EYENT ANALYSIS REPORT :

UNIT NO.7 TPS: Newlarli TPS Unit Capacity : 250 MW


Station Code : PTPS/New/
l*HO Code: Time - 22:16 Hrs Date: 23.08.2017
u.6/FY 2017-18/05

2. Operating conditions at the time of Event :

Load (MW) Coal Cycles in seruice: Oil Suppoft:


235 MW CD&EF Nil

3. Nature of Event : Forced


*. ttame of Protection Operated (First Up) and other main protections Operated:
(1) Generator trioped 2)Turbine Tripped 3) Boiler tripped 4) MFT operated
SOfserviUons.: TA Set was sharing a load of 235 MW with C.oal Mill CD & EF . Suddenly TA Set tripped on
Generator protection al22.l6 hrs on date23l08l20L7.
i
6. Remedial Action / Work Done: Generator protaction relay P 630 checked and resetted. Allevent,
di$r.rrbance recording found no problem.

7. Root Cause Analysis: Generator protection operated due to malfunction of Generabr protaction relay P
630.

B. Preventive action suggested (Short Term) : Nil

9. PrevenUve action suggested (Long Term) : Generator protaction relay P 630 Areva make to be
replaced with P 343 relay in next shut down

10, Similar event occurred last time : Unit- 6 11.11.2016 07:02 Hrs
10A. Implementation Status of Long TermlShoft Term measures stated at Sr No 10:- Nil

11. Boiler lighted up Time : 23:16 Hrs Date:23.08.2OL7

12. T-A Set Synchronized Time :00:59 Hrs Date: 24.08.2017


13. Remarks :

I I rVV- |
l-
l[cni"r Enqineer
14. Recommendations of Works Section: j
1. Procurement/ Replacement Plan:
2. Operational Error: i
3. Delay in Maintenance: i
:
4. Delay in bringing back the Unit: