMM,Tirupathi 2nd Prize
(10F65A0103)

T.UmaMaheshwari
11 Symposium 25th Jan2012 KMM,Tirupathi 1st Prize
(09F61A0142)

K.Kavya
12 Symposium 21st &22nd 2011 VishvodayaTechnicalAcademy 2ndPrize
(08F61A0116)

K.Sailaja
13 PosterPresentation 28th Sep2011 SVCET,Tirupathi 3rd Prize
(09F61A0129)

Y.Nimeelika
14 Symposium 28th Sep2011 SVCET,Tirupathi CertificateAwarded
(08F61A0130)

Y.Nimeelika
15 Symposium 21st &22nd 2011 VishvodayaTechnicalAcademy 2nd Prize
(08F61A0130)

Y.Nimeelika
16 Symposium 21st &22nd 2011 VishvodayaTechnicalAcademy CertificateAwarded
(08F61A0130)

U.Manjunath
17 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 170/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(11F61A0130)

K.Lavanya
18 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0122)

N.Bhargavi
19 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0108)

G.MaheshKumar
20 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0127)

G.MaheshKumar
21 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0127)

B.Madhu
22 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0125)

L.Mallikarjuna
23 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0128)

P.DilipKumar
24 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0113)

N.Bhargavi
25 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0108)

V.Madhupriya
26 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0124)

K.Lavanya
27 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0122)

S.MaheshBabu
28 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0126)

T.Reddaiah
29 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0142)

S.MukeshKumar
30 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0132)

P.Balasubramanyam
31 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0105)

B.Avinash
32 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0103)

P.Harijyothi
33 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0117)

U.Manjunath
34 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0130)

P.Ashok
35 Workshop 7th Sep2012 VisvodayaCollege,Kavali CertificateAwarded
(11F61A0102)

K.Kavya
36 Symposium 9th &10th Jan2012 KSRM,Kadapa CertificateAwarded

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 171/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
(08F61A0116)

YNimeelika
37 Symposium 9th &10th Jan2012 KSRM,Kadapa CertificateAwarded
(08F61A0130)

PSKarthik
38 Symposium 18th &19thFeb2012 SVNE,Tirupathi CertificateAwarded
(10F61A0117)

39 P.NarendhraReddy Symposium 9th &10th Mar2012 SVU,Tirupathi CertificateAwarded

PSKarthik
40 Symposium 9th &10th Mar2012 SVU,Tirupathi CertificateAwarded
(10F61A0117)

C.H.Praveen
41 Symposium 10th Mar2012 SIST,Puttur CertificateAwarded
(10F61A0130)


Table9.21:CoCurricularAchievements


CoCurricularActivities:

Extracurricularactivities:

TheinstitutionhasseparateNSSunitwith100studentvolunteers,sanctionedbyJNTUA.
TheNSSunitisheadedbyprogrammeofficer(facultyincharge)andChairman(Principal).
ThevariousactivitiesconductedthroughtheNSSunitareblooddonation,
Globalhandwashingday,SwatchBharathAbhiyan,GoodGovernanceday,Nationalunityday,Nationalyouthfestivalcelebration,Nationalvotersday,Republicdaycelebration,Massplantationprogramme,Roadsafetyawarenessprogramme,Internationalwomensday,etc.
Industrialvisitisorganizedeverymonthtoprovideexposureonrealtimeindustry&technologies.
Studentsaremotivatedtoparticipateinintercollegeeventsforpaperpresentationandprojectexhibitions.
Studentsareallowedtoparticipateinworkshop,technicalsymposium&eventswhichareconductedinothercolleges.
Intercollegecompetitionsforvariousindoorandoutdoorgamesareconducted.
ThestudentsareallowedtoparticipateinCulturaleventsduringvariouscollegefunctions.


ExtracurricularAchievementsinSports:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 172/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
No.ofparticipants
Sr.No. Events Levels
201415 201413 201312


1 National 4


2 HandBall State 1 1

VolleyBall
ShuttleBadminton
Cricket
3 Kabaddi University 16 3 1
ThrowBall
Tennikoit

BasketBall
Taekwondoselectiontrails
4 Zone 1
Chess
ShuttleBadminton


5 Intercollegiate 6


Table9.22:ExtraCurricularAchievements


SamplecopyofExtraCurricularAchievements:

Department:CivilEngineering

YEAR201415

Date Events Hostinstitutions Nameofthestudent Prize

27022015 Volleyball S.I.E.T.K U.Manjunath 2nd

14092015 shuttle S.I.E.T.K Maheshbabu Participation

YEAR201314

28032014 ThrowBall S.I.E.T.K A.Mounika 2nd

28032014 ThrowBall S.I.E.T.K R.S.Surekha 2nd

14032014 ThrowBall S.I.E.T.K P.Sravani 1st

19122014 Cricket S.I.E.T.K S.Aslam Participation

25122014 Volleyball S.I.E.T.K C.Giridhar Participation

YEAR201213

11012013 ThrowBall S.I.E.T.K Y.Yashodha 1st

1032013 Volleyball S.I.E.T.K A.Naresh 2nd

28122013 ThrowBall S.I.E.T.K Nirupa.N 1st

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 173/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Table9.23:ExtraCurricularAchievements


ExtraCurricularActivities:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 174/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 175/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


NSSactivities:

No.of
Sr.No. Date Nameofactivity Place
volunteers

Year:201415

1 08032015 Internationalwomensday. College 50

2 08022015 Roadsafetyawarenessprogramme. College 100

3 06022015 Massplantationprogramme. College 100

4 26012015 Republicdaycelebration. College 75

Headquarters,
5 25012015 Nationalvotersday. 80
Narayanavam(M).

6 12012015 Nationalyouthfestivalcelebration. College 100

7 23122014 Goodgovernanceday. College 100

Jogalaindlu,
8 17112014 Swatchbharathabhiyan. 100
RajivNagar.

9 31102014 Nationalunityday. College 100

10 21102014 Blooddonationcamp. GovernmentHospital,Puttur. 85

11 15102014 GlobalHandWashingday. College 100

12 24092014 NSSFoundationcelebration. College 100

13 15082014 Independenceday. College 100

Year:201314

1 24092013 NSSdayTreeplantation College 100

2 23112013 Blooddonationcamp. GovernmentHospital,Puttur. 90

3 29012014 YouthFestivalprogram college 80

4 25012014 Notionalvotersday Kalayanapuram(V) 80

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 176/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
5 26012014 Republicdaycelebration College. 75

6 08032014 Internationalwomensday. College. 50

7 29032014 Playgroundrepair Kalayanapuram(V) 90

Year:201213

VeerappareddyPalemVillage,
1 25012013 Notionalvotersday 80
Puttur

18022013
VeerappareddyPalemVillage,
2 to SpecialcampProgramme 51
Puttur
24022013

3 23112013 Blooddonationcamp GovernmentHospital,Puttur. 60


Table9.24:NSSActivities

10GOVERNANCE,INSTITUTIONALSUPPORTANDFINANCIALRESOURCES(120) TotalMarks120.00
10.1Organization,GovernanceandTransparency(40) TotalMarks

10.1.1StatetheVisionandMissionoftheInstitute(5) InstituteMarks
(VisionstatementtypicallyindicatesaspirationsandMissionstatementstatesthebroadapproachtoachieveaspirations)

Vision:

Tobeoneamongthepremierinstitutionsofthecountryinproducingethicallystrongandtechnicallysoundengineersandmanagerstoservethenation.

