S.No Description P.G. Rs. Rate Per
580 mm Porcelain clay white glazed Orissa Pan with low level glazed
1001
cistern with complete set 1 Rs. 13,158.30 Set
580 mm Porcelain clay white glazed Indian Pan with low level glazed
1002
cistern with complete set 1 Rs. 12,160.10 Set
530mm Porcelain clay Orissa pan with low level cistern with complete
1003
set 1 Rs. 12,211.85 Set
1004 580mm Porcelain clay white glazed Orissa pan with complete set 1 Rs. 5,327.95 Set
1005 10.0 Ltr. Low level Porceline glazed cistern complete set 2 Rs. 7,261.10 Set
1006 10.0 Ltr. Low level PVC cistern with 3/6 litre dual complete set 2 Rs. 6,059.35 Set
Porcelain clay white glaze Indian Pattern Comode (Hindware, Parryware
1007
or equivalent ) 2 Rs. 11,520.70 Set
Porcelain clay White glazed EWC Comode , cistern, seat cover all
1008
complete set 2 Rs. 18,535.70 Set
Porcelain clay white glaze Cascade Comode with dual flush and
1009 primium seat cover- all complete set(Hindware, Parryware or
equivalent ) Constellation type, 3 Rs. 24,967.65 Set
Porcelain clay white glaze EPWC Comode with cistern, slow falling seat
1010 cover One piece Ellisa, mogen, Cotto( American standard or
equivalent ) 3 Rs. 37,090.95 Set
50x40cm Porcelain clay white glaze Oval Wash basin with mixer
1011
( jaquar, parryware or eqv. )All complete set 3 Rs. 9,703.70 Set
63x50cm Porcelain clay white glaze O-counter Wash basin Euorpean
1012
pattern complete set . 3 Rs. 23,750.95 Set
75x50cm Porcelain clay Wash basin Euorpean pattern (cotto or mogen)
1013
with mixer ( jaquar, parryware or eqv. ) complete set 4 Rs. 15,328.35 Set
50x40cm Porceline clay Wash basin regular with mixer and Pedestal
1014
complete set . 4 Rs. 11,397.65 Set
50x40cm Porcelain clay white glaze Wash basin (Hindware, Parryware,
1015
Classica or equivalent ) Regular 4 Rs. 7,147.25 Set
40x40cm Porcelain clay white glaze Corner Wash basin (Hindware,
1016
Parryware, Classica or equivalent ) 5 Rs. 6,350.30 Set
45x30x15Cm(18"x12"x6") White glaze Lavotary sink (Hindware,
1017
Parryware, Classica or equivalent) 5 Rs. 6,465.30 Set
53x43x18 (21"x17"x7") White glaze sink Lavotary (Hindware,
1018
Parryware, Classica or equivalent ) 5 Rs. 7,100.10 Set
1019 60x45x25cm White glazed Kitchen sink (large) complete set 5 Rs. 9,723.25 Set
1020 Flat back inbuilt Urinal with sensor complete set 6 Rs. 18,066.50 Set
1021 46.5x35.5x26.5cm White glazed Urinal complete set 6 Rs. 4,611.50 Set
61x41x38 cm Large Flat back White glazed urinal (Hindware,
1022
Parryware, Classica or equivalent.) 6 Rs. 9,267.85 Set
1023 45x35x27.5cm Angle back Urinal complete set 6 Rs. 4,320.55 Set
1024 45x35cm Squatting plate Urinal complete set 6 Rs. 3,820.30 Set
1025 Urinal Partation 68x30cm size complete set 7 Rs. 2,772.65 Set
1026 1000 ltr. Stainless steel water tank with all complete. 7 Rs. 19,548.85 nos
1027 1500 ltr. Stainless steel water tank with all complete. 7 Rs. 27,690.85 nos

1
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1028 2000 ltr. Stainless steel water tank with all complete. 7 Rs. 36,849.45 nos

2
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1029 5000.0 ltr. PVC \ HDPE water tank 7 Rs. 78,221.85 nos
1030 1000.0 ltr. PVC \ HDPE water tank 8 Rs. 19,369.45 nos
1031 500.0 ltr. PVC \ HDPE water tank 8 Rs. 12,408.50 nos
1032 2000.0 ltr. PVC \ HDPE water tank 8 Rs. 34,759.90 nos
1033 1.0 H.P.Electrical motor water pump,Submersible pump Italian 8 Rs. 34,107.85 nos
1034 0.5 H P Electric motor pump monoblock (Crompton or eqv.) 8 Rs. 11,965.75 nos
1035 1.0 H P Electric motor pump monoblock (Crompton) 9 Rs. 15,546.85 nos
1036 1 H P Electric motor pump Multi stage coupled (Crompton) 9 Rs. 20,918.50 nos
1037 2.0 H P Electric motor pump multi stage couple (Crompton) 9 Rs. 30,859.10 nos
1038 3.0 H P Electric motor pump monoblock (Crompton) 9 Rs. 32,927.95 nos
1039 5.0 H P Electric motor pump monoblock (Crompton) 9 Rs. 40,102.80 nos
1040 Porceline Clay Toilet Paper Holder (Recessed )American standard 10 Rs. 1,437.90 nos
1041 Chrome plate toilet paper holder 10 Rs. 714.55 nos
1042 Stainless Steel Soap container (Cotto) or eqv. 10 Rs. 6,913.05 nos
1043 Porcelain clay soap tray 15x15 cm size (Recessed type) 10 Rs. 883.60 nos
1044 Chrome plate soap tray 10 Rs. 714.55 nos
1045 Stainless Steel towel rod 1.5x45cm ("x 18") 10 Rs. 1,629.20 nos
1046 Chrome plate Towel rod 1.5 x 60cm size 11 Rs. 2,101.85 nos
1047 Chrome plate Towel rod 1.5 x 45cm size 11 Rs. 2,006.40 nos
1048 Glass shelf with guard rails .. 11 Rs. 1,003.60 nos
1049 Looking Mirror Modi guard 450x600mm (18"x 24") 11 Rs. 1,973.45 nos
1050 75 mm Ms Seamless Pipes SCH 40 11 Rs. 6,937.37 Rm
1051 110 mm Ms Seamless Pipes SCH 40 12 Rs. 8,307.02 Rm
1052 Chrome plate shower rose 7.5cm dia 12 Rs. 1,309.90 nos
1053 Stainless Steel Shower rose with sliding bar all complete. 12 Rs. 3,620.25 nos
1054 Stainless telephonic shower rose with all complete set. 12 Rs. 1,682.50 nos
1055 32 mm dia C.P . FLUSH VALVE ( American standard) Cotto 12 Rs. 6,133.35 nos
1056 15mm CP Bib Cock 12 Rs. 1,618.45 nos
1057 15 mm Stainless Steel bib cock 13 Rs. 5,039.70 nos
1058 15mm Auto closing Bib Cock with aerator, jaquar or eqv. 13 Rs. 3,015.70 nos
1059 15mm Urinal Auto closing Valve with built in control cock 13 Rs. 3,107.70 nos
1060 15mm Stainless Steel Angle valve 13 Rs. 1,022.75 nos
1061 C P 15 mm Angle valve 13 Rs. 1,134.30 nos
1062 15mm two way angle valve 13 Rs. 1,391.90 nos
1063 15 mm Stainless Steel Piller cock 14 Rs. 5,039.70 nos
1064 C P 15 mm Stainless Steel Concealled valve 14 Rs. 2,117.55 nos
1065 G.M. 15mm Gate valve 14 Rs. 1,021.60 nos
1066 G.M. 20mm Gate valve 14 Rs. 1,247.00 nos
1067 G.M. 25mm Gate valve 14 Rs. 2,047.80 nos
1068 G.M 32mm Gate valve 14 Rs. 2,836.70 nos
1069 G.M .40mm Gate valve 15 Rs. 3,719.56 nos
1070 G.M. 50mm Gate valve 15 Rs. 5,686.06 nos
1071 G.M 65mm Gate valve 15 Rs. 11,332.56 nos
1072 G.M. 80mm Gate valve 15 Rs. 14,318.65 nos
1073 G.M. 100mm Gate valve 15 Rs. 22,991.95 nos

3
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1074 G.M. 15mm Check valve 15 Rs. 954.90 nos

