Training Objective
The main objective of this training is to equip the participants with methodology and tools to manage
their plant energy efficiency and energy usage. Participants will be taught to develop and implement
Energy Management System specific for their plants.

Target Audience
This workshop is meant for Performance engineer, Facility/Energy Managers, Executives, personnel in
charge of Energy Management System in the plant, Management Representatives, and ISO 50001
committee members.

Schedule
Day/Time 1st Day 2nd Day 3rd Day
8:30am-10:00am Fundamental Of Energy Gas Turbine Steam Turbine
Management System

10:15am-12:30pm ISO50001:2011 Gas Turbine/HRSG Condenser


Standards compliance

1:30pm-3:30pm Energy Baseline and HRSG Auxiliary Equipment


Current Energy
Performance

3:45pm-5:30pm Mass and Heat Balance Steam Turbine Energy Conservation


Act (ECA) Template

Course Content
Topic Detail
Energy Management System Fundamental
ISO50001:2011 Standards compliance
Energy Baseline and Current Energy Performance How to establish for overall plant and individual
equipment
Mass and Heat Balance Fundamental & Steam and Water Mass Balance
Gas Turbine Performance GT Compressor
- Introduction to GT Compressor
- GT Compressor Performance Evaluation

GT Turbine
- Introduction to Gas Turbine
- Gas Turbine performance evaluation
Inlet Air Filters Performance
Overall Gas Turbine Performance
Actual Plant Case Studies

Energy
EES Consultants Pte Ltd Page 1
Energy Management System For Combined Cycle Power Plant 2017

Heat Recovery Steam Generator Performance evaluation of HRSG componenets:


Superheater, Evaporator ,Economizer and
Deaerator
Other key performance factors
Actual Plant Case Studies

Steam Turbine Introduction to steam turbine performance


Factors contributing to the efficiency loss
Actual Plant Case Studies

Condenser Condenser performance at different operating


condition
Factors contributing to condenser performance
deterioration
Actual Plant Case Studies

Auxiliary Power Performance of pumps at different operating


condition
Factors contributing to pump performance
deterioration
Actual Plant Case Studies

Energy Conservation Act (ECA) Template How to fill in the ECA Template accurately

Maximum Number of Participant:


5 participants

Special requirement
Participants should be equipped with PC/laptop. Ebsilon@Professional trial will be installed.

Each participants should have 1 set of major plant P&IDs (Water Steam Cycle, Gas Turbine etc) and
Design Heat Balance data.

Course Duration
This will be a 3 days course package.

Course Date and Venue


To be nominated.

Energy
EES Consultants Pte Ltd Page 2
Energy Management System For Combined Cycle Power Plant 2017

Course Fees

Items Training Fees (SGD)

3 days training (Net of local taxes) 6,000

Trainer Profile
Mrs Goh Yi Yi is the Principal Consultant for EES Consultants PLT and EES Consultants Pte
Ltd. She specializes in Energy Management System, Energy Audit and Power/Process Plant
Performance Monitoring Program. Throughout her 12 years consulting career, she has been
helping customers to squeeze profit in this competitive market, constantly point out to customers
Where are they now and Where should they be. She strongly believes that Belief comes
after understanding. So the projects executed by her always come with in-depth training and
technology transfer to the customers. She holds Bachelor and MSc degrees of Chemical
Engineering from National University of Singapore. She is also a Chartered Chemical Engineer
(UK) and Singapore Certified Energy Manager (SCEM). As a professional trainer, she is
certified for Australian Cert IV in Training and Assessment, Singapore Advanced Certificate in
Training and Assessment (ACTA 5) and Malaysian PSMB Train the trainer certificate.

Energy
EES Consultants Pte Ltd Page 3

Das könnte Ihnen auch gefallen