Mission:

Tocreatesacredenvironmentforthestudentstoacquireknowledgethroughinnovativeandprofessionalapproachandutilizeitforthewelfareofthemankind.

10.1.2Governingbody,administrativesetup,functionsofvariousbodies,servicerules,procedures,recruitmentandpromotionalpolicies(10) InstituteMarks
Listthegoverning,senate,andallotheracademicandadministrativebodiestheirmemberships,functions,andresponsibilitiesfrequencyofthemeetingsandattendancetherein,inatabularform.Afewsampleminutesofthemeetingsandactiontaken
reportsshouldbeannexed.
Thepublishedrulesincludingservicerules,policiesandproceduresyearofpublicationshallbelisted.Alsostatetheextentofawarenessamongtheemployees/students.

TheInstitutionhasbeenestablishedin2001underJayaEducationalSociety.IthasaGoverningbodytomonitorandachievingthevisionandmissionoftheinstitution.Ithasaneffectiveorganizationalstructurewhichmonitorsandimprovestheinstitution.Theorganizationalstructureoftheinstitutionisgivenbelow.


OrganizationalStructure:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 177/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig10.1Organizationalstructureoftheinstitution


A.GoverningBody

TheInstitutionhasaGoverningBody.ItisaPolicymakingbodyoftheInstitutionandmeetsfrequentlyanddiscussestheagendapreparedbythePrincipal.Itreviewstheperformanceoftheinstitutionanddecisionstakeninthepreviousmeetingandalsoapprovesthepolicydecisions.Thebudgetofthecurrentacademicyearisfinalized.All
newproposalsarediscussedanddecisionstaken.

Qualificationsandpositioninthecurrent
Sr.No. NameoftheMemberofBoG PositioninBoG Nominatedby
engagements

Chairperson

1 Dr.K.AshokRaju Ph.D.&Industrialist Chairman Society

MembersoftheTrust/Society/Management

2 Smt.K.IndiraVeni M.Tech., Member Society

3 Mr.K.Madhu M.Tech., Member Society

4 Dr.K.Sudheer M.B.B.S.,Doctor,Hyderabad Member Society

B.Tech.(IIT,Gowhathi)

5 Mr.D.Karthik SeniorDevelopmentEngineer, Member Society

VIVUTechnologies(P)LTD.,USA

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 178/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

FacultymembersoftheInstitution

M.E.,Ph.D.
6 Dr.M.JanardhanRaju Member Principal
Prof.&HOD,ECE

7 Dr.S.SunilkumarReddy M.Tech.,Ph.D. Member Principal

EducationistsorIndustrialists

M.Tech.,CMD,
8 Mr.D.JaiRamesh Member Society
VijayElectricalsLimited,Hyderabad

M.S.,VicePresident,
9 Mr.GaddeSridhar Member Society
ICOMLimited,Hyderabad

OnenomineeoftheAICTE/UGC.

UnderProcessRequestedAICTEfor
10 Tobenominated Member AICTE
nominationofaMember

OnenomineeoftheStateGovernment

11 Mr.Prabhakar RJD,TechnicalEducation,Hyderabad Member StateGovt.

OnenomineeoftheUniversitytowhichtheInstitutionisaffiliated.

M.Tech.,Ph.D.(NominatedbyJNTUA, JNTUA,
12 Dr.V.Sankar Member
Ananthapuramu) Ananthapuramu

HeadoftheInstitution,Exofficio

M.Tech.,Ph.D., Member
13 Dr.K.ChandrasekharReddy ExOfficio
Principal Secretary


Table10.1ListoftheGoverningBody(BoG)members
1.TheSampleminutesofmeetingoftheGoverningbodyminutesofmeetingandWebsite/ICT/InternetCommitteeareannexedin10.1.
2.Rulesofannualleaves,casualleaves,studyandspecialleavesandincentivesareannexedin10.2.


B.VariousCommitteesoftheInstitution

TheInstitutionhas31committeesfortheeffectivefunctioningoftheorganization.Theobjectivesandfunctionsofthecommitteesareorganizedaspertheguidelinesoftheheadoftheinstitution.

Thelistandfrequencyofthemeetingsarementionedinthebelowtable.

S.No. NameoftheCommittee FrequencyofMeetingsheld

1 AcademicAdvisoryCommittee Onceinthesemester,asandwhenrequired

2 CollegeAcademicCommittee Monthlyonce,asandwhenrequired

3 GrievanceRedressalCell Monthlyonce,asandwhenrequired

4 StudentCounselingCommittee onceinthesemester,asandwhenrequired

5 Purchase/StoresCommittee onceinsemester,asandwhenrequired

6 PublicRelations&PublicationsCommittee Monthlyonceinthesemesterwheneverrequired

7 R&DandConsultancyCommittee Monthlyonceinthewheneverrequired

8 Training&PlacementCommittee Onceineveryfortnight,asandwhenrequired

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 179/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
9 HostelCommittee Onceineveryfortnight,asandwhenrequired

10 CollegeMaintenanceCommittee Monthlyonce,asandwhenrequired

11 NSSCommittee Monthlyonce,asandwhenrequired

12 SocialWelfare(BC/SC/ST)Committee Onceineveryfortnight,asandwhenrequired

13 Sports&GamesCommittee Monthlyonce,asandwhenrequired

14 TransportationCommittee Monthlyonce,asandwhenrequired

15 Arts/CulturalCommittee Onceineveryfortnight,asandwhenrequired

16 DepartmentAssociationsCommittee Onceineveryfortnight,asandwhenrequired

17 Examinations/TimeTable/AdmissionsCommittee Monthlyonce,asandwhenrequired

18 LibraryCommittee Onceineveryfortnight,asandwhenrequired

19 IndustryInstitutePartnershipCell Monthlyonce,asandwhenrequired

20 EntrepreneurshipDevelopmentCell Monthlyonce,asandwhenrequired

21 Website/ICT/InternetCommittee Onceineveryfortnight,asandwhenrequired

22 AlumniCoordinationCommittee onceinthesemester,asandwhenrequired

23 InternalQualityAssuranceCell onceinthesemester,asandwhenrequired

24 InternalComplaintsCommittee Monthlyonce,asandwhenrequired

25 RTICell Monthlyonce,asandwhenrequired

26 ProfessionalSocieties&ActivitiesCommittee Onceineveryfortnight,wheneverrequired

27 GenderChampionshipCommittee Monthlyonce,asandwhenrequired

28 AntiRaggingCommittee Monthlyonce,asandwhenrequired

29 ResultAnalysisCommittee Onceinthesemester

30 WomenEmpowermentCell Monthlyonce,asandwhenrequired

Onceinbeginningoftheacademicyear,asandwhen
31 JNTUA,AICTE,NAAC,NBA&ISOCommittee
required


Table10.2Listofvariouscommitteesoftheinstitution

C.ConstructionandMaintenanceWing:

ItworksundercontroloftheSecretarywiththeassistanceofChiefOperatingOfficer,MaterialsManager,ConstructionManager,MaintenanceManageretc.