4
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1075 G.M. 20mm Check valve 16 Rs. 1,348.60 nos
1076 G.M. 25mm Check valve 16 Rs. 1,899.45 nos
1077 G.M.32mm Check valve 16 Rs. 2,712.50 nos
1078 G.M. 50mm Check valve 16 Rs. 5,121.00 nos
1079 G.M. 65mm Check valve 16 Rs. 10,196.36 nos
1080 G.M. 80mm Check valve 16 Rs. 13,485.36 nos
1081 G.M. 100mm Check valve with flange 16 Rs. 18,893.81 nos
1082 PVC Floor trap 11x7.5cm 17 Rs. 487.42 nos
1083 ALUMINIUM GRATING 100mm (4") dia 17 Rs. 101.31 nos
1084 C P Gratting 125mm dia size 17 Rs. 124.31 nos
1085 C P Gratting 100mm dia size 17 Rs. 109.36 nos
1086 160mm dia DWV Upvc pipe, SN- 4, Astral or eqv. 17 Rs. 2,966.31 Rm
1087 110mm dia DWV Upvc pipe,SN- 4, Astral or eqv 17 Rs. 829.66 Rm
1088 75 mm dia DWV Upvc pipe,SN- 4, Astral or eqv 18 Rs. 473.34 Rm
1089 Stainless Steel wall Mixer 18 Rs. 4,769.45 Set
1090 15mm dia. G I pipe ( Medium ) 18 Rs. 550.04 Rm
1091 20mm dia. G I pipe ( Medium ) 18 Rs. 586.84 Rm
1092 25mm dia. G I pipe ( Medium ) 18 Rs. 811.09 Rm
1093 32mm dia. G I pipe ( Medium ) 19 Rs. 891.59 Rm
1094 40mm dia. G I pipe ( Medium ) 19 Rs. 1,036.09 Rm
1095 50mm dia. G I pipe ( Medium ) 19 Rs. 1,200.54 Rm
1096 80mm dia. G I pipe ( Medium ) 19 Rs. 1,550.14 Rm
1097 Stainless Steel Basin Mixer with all complete. 19 Rs. 7,851.45 nos
1098 9 cm Concealled Flushing Cistern (Geberit .Perryware or eqv.) 20 Rs. 15,866.55 Set
Inspection Plastic Chamber 315 mm (12"X12") with base , riser and
1099
cover all complete 20 Rs. 8,714.75 Set
Inspection Plastic Chamber 450mm (18"X18")with base , riser and cover
1100
all complete 20 Rs. 17,907.85 Set
1101 50 mm PVC Pipe 6 kg/cm 2
20 Rs. 262.89 Rm
1102 75 mm PVC pipe 6 kg\cm2 20 Rs. 456.09 Rm
1103 110 mm PVC Pipe 6 kg\cm 2
21 Rs. 845.76 Rm
1104 15.0 Ltr Electric Water Heater Geyser ( Aeroston , fazer or eqv) 21 Rs. 17,595.00 nos
1105 Acrylic type Bath tub 5'-6" x2'-6" size with all accessories. 21 Rs. 15,427.25 nos
1106 C P Telephonic shower with mixer (parryware or eqv) 21 Rs. 6,960.95 nos
1107 Sensor flush valve for urinal ( American standard) Cotto 21 Rs. 11,990.30 nos
1108 15mm CP Bath spout Euorpean pattern( American st.) Cotto 22 Rs. 2,355.60 nos
1109 Sensor mixer for basin (Battery operating) 22 Rs. 23,770.50 nos
CP Water Spray 1.5cm 34 Rs. 1618.05 nos
1110 C P Sink mixer 22 Rs. 5,120.20 nos
1111 C I cover 45x45cm ( medium ) 22 Rs. 3,099.30 nos
1112 C I cover 55x55cm (medium ) 22 Rs. 4,034.25 nos
1113 Fire post with landing valve, hose reel or box wit 22 Rs. 37,132.35 Set
20 HP Electric Motor Pump with control pannel, pressure gauge (2 set)
1114
kiloskar or eqv. 23 Rs. 640,561.50 Set
1115 20 mm dia Fire hose reel complete set 23 Rs. 27,588.50 Set

5
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1116 G.M. 25mm float valve 23 Rs. 1,690.15 nos

6
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1117 Grab bar American standard 23 Rs. 7,012.35 nos
Water filter with UV lamp and filter media , 1 lit\min (Euro guard or eqv
1118
) with complete set 23 Rs. 22,733.20 Set
Kitchen Sink Stainless steel 90cm longx 20 cm deep with sink cock all
1119
complete. 24 Rs. 7,043.75 Set
Kitchen Sink Stainless steel 150cm longx 20 cm deep with sink cock all
1120
complete. 24 Rs. 12,530.40 Set
1121 Hand drayer Germany, italian or eqv 24 Rs. 21,756.10 nos
1122 4 Kg/cm2, High Density Polethene Pipe 50mm 24 Rs. 378.86 Rm
1123 4 kg\cm2 (110 mm) HDP pipe 25 Rs. 704.31 Rm
1124 4 kg\cm (125 mm) HDP pipe
2
25 Rs. 849.21 Rm
1125 4 kg\cm (140mm) HDP pipe
2
25 Rs. 1,060.01 Rm
1126 4 kg\cm2 (160mm) HDP pipe 25 Rs. 1,371.95 Rm
1127 4 kg\cm (180mm) HDP pipe
2
25 Rs. 1,800.38 Rm
1128 4 kg\cm (200mm) HDP pipe
2
25 Rs. 2,231.00 Rm
5 kg Fire Extingusher including pressure guage, Minimax, eversafe or
1129
equivalent 26 Rs. 9,102.25 nos
1130 560mm dia 100kg CI heavy cover with frame all complete 26 Rs. 19,805.30 Set
15 mm CPVC (Chlorinated Polyvinyl Chloride) Pipe SDR 13.5 CTS,
1131
22.5 kg/cm2 (flowguard or ISI Standard.) 26 Rs. 297.39 Rm
20 mm CPVC (Chlorinated Polyvinyl Chloride) Pipe SDR 13.5 CTS,
1132
22.5 kg/cm2 (flowguard or ISI Standard.) 26 Rs. 349.14 Rm
25 mm CPVC (Chlorinated Polyvinyl Chloride) Pipe SDR 13.5 CTS,
1133
22.5 kg/cm2 (flowguard or ISI Standard. 26 Rs. 436.48 Rm
32 mm CPVC (Chlorinated Polyvinyl Chloride) Pipe SDR 13.5 CTS,
1134
22.5 kg/cm2(flowguard or ISI Standard.) 27 Rs. 495.13 Rm
40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 (flowguard or ISI
1135
Standard. 27 Rs. 673.38 Rm
50 mm CPVC (Chlorinated Polyvinyl Chloride) Pipe SDR 13.5 CTS,
1136
22.5 kg/cm2 (flowguard or ISI Standard.) 27 Rs. 924.08 Rm
1137 15 mm CPVC ball valve, CTS sockets 27 Rs. 519.05 nos
1138 20 mm CPVC ball valve, CTS sockets 27 Rs. 658.20 nos
1139 25 mm CPVC ball valve, CTS sockets 27 Rs. 775.50 nos
1140 32 mm CPVC ball valve, CTS sockets 28 Rs. 1,675.95 nos
1141 40 mm CPVC ball valve, CTS sockets 28 Rs. 1,988.75 nos
1142 50 mm CPVC ball valve, CTS sockets 28 Rs. 2,533.85 nos
1143 16 mm Pex\Al\Pex (PAP) mulitlayer composite Pipe 28 Rs. 218.04 Rm
1144 20 mm Pex\Al\Pex (PAP) mulitlayer composite Pipe 28 Rs. 238.74 Rm
1145 25 mm Pex\Al\Pex (PAP) mulitlayer composite Pipe 28 Rs. 344.48 Rm
1146 32 mm Pex\Al\Pex (PAP) mulitlayer composite Pipe 29 Rs. 460.63 Rm
1147 40 mm Pex\Al\Pex (PAP) mulitlayer composite Pipe 29 Rs. 679.13 Rm
1148 50 mm Pex\Al\Pex (PAP) mulitlayer composite Pipe 29 Rs. 945.93 Rm
1149 20 mm PPR pipe, PN-10 \SDR 11, Pachanya, Napatop or eqv, 29 Rs. 116.84 Rm
1150 25mm PPR pipe, PN-10 \SDR 11, Pachanya, Napatop or eqv, 29 Rs. 160.48 Rm

7
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1151 32 mm PPR pipe, PN-10 \SDR 11, Pachanya ,Napatop or eqv, 30 Rs. 226.03 Rm
1152 40 mm PPR pipe, PN-10 \SDR 11, Pachanya, Napatop or eqv, 30 Rs. 354.83 Rm
1153 50 mm PPR pipe, PN-10 \SDR 11, Pachanya, Napatop or eqv, 30 Rs. 507.78 Rm
1154 150 mm RCC hump pipe NP2 with collar 30 Rs. 1,057.49 Rm
1155 200 mm RCC hump pipe NP2 with collar 31 Rs. 1,392.64 Rm
1156 300 mm RCC hump pipe NP2 with collar 31 Rs. 2,089.87 Rm
1157 400 mm RCC hump pipe NP2 with collar 31 Rs. 2,638.74 Rm
1158 600 mm RCC hump pipe NP2 with collar 31 Rs. 4,193.66 Rm
1159 150 mm RCC hump pipe NP3 32 Rs. 1,710.47 Rm
1160 200 mm RCC hump pipe NP3 32 Rs. 2,283.85 Rm
1161 300 mm RCC hump pipe NP3 32 Rs. 3,774.01 Rm
1162 400 mm RCC hump pipe NP3 32 Rs. 4,633.06 Rm
1163 600 mm RCC hump pipe NP3 33 Rs. 7,235.67 Rm
1164 140 mm Plastic Gutter water pipe (Half round) 33 Rs. 996.36 Rm
1165 180 mm Plastic Gutter water pipe (Half round) 33 Rs. 1,117.18 Rm
1166 250 mm Plastic Gutter water pipe (Half round) 34 Rs. 2,023.69 Rm
UPVC Bend Specials
1167 50 mm Plain Tee 35 Rs. 222.29 nos
1168 50 mm Bend 90 degree 35 Rs. 196.99 nos
1169 50 mm Bend 45 degree 35 Rs. 195.84 nos
1170 75 mm Vent cowl 35 Rs. 232.12 nos
1171 75 mm Plain tee 35 Rs. 340.22 nos
1172 75 mm Plain door tee 35 Rs. 398.87 nos
1173 75 mm Bend 90 degree 35 Rs. 295.37 nos
1174 75 mm Door bend 35 Rs. 331.02 nos
1175 75 mm Bend 45 degree 35 Rs. 272.37 nos
1176 75 mm Y- Branch 35 Rs. 364.37 nos
1177 75 mm Cross tee 35 Rs. 541.47 nos
1178 75 mm Pipe clip 35 Rs. 37.95 nos
1179 110 mm Vent cowl 35 Rs. 382.49 nos
1180 110 mm Plain tee 35 Rs. 603.29 nos
1181 110 mm Door tee 35 Rs. 706.79 nos
1182 110 mm Bend 90 degree 35 Rs. 512.44 nos
1183 110 mm Door bend 35 Rs. 560.74 nos

8
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rates for 072/073 for Kathmandu


