Beruflich Dokumente
Kultur Dokumente
MANAGEMENT TEMPLATE
Home Blog Management Template BORED PILING METHOD STATEMENT
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 1/8
11/16/2017 BORED PILING METHOD STATEMENT Planning Engineer Est.
WORK PROCEDURE
Sign-up now! get useful contents into your email. Your email address.. SUBSCRIBE
PROJECT: Ref No. FOUN/04
PAGE 1 OF 2
SUBJECT: BY:
APPROVED BY:
QEHS MANAGER
ACTION VERIFY
The scope of this procedure covers the control of installation of Bored Cast-in-Situ Manager Statement
Concrete piles executed by a sub-contractor.
Sub-contractor Approved
2. PROCEDURE
Project Construction
.1 Method Statement: Programme
Manager
A method statement shall be submitted by the piling Sub-contractor for approval which Approval
shall include: Subcon/
Field Book
i) Construction procedure. FCC Surveyor
.2 Construction Programme:
The sub-contractor shall submit a programme for approval based on the Contract
Programme. The subcontractor shall also indicate the mobilisation time of plant,
equipment, materials and work force.
.3 Piling Sequence:
.4 Setting-Out:
HEE will execute pre-piling setting out and offer for cross-checking by Subcontractors
Surveyor and Consultants Representative.
WORK PROCEDURE
PAGE 2 OF 2
SUBJECT: BY:
QA/QC ENGINEER
QHSE MANAGER
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 3/8
11/16/2017 BORED PILING METHOD STATEMENT Planning Engineer Est.
ACTION VERIFY
Reinforcement steel and Bentonite test certificates if required shall be obtained from the Project Test result,
Subcontractor and, submitted for approval by the Consultant. Engineer/ FOUN/04/A
Cube results will be assessed and retained. The cube test reports shall be clearly Subcon. Checksheet
identified with the location of pour by reference to the checksheet.
QA/QC Non-
.7 Testing of Piles:
QA/QC Conformity Report
The Subcontractor shall carry out a load test and integrity test as specified in the Contract.
.8 Inspection of Work/Checksheet:
The work shall be inspected using the attached checksheet as Appendix FOUN/04/A
which shall be completed as verification and record of compliance.
.9 Non-Conformity:
SUBCONTRACTOR: FATAYERJI
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 4/8
11/16/2017 BORED PILING METHOD STATEMENT Planning Engineer Est.
by
DATE
PREPARATION 1. Subcontractors method statement approved. PE
CM Construction Manager, QA/QC Quality Assurance/Quality Control, PE Project Engineer, SE Site Engineer, GF General Foreman, SU
Surveyor, Lab Laboratory Technician
Tag: BORED, bored piling, construction programme, METHOD, method statement, PILING, piling method, procedure project, project
engineer, project manager, statement
Share:
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 5/8
11/16/2017 BORED PILING METHOD STATEMENT Planning Engineer Est.
Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer,
technical o ce engineer, planning engineer, planning manager, and nally planning department manager where he has been
involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt
Planning Engineer Est. Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP
certi ed from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of
planning and project management training on his website planningengineer.net, YouTube channel, and o ine courses since 2011.
He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and
courses.
Excavation, Earthwork and Filling Method Statement Batching Of Concrete Method Statement
February 7, 2014 February 8, 2014
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 6/8
11/16/2017 BORED PILING METHOD STATEMENT Planning Engineer Est.
Why you should add the advanced payment to your sched Primavera Currency How to Add New Currency or Chang
22 October, 2017 8 October, 2017
LEAVE A REPLY
SEARCH
Search
PLANNING COURSES
Free
$665.00
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 7/8
11/16/2017 BORED PILING METHOD STATEMENT Planning Engineer Est.
Claims Management, Extension of Time (EOT) and Delays Analysis-Online Workshop
$399.00
$149.00
$150.00
$119.00
info@planningengineer.net
FOLLOW US:
Offline
https://planningengineer.net/bored-piling-method-statement-2/ 8/8