TheBuildingInchargemaintainsthebuildingsandfacilitieswiththehelpofACmechanic,Electrician,PlumberandCarpenter.TheMaintenanceManagerwillkeeptheinstitutewithefficientmaintenancewiththehelpofhousekeeping,gardenersandSecurity.

OrganizationalsetupoftheConstructionandMaintenanceWing:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 180/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fig.10.2OrganizationalsetupoftheConstructionandMaintenanceWing


D.Servicerules,policiesandprocedures

Theinstitutionhasitsownservicerules,policiesandproceduresforeffectivefunctioningoftheinstitution.Itispublishedin2002andrevisedin2015

AlltheseareavailableatPrincipalsoffice,HODschamber,library,Examinationcell,placementcelletc.,anddistributedamongalltheemployees.Itisalsodisplayedininstitutionalwebsite.


HRManualCoverpage

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 181/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


HRManualContents

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 182/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 183/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547


TheinstitutionhasitsownHRpoliciesforthesmoothorganization.ThecontentsoftheHRmanualaregivenabove.TheseHRpolicieshelpsinachievingtheinstitutionvisionandmissioneffectively.


E.RecruitmentandPromotionalPolicies

RecruitmentofFaculty/SupportingStaff

Itisoneofthefirstinstitutionsintheregiontoadvertiseforfacultytoattractthebesttalent.
Advertisementsarepublishedinthestateandnationallevelnewspapers.
Interviewsareconductedbyapanelconsistingofseniorfaculty,HeadoftheDepartment,Externalsubjectexpert,PrincipalandChairman.
Preferenceisgiventorelevantqualifications,teaching,researchandindustrialexperience.
Ademonstrationistakenfromeachpersontounderstandtheteachingcapabilitiesandcompetency.
TheguidelinesoftheuniversityandAICTEarefollowedduringtherecruitmentofthefaculty.
Theselectedcandidatesarerequiredtoattendtheuniversityratificationprocess.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 184/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
SupportingstaffarerecruitedbythepanelconsistsofHODs,PrincipalandChairman.


PromotionalPolicies

Basedonthestaffperformanceappraisal,theyarepromotedtohigherlevels.

10.1.3Decentralizationinworkingandgrievanceredressalmechanism(10) InstituteMarks
Listthenamesofthefacultymemberswhohavebeendelegatedpowersfortakingadministrativedecisions.Mentiondetailsinrespectofdecentralizationinworking.SpecifythemechanismandcompositionofgrievanceredressalcellincludingAntiRagging
Committee&SexualHarassmentCommittee.

Theinstitutionhas31committees/cellstoensurethedecentralizationandefficientexecutionofadministrativeworks.Eachcommitteehasonecoordinatorandfacultymembersfromeverydepartment.Thesecommitteesaremonitoredbytheheadoftheinstitution.Allthesecommitteesareinvolvedindatacollection,organizingactivities,
periodicalreviewsandprovidingsuggestionsforfurtheractions.Theyfrequentlyconductmeetingsandmaintaintherecords.Inadditiontotheinvolvementinthesecommittees,therearesomeotherdepartmentalresponsibilitiesforthefacultysuchasClassincharge,Projectincharge,labincharge,attendanceinchargeetc.Theadministrative
setupofthedepartmentisgivenbelow.

OrganizationalSetupoftheDepartment

Fig10.3OrganizationalSetupoftheDepartment


Thenamesofthecoordinatorsofallcommitteesarementionedinthefollowingtables.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 185/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
CommitteesandCoordinators

S.No. NameoftheCommittee NameoftheCoordinator

1. AcademicAdvisoryCommittee Dr.K.ChandrasekharReddy(Principal)

2. CollegeAcademicCommittee Dr.K.ChandrasekharReddy(Principal)

3. GrievanceRedressalCell C.P.Gopi

4. StudentCounselingCommittee J.Suneetha

5. Purchase/StoresCommittee Dr.M.JanardhanaRaju

6. PublicRelations&PublicationsCommittee Dr.P.Subramanyachari

7. R&DandConsultancyCommittee P.RameshBabu

8. Training&PlacementCommittee G.PrasadBabu

9. HostelCommittee O.NarendraReddy

10. CollegeMaintenanceCommittee F.AnandRaju

11. NSSCommittee T.Bhaskaraiah

12. SocialWelfare(BC/SC/ST)Committee V.GovindaNaick

13. Sports&GamesCommittee B.RavindraNaick

14. TransportationCommittee S.VamsiKrishna

15. Arts/CulturalCommittee R.G.Kumar

16. DepartmentAssociationsCommittee M.Amarnath

17. Examinations/TimeTable/AdmissionsCommittee P.Balaji

18. LibraryCommittee Dr.P.MadhuMohanReddy

19. IndustryInstitutePartnershipCell B.SiddeswaraRao

20. EntrepreneurshipDevelopmentCell Dr.S.Kishore

21. Website/ICT/InternetCommittee M.SathishBabu

22. AlumniCoordinationCommittee C.P.Gopi

23. InternalQualityAssuranceCell Dr.M.JanardhanRaju

24. InternalComplaintsCommittee A.Kalpana

25. RTICell C.P.Gopi

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 186/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
26. ProfessionalSocieties&ActivitiesCommittee C.Dhanalakshmi

27. GenderChampionshipCommittee E.Chudamani

28. AntiRaggingCommittee B.HariKrishna

29. ResultAnalysis&AssessmentCommittee B.Pavankumar

30. WomenEmpowermentCell M.Jayalakshmi

31. JNTUA,AICTE,NAAC,NBA&ISOCommittee S.HrushikesavaRaju


Table10.3ListofCommitteecoordinatorsofvariouscommittee

AdministrationCoordinators:

S.No. NameofthePosition NameoftheCoordinator

1. HeadoftheInstitution(Principal) Dr.K.ChandraSekharReddy

2. ChiefOperatingOfficer M.B.AnilMenon

3. HeadoftheDepartmentCIVIL Dr.S.SiddiRaju

4. HeadoftheDepartmentEEE N.RameshRaju

5. HeadoftheDepartmentMECH Dr.S.SunilKumarReddy

6. HeadoftheDepartmentECE Dr.M.JanardhanRaju

7. HeadoftheDepartmentCSE P.Nirupama

8. HeadoftheDepartmentBS&H B.HariKrishna

9. HeadoftheDepartmentMBA C.P.Gopi

10. HeadoftheDepartmentMCA S.Choudaiah

11. ITManager M.SatishBabu

12. Manager(MaterialManagement) E.VinodKumar

13. Manager(Works&Maintenance) T.HariBabu


Table10.4Listofcoordinatorsforvariousadministrativecommittees

MechanismandCompositionofGrievanceRedressalCell,AntiraggingCommittee&SexualHarassmentCommittee

i)GrievanceRedressalCell

TheinstitutionhasaGrievanceRedressalCell(GRC)headedbyaseniorfacultyandsupportedbytheotherfacultymembersfromallthedepartments.ThecommitteeismaintainedaspertheAICTEguidelines.TheGRCtakescareofthegrievancesofstudents/staff.Theyeithercandroptheirgrievancesinthesuggestionboxorcandirectly
reporttotheGRC.Thestudentsareallowedtosharetheirgrievancesevenwiththeircounsellorsandclassteachers.NecessaryremedialmeasureswillbeinitiatedbytheGRC,ifitisnecessarythesamewillbebroughttothenoticeofPrincipal/Chairman.