S.No Description P.G. Rs. Rate Per
1184 110 mm Bend 45 degree 35 Rs. 464.14 nos
1185 110 mm Y- Branch 35 Rs. 699.89 nos
1186 110 mm Cross tee 35 Rs. 868.94 nos
1187 110 mm Pipe clip 35 Rs. 48.30 nos
1188 111 mm Gully trap 35 Rs. 629.74 nos
DWV Upvc fittings.
1189 50 mm Bend 90 degree 36 Rs. 1,313.12 nos
1190 50 mm Vent cowl 36 Rs. 693.27 nos
1191 50 mm Door tee 36 Rs. 2,495.32 nos
1192 50 mm Trap p or s 36 Rs. 1,170.52 nos
1193 50 mm Plain tee 36 Rs. 1,507.47 nos
1194 50 mm Y- Branch 36 Rs. 2,612.62 nos
1195 50 mm Door bend 36 Rs. 1,170.52 nos
1196 75 mm Bend 90 degree 36 Rs. 446.60 nos
1197 75 mm Vent cowl 36 Rs. 507.55 nos
1198 75 mm Door tee 36 Rs. 644.40 nos
1199 75 mm Trap p or s 36 Rs. 404.05 nos
1200 75 mm Plain tee 36 Rs. 498.35 nos
1201 75 mm Y- Branch 36 Rs. 574.25 nos
1202 75 mm Door bend 36 Rs. 336.20 nos
1203 110 mm Bend 90 degree 36 Rs. 659.64 nos
1204 110 mm Vent cowl 36 Rs. 473.34 nos
1205 110 mm Door tee 36 Rs. 809.14 nos
1206 110 mm Trap p or s 36 Rs. 612.49 nos
1207 110 mm Plain tee 36 Rs. 790.74 nos
1208 110 mm Y- Branch 36 Rs. 834.44 nos
1209 110 mm Door bend 36 Rs. 406.64 nos
1210 Hard Soil Cutting (for Well) 37 Rs. 2,928.67 M3
1211 4' R.C.C. Ring for Well fitting 37 Rs. 8,547.95 Rm
1212 3'6" R.C.C. Ring for Well fitting 38 Rs. 7,003.50 Rm
1213 3' R.C.C. Ring for Well fitting 38 Rs. 6,072.00 Rm
1214 2'6" R.C.C. Ring for Well fitting 38 Rs. 4,866.80 Rm

9
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1001

580 mm size Orissa pan with low level cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. 580 mm Porcelain clay white glaze Orissa Pan
(Hindware, Parryware, Classica, bolan or equivalent.) 1 nos 3,273.00 3,273.00
b.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 3,455.00 3,455.00
c 32mmx60mm size flushing CP pipe 1 nos 495.00 495.00
7,223.00
d.1.5x45 Cm (" x18") PVC pipe connector 1 nos 139.00 139.00 7,362.00
Actual rate 11,442.00
15% contractor overhead 1,716.30
Rate per set Rs. 13158.30 Total (Rs.) 13,158.30

1002
500 mm IPWC with low level cistern (Indian pan)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. 580 mm Porcelain clay white glaze Indian Pan
(Hindware, Parryware, Classica, cera or eqv. ) 1 nos 1,019.00 1,019.00
b. P or S trap. 1 nos 572.00 572.00
c. White glazed foot rest 2 nos 407.00 814.00
d.10.0 ltr. porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 3,455.00 3,455.00
e. 32mmx60mm size flushing CP pipe 1 nos 495.00 495.00
f. 1.5x45 Cm (" x18") PVC pipe connector 1 nos 139.00 139.00 6,494.00
Actual rate 10,574.00
15% contractor overhead 1,586.10
Rate per set Rs. 12160.10 Total (Rs.) 12,160.10

1003

530 mm Orissa pan with low level cistern complete set.


sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. 530 mm Porcelain clay white glaze Orissa Pan
(Hindware, Parryware, Classica, or equivalent.) 1 nos 2,450.00 2,450.00
b.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 3,455.00 3,455.00
c. 32mmx60mm size flushing CP pipe 1 nos 495.00 495.00
d.1.5x45 Cm (" x18") PVC pipe connector 1 nos 139.00 139.00 6,539.00
Actual rate 10,619.00
15% contractor overhead 1,592.85
Rate per set Rs. 12211.85 Total (Rs.) 12,211.85
1004
580 mm Orissa pan complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 785.00 785.00
un skilled 1 nos 575.00 575.00 1,360.00
a. 580 mm Porcelain clay white glaze Orissa Pan
materials (Hindware, Parryware, Classica, or equivalent.) 1 nos 3,273.00 3,273.00
3,273.00
Actual rate 4,633.00
15% contractor overhead 694.95
Rate per set Rs. 5327.95 Total (Rs.) 5,327.95

1
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1005
10.0 Litre. Porceline clay Cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories 1 nos 3,455.00 3,455.00
b. 1.5x45 Cm(" x18") pipe connector 1 nos 139.00 139.00 3,594.00
Actual rate 6,314.00
15% contractor overhead 947.10
Rate per set Rs. 7261.1 Total (Rs.) 7,261.10

1006
10.0 Lit. PVC Cistern with dual flushing systemcomplete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a.10.0 ltr.PVC low level flushing cistern 3/6 litre dual
materials flushing with complete accessories 1 nos 1,915.00 1,915.00
b.3.2x60 Cm(1"x24") flushing pipe 1 nos 495.00 495.00
c. 1.5x45 Cm(" x18") pipe connector 1 nos 139.00 139.00 2,549.00
Actual rate 5,269.00
15% contractor overhead 790.35
Rate per set Rs. 6059.35 Total (Rs.) 6,059.35

1007
I.P W C. COMODE with low level cistern complete set.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. Porcelain clay white glaze Indian Pattern Comode
(Hindware Parryware, or equivalent ) regular 1 nos 1,541.00 1,541.00
b.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories( Internal PVC fittings) 1 nos 3,455.00 3,455.00
c .Bakelite toilet seat cover 1 nos 268.00 268.00
d. 3.2x60 Cm (1 1/4"x24") flushing CP pipe 1 nos 495.00 495.00
e. 1.5x45 CM (" x18") PVC pipe connector 1 nos 139.00 139.00
f. screw, etc. Ls 40.00 5,938.00
Actual rate 10,018.00
15% contractor overhead 1,502.70
Rate per set Rs. 11520.70 Total (Rs.) 11,520.70

1008
E W C. COMODE with cistern and seat cover with complete set.

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. Porcelain clay European Pattern floor mounted
materials Comode with all complete set . 1 nos 8,404.00 8,404.00
b.10.0 ltr.porcelain clay low level flushing cistern
complete accessories( Internal PVC fittings) 1 nos 3,455.00 3,455.00
c. 1.5x45 CM (" x18") PVC pipe connector 1 nos 139.00 139.00
d. screw, etc. Ls 40.00 12,038.00
Actual rate 16,118.00
15% contractor overhead 2,417.70
Rate per set Rs. 18535.7 Total (Rs.) 18,535.70

2
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1009
Cascade COMODE with cistern and seat cover complete set.( constallation type)

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. Porcelain clay white glaze Indian Pattern 305 mm
distance Comode all complete set. (Hindware,
Parryware or equivalent ) Constellation type, 1 nos 17,591.00 17,591.00
b. screw, etc. Ls 40.00 17,631.00
Actual rate 21,711.00
15% contractor overhead 3,256.65
Rate per set Rs. 24967.65 Total (Rs.) 24,967.65

1010
E.P W C. COMODE with Cistern seat cover complete set. ( One piece ) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. Porcelain clay white glaze European Pattern
Comode with cistern , slow falling seat cover One
piece Ellisa, Plaza, mogen ( American standard) Cotto
materials or equivalent 1 nos 28,034.00 28,034.00
b.1.5x45 cm(" x18") PVC pipe connector 1 nos 139.00 139.00 28,173.00
Actual rate 32,253.00
15% contractor overhead 4,837.95
Rate per set Rs. 37090.95 Total (Rs.) 37,090.95

1011
50x40cm OVAL WASH BASIN with mixer COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 50x40cm Porcelain clay Oval white glaze Wash
basin (Hindware, Parryware, Classica, cera or
equivalent ) regular 1 nos 1,438.00 1,438.00
b. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 462.00 462.00
c. 15 mm CP basin mixer jaquar,Parrtware or
equivalent 1 nos 3,778.00 3,778.00
d. screw etc Ls 40.00 5,718.00
Actual rate 8,438.00
15% contractor overhead 1,265.70
Total (Rs.) 9,703.70
Rate per set Rs. 9703.70

1012
WASH BASIN 63x50cm with mixer COMPLETE SET ( American standard) Cotto

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 63x50cm Porcelain clay O- counter white glaze
materials Wash basin (large) 1 nos 13,375.00 13,375.00
b. 32 mm pvc bottle trap including 32mm CP waste 1 nos 462.00 462.00
coupling with CP chain and rubber plug etc.
c.15 mm CP basin mixer jaquar or equivalent 1 nos 3,778.00 3,778.00
d. 1.5x45Cm ("x18") pipe connector 2 nos 139.00 278.00
e. screw etc Ls 40.00 17,933.00
Actual rate 20,653.00
15% contractor overhead 3,097.95
Rate per set Rs. 23750.95 Total (Rs.) 23,750.95

3
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1013
75x50 cm Wash BASIN with mixer , COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a .75x50cm Porcelain clay white glaze Wash basin
materials with all complete. 1 nos 6,051.00 6,051.00
b. 32 mm pvc bottle trap including 32mm CP waste 1 nos
coupling with CP chain and rubber plug etc. 462.00 462.00
c.15 mm CP basin mixer jaquar, parryware or equ. 1 nos 3,778.00 3,778.00
d. 1.5x45Cm ("x18") pipe connector 2 nos 139.00 278.00
e. screw etc Ls 40.00
10,609.00
Actual rate 13,329.00
15% contractor overhead 1,999.35
Rate per set Rs. 15328.35 Total (Rs.) 15,328.35

1014
50x40cm WASH BASIN WITH PEDESTAL AND MIXER COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 50x40cm Porcelain clay white glaze Wash basin
(Hindware Parryware, bolan or equivalent ) regular 1 nos 1,438.00 1,438.00
b. Bracket 1 nos 135.00 135.00
c. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 462.00 462.00

d. 15 mm CP basin mixer jaquar, Nova or equivalent 1 nos 3,778.00 3,778.00


e. pedestal 1 nos 1,338.00 1,338.00
f. screw etc Ls 40.00 7,191.00
Actual rate 9,911.00
15% contractor overhead 1,486.65
Total (Rs.) 11,397.65
Rate per nos Rs. 11397.65

