PART 1 - GENERAL
Work of this section, as shown or specified, shall be in accordance with the requirements of
the whole set of the Contract Documents.
A. The Contractor shall provide all labour include certified welder, materials,
equipment and services and perform all work required for furnishing,
delivering and related work in strict accordance with the contract drawings.
B. The Contractor shall secure such field measurement as required for proper
fabrication and installation of the structural steel and related work. All
measurements shall be the Main Contractor responsibility.
D. The inspection and approval carried out and obtained in accordance with
these specifications do not release the contractor from any of this
obligations.
A. Work Included :
1. Furnishing all labour, materials etc. as describe on General fabricating,
delivery, erecting, testing and inspection of structural steel.
2. All shoring, temporary bracing, and guying of structural steel
installations.
3. Shop preparation and prime painting of structural steel members.
4. Field touch-up for items of structural steel not indicated to be
fireproofed.
5. Furnishing anchor bolt, base and levelling plates, templates, rigging
and scaffolding necessary for erection.
6. Metal deck support members.
7. All connections and connectors.
8. Submittal requirements.
9. Coordinating this work with other related works.
10. The Notation on the Structural Drawings are part of this section.
B. Related Work
Examine all sections for work related to the principal items of which are :
1. Miscellaneous metal items shown on architectural drawing, including
steel stairs.
2. Metal Decking
3. Sprayed on fire proofing, if required.
1.3. References
The work described in this section, unless otherwise noted on the Drawings or
herein specified, shall confirm to the latest editions of the following Codes,
Standards or Specifications :
1. PPBBI - 1984 : Peraturan Perencanaan Bangunan Baja Indonesia.
2. SNI 03.1729.2002 : Tata Cara Perencanaan Struktur Baja Untuk
Bangunan Gedung
3. AISC : Specification for the design, Fabrication and Erection
of Structural Steel for buildings.
4. AISC : Code of standard practice
5. AWS D1.1 : Specification for Welding Electrodes.
1.4. SUBMITTALS
The following submittals shall be performed by the Contractor in accordance with
the agreed schedule for submission and with such promptness as to cause no
delay in his own work nor in that of any other contractor or subcontractor.
A. Shop Drawings
The Contractor shall submit shop drawings to the Engineer four weeks
before fabrication, the Shop Drawings shall include complete details and
schedules for fabrication and shop assembly of members.
1. Include details of cuts, connections, camber, holes, and other
pertinent data;
2. Indicate welds by AWS symbols, and show size, type, and length of
weld;
3. Inform the welding sequences.
4. Provide setting drawings, templates, and directions for installing
anchor bolts and other required anchors :
5. Identify details of all connections by reference to sheet and detail
number of the Drawings.
B. As Built Drawings
After erection has been finished, the Contractor should revise shop drawing
correspond with changes made in the field, and submit these to the
Engineer at time of Practical Completion.
C. Product Data
Producers' or manufactures' specifications and installation recommendations
for the following products, including laboratory test reports and other data
required to prove compliance with the specified requirements :
1. Structural steel, including certified copies of mill test reports covering
chemical and physical properties;
2. High strength bolts, including nuts and washers;
3. Unfinished bolts and nuts;
4. Structural steel primer paint;
5. Welding electrodes
6. Steel decks.
7. Stud connectors
D. Welder Certificates
Submit welder certificates, that certifies welder Qualification.
E. Report
Submit certified copies of mill test reports for all steel furnished. Include
names and locations of mills and shops and analysis of chemical and
physical properties of all steel. Comply with all parts of ASTM's specified.
A. Test for Structural Steel shall be made and reports furnished by the Testing
Laboratory in accordance with the following requirements :
1. Perform all testing of structural steel in accordance with the
requirements of "Standard Methods and Definitions for Mechanical
Testing of Steel Products" ASTM A370.
2. Ultrasonic testing shall conform with requirements of American
Welding Society's (AWS) D1.1, Chapter 6.
3. Dye Panetrant testing shall conform to requirements of ASTM E165
and AWS D1.1.
4. Test specimens shall be taken under direction of the testing agency
and shall be machined by the Contractor to dimensions as required by
the related applicable Standard ASTM Specifications or AWS
Standards.
D. Steel pipe shall have one tension, one bend and one flattening test for each
lot of 500 lengths or fraction thereof of each size.
F. Tests of Welding and Bolting : Testing Laboratory shall inspect shop and
field welding and high tension bolt. Testing Laboratory shall comply with
regulations of the applicable Building Department and shall certify in writing,
upon completion of work, that welding and high tensile bolting has been
performed in accordance with the Drawings and Specifications and applicabe
ordinaries.
PART 2 - MATERIALS
2.1. MATERIALS
Steel materials referred to this section are shape steel, steel plates, steel decking
for floor and other items such as studs, anchor bolts, welding electrodes, etc.
All materials to be new, of best commercial quality. Stock items to be well
manufactured by concerns specializing in particular articles, subject to approval by
Architect.
A. Structural steel : ASTM A-36 & ASTM A 572, grade as noted on the
drawings.
C. Welding electrodes for Structural steel : AWS D.1.1 only those electrodes in
E-60 XX series included in above specifications may be used as required by
conditions of intended use.