FollowingistheconstitutionofGrievanceRedressalCell:

S.No. NameoftheMember Department Position

C.P.Gopi
1. MBA Coordinator

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 187/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Professor&HOD

S.Choudaiah
2. MCA Cocoordinator
Professor&HOD

Dr.S.SiddiRaju
3. CIVIL Member
Professor&HOD

N.RameshRaju
4. EEE Member
Professor&HOD

Dr.S.SunilKumarReddy
5. MECH Member
Professor&HOD

Dr.M.JanardhanRaju
6. ECE Member
Professor&HOD

P.Nirupama
7. CSE Member
Professor&HOD

B.HariKrishna
8. BS&H Member
Professor&HOD

P.ChandraSekhar
9. EEE Member
AssociateProfessor

B.Ganeshan
10. BS&H Member
AssistantProfessor

11. S.MidhunPratap CIVIL StudentMember

12. T.Sunil EEE StudentMember

13. K.Upendra MECH StudentMember

14. B.Govindamma ECE StudentMember

15. K.Jayasri CSE StudentMember

16. M.UmaSree MBA StudentMember

17. A.Nagendra MCA StudentMember


Table10.5ListofCommitteemembersoftheGrievanceRedressalCell


SomeoftheGrievancesreceivedandaddressedareasfollows:

Grievancesreceived

Suggestionboxesshouldbesetupinthemajorlocationsofthecampus.
Foodqualityinthecanteenshouldbeimproved
WiFifacilityshouldbeextendedforstudentsalso
Transportationfacilitiesshouldbeprovidedwhenadepartmentorganizesextracurricularactivitiesbeyondworkinghours
Transportationfacilitiesshouldbeprovidedtoadditionalroutes
Additionalparkingfacilitiesforbikes


Grievancesaddressed

Suggestionboxesweresetupinthemajorlocationsofthecampus.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 188/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Earlier,thecanteenwasoutsourced.Now,themanagementisrunningthecanteenandthequalityoffoodhasimprovedsignificantly.
WiFifacilityisprovidedforallfacultiesandstudents.
Withpriorintimationtobusinchargeandprincipal,eventorganizers/coordinatorscanarrangespecialbuses.
Transportationfacilitiesareextendedtoadditionalroutesaspertherequestsmadebythestudentsandthestaff.
Parkingplaceisprovidedoutsideofthecollegeforstudentsandinsideforfaculty.


ii)AntiRaggingCommittee

Theinstitutionhasconstitutedantiraggingcommitteetopreventragginginsidetheinstitutionpremisesandalsotocreateawarenessamongthestudentssoastopreventthesamefromhappeningoutsidethecampus.IthasthePrincipal,HODs,faculty,supportingstaffandseniorstudents.

FollowingarethemembersoftheAntiRaggingCommittee

S.No. NameoftheMember Department Position

Dr.K.ChandrasekharReddy
1. ADMIN Chairman
Principal

B.HariKrishna
2. BS&H Coordinator
Professor&Head

P.RameshBabu
3. CSE Cocoordinator
AssociateProfessor

C.P.Gopi
4. MBA Member
Professor&Head

S.Choudaiah
5. MCA Member
Professor&Head

Dr.S.SiddiRaju
6. CIVIL Member
Professor&Head

N.RameshRaju
7. EEE Member
Professor&Head

Dr.S.SunilKumarReddy
8. MECH Member
Professor&Head

Dr.M.JanardhanRaju
9. ECE Member
Professor&Head

P.Nirupama
10. CSE Member
Professor&Head

S.VamsiKrishna
11. ECE Member
AssociateProfessor

12. R.Seshadri CIVIL StudentMember

13. K.Meenakshi EEE StudentMember

14. K.KrishnaVamsi MECH StudentMember

15. V.Sivanarayana ECE StudentMember

16. K.LalithSagar CSE StudentMember

17. B.Madhavaiah MBA StudentMember

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 189/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
18. K.Pushparaj MCA StudentMember


Table10.6ListofthecommitteemembersoftheAntiraggingcommittee


Theinstitutionhastakenthefollowingmeasurestopreventragging.

AntiRaggingcommitteesinvolvingteaching,Nonteachingstaffandseniorstudentsareconstituted.
TheentirecampusisunderCCTVcamerasurveillance.
Bannersandpostersonantiraggingactaredisplayedatprominentplaces.
Complaintboxesatfirstyearclassroomsandatprominentplacesarearranged.
TheTelephonenumbersofthecollegeadministration,D.S.P.,C.I.,andS.I.ofpolicearedisplayedatprominentplaces.
AntiRagginghelplinenumberandwebsiteaddressaredisplayedinthecampusatprominentplaces,usingwhichstudentscanreceiveassistancewithin15minutes.
AwarenessonAntiRaggingactiscreatedtoallthestudentswiththeinvolvementofjudiciary,revenueandpolicedepartments.
AwarenessonAntiRaggingactiscreatedtoallthestudentsbytheprincipal,HODsandseniorfacultymembersineachclass.
ThedateofcommencementoffirstyearclassworkisinformedtothelocalpolicestationandalsointimatedtoC.I.,D.S.P.,Puttur.
Undertakingformsareobtainedfromthestudentsandtheirparentsstatingthatseniorstudentsdonotinvolveinraggingofanyform.
Separatebusesarearrangedforthefirstyearstudents.
Lunchtimingsandclasstimingsofthefirstyearstudentsaredifferentfromthatoftheseniorstudents.
Classroomsforfirstyearstudentsarearrangedinaseparateblock.
Freshersdayisconductedwithinonemonthfromthecommencementoffirstyearclasswork.
Thefacultymembersaredeputedashostelwardensinordertohavebettervigilance.
AllthestudentsareissuedIDcardsandnooutsidersareallowedintothehostel.

Theimplementationoftheabovemeasuresresultedin,noincidentofragginghasbeenhappenedtilldateinthecampus.Ourcampusisraggingfreecampus.


iii)SexualHarassmentCommittee(InternalComplaintsCommittee)

InpursuanceoftheSexualHarassmentofWomenatWorkplace(Prevention,ProhibitionandRedressal)Act2013andtheRulesframedthereunder,theInstituteherebyadoptsthefollowingprocedurefordeterminingcomplaintsfiledtotheInternalComplaintsCommittee(ICC)constitutedundertheAct.Theprocedurecomplieswiththe
basicprinciplesofnaturaljusticeandfairplayandhastobeadheredtoinallcomplaints,though,inindividualcomplaints.