1015
50X40 CM WASH BASIN COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a) 50x40cm Porcelain clay white glaze Wash basin
(Hindware, Parryware, cera or equivalent ) Regular 1 nos 1,438.00 1,438.00
materials b. bracket 1 set 135.00 135.00
c.32 mm PVC bottle trap including 32mm cp waste
coupling with CP chain and rubber plug etc. 1 set 462.00 462.00
d. 15mm swan neck type cp pillar cock 1 nos 1,321.00 1,321.00
e. 1.5x45cm ("x18") pipe connector 1 nos 139.00 139.00 3,495.00
Actual rate 6,215.00
15% contractor overhead 932.25
Rate per set Rs. 7147.25 Total (Rs.) 7,147.25

4
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1016
40X40 CM CORNER WASH BASIN COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 40x40cm Porcelain clay white glaze Corner Wash

basin (Hindware, Parryware, cera or equivalent ) 1 nos 1,166.00 1,166.00


materials b. bracket 1 set 135.00 135.00
c. 32 mm PVC bottle trap including 32mm cp waste
coupling with CP chain and rubber plug etc. 1 set 462.00 462.00
d. 15 mm fancy type CP pillar cock 1 nos 900.00 900.00
e. 1.5x45cm ("x18") PVC pipe connector 1 nos 139.00 139.00 2,802.00
Actual rate 5,522.00
15% contractor overhead 828.30
Rate per set Rs. 6350.3 Total (Rs.) 6,350.30

1017
45x30x15 (18"X12"X6") SMALL LAVATORY SINK COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 45x30x15 Cm (18"x12"x6") White glaze sink with C I
bracket (Hindware, Parryware cera or equivalent) 1 nos 1,605.00 1,605.00
b. 32 mm PVC bottle trap including 32mm waste
coupling with CP chain and rubber plug etc. 1 nos 462.00 462.00
materials c. 1.5cm (" ) dia.CP Sink cock (swan neck type) 1 nos 1,271.00 1,271.00
d.1.5x45 (" x18") pipe connector 1 nos 139.00 139.00 3,477.00
Actual rate 5,622.00
15% contractor overhead 843.30
Rate per set Rs. 6465.30 Total (Rs.) 6,465.30

1018
53x43x18cm ( 21"x17"x7") size LARGE LAVATORY SINK COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 53x43x18 (21"x17"x7") White glaze sink with C I
bracket (Hindware, Parryware, cera or equivalent ) 1 nos 2,157.00 2,157.00
b.PVC bottle trap including waste coupling with CP
chain and rubber plug etc. 1 set 462.00 462.00
materials c. 1.5Cm (") dia.Cp Sink cock 1 nos 1,271.00 1,271.00
d.1.5x45 ("x18") Pvc pipe connector 1 nos 139.00 139.00 4,029.00
Actual rate 6,174.00
15% contractor overhead 926.10
Rate per set Rs. 7100.1 Total (Rs.) 7,100.10

1019
60x45x25Cm ( 24"x18"x10") size LARGE KITCHEN SINK COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 1 nos 575.00 575.00 2,930.00
a. 60x45x25Cm (24"x18"x10") White glaze sink with

bracket (Hindware, Parryware, cera or equivalent ) 1 nos 3,653.00 3,653.00


b.Pvc bottle trap including 1" waste coupling with c p
chain and rubber plug etc. 1 set 462.00 462.00
materials c. " Sink cock 1 nos 1,271.00 1,271.00
d.1.5x45 ("x18") Pvc pipe connector 1 nos 139.00 139.00 5,525.00
Actual rate 8,455.00
15% contractor overhead 1,268.25
Rate per set Rs. 9723.25 Total (Rs.) 9,723.25

5
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1020
Flat back Urinal with inbuilt sensor valve complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
materials a. Flat back White glazed urinal 1 nos 1,825.00 1,825.00
b. sensor valve for urinal 1 nos 10,340.00 10,340.00
c.screw etc. Ls 40.00 12,205.00
Actual rate 15,710.00
15% contractor overhead 2,356.50
Rate per set Rs. 18066.50 Total (Rs.) 18,066.50

1021
46.5x35.5x26.5 cm SIZE URINAL COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 46.5x35.5x26.5 cm White glaze flat back Urinal
materials (Hindware, Parryware,cera or eqv.) 1 nos 1,825.00 1,825.00
b.screw etc. Ls 40.00 1,865.00
Actual rate 4,010.00
15% contractor overhead 601.50
Rate per set Rs. 4611.5 Total (Rs.) 4,611.50

1022
61x41x38 cm size Large Flat back Urinal
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
a.61x41x38 cm Large Flat back White glazed urinal
with bracket (Hindware, Parryware, Classica, cera or
materials equivalent.) 1 nos 4,052.00 4,052.00
b. 32 mm pvc bottle trap with all complete. 1 nos 462.00 462.00
c.screw etc. Ls 40.00 4,554.00
Actual rate 8,059.00
15% contractor overhead 1,208.85
Rate per set Rs. 9267.85 Total (Rs.) 9,267.85

1023
ANGLE BACK URINAL COMPLETE SET 45x35x27.5cm (18"X14"X11") SIZE (CORNER )
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a.18"X14"X11" White glaze Angle back back Urinal
materials cascade type (Hindware eqv.) 1 nos 1,572.00 1,572.00
b.screw etc. Ls 40.00 1,612.00
Actual rate 3,757.00
15% contractor overhead 563.55
Rate per set Rs. 4320.55 Total (Rs.) 4,320.55

1024
45x35cm SQUATTING PLATE URINAL
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 45X35 cm White glaze squatting plate urinal
materials (Hindware or equivalent) 1 nos 1,177.00 1,177.00 1,177.00
Actual rate 3,322.00
15% contractor overhead 498.30
Rate per set Rs. 3820.3 Total (Rs.) 3,820.30

6
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1025
68x30cm size URINAL Partation with all complete.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 785.00 392.50
un skilled 0.5 nos 575.00 287.50 680.00
a.68X30 cm White glaze Division plate urinal
materials Partation (Hindware or equivalent) 1 nos 1,691.00 1,691.00
b.screw etc. Ls 40.00 1,731.00
Actual rate 2,411.00
15% conctractor overhead 361.65
Rate per set Rs. 2772.65 Total (Rs.) 2,772.65

1026
1000 litre stainless steel WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 785.00 -
un skilled nos 575.00 - -
a. 1000 liter stainless steel water tank 304 grade steel
materials with Inlet, outlet, over flow, cleanout hole etc. all 1 nos 16,814.00 16,814.00
compete
b.Tanki nipples etc. Ls 185.00 16,999.00
Actual rate 16,999.00
15% contractor overhead 2,549.85
Rate per nos Rs. 19548.85 Total (Rs.) 19,548.85

1027
1500 litre stainless steel WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 785.00 -
un skilled nos 575.00 - -
a. 1500 liter stainless steel water tank 304 grade steel
materials with Inlet, outlet, over flow, cleanout hole etc. all 1 nos 23,894.00 23,894.00
compete
b.Tanki nipples etc. Ls 185.00 24,079.00
Actual rate 24,079.00
15% contractor overhead 3,611.85
Rate per nos Rs. 27690.85 Total (Rs.) 27,690.85

1028
2000 litre stainless steel WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 785.00 -
un skilled nos 575.00 - -
a. 2000 liter stainless steel water tank 304 grade steel
materials with Inlet, outlet, over flow, cleanout hole etc. all 1 nos 31,858.00 31,858.00
compete
b.Tanki nipples etc. Ls 185.00 32,043.00
Actual rate 32,043.00
15% contractor overhead 4,806.45
Rate per nos Rs. 36849.45 Total (Rs.) 36,849.45

1029
5000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 8 nos 575.00 4,600.00 7,740.00
a. 5000 Ltr. capacity pvc water tank with Inlet, outlet,
materials over flow, cleanout hole etc. 1 nos 60,000.00 60,000.00
b.Tanki nipples etc. Ls 279.00 60,279.00
Actual rate 68,019.00
15% contractor overhead 10,202.85
Rate per nos Rs. 78221.85 Total (Rs.) 78,221.85

7
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1030
1000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 4 nos 575.00 2,300.00 4,655.00
a. 1000Ltr. PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 12,000.00 12,000.00
b.Tanki nipples with wash out plug etc. Ls 188.00 12,188.00
Actual rate 16,843.00
15% contractor overhead 2,526.45
Rate per nos Rs. 19369.45 Total (Rs.) 19,369.45

1031
500 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 4 nos 575.00 2,300.00 4,655.00
a. 500 ltr PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 6,000.00 6,000.00
b.Tanki nipples with wash out plug etc. Ls 135.00 6,135.00
Actual rate 10,790.00
15% contractor overhead 1,618.50
Rate per nos Rs. 12408.5 Total (Rs.) 12,408.50

1032
2000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 6 nos 575.00 3,450.00 5,805.00
a.2000 Ltr.PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 24,000.00 24,000.00
b.Tanki nipples with wash out plug etc. Ls 421.00 24,421.00
Actual rate 30,226.00
15% contractor overhead 4,533.90
Rate per nos Rs. 34759.90 Total (Rs.) 34,759.90

1033
1.0 H.P. Electrical motor water pump, Submersible pump Italian
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.1.0 H P Electric motor pump (Submersible) Italian or
materials equivalent 1 nos 25,329.00 25,329.00
b.Zink oxide screws etc. Ls 40.00 25,369.00
Actual rate 29,659.00
15% contractor overhead 4,448.85
Rate per nos Rs. 34107.85 Total (Rs.) 34,107.85

1034
0.5 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.0.5 H P Electric motor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 6,075.00 6,075.00
b.Zink oxide screws etc. Ls 40.00 6,115.00
Actual rate 10,405.00
15% contractor overhead 1,560.75
Rate per nos Rs. 11965.75 Total (Rs.) 11,965.75

