The action plan for this project is described in the table below.
Objectives Actions Responsibility
Proposal Phase Work as a group to compose Project Team an effective proposal based Member on the requirements. Analyze the machine Thermal Design Phase invented by Yoshiki Tsuchida Modelling and search for any Engineer improvement the analyst could possibly make. Project Team Review I 1. Review the budget Project Team approved by the Member committee. 2. Review the action plan if any necessary changes need to be made. Productio Assemble the 1. Attach the steel to the Thermal n Phase main chamber specimen based on the Engineer of the machine. design. 2. Add thermal paste between the steel and the specimen to reduce thermal contact resistance. 3. Make the surface of the specimen really smooth to avoid air gap when attaching it to the steel. Assemble the 1. Assemble a lower heat Thermal main body of insulator, an upper heat Engineer the insulation. insulator, and a cylindrical heat insulator. 2. Install graphite in the inside surface of the insulator. Graphite has high thermal conductivity allowing the temperature distribution to be persistent within main chamber. 3. Measuring the heat loss from the main body of the insulation. Assemble the 1. Install the main chamber Thermal main chamber to the main body of the Engineer and the main insulation. body of the 2. Add one additional insulation. cylindrical heat insulator to make sure no gap
Page | 1 Engineering Design Inc.
between the main
chamber and the main body insulation. 3. Measure the temperature of the air above the main chamber. Assemble the 1. Install heating system to Electrical heater to the the machine by using two Engineer main chamber main electrical terminals. and the main 2. Measuring heat the body of the requirement for the insulation. whole system. Producing a 1. Request production of Engineers metal cap for the metal cap to Tempco from Tempco the machine. Manufacturing Company Inc. Inc. 2. Re-evaluate the specification of the metal cap ensuring that it meets with our standard. Create a 1. Create the software using Software software to Phyton. Engineer process the output data from thermocouples. Final Assembly 1. Assemble all components Project Team into one machine based Member on the design. 2. Install the thermocouple to the machine. 3. Connect the machine to the computerized system. Feasibility Test and Quality 1. Simulate the actual Project Team Assurance operating system as Member closely as possible to thoroughly examine all components for performance, durability, and reliability. Project Team Review II 1. Review the real action Project Team plan, budget, and Member feasibility test result. 2. Compose the final report of the project.