FollowingarethemembersoftheInternalComplaintsCommittee:

S.No. NameoftheMember Department Position

1. A.Kalpana ECE Coordinator

2. J.Suneetha CSE Cocoordinator

3. V.Mamatha CIVIL Member

4. V.Vaishnavi EEE Member

5. A.Asha MECH Member

6. M.KeziaRani BS&H Member

7. C.PriyaDarshini MBA Member

8. A.SwarupaRani MCA Member

9. K.Vasundhara T&P Member

10. C.NishidhaDevi ADMIN Member

11. G.Nandini CIVIL StudentMember

12. B.Vasavi EEE StudentMember

13. B.Ponselvi MECH StudentMember

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 190/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

14. R.Vidya ECE StudentMember

15. D.Chitra CSE StudentMember

16. M.E.Renuka MBA StudentMember

17. C.Yasaswi MCA StudentMember


Table10.7ListofcommitteemembersoftheInternalComplaintsCommittee


TheICCFunctioningprocedure

AnyaggrievedwomanmaycomplaintofsexualharassmentatworkplacetotheICC,withinaperiodofthreemonthsfromthedateofincidentandincaseofseriesofincidents,withinaperiodofthreemonthsfromthedateoflastincident.
AdditionaldocumentsandlistofwitnessescanbesubmittedtoICCatalaterstageduringtheproceeding.
AnycomplaintreceivedbythemembersshouldimmediatelybeforwardedtotheSecretaryoftheICC,andthismustbenotifiedtoothercommitteemembersattheearliestandameetingshouldbecalledfordiscussingthematter.
TheICCshalldiscussanddecideonitsjurisdictiontodealwiththecaseorrejectthecomplaintprimafacieandrecommendtotheheadoftheinstitutionforfurtheractions.
TheCommitteewillprovideassistancetotheaggrievedwoman,ifshesochooses,tofileapolicecomplaintinrelationtoanoffenceunderIndianPenalCode.
TheCommitteesuggeststheheadoftheinstitutiontoensurethesafetyandprotectionoftheaggrievedwomanasandwhenrequired.
TheinstitutionstrictlyimplementstherulesthataregivenbytheUGCtoavoidsexualharassmentatworkplace.

Duetotheseprecautionarymeasures,nosuchanincidentofwomanharassmenthasbeenhappenedtilldateinthecampus.

10.1.4Delegationoffinancialpowers(10) InstituteMarks
InstitutionshouldexplicitlymentionfinancialpowersdelegatedtothePrincipal,HeadsofDepartmentsandrelevantincharges.Demonstratetheutilizationoffinancialpowersforeachyearoftheassessmentyears

TheinstitutionismaintainingaseparateaccountinthenameofthePrincipal.Allthefinancialtransactionsarecarriedthroughthisaccount.TheHODsandInchargescansubmitthefinancialproposalstotheprincipalwellinbeforethecommencementoftheacademicyear.Thedepartmentheadshavethefinancialpowerthrough
theprincipalsaccount.Eachdepartmentutilizesthefinancialprovisionmaximumof1lakhthroughprincipalsaccountpermonth.Ifitismorethan1lakh,theletterhastobeforwardedtothechairmanoftheinstitutionfortheapproval.TheGoverningBodyreviewstheproposalsandmakesappropriatebudgetallocations.

10.1.5Transparencyandavailabilityofcorrect/unambiguousinformationinpublicdomain(5) InstituteMarks
(Informationonpolicies,rules,processesanddisseminationofthisinformationtostakeholdersistobemadeavailableonthewebsite)

TheinstitutionhasitsownHRpolicies,servicerulesandprocesseswhicharedisseminatedtothestakeholdersbydisplayingatPrincipalsoffice,HODschamber,library,Examinationcell,placementcelletc.,anddistributedamongalltheemployees.Itisalsomadeavailableintheinstitutionalwebsite(www.sietk.org).
Theparticularsrelatedtothestudents,facultyandsupportingstaffandotherinstitutionaldetailsaremadeavailableinthewebsite.
TheinstitutionHRManual(policies,rulesandprocesses)isavailableatPrincipal&HODoffices.
Theauditreportsareplacedintheinstitutionwebsite(www.sietk.org/audit.html(http://www.sietk.org/audit.html))andstudentandfacultyincentivesarealsoavailableintheinstitutionwebsite(www.sietk.org/incentives.(http://www.sietk.org/incentives.)html)

10.2BudgetAllocation,Utilization,andPublicAccountingatInstitutelevel(30) TotalMarks

Summaryofcurrentfinancialyearsbudgetandactualexpenditureincurred(fortheinstitutionexclusively)inthethreepreviousfinancialyears

TotalIncomeatInstitutelevel:ForCFY,CFYm1,CFYm2&CFYm3
CFY:(CurrentFinancialYear),
CFYm1:(CurrentFinancialYearminus1),
CFYm2:(CurrentFinancialYearminus2)and
CFYm3:(CurrentFinancialYearminus3)

Table1CFY20142015

TotalIncome138564400 Actualexpenditure(till):135583900 TotalNo.OfStudents3249

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 191/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Fee Govt. Grants Othersources(specify)Busfee,Hostelfee Recurringincludingsalaries NonRecurring SpecialProjects/Anyother,specify Expenditureperstudent

112995400 0 0 25569000 76588900 58995000 41730

Table2CFYm120132014

TotalIncome125835900 Actualexpenditure(till):125078000 TotalNo.OfStudents3333

Fee Govt. Grants Othersources(specify)Busfee,Hostelfee Recurringincludingsalaries NonRecurring SpecialProjects/Anyother,specify Expenditureperstudent

101285900 0 0 24550000 67755500 57322500 37527

Table3CFYm220122013

TotalIncome108875600 Actualexpenditure(till):100708000 TotalNo.OfStudents3019

Fee Govt. Grants Othersources(specify)Busfee,Hostelfee Recurringincludingsalaries NonRecurring SpecialProjects/Anyother,specify Expenditureperstudent

88138600 0 0 20737000 59643000 41065000 33358

Table4CFYm320112012

TotalIncome90190200 Actualexpenditure(till):76717000 TotalNo.OfStudents2643

Fee Govt. Grants Othersources(specify)Busfee,Hostelfee Recurringincludingsalaries NonRecurring SpecialProjects/Anyother,specify Expenditureperstudent

75690200 0 0 14500000 34937000 41780000 29026

Budgetedin2014 ActualExpensesin2014 Budgetedin2013 ActualExpensesin2013 Budgetedin2012 ActualExpensesin2012 Budgetedin2011 ActualExpensesin2011


Items
2015 2015till 2014 2014till 2013 2013till 2012 2012till

InfrastructureBuiltUp 57037400 54525000 52450900 51852500 39835600 32000000 52515200 39200000

Library 252000 229000 765000 695000 830000 820000 400000 380000

Laboratoryequipment 4585000 4241000 4800000 4775000 8550000 8245000 2300000 2200000

Laboratoryconsumables 525000 522500 750000 737500 250000 248000 150000 130000

Teachingandnonteaching
72022000 72020000 63421000 63421000 55300000 55300000 30700000 30700000
staffsalary

Maintenanceandspares 758000 748200 625000 622500 935000 932500 850000 845000

R&D 1500000 1451000 1126000 1115000 1100000 1095000 1000000 995000

TrainingandTravel 650000 638500 650000 634500 875000 874000 1150000 1148500

425000 418700 468000 460000 450000 445000 425000 420000

Others,specify 810000 790000 780000 765000 750000 748500 700000 698500

Total 138564400 135583900 125835900 125078000 108875600 100708000 90190200 76717000

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 192/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

10.2.1Adequacyofbudgetallocation(10) InstituteMarks
(Theinstitutionneedstojustifythatthebudgetallocatedduringassessmentyearswasadequate)

Basedontherecommendationsofthevariouscommitteesbudgetisallocatedforvariousitemssuchasinfrastructure,library,laboratoryconsumables,teachingandnonteachingsalaries,maintenanceandspares,R&Detc.,aresatisfactory.ItisevidentfromtheaboveBudgettables.