8
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1035
1.0 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.1.0 H P Electric motor pump with base plate
materials nuts,bolts,etc.set 1 nos 9,189.00 9,189.00
b.Zink oxide screws etc. Ls 40.00 9,229.00
Actual rate 13,519.00
15% contractor overhead 2,027.85
Rate per nos Rs. 15546.85 Total (Rs.) 15,546.85

1036
1 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton) supersuction
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.1 H P Electric motor pump with base plate nuts, bolts
materials etc.set crompton supersuction. 1 nos 13,860.00 13,860.00
b.Zink oxide screws etc. Ls 40.00 13,900.00
Actual rate 18,190.00
15% contractor overhead 2,728.50
Rate per nos Rs. 20918.50 Total (Rs.) 20,918.50

1037
2 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 3 nos 575.00 1,725.00 4,865.00
a.2 H P Electricmotor pump with base plate nuts, bolts
materials etc.set crompton 1 nos 21,929.00 21,929.00
b.Zink oxide screws etc. Ls 40.00 21,969.00
Actual rate 26,834.00
15% contractor overhead 4,025.10
Rate per nos Rs. 30859.10 Total (Rs.) 30,859.10

1038
3 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 4 nos 575.00 2,300.00 5,440.00
a. 3 H P Electricmotor pump with base plate nuts, bolts
materials etc.set crompton 1 nos 23,153.00 23,153.00
b.Zink oxide screws etc. Ls 40.00 23,193.00
Actual rate 28,633.00
15% contractor overhead 4,294.95
Rate per nos Rs. 32927.95 Total (Rs.) 32,927.95

1039
5 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 4 nos 575.00 2,300.00 7,010.00
a. 5 H P Electricmotor pump with base plate nuts, bolts
materials etc.set crompton 1 nos 27,822.00 27,822.00
b.Zink oxide screws etc. Ls 40.00 27,862.00
Actual rate 34,872.00
15% contractor overhead 5,230.80
Rate per nos Rs. 40102.80 Total (Rs.) 40,102.80

9
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1040
PORCELAIN CLAY TOILET PAPER HOLDER (Recessed type) American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.11 nos 785.00 86.35
materials a. WHITE GLAZE TOILET PAPER HOLDER 1 nos 1,124.00 1,124.00
b. Zink oxide screw etc. Ls 40.00 1,250.35
Actual rate 1,250.35
15% conctractor overhead 187.55
Rate per nos Rs. 1437.90 Total (Rs.) 1,437.90

1041
CHROME PLATE TOILET PAPER HOLDER
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.Chrome plate toilet paper holder 1 nos 495.00 495.00
b.Zink oxide screw etc. Ls 40.00 535.00
Actual rate 621.35
15% contractor overhead 93.20
Rate per nos Rs. 714.55 Total (Rs.) 714.55

1042
Stainless Steel liquid soap container (cotto)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
a. Stainless Steel Liquid Soap container all complete.
materials 1 nos 5,885.00 5,885.00
b.Zink oxide screw etc. Ls 40.00 5,925.00
Actual rate 6,011.35
15% contractor overhead 901.70
Rate per nos Rs. 6913.05 Total (Rs.) 6,913.05

1043
PORCELAIN CLAY SOAP TRAY 15x15 cm (6"X 6") SIZE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.White glaze soap tray 1 nos 642.00 642.00
b.Zink oxide screw etc. Ls 40.00 682.00
Actual rate 768.35
15% contractor overhead 115.25
Rate per nos Rs. 883.60 Total (Rs.) 883.60

1044
CHROME PLATE SOAP DISH.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.C.P Soap dish 1 nos 495.00 495.00
b.Zink oxide screw etc. Ls 40.00 535.00
Actual rate 621.35
15% contractor overhead 93.20
Rate per nos Rs. 714.55 Total (Rs.) 714.55

1045
Stainless Steel towel rod 1.5x45cm ("x18")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a . Stainless Steel Towel rod 1 nos 1,204.00 1,204.00
b. Screws etc. Ls 40.00 1,244.00
Actual rate 1,416.70

15% contractor overhead 212.50


Rate per nos Rs. 1629.20 Total (Rs.) 1,629.20

10
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1046
C P towel rod 1.5x60cm ("x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(2/9) 0.22 nos 785.00 172.70 172.70
materials a .C P Towel rod 1 nos 1,615.00 1,615.00
b. Screws Ls 40.00 1,655.00
Actual rate 1,827.70
15% contractor overhead 274.15
Rate per nos Rs. 2101.85 Total (Rs.) 2,101.85

1047
C P towel rod 1.5x45cm ("x 18")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a . C PTowel rod 1 nos 1,532.00 1,532.00
b. Screws etc. Ls 40.00 1,572.00
Actual rate 1,744.70
15% contractor overhead 261.70
Rate per nos Rs. 2006.40 Total (Rs.) 2,006.40

1048
CP Glass Shelf with guard rail with glass
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a. C P Guard rail with glass 1 nos 660.00 660.00
b. Screws etc. Ls 40.00 700.00
Actual rate 872.70
15% contractor overhead 130.90
Rate per nos Rs. 1003.60 Total (Rs.) 1,003.60

1049
Looking Mirror Modi guard 450x600mm (18"x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials a.Bevelled edge looking mirror 50x40 cm 1 nos 1,417.00 1,417.00
b . Screws Ls 40.00 1,457.00
Actual rate 1,716.05
15% contractor overhead 257.40
Rate per nos Rs. 1973.45 Total (Rs.) 1,973.45

1050
73 mm Ms Seamless Pipes SCH 40
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 2.7 nos 785.00 2,119.50
un skilled 3.2 nos 575.00 1,840.00 3,959.50
a 73 mm OD Ms Seamless pipes SCH 40, 5.16 mm
materials thick 1 Rm 1,723.00 1,723.00
b. Jointing materials and painting Ls 350.00
2,073.00
Actual rate 6,032.50
15% contractor overhead 904.87
Rate per Rm Rs.. 6937.37 Total (Rs.) 6,937.37

11
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1051
101.6 mm Ms Seamless Pipes SCH 40
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 2.7 nos 785.00 2,119.50
un skilled 3.2 nos 575.00 1,840.00 3,959.50
a 101.6 mm Ms Seamless pipes SCH 40 ,5.74mm
materials thickness 1 Rm 2,914.00 2,914.00
b. Jointing materials and painting Ls 350.00
3,264.00
Actual rate 7,223.50
15% contractor overhead 1,083.52
Rate per Rm Rs.. 8307.02 Total (Rs.) 8,307.02
1052
CP Shower rose 7.5 cm (3") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials a.7.5cm dia shower rose fancy type with 30cm CP rod
1 nos 880.00 880.00 880.00
Actual rate 1,139.05
15% contractor overhead 170.85
Rate per nos Rs. 1309.90 Total (Rs.) 1,309.90

1053
Stainless Steel Shower rose
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials Stainless Steel Shower rose with complete set. 1 nos 2,889.00 2,889.00 2,889.00
Actual rate 3,148.05
15% contractor overhead 472.20
Rate per nos Rs. 3620.25 Total (Rs.) 3,620.25

1054
Stainless steel telephonic Shower Rose
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials Stainless steel telephonic Shower Rose 1 nos 1,204.00 1,204.00 1,204.00
Actual rate 1,463.05
15% contractor overhead 219.45
Rate per nos Rs. 1682.50 Total (Rs.) 1,682.50

1055
C.P . FLUSH VALVE ( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials 32 mm C.P Flush valve Euorpean pattern 1 nos 5,247.00 5,247.00 5,247.00
Actual rate 5,333.35
15% conctractor overhead 800.00
Rate per nos Rs. 6133.35 Total (Rs.) 6,133.35

1056
15mm CP Bib Cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials 15mm CP bib cock 1 nos 1,321.00 1,321.00 1,321.00
Actual rate 1,407.35
15% contractor overhead 211.10
Rate per nos Rs. 1618.45 Total (Rs.) 1,618.45

12
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1057
15mm Stainless Steel Bib Cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Stainless Steel bib cock 1 nos 4,296.00 4,296.00 4,296.00
Actual rate 4,382.35
15% contractor overhead 657.35
Rate per nos Rs. 5039.70 Total (Rs.) 5,039.70

1058
15mm Auto closing Bib Cock with aerator
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Auto closing bib cock with aerator 1 nos 2,536.00 2,536.00 2,536.00
Actual rate 2,622.35
15% contractor overhead 393.35
Rate per nos Rs. 3015.70 Total (Rs.) 3,015.70

1059
15mm Urinal Auto closing Valve with built in control cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Urinal Auto closing valve with 1 nos 2,616.00 2,616.00 2,616.00
built - in control cock
Actual rate 2,702.35
15% contractor overhead 405.35
Rate per nos Rs. 3107.70 Total (Rs.) 3,107.70

1060
15mm Stainless Steel Angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Stainless Steel angle valve 1 nos 803.00 803.00 803.00
Actual rate 889.35
15% contractor overhead 133.40
Rate per nos Rs. 1022.75 Total (Rs.) 1,022.75

1061
C.P. 15mm Angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm fancy type angle valve 1 nos 900.00 900.00 900.00
Actual rate 986.35
15% contractor overhead 147.95
Rate per nos Rs. 1134.30 Total (Rs.) 1,134.30

1062
15mm two way angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm two way angle valve 1 nos 1,124.00 1,124.00 1,124.00
Actual rate 1,210.35
15% contractor overhead 181.55
Rate per nos Rs. 1391.90 Total (Rs.) 1,391.90

13
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1063
15mm dia Stainless Steel Pillar Cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15 mm dia Stainless Steel Piller Cock 1 nos 4,296.00 4,296.00 4,296.00
Actual rate 4,382.35
15% contractor overhead 657.35
Rate per nos Rs. 5039.70 Total (Rs.) 5,039.70

