Project - Four Lanes with paved side shoulder of Lambra-shahkot of NH-71(New NH -703) from km 12+120 to 45+500 including construction of
Nakodar and shahkot bypasses in the state of Punjab under NHDP-IV through an (EPC.) basis.
Client : Public works Department B&R
Authority Engineer : SA infrastructure Consultants Private Limited
EPC. Contractor : Patel infrastructure Private Limited
OBSERVATION SHEET FOR TRIAL PATCH OF DLC
Date :- 01.02.2017 MDD (gm/cc) 2.290 OMC (%) 6.30
Rolling pattern Density
Heavy Compaction
Sr. No Location Laying Time Rolling time Low vibration Low Vibration
Plane Pass Vibration Plane Pass OMC (%) FDD (gm/cc) (%)
Pass. Pass
Pass.
Finalized :- 1 1 3 3 2
Remark- _________________________________________________________________________________
Project - Four Lanes with paved side shoulder of Lambra-shahkot of NH-71(New NH -703) from km 12+120 to 45+500 including construction of
Nakodar and shahkot bypasses in the state of Punjab under NHDP-IV through an (EPC.) basis.
Client : Public works Department B&R
Authority Engineer : SA infrastructure Consultants Private Limited
EPC. Contractor : Patel infrastructure Private Limited
OBSERVATION SHEET FOR TRIAL PATCH OF DLC
Date :-
Chainage Rolling pattern Density
Sr. no Laying Time Rolling time
from To Plain pass Low vibration High Vibration Plain pass OMC (%) MDD (gm/cc) Remark
Remark-