10.2.2Utilizationofallocatedfunds(15) InstituteMarks
(Theinstitutionneedstostatehowthebudgetwasutilizedduringassessmentyears)

Fundprovidedtothealldepartmentsisproperlyusedtodeveloptheinfrastructureoftheofeachdepartmenttoachieveabetterprogrammeoutcome.

10.2.3Availabilityoftheauditedstatementsontheinstituteswebsite(5) InstituteMarks
(Theinstitutionneedstomakeauditedstatementsavailableonitswebsite)

TheaccountoftheInstituteisauditedbyateamofAuditors.AcopyoftheReportissubmittedtotheInstitute.ThisReportisplacedintheinstituteswebsiteeveryyearimmediatelyafterreceivingfromtheauditors.Thereportremainsconfidentialuntilitsconsiderationandfinalapproval.

10.3ProgramSpecificBudgetAllocation,Utilization(30) TotalMarks

InstituteMarks

TotalIncomeatInstitutelevel:ForCFY,CFYm1,CFYm2&CFYm3
CFY:(CurrentFinancialYear),
CFYm1:(CurrentFinancialYearminus1),
CFYm2:(CurrentFinancialYearminus2)and
CFYm3:(CurrentFinancialYearminus3)

Table1::CFY20142015

1836000 Actualexpenditure(till):1775000 TotalNo.OfStudents199

NonRecurring Recurring NonRecurring Recurring Expenditureperstudent

1335000 501000 1304000 471000 8919

Table2::CFYm120132014

2254000 Actualexpenditure(till):2210000 TotalNo.OfStudents202

NonRecurring Recurring NonRecurring Recurring Expenditureperstudent

1790000 464000 1770000 440000 10940

Table3::CFYm220122013

1708000 Actualexpenditure(till):1616000 TotalNo.OfStudents188

NonRecurring Recurring NonRecurring Recurring Expenditureperstudent

1360000 348000 1290000 326000 8595

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 193/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Table4::CFYm320112012

1195000 Actualexpenditure(till):1066000 TotalNo.OfStudents188

NonRecurring Recurring NonRecurring Recurring Expenditureperstudent

840000 355000 745000 321000 5670

Budgetedin2014 ActualExpensesin2014 Budgetedin2013 ActualExpensesin2013 Budgetedin2012 ActualExpensesin2012 Budgetedin2011 ActualExpensesin2011


Items
2015 2015till 2014 2014till 2013 2013till 2012 2012till

Laboratoryequipment 1335000 1304000 1790000 1770000 1360000 1290000 840000 745000

Software 0 0 0 0 0 0 0 0

Laboratoryconsumable 166000 156000 161000 151000 90000 87000 100000 87000

Maintenanceandspares 166000 156000 136000 131000 106000 93000 106000 93000

R&D 122000 116000 125000 119000 120000 114000 120000 114000

TrainingandTravel 32000 29000 31000 28000 24000 24000 21000 19000

15000 14000 11000 11000 8000 8000 8000 8000

Total 1836000 1775000 2254000 2210000 1708000 1616000 1195000 1066000

10.3.1Adequacyofbudgetallocation(10) InstituteMarks
(Programneedstojustifythatthebudgetallocatedovertheassessmentyearswasadequatefortheprogram)

Thebudgetallocatedwassufficientforthecivilengineeringdepartmentequipmentpurchase,maintenanceoflabs,conductingworkshopsetc.Themanagementisallottingrequiredbudgettodevelopthedepartmentinallaspects.Thebudgetisshowninabovetable.

10.3.2Utilizationofallocatedfunds(20) InstituteMarks
(Programneedstostatehowthebudgetwasutilizedduringthelastthreeassessmentyears)

Fundprovidedtothedepartmentisproperlyusedtodeveloptheinfrastructureoftheofthedepartmenttoachieveabetterprogrammeoutcome.

10.4LibraryandInternet(20) TotalMarks

(IndicatewhetherzerodeficiencyreportwasreceivedbytheInstitutionforalltheassessmentyears.Effectiveavailability/purchaserecordsandutilizationoffacilities/equipmentetc.tobedocumentedanddemonstrated)

TheInstitutionisreceivedthezerodeficiencyreportforallthethreeassessmentyears.Itishavingallthefacilitiesinthelibraryaspernorms.


Thelibraryishavingdedicatedstaff,thedetailsarementionedinbelowtable.

S.No. NameoftheStaff Position

1 H.KasthuriM.A.,B.Ed.,M.LiSc.,M.Phil Librarian

2 P.SharadhaB.A.,M.LiSc AssistantLibrarian

3 T.MuralikrishnaM.A.,PGDCA DataEntryOperator

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 194/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
4 K.Sujatha DigitalLibraryIncharge

5 K.Praveena LibraryAssistant

6 K.Megavarnam Attendar


Table10.12ListofStaffMembersinthelibrary

ThelibraryhasanadvisorycommitteewiththeChiefLibrarianastheCoordinator&seniorfacultyandthestudentrepresentativesfromallthedepartmentsasmembers.TheCommitteetakescareofallthepurchasesandutilizationoffacilitiesinthelibrary.Thelistofcommitteemembersandtheirresponsibilitiesismentionedbelow.

