GOVERNMENT OF PUNJAB

PUBLIC WORKS DEPARTMENT B&R BRANCH ON BEHALF OF (MORT&H)

Project - Four Lanes with paved side shoulder of Lambra-shahkot of NH-71(New NH -703) from km 12+120 to 45+500 including construction of
Nakodar and shahkot bypasses in the state of Punjab under NHDP-IV through an (EPC.) basis.
Client : Public works Department B&R
Authority Engineer : SA infrastructure Consultants Private Limited
EPC. Contractor : Patel infrastructure Private Limited
OBSERVATION SHEET FOR TRIAL PATCH OF DLC
Date :- 01.02.2017 MDD (gm/cc) 2.290 OMC (%) 6.30
Rolling pattern Density
Heavy Compaction
Sr. No Location Laying Time Rolling time Low vibration Low Vibration
Plane Pass Vibration Plane Pass OMC (%) FDD (gm/cc) (%)
Pass. Pass
Pass.

1 12:10 PM 1:30 PM 1 1 1 1 1 6.4 2.119 92.55

2 1:55 PM 1 1 5.97 2.193 95.75

3 2:10 PM 1 1 1 5.66 2.285 99.79

4 2:35PM 1 1 1 1 1 5.42 2.276 99.40

Finalized :- 1 1 3 3 2

Remark- _________________________________________________________________________________

EPC Contractor ' Representative Client/AE'Representative


GOVERNMENT OF PUNJAB
PUBLIC WORKS DEPARTMENT B&R BRANCH ON BEHALF OF (MORT&H)

Project - Four Lanes with paved side shoulder of Lambra-shahkot of NH-71(New NH -703) from km 12+120 to 45+500 including construction of
Nakodar and shahkot bypasses in the state of Punjab under NHDP-IV through an (EPC.) basis.
Client : Public works Department B&R
Authority Engineer : SA infrastructure Consultants Private Limited
EPC. Contractor : Patel infrastructure Private Limited
OBSERVATION SHEET FOR TRIAL PATCH OF DLC
Date :-
Chainage Rolling pattern Density
Sr. no Laying Time Rolling time
from To Plain pass Low vibration High Vibration Plain pass OMC (%) MDD (gm/cc) Remark

Remark-

EPC Contractor ' Representative Client/AE'Representative