D. Metal decking : ASTM A 446-87 and A 525-87 and Steel Deck Institute (SDI)
Design Manual for Floor Deck and Roofs Decks.
A. General :
Except as otherwise specified or indicated, perform fabrication and
workmanship per AISC Specifications. Clean contact surfaces before
assembly. Tolerances for materials fabrication shall be per AISC "Code of
Standard Practice".
C. Shop Connections :
Bolts or welds as indicated, unless otherwise approved.
D. Bearing Surfaces :
Straighten column base plates 10 mm thick and under by pressing to
provide a satisfactory contact bearing between plate and column. All bearing
surfaces shall be planed for full contact.
E. Welding :
See PART 3 of this specification.
1. Beam length 3 mm
3. Storey height 3 mm
4. Bend of beam 1
L
1000
and
10 mm
H 800 mm 4 mm
7. Width of section 3 mm
8. Squareness B
100
and
3 mm
9. Bending of Flange b
100
and
1.5 mm
B
e2
150
not applied for t 6 mm
A. Do not handle structural steel until paint prime coating has thoroughly dried.
Exercise care to avoid abrasions and other damage.
C. Deliver to site in ample time for installation : Anchor bolts, bearing plates
and other items to be set as part of other work for this project and complete
with templates and/or other setting instructions.
3.2. INSTALLATION
A. General
1. Erect structural steel with qualified riggers. Steel erection shall be
carefully planned and laid out to require minimum of cutting. Erect
work plumb, square and true to line and level and in precise positions.
Provide temporary bracing and guys to counterpart loads and stresses
to which structure may be subjected, including those due to erection
equipment and its operation; leave in place as required to safeguard
work. Do not unnecessarily encumber premises with material or
equipment. Arrange operations to cause no delay in or interferences
with other trades. Assume all risks in connection with performance of
this work.
2. Damaged Members : During erection, straighten or replace members,
which are bent, twisted or damaged, as directed. If heating is required
in straightening, perform such heating by methods which will insure
uniform temperature throughout entire member. Remove members,
which in the opinion of the Engineer are damaged to such an extent
impairing their appearance, strength or serviceability and replace with
new members.
3. Tolerance for Erection : Structural steel work, erection tolerances shall
be in accordance with the latest edition of the "AISC Specification for
the Design, Fabrication and Erection of Structural Steel for Buildings"
and "AISC Code of Standard Practice for Steel Buildings and Bridges",
and shall conform the tolerance as follows :
Inclination of building 1
(/H) And 25 mm
500
Inclination of column 1
(/H) 500
Horizontal inclination of 1
beam (/L) And 5 mm
1000
B. Connections :
1. Unfinished Bolts : Make field connections with unfinished bolts only
where indicated.
The tolerance shall be as follows :
Item Figures Tolerances
a. Difference of hole 1 mm
center
b. Difference of hole 2 mm
distance
T
However 0 < G
3
in case of I shaped edge.
1. Gap of filler 2 mm
welding () The size should be
increased by
3. Gap of the 1 mm
backing strip ()
t 30 mm --> 3 mm
t is the thickness of
the material with the
smaller thickness
8. Included angle + 5o
- 5o
Note :
L = leg length
s = fillet welding
size
e2 < 5 mm
(L 150 mm)
3.4. CLEAN-UP
Upon completion of the work of this section, remove surplus materials, rubbish,
and debris resulting from the cooperations, including disused equipments of
service, and leave the entire structure and site, insofar as the work of this section
is concerned, in a neat, clean, and acceptable condition.
3.5. PAINTING
A. Description of Service
This section contains stipulations referring to the anti-corrosive paint and
finish paint of all steel structures of the civil and building construction works,
anti-corrosive paint and finish paint of steel fittings, painting of other metal
works and interior/exterior finishing paint of the buildings.
The Main Contractor shall present to the Architect/Engineer cataloques,
color samples and quality certificates indicating clearly the quality
characteristics of all paints to be used, for the purpose of obtaining his
approval.
Furthermore, the Main Contractor shall present to the Architect/ Engineer
the color schedule covering the whole site, for the purpose of selection and
approval.
C. Materials
For this painting work, the following paints, shall be used. The use of ICI
products or equal other than those specified here in shall be subject to
approval of the Engineer.
No. General Description
1. Alkyd based red lead/zinc chromate primer
2. Long oil alkyd resin varnish
3. Rich zinc chromate primer
D. Painting Schedule
All specification herein are subject to item 3.5.B. "Surface Preparation".
No. No of Coats Dry Film Thickness (u/coat) Method of Application
SPECIFICATION 1 : Exterior and interior steel surface
At shop
No.1 2 35 BR
At Shop
No.3 1 15 BR / AS
At Site
After delivery to site, all surface shall be washed with water to remove dirt,
salty particles, etc. adhered while transported and damage of shop-primed
surfaces shall be cleaned by power tool to SIS S5-3.0.
No.1 1 35 BR
(touch-up primer)
No.2 2 25 BR / AS
(finish coat)
Abbreviations : BR . . . . . . . . Brush
AS . . . . . . . . Airless Spray
RL . . . . . . . . Roller Brush
ATA . . . . . . . . Spatula
END OF SECTION