MembersofLibraryCommittee

S.No. Nameofthemember Department Position

1. Dr.P.MadhuMohanReddy BS&H Coordinator

H.Kasthuri,
2. Library Cocoordinator
ChiefLibrarian

N.DeepakKumar,
3. CSE Member
AssociateProfessor

V.S.Meganathan
4. CIVIL Member
AssistantProfessor

K.Shruthi,
5. EEE Member
AssistantProfessor

B.A.Devan,
6. MECH Member
AssistantProfessor

R.P.V.G.AshokReddy,
7. ECE Member
AssistantProfessor

G.Yamuna,
8. MBA Member
AssistantProfessor

P.Karthikeyan,
9. MCA Member
AssistantProfessor

10. M.Chandana CIVIL StudentMember

11. C.PavanKumar EEE StudentMember

12. S.SyedUmar MECH StudentMember

13. CH.SriManiteja ECE StudentMember

14. K.UmeshChandra CSE StudentMember

15. G.UshaRani MBA StudentMember

16. P.Mallikarjuna MCA StudentMember


Table10.13ListofCommitteemembersofthelibrary


Responsibilitiesofthecommittee

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 195/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
TheCommitteefrequentlyconductsmeetingstodiscussindetail,theadditionalfacilitiesrequiredforthelibrary.
Itcollectstherequirementsofthelibraryfromthedepartmentsatthebeginningoftheacademicyear.
Itpreparesquotationsforpurchasingbooks,journals,magazinesetc.,
Itensurestheavailabilityofthelibraryresourceswellinbeforethecommencementoftheclasswork.
Itensuresthattheeresourcesareavailableinthedigitallibraryforselflearning.
Italsoemphasizesonsubscribingthemostreputedmagazinesandjournalsforthepurposeofresearch.
Itmaintainsthestockregistersofthelibrarybooks,journalsandmagazinesetc.,
Itpreparesthebudgetrequiredforlibraryinthebeginningofacademicyear.
TheinitiativesareimplementedbytheCommitteetorenderthelibrary,student/userfriendly.


TheinstitutionhastheWebsite/ICT/InternetCommitteewiththeChiefITManagerastheCoordinator&seniorfacultyandthestudentrepresentativesfromallthedepartmentsasmembers.TheCommitteetakescareofallthepurchasesandutilizationoffacilitiesofInternet.Thelistofcommitteemembersandtheirresponsibilitiesis
mentionedbelow.


MembersofWebsite/ICT/InternetCommittee


S.No. NameoftheMember Department Position

M.SatheeshBabu
1 IT Coordinator
ChiefITManager

A.Dhasaradhi
2 CSE Cocoordinator
AssociateProfessor

S.ArifHussian
3 CIVIL Member
AssistantProfessor

4 P.ChandraSekharAssociateProfessor EEE Member

B.Srinivasulu
5 MECH Member
AssistantProfessor

M.Amarnadh
6 ECE Member
AssistantProfessor

V.Sreedhar
7 BS&H Member
AssistantProfessor

M.NareshBabu
8 MBA Member
AssistantProfessor

9 B.MohinderSinghAssistantProfessor MCA Member

10 B.Gowthami CIVIL StudentMember

11 S.Suresh EEE StudentMember

12 Y.LeelaVigneswar MECH StudentMember

13 A.Dhanasekhar ECE StudentMember

14 B.K.SaiGanesh CSE StudentMember

15 K.Priyanka MBA StudentMember

16 A.Nagendra MCA StudentMember


Table10.14ListofCommitteemembersoftheWebsite/ICT/InternetCommittee

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 196/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

Responsibilitiesofthecommittee

TheCommitteefrequentlyconductsmeetingstodiscussindetailtheenhancementoftheWebsite/ICT/Internetfacilities.
Itdevelopstheinstitutionswebsitewithmoderntechnology,providestheappropriateandrelevantinformation.
ItprovidestheICTtoolsforallthedepartments.
IttakescareofadequateInternetfacilitythroughoutthecampus.
MaintenanceoftheLAN,routersthroughoutthecampus.
ProvidingthehighsecurityforinstitutionsdatafromtheHackers.
ItensuresthattheInternetresourcesareavailableforselflearning.
Italsoemphasizesonsufficientbandwidthtomeettherequirementsoftheinstitution.
ItpreparesthebudgetproposalrequiredforWebsite/ICT/Internetfacilitiesinthebeginningofacademicyear.

10.4.1Qualityoflearningresources(hard/soft)(10) InstituteMarks
Relevanceofavailablelearningresourcesincludingeresources
Accessibilitytostudents
Supporttostudentsforselflearningactivities
i)Relevanceofavailablelearningresourcesincludingeresources

Thelibraryhasvariouslearningresources,includingeresources.Thedetailsarementionedbelow:

Totalareaofthelibrary=720Sqm(areasplitforallsections)

LibraryAreadivisionandMeasurements

S.No. Nameofthesection AreainSquaremeters

1 Textbook&Librarysection 250

2 ReadingandCirculation 200

3 Referencesection 55

4 Enrollmentsection 15

5 DigitalLibrary 70

6 NPTELvideosection 130


Table10.15ListofDifferentsectionsofthelibrary

Totalseatingcapacity=300persons
5024titles
26635volumes
5128referencebooks
1053ebooks
140journals/magazines
3164projectreports(hardandsoftcopies)
DigitalLibrarywith30computers
Internetfacility
NPTELVideolessonsareavailableforalltheprograms.

S.No. Department Total

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 197/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
1 CIVIL 640

2 ME 599

3 EEE 822

4 ECE 816

5 CSE 635

TOTAL 3512


Table10.16ListofNPTELVideos

IEEEInternationalJournals(hardandsoftcopies)

S.No. Department NationalJournals InternationalJournals

1 CIVIL 8 9

2 ME 7 13

3 EEE 7 14

4 ECE 11 23

5 CSE 11 10


Table10.17ListofJournals

JGateandDELNETEJournalresourcesusingusernameandpasswordprovidedbythedigitallibraryincharge.
SONETvideolecturesofallprograms.
VideolecturesonJNTUAcurriculumwhicharesuppliedbyPearsonEducare
Coursematerialisavailableforalltheprograms.
Booksareavailableforvariouscompetitiveexams.
Scanning,printingandreprographicfacilities.


Thefollowingpicturesshowtheresourcesavailableinthelibrary:

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 198/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

ii)Accessibilitytostudents

Alibraryhourisincludedinthetimetableandismandatoryforallclasses.Thestudentsareencouragedtoutilisetheresourcesavailableinthelibraryduringthehour.Theclassteacherconcernedaccompaniesthestudentstoproperutilizationoftheresources.
Thelibraryiskeptopenbeyondtheworkinghoursoftheinstitutionforthebenefitofstudentsandfaculty.Studentsareencouragedtopreparetheirownnotes/materialbyusingthevarietyofresourcesavailableinthelibrary.
Thestudentsandfacultyareissuedthelibrarycardsforborrowingthebooks.
TheBookbankfacilityisalsoavailable.
Forvisually/physicallychallengedstudentsbooksareissuedfortheentiresemesterandsuchstudentsneednotcometothelibraryforborrowingbooks.TheLibrarystaffmembersassistthem.
Eresourcesareaccessiblefromthedigitallibraryanddepartmentallibraryalso.
Studentcanaccessonlinejournalsavailableinthedigitallibraryanddepartmentlibrarywithusernameandpasswordprovidedbytheconcernedincharges.


Librarytimings:

Duration WorkingHours

WorkingDays 8a.m.6p.m.

Holidays 9a.m.4p.m.

BeforeExaminations 8a.m.8p.m.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 199/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547

DuringExaminations 8a.m.8p.m.

DuringVacation 9a.m.4p.m.