1064
15mm CP concealed stop cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm CP concealed stop cock 1 nos 1,755.00 1,755.00 1,755.00
Actual rate 1,841.35
15% contractor overhead 276.20
Rate per nos Rs. 2117.55 Total (Rs.) 2,117.55

1065
G.M.15 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm gate valve 1 nos 802.00 802.00 802.00
Actual rate 888.35
15% contractor overhead 133.25
Rate per nos Rs. 1021.60 Total (Rs.) 1,021.60

1066
G.M. 20 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.20 mm gate valve 1 nos 998.00 998.00 998.00
Actual rate 1,084.35
15% contractor overhead 162.65
Rate per nos Rs. 1247.00 Total (Rs.) 1,247.00

1067
G.M. 25mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.25mm gate valve 1 nos 1,608.00 1,608.00 1,608.00
Actual rate 1,780.70
15% contractor overhead 267.10
Rate per nos Rs. 2047.80 Total (Rs.) 2,047.80

1068
G.M.32 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.32 mm gate valve 1 nos 2,294.00 2,294.00 2,294.00
Actual rate 2,466.70
15% contractor overhead 370.00
Rate per nos Rs. 2836.70 Total (Rs.) 2,836.70

14
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1069
G.M. 40 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.40mm gate valve 1 nos 2,889.00 2,889.00 2,889.00
Actual rate 3,234.40
15% contractor overhead 485.16
Rate per nos Rs. 3719.56 Total (Rs.) 3,719.56

1070
G.M. 50 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.50 mm gate valve 1 nos 4,599.00 4,599.00 4,599.00
Actual rate 4,944.40
15% contractor overhead 741.66
Rate per nos Rs. 5686.06 Total (Rs.) 5,686.06

1071
G.M.65 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.65 mm gate valve 1 nos 9,509.00 9,509.00 9,509.00
Actual rate 9,854.40
15% contractor overhead 1,478.16
Rate per nos Rs. 11332.56 Total (Rs.) 11,332.56

1072
G.M 80 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 785.00 628.00 628.00
materials a.80 mm gate valve 1 nos 11,823.00 11,823.00 11,823.00
Actual rate 12,451.00
15% contractor overhead 1,867.65
Rate per nos Rs. 14318.65 Total (Rs.) 14,318.65

1073
G.M.100 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 785.00 628.00 628.00
materials a 100 mm gate valve 1 nos 19,365.00 19,365.00 19,365.00
Actual rate 19,993.00
15% contractor overhead 2,998.95
Rate per nos Rs. 22991.95 Total (Rs.) 22,991.95

1074
15 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15 mm G M check valve 1 nos 744.00 744.00 744.00
Actual rate 830.35
15% contractor overhead 124.55
Rate per nos Rs. 954.90 Total (Rs.) 954.90

15
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1075
20 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a. 20 mm G M check valve 1 nos 1,000.00 1,000.00 1,000.00
Actual rate 1,172.70
15% contractor overhead 175.90
Rate per nos Rs. 1348.60 Total (Rs.) 1,348.60

1076
25 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.25 mm G M check valve 1 nos 1,479.00 1,479.00 1,479.00
Actual rate 1,651.70
15% contractor overhead 247.75
Rate per nos Rs. 1899.45 Total (Rs.) 1,899.45

1077
32 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.32 mm G M check valve 1 nos 2,186.00 2,186.00 2,186.00
Actual rate 2,358.70
15% contractor overhead 353.80
Rate per nos Rs. 2712.50 Total (Rs.) 2,712.50

1078
50mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials a 50 mm G M check valve 1 nos 4,194.00 4,194.00 4,194.00
Actual rate 4,453.05
15% contractor overhead 667.95
Rate per nos Rs. 5121.00 Total (Rs.) 5,121.00

1079
65mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a. 65 mm G M check valve 1 nos 8,521.00 8,521.00 8,521.00
Actual rate 8,866.40
15% contractor overhead 1,329.96
Rate per nos Rs. 10196.36 Total (Rs.) 10,196.36

1080
80mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.80 mm G M check valve 1 nos 11,381.00 11,381.00 11,381.00
Actual rate 11,726.40
15% contractor overhead 1,758.96
Rate per nos Rs. 13485.36 Total (Rs.) 13,485.36

1081
100mm GM CHECK VALVE with flange
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials 100mm GM CHECK VALVE with flange 1 nos 16,084.00 16,084.00 16,084.00
Actual rate 16,429.40
15% contractor overhead 2,464.41
Rate per nos Rs. 18893.81 Total (Rs.) 18,893.81

16
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

1082
PVC FLOOR TRAP 11x7.5cm (4" X 2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
un skilled 0.10 nos 575.00 57.50 143.85
materials Floor Trap 11x7.5cm (4" X 2") 1 nos 280.00 280.00 280.00
Actual rate 423.85
15% contractor overhead 63.57
Rate per nos Rs. 487.42 Total (Rs.) 487.42

1083
ALUMINIUM GRATING 100mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 785.00 47.10 47.10
materials Aluminium Grating 100 mm 1 nos 41.00 41.00 41.00
Actual rate 88.10
15% contractor overhead 13.21
Rate per nos. Rs. 101.31 Total (Rs.) 101.31

1084
C P GRATING 12.5cm (5") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 785.00 47.10 47.10
materials C P GRATTING 12.5cm (5") DIA SIZE 1 nos 61.00 61.00 61.00
Actual rate 108.10
15% contractor overhead 16.21
Rate per nos. Rs. 124.31 Total (Rs.) 124.31

1085
C P GRATING 110mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 785.00 47.10 47.10
materials C P GRATTING 110 mm (4") DIA SIZE 1 nos 48.00 48.00 48.00
Actual rate 95.10
15% contractor overhead 14.26
Rate per nos. Rs. 109.36 Total (Rs.) 109.36

1086
160mm dia DWV PIPE, SN-4
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.09 nos 785.00 855.65
un skilled 0.65 nos 575.00 373.75 1,229.40
a . 160 mm dia DWV Upvc Pipe with Double sockets
materials SN-4, Astral or eqv. 1 Rm 1,350.00 1,350.00
1,350.00
Actual rate 2,579.40
15% contractor overhead 386.91
Rate per Rm Rs. 2966.31 Total (Rs.) 2,966.31

1087
110mm dia DWV PIPE SN-4
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
a . 110 mm dia DWV Upvc Pipe with Double sockets
materials SN-4, Astral or eqv. 1 Rm 473.00 473.00
473.00
Actual rate 721.45
15% contractor overhead 108.21
Rate per Rm Rs. 829.66 Total (Rs.) 829.66

17
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1088
75mm dia DWV PIPE, SN-4
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
un skilled 0.11 nos 575.00 63.25 149.60
a. 75 mm dia DWV Upvc Pipe with foamcore Double
materials sockets SN-4, Astral or eqv. 1 Rm 262.00 262.00
262.00
Actual rate 411.60
15% contractor overhead 61.74
Rate per Rm Rs. 473.34 Total (Rs.) 473.34

1089
Stainless Steel wall Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. Stainless Steel Wall mixture complete set. 1 nos 4,061.00 4,061.00 4,061.00
Actual rate 4,147.35
15% contractor overhead 622.10
Rate per set Rs. 4769.45 Total (Rs.) 4,769.45

1090
15mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.16 nos 575.00 92.00 233.30
materials a.15 mm G. I . Pipe 'B ' class 1 Rm 120.00 120.00
b. G I fitting and painting Ls 100.00
c. Jointing materials Ls 25.00 245.00
Actual rate 478.30
15% contractor overhead 71.74
Rate per Rm Rs. 550.04 Total (Rs.) 550.04

1091
20 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.16 nos 575.00 92.00 233.30
materials a. 20 mm G. I . Pipe B' class 1 Rm 152.00 152.00
b. G I fitting and painting Ls 100.00
c. Jointing materials Ls 25.00 277.00
Actual rate 510.30
15% contractor overhead 76.54
Rate per Rm Rs. 586.84 Total (Rs.) 586.84

1092
25 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.32 nos 575.00 184.00 325.30
materials a. 25 mm G. I . Pipe B ' class 1 Rm 230.00 230.00
b. G I fitting and painting Ls 125.00
c. Jointing materials Ls 25.00 380.00
Actual rate 705.30
15% contractor overhead 105.79
Rate per Rm Rs. 811.09 Total (Rs.) 811.09

18
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1093
32 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.32 nos 575.00 184.00 325.30
materials a. 32 mm G. I . Pipe 'B' class 1 Rm 300.00 300.00
b. G I fitting and painting Ls 125.00
c. Jointing materials Ls 25.00 450.00
Actual rate 775.30
15% contractor overhead 116.29
Rate per Rm Rs. 891.59 Total (Rs.) 891.59

1094
40 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 785.00 211.95
un skilled 0.32 nos 575.00 184.00 395.95
materials a.40 mm G. I . Pipe 'B ' class 1 Rm 345.00 345.00
b. G I fitting and painting Ls 135.00
c. Jointing materials Ls 25.00 505.00
Actual rate 900.95
15% contractor overhead 135.14
Rate per Rm Rs. 1036.09 Total (Rs.) 1,036.09

1095
50mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 785.00 211.95
un skilled 0.32 nos 575.00 184.00 395.95
materials a 50 mm G. I . Pipe 'B ' class 1 Rm 473.00 473.00
b. G I fitting and painting Ls 150.00
c. Jointing materials Ls 25.00 648.00
Actual rate 1,043.95
15% contractor overhead 156.59
Rate per Rm Rs.. 1200.54 Total (Rs.) 1,200.54

1096
80mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 0.27 nos 785.00 211.95
un skilled 0.32 nos 575.00 184.00 395.95
materials a 80 mm G. I . Pipe 'B ' class 1 Rm 752.00 752.00
b. G I fitting and painting Ls 175.00
c. Jointing materials Ls 25.00 952.00
Actual rate 1,347.95
15% contractor overhead 202.19
Rate per Rm Rs.. 1550.14 Total (Rs.) 1,550.14

1097
Stainless Steel Basin Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. Stainless Steel Basin mixture complete set. 1 nos 6,741.00 6,741.00 6,741.00
Actual rate 6,827.35
15% contractor overhead 1,024.10
Rate per set Rs. 7851.45 Total (Rs.) 7,851.45

19
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1098
9 cm Concealed Flushing Cistern (Geberit)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 9 cm Concealled flushing cistern complete
materials accessories ( Geberit or eqv. ) 1 nos 7,431.00 7,431.00
b. Dual flush Actuator plate 1 nos 3,646.00 3,646.00 11,077.00
Actual rate 13,797.00
15% contractor overhead 2,069.55
Rate per set Rs. 15866.55 Total (Rs.) 15,866.55

1099
Inspection Chamber 315mm (12"X12")
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
Inspection Chamber body 32cm 1 nos 3,000.00 3,000.00
Inspection Chamber Riser 1 nos 1,490.00 1,490.00
materials Inspection Chamber Lid with cover 1 nos 2,829.00 2,829.00 7,319.00
Actual rate 7,578.05
15% contractor overhead 1,136.70
Rate per set Rs. 8714.75 Total (Rs.) 8,714.75

1100
Inspection Chamber 45cm dia (18"X18")
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
Inspection Chamber body 45x45cm 1 nos 8,284.00 8,284.00
Inspection Chamber Riser 1 nos 2,634.00 2,634.00
materials Inspection Chamber Lid with cover 1 nos 4,395.00 4,395.00 15,313.00
Actual rate 15,572.05
15% contractor overhead 2,335.80
Rate per set Rs. 17907.85 Total (Rs.) 17,907.85

1101
50 mm dia PVC PIPE 6 KG/CM. SQ.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/18) 0.06 nos 785.00 47.10
un skilled(1/10) 0.10 nos 575.00 57.50 104.60
materials a.50 mm dia. Pvc pipe 1 RM 99.00 99.00
b. Jointing materialsetc. Ls 25.00 124.00
Actual rate 228.60
15% contractor overhead 34.29
Rate per Rm Rs. 262.89 Total (Rs.) 262.89

1102
75 mm dia PVC PIPE 6 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
un skilled 0.11 nos 575.00 63.25 149.60
materials a.75 mm dia. Pvc pipe 1 Rm 222.00 222.00
b. Jointing materialsetc. Ls 25.00 247.00
Actual rate 396.60
15% contractor overhead 59.49
Rate per Rm Rs. 456.09 Total (Rs.) 456.09

20
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1103
110 mm dia PVC PIPE 6 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
materials a.110 m m dia. Pvc pipe 1 Rm 462.00 462.00
b. Jointing material setc. Ls 25.00 487.00
Actual rate 735.45
15% contractor overhead 110.31
Rate per nos Rs. 845.76 Total (Rs.) 845.76

1104
15.0 Ltr WATER HEATER ( Aeroston Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
a. 15.0 Ltr wate heater including copper pipe connector

materials with coupling and other necessary fittings complete. 1 nos 11,770.00 11,770.00
b. Jointing materialsetc. Ls 25.00 11,795.00
Actual rate 15,300.00
15% contractor overhead 2,295.00
Rate per nos Rs. 17595.00 Total (Rs.) 17,595.00

1105
FIBER BATH TUB American standard or eqv.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
materials a. Bath tub 5"-6"x2"-6" with complete fittings. 1 nos 9,100.00 9,100.00
b. Jointing material set. Ls 25.00 9,125.00
Actual rate 13,415.00
15% contractor overhead 2,012.25
Rate per nos Rs. 15427.25 Total (Rs.) 15,427.25

1106
C.P. TELEPHONIC SHOWER with mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 785.00 785.00
un skilled 1 nos 575.00 575.00 1,360.00
a. Bath tub spout(Hot and cold) with Telephonic
materials shower. 1 nos 4,693.00 4,693.00 4,693.00
Actual rate 6,053.00
15% contractor overhead 907.95
Rate per set Rs. 6960.95 Total (Rs.) 6,960.95

1107
SENSOR FLUSH VALVE FOR URINAL ( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
C.P Flush valve for urinal sensor type electric
materials Euorpean pattern 1 nos 10,340.00 10,340.00 10,340.00
Actual rate 10,426.35
15% contractor overhead 1,563.95
Rate per nos Rs. 11990.30 Total (Rs.) 11,990.30

21
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1108
15mm CP Bath spout
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm CP Bath spout 1 nos 1,962.00 1,962.00 1,962.00
Actual rate 2,048.35
15% contractor overhead 307.25
Rate per nos Rs. 2355.60 Total (Rs.) 2,355.60

1109
Sensor cock with mixer for basin (Battery operating)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.00 nos 785.00 785.00 785.00
materials Sensor mixer for basin (Battery operating) 1 nos 19,885.00 19,885.00 19,885.00
Actual rate 20,670.00
15% contractor overhead 3,100.50
Rate per set Rs. 23770.50 Total (Rs.) 23,770.50

1110
C.P. SINK Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. Sink mixture complete set. 1 nos 4,341.00 4,341.00
b. Jointing material set. 25.00 4,366.00
Actual rate 4,452.35
15% contractor overhead 667.85
Rate per set Rs. 5120.20 Total (Rs.) 5,120.20

1111
C I Cover 45x45cm (18"X18") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials CI Cover 45x45cm (18" X 18") 14 kg wt. 1 nos 2,436.00 2,436.00 2,436.00
Actual rate 2,695.05
15% contractor overhead 404.25
Rate per set Rs. 3099.30 Total (Rs.) 3,099.30

1112
C I Cover 55x55cm (22"X 22") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials CI Cover 22" X 22" of 20 kg wt. 1 nos 3,249.00 3,249.00 3,249.00
Actual rate 3,508.05
15% contractor overhead 526.20
Rate per set Rs. 4034.25 Total (Rs.) 4,034.25

1113
Fire Post
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 5 nos 785.00 3,925.00
un skilled 2 nos 575.00 1,150.00 5,075.00
materials a. Landinng valve ISI marked is : 5290, Hose
box 18 gauge mild steel, 75x60x25cm (30"x24"x10") to
accommodate two hose length of 15 meters each and
one branch pipes with locking arrangement, 2 lengths
Jayashree RRL hose
(ISI is : 636 in 15 meter length with male and female
coupling dully binded with wires, Branch pipe short
GM.)( minimax) 1 sets 27,214.00 27,214.00 27,214.00
Actual rate 32,289.00
15% contractor overhead 4,843.35
Rate per set Rs. 37132.35 Total (Rs.) 37,132.35

22
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1114
20 HP Electric motor pump(Fire PUMP).
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 6 nos 785.00 4,710.00
un skilled 4 nos 575.00 2,300.00 7,010.00
a. Fire pump 20 HP two pump set with panel board and
materials acessories kiloskar or eqv 1 sets 550,000.00 550,000.00 550,000.00
Actual rate 557,010.00
15% contractor overhead 83,551.50
Rate per set Rs. 640561.50 Total (Rs.) 640,561.50

1115
Fire hose reel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a. Swinging hose reel with 20 mm hydraulic rubber
braided hose 30 mt. Long, swinging up to 170 nozzle,
materials
U shape reel carriel, diamension 31" heigth over all
29" projection from wall (minimax) 1 sets 19,700.00 19,700.00 19,700.00
Actual rate 23,990.00
15% conctractor overhead 3,598.50
Rate per set Rs. 27588.50 Total (Rs.) 27,588.50

1116
G.M. 25mm float valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials G.M. 25mm float valve 1 nos 1,297.00 1,297.00 1,297.00
Actual rate 1,469.70
15% contractor overhead 220.45
Rate per nos Rs. 1690.15 Total (Rs.) 1,690.15

1117
Grab bar American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.22 nos 785.00 172.70 172.70
materials Grab bar American standard 1 nos 5,885.00 5,885.00
b. Zink oxide screw etc. Ls 40.00 5,925.00
Actual rate 6,097.70
15% contractor overhead 914.65
Rate per nos Rs. 7012.35 Total (Rs.) 7,012.35

1118
Euro Guard (Filter)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00

materials a. Euro Guard Water purification set (one litre per


minute) 1 sets 16,263.00 16,263.00 16,263.00
Actual rate 19,768.00
15% conctractor overhead 2,965.20
Rate per set Rs. 22733.2 Total (Rs.) 22,733.20

23
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1119
Kitchen Sink 37" long stainless steel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. Stainless steel, 19"x16" size Bowl with drain board.
materials
Ordinary type 1 sets 2,247.00 2,247.00
b. Pvc bottle trap with 32mm Dia CP waste coupling
with CP chain and rubber. 1 nos 462.00 462.00
c. " dia CP sink cock. 1 nos 1,271.00 1,271.00 3,980.00
Actual rate 6,125.00
15% contractor overhead 918.75
Rate per set Rs. 7043.75 Total (Rs.) 7,043.75

1120
Kitchen Sink 150 cm long
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00

materials a. Stainless steel, 62" x 20" size Bowl with drain


board.Ordinary type 1 sets 5,618.00 5,618.00
b. 32 cm PVC bottle with cleaning hole and CP waste
coupling with CP chain and rubber. 1 nos 462.00 462.00
c. Zink Oxide screw etc. LS 40.00
d. " dia CP bib cock. 1 nos 1,271.00 1,271.00 7,391.00
Actual rate 10,896.00
15% contractor overhead 1,634.40
Rate per Set Rs. 12530.40 Total (Rs.) 12,530.40

1121
Hand drayer Germany
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a) Hand dryer with complete accessories 1 nos 18,832.00 18,832.00 18,832.00
Actual rate 18,918.35
15% contractor overhead 2,837.75
Rate per nos Rs. 21756.10 Total (Rs.) 21,756.10

1122
4 Kg/cm2, High Density Polethene Pipe 50mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
materials a.High density polethene pipe 50mm. 1 RM 81.00 81.00 81.00
Actual rate 329.45
15% contractor overhead 49.41
Rate per Rm Rs. 378.86 Total (Rs.) 378.86