Table10.18LibraryTimings


Samplecopyofclasstimetablewithlibraryhour


iii)Supporttostudentsforselflearningactivities

Theinstitutionsupportsvariousselflearningactivitiestothestudents.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 200/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
Thelibraryisthebestresourcesforselflearning.
Thelibrarycontainsvastcollectionoftitles,volumes,referencebooksandebooks.
IthasgoodnumberofpeerreviewedNationalandInternationaljournalsforalltheprograms.
Hardandsoftcopiesofprojectreportsaremadeavailablewiththelibrary.
IthasDigitallibrarywith30systemswithinternetconnectivity.
HardandsoftcopiesofIEEEJournalsareavailable.
NPTEL,SONETandPearsonEducarevideolecturesareavailable.
JGateandDELNETonlineresourcesareavailable.
Coursematerialsareavailableforalltheprograms.
Booksareavailableforvariouscompetitiveexams.
Studentsaremotivatedtoparticipateintechnicalseminarsandconferences.
Specialappreciationstothestudentswhopublishedpapersinreputedjournals.

10.4.2Internet(10) InstituteMarks

NameoftheInternetprovider BSNL,ExcellMediaPvt.Ltd

Availablebandwidth 10Mbps(BSNL),100Mbps(ExcellMediaPvt.Ltd)

WiFiavailability TheWiFifacilityisavailableintheinstitutionwith10Mbpsspeedand
thisfacilityisextendedtodifferentlocationsinandaroundthecampus.
Internetaccessinlabs,classrooms,library Internetisprovidedtoallthestudentsandfacultybyusernameand
TheInternetaccessisavailableintheCentralComputingCentre,
andofficesofallDepartments
passwordprovidedbythesystemadministrator.Description:1.UniFi
laboratories,classrooms,libraryandofficesofallthedepartments.
Securityarrangements APLR3Pack:Indoor2.4GHzAccesspoint.2.Metal2SHPnwith17
ThecampusalsoisWiFienabled.
Thecomputersaremaintainedwithhighsecurityantivirussoftwares.
dBiSectorAntenna:Outdoor2.4GHzAccessPointwith180Degrees
KasperskyAntivirus(client),QuickHealServerEdition. Firewalls
Sector.
andphishingconfiguredinserversfordatamanagement. User AnnexureI
authenticationisprovidedforallthestudentsandfaculty. Proxy
(A)PROGRAMOUTCOME(POs)
EngineeringGraduateswillbeableto: serverisrunningonFedoratotransfersecuredpackets. Server
roomisundersurveillance. TheStudentsareabletoaccessWiFi
connectivitywithusernameandpasswordmechanismprovidedbythe
1.EngineeringKnowledge:Applytheknowledgeofmathematics,science,engineeringfundamentals,andanengineeringspecializationtothesolutionofcomplexengineeringproblems.
Networkadministrator. AlltheWiFiuseractivities(browsinghistory)
2.ProblemAnalysis:Identify,formulate,reviewresearchliterature,andanalyzecomplexengineeringproblemsreachingsubstantiatedconclusionsusingfirstprinciplesofmathematics,naturalsciences,andengineeringsciences.
arestoredintheInternetServer.
3.Design/developmentofsolutions:Designsolutionsforcomplexengineeringproblemsanddesignsystemcomponentsorprocessesthatmeetthespecifiedneedswithappropriateconsiderationforthepublichealthandsafety,andthecultural,
societal,andenvironmentalconsiderations.
4.Conductinvestigationsofcomplexproblems:Useresearchbasedknowledgeandresearchmethodsincludingdesignofexperiments,analysisandinterpretationofdata,andsynthesisoftheinformationtoprovidevalidconclusions.
5.Moderntoolusage:Create,select,andapplyappropriatetechniques,resources,andmodernengineeringandITtoolsincludingpredictionandmodelingtocomplexengineeringactivitieswithanunderstandingofthelimitations.
6.Theengineerandsociety:Applyreasoninginformedbythecontextualknowledgetoassesssocietal,health,safety,legalandculturalissuesandtheconsequentresponsibilitiesrelevanttotheprofessionalengineeringpractice.
7.Environmentandsustainability:Understandtheimpactoftheprofessionalengineeringsolutionsinsocietalandenvironmentalcontexts,anddemonstratetheknowledgeof,andneedforsustainabledevelopment.
8.Ethics:Applyethicalprinciplesandcommittoprofessionalethicsandresponsibilitiesandnormsoftheengineeringpractice.
9.Individualandteamwork:Functioneffectivelyasanindividual,andasamemberorleaderindiverseteams,andinmultidisciplinarysettings.
10.Communication:Communicateeffectivelyoncomplexengineeringactivitieswiththeengineeringcommunityandwithsocietyatlarge,suchas,beingabletocomprehendandwriteeffectivereportsanddesigndocumentation,makeeffective
presentations,andgiveandreceiveclearinstructions.
11.Projectmanagementandfinance:Demonstrateknowledgeandunderstandingoftheengineeringandmanagementprinciplesandapplythesetoonesownwork,asamemberandleaderinateam,tomanageprojectsandinmultidisciplinary
environments.
12.Lifelonglearning:Recognizetheneedfor,andhavethepreparationandabilitytoengageinindependentandlifelonglearninginthebroadestcontextoftechnologicalchange.

(B)PROGRAMSPECIFICOUTCOME(PSOs)

Declaration
TheheadoftheinstitutionneedstomakeadeclarationaspertheformatgivenBelow:
ThisSelfAssessmentReport(SAR)ispreparedforthecurrentacademicyearandthecurrentfinancialyearonbehalfoftheinstitution.

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 201/202
5/16/2016 https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547
IcertifythattheinformationprovidedinthisSARisextractedfromtherecords,andtothebestofmyknowledge,iscorrectandcomplete.

Iunderstandthatanyfalsestatement/informationofconsequencemayleadtorejectionoftheapplicationfortheaccreditationforaperiodofthreeormoreyears.

IalsounderstandthattheNationalBoardofAccreditation(NBA)oritssubcommitteeswillhavetherighttodecideonthebasisofthesubmittedSARwhethertheinstitutionshouldbeconsideredforanaccreditationvisit.

IftheinformationprovidedintheSARisfoundtobewrongduringthevisitorsubsequenttograntofaccreditation,theNBAhastherighttowithdrawthegrantofaccreditationandnoaccreditationwillbeallowedforaperiodofnextthreeyearsormore
andthefeewillbeforfeited.

Iundertakethattheinstitutionshallcooperatethevisitingaccreditationteam,shallprovidealldesiredinformationduringthevisitandarrangeforthemeetingasrequiredforaccreditationaspertheNBAsprovision.

Iundertakethat,theinstitutioniswellawareabouttheprovisionsintheNBAsaccreditationmanualconcernedforthisapplication,rules,regulationsandnotificationsinforceasondateandtheinstituteshallfullyabidetothem.

ISolemnlyaffirmandagreetotheabovementionedinformation/facts.

HeadoftheDepartment HeadoftheInstitute
Name: Name:Dr.K.ChandrasekharReddy
Designation: Designation:Principal
Signature: Signature:

SealofTheInstitution:

Place:Puttur
Date:0605201616:05:38

https://enba.nbaind.org/SARTemplates/SARUGTireIITemplateRevisedPrint.aspx?Appid=1493&Progid=547 202/202