24
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1123
4 Kg/cm2, High Density Polethene Pipe 110mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
materials a.High density polethene pipe 110mm. 1 RM 364.00 364.00 364.00
Actual rate 612.45
15% contractor overhead 91.86
Rate per Rm Rs. 704.31 Total (Rs.) 704.31

1124
4 Kg/cm2, High Density Polethene Pipe 125 mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
materials a.High density polethene pipe 125 mm. 1 RM 490.00 490.00 490.00
Actual rate 738.45
15% contractor overhead 110.76
Rate per Rm Rs. 849.21 Total (Rs.) 849.21

1125
4 Kg/cm2, High Density Polethene Pipe 140mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.20 nos 785.00 157.00
un skilled 0.25 nos 575.00 143.75 300.75
materials a.High density polethene pipe 140mm.dia. 1 RM 621.00 621.00 621.00
Actual rate 921.75
15% contractor overhead 138.26
Rate per Rm Rs. 1060.01 Total (Rs.) 1,060.01

1126
4 Kg/cm2, High Density Polethene Pipe 160mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 785.00 196.25
un skilled 0.33 nos 575.00 189.75 386.00
materials a.High density polethene pipe 160mm. Dia 1.0 RM 807.00 807.00 807.00
Actual rate 1,193.00
15% contractor overhead 178.95
Rate per Rm Rs. 1371.95 Total (Rs.) 1,371.95

1127
4 Kg/cm2, High Density Polethene Pipe 180mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05
un skilled 0.50 nos 575.00 287.50 546.55
materials a.High density polethene pipe 180mm. 1.0 RM 1,019.00 1,019.00 1,019.00
Actual rate 1,565.55
15% contractor overhead 234.83
Rate per Rm Rs. 1800.38 Total (Rs.) 1,800.38

1128
4 Kg/cm2, High Density Polethene Pipe 200mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.50 nos 785.00 392.50
un skilled 0.50 nos 575.00 287.50 680.00
materials a.High density polethene pipe 200mm. 1.0 RM 1,260.00 1,260.00 1,260.00
Actual rate 1,940.00
15% contractor overhead 291.00
Rate per Rm Rs. 2231.00 Total (Rs.) 2,231.00

25
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1129
5 kg Fire extingusher
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 785.00 785.00 785.00
materials a.5 kg Fire extingusher ABC type minimax 1.0 nos
7,130.00 7,130.00 7,130.00
Actual rate 7,915.00
15% contractor overhead 1,187.25
Rate per set Rs. 9102.25 Total (Rs.) 9,102.25

1130
560 mm dia 100 kg CI heavy Cover
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 785.00 785.00
un skilled 3.0 nos 575.00 1,725.00 2,510.00
materials a.100 kg CI heavy Manhole cover. 1.0 sets 14,712.00 14,712.00 14,712.00
Actual rate 17,222.00
15% contractor overhead 2,583.30
Rate per set Rs. 19805.30 Total (Rs.) 19,805.30

1131
CPVC Pipe SDR 13.5, 15mm (1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a. 15 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 115.00 115.00
b. Cpvc fittings Ls 100.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 245.00
Actual rate 258.60
15% contractor overhead 38.79
Rate per Rm Rs. 297.39 Total (Rs.) 297.39

1132
CPVC Pipe SDR 13.5, 20mm (3/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a. 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 160.00 160.00
b. Cpvc fittings Ls 100.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 290.00
Actual rate 303.60
15% contractor overhead 45.54
Rate per Rm Rs. 349.14 Total (Rs.) 349.14

1133
CPVC Pipe SDR 13.5, 25mm (1") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 210.00 210.00
b. Cpvc fittings Ls 120.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 360.00
Actual rate 379.55
15% contractor overhead 56.93
Rate per Rm Rs. 436.48 Total (Rs.) 436.48

26
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1134
CPVC Pipe SDR 13.5, 32mm (1 1/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 261.00 261.00
b. Cpvc fittings Ls 120.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 411.00
Actual rate 430.55
15% contractor overhead 64.58
Rate per Rm Rs. 495.13 Total (Rs.) 495.13

1135
CPVC Pipe SDR 13.5, 40mm (1 1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 366.00 366.00
b. Cpvc fittings Ls 150.00
c. Jointing materials (flow guard adesive soln) Ls 50.00 566.00
Actual rate 585.55
15% contractor overhead 87.83
Rate per Rm Rs. 673.38 Total (Rs.) 673.38

1136
CPVC Pipe SDR 13.5, 50mm (2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 50 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 559.00 559.00
b. Cpvc fittings Ls 175.00
c. Jointing materials (flow guard adesive soln) Ls 50.00 784.00
Actual rate 803.55
15% contractor overhead 120.53
Rate per Rm Rs. 924.08 Total (Rs.) 924.08

1137
CPVC CTS.15 mm ball Valve( 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 15 mm CPVC ball valve, CTS sockets, 1 set 365.00 365.00 451.35
Actual rate 451.35
15% contractor overhead 67.70
Rate per Rm Rs. 519.05 Total (Rs.) 519.05

1138
CPVC CTS. 20 mm ball Valve( 3/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 20 mm CPVC ball valve, CTS sockets, 1 set 486.00 486.00 572.35
Actual rate 572.35
15% contractor overhead 85.85
Rate per Rm Rs. 658.20 Total (Rs.) 658.20

1139
CPVC CTS. 25 mm ball Valve (1")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 25 mm CPVC ball valve, CTS sockets, 1 set 588.00 588.00 674.35
Actual rate 674.35
15% contractor overhead 101.15
Rate per Rm Rs. 775.50 Total (Rs.) 775.50

27
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1140
CPVC CTS. 32 mm ball Valve (1 1/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 32 mm CPVC ball valve, CTS sockets, 1 set 1,371.00 1,371.00 1,457.35
Actual rate 1,457.35
15% contractor overhead 218.60
Rate per Rm Rs. 1675.95 Total (Rs.) 1,675.95

1141
CPVC CTS. 40 mm ball Valve (1 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 40 mm CPVC ball valve, CTS sockets, 1 set 1,643.00 1,643.00 1,729.35
Actual rate 1,729.35
15% contractor overhead 259.40
Rate per Rm Rs. 1988.75 Total (Rs.) 1,988.75

1142
CPVC CTS. 50 mm ball Valve (2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 50 mm CPVC ball valve, CTS sockets, 1 set 2,117.00 2,117.00 2,203.35
Actual rate 2,203.35
15% contractor overhead 330.50
Rate per Rm Rs. 2533.85 Total (Rs.) 2,533.85

1143
Multilayer composite PEX/AL/PEX Pipe , 16mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a.16 mm mulitlayer composite PAP Pipe, sangahi or eq 1 Rm 101.00 101.00
b. Brass fittings Ls 50.00
c. Jointing materials Ls 25.00 176.00
Actual rate 189.60
15% contractor overhead 28.44
Rate per Rm Rs. 218.04 Total (Rs.) 218.04

1144
Multilayer composite PEX/AL/PEX Pipe , 20mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a.20 mm mulitlayer composite PAP Pipe 1 Rm 119.00 119.00
b. Brass fittings Ls 50.00
c. Jointing materials Ls 25.00 194.00
Actual rate 207.60
15% contractor overhead 31.14
Rate per Rm Rs. 238.74 Total (Rs.) 238.74

1145
Multilayer composite PEX/AL/PEX Pipe , 25mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.25 mm mulitlayer composite PAP Pipe 1 Rm 180.00 180.00
b. Brass fittings Ls 75.00
c. Jointing materials Ls 25.00 280.00
Actual rate 299.55
15% contractor overhead 44.93
Rate per Rm Rs. 344.48 Total (Rs.) 344.48

28
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1146
Multilayer composite PEX/AL/PEX Pipe , 32mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.32 mm mulitlayer composite PAP Pipe, 1 Rm 281.00 281.00
b. Brass fittings Ls 75.00
c. Jointing materials Ls 25.00 381.00
Actual rate 400.55
15% contractor overhead 60.08
Rate per Rm Rs. 460.63 Total (Rs.) 460.63

1147
Multilayer composite PEX/AL/PEX Pipe , 40 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.40 mm mulitlayer composite PAP Pipe, 1 Rm 446.00 446.00
b. Brass fittings Ls 100.00
c. Jointing materials Ls 25.00 571.00
Actual rate 590.55
15% contractor overhead 88.58
Rate per Rm Rs. 679.13 Total (Rs.) 679.13

1148
Multilayer composite PEX/AL/PEX Pipe , 50 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.50 mm mulitlayer composite PAP Pipe, 1 Rm 653.00 653.00
b. Brass fittings Ls 125.00
c. Jointing materials Ls 25.00 803.00
Actual rate 822.55
15% contractor overhead 123.38
Rate per Rm Rs. 945.93 Total (Rs.) 945.93

1149
PPR Pipe( Poly propylene Random Co-polymer ) , 20 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a.20 mm PP-R Pipe,(PN-10,SDR 11), napatop or eqv 1 Rm 63.00 63.00
b. PPR fittings Ls 25.00
88.00
Actual rate 101.60
15% contractor overhead 15.24
Rate per Rm Rs. 116.84 Total (Rs.) 116.84

1150
PPR Pipe( Poly propylene Random Co-polymer ) , 25 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.25 mm PP-R Pipe,(PN-10,SDR 11) napatop or eqv 1 Rm 95.00 95.00
b. PPR fittings Ls 25.00
120.00
Actual rate 139.55
15% contractor overhead 20.93
Rate per Rm Rs. 160.48 Total (Rs.) 160.48

29
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1151
PPR Pipe( Poly propylene Random Co-polymer ) , 32 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.32 mm PP-R Pipe,(PN-10,SDR 11), napatop or eqv 1 Rm 152.00 152.00
b. PPR fittings Ls 25.00
177.00
Actual rate 196.55
15% contractor overhead 29.48
Rate per Rm Rs. 226.03 Total (Rs.) 226.03

1152
PPR Pipe( Poly propylene Random Co-polymer ) , 40 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.40 mm PP-R Pipe,(PN-10,SDR 11)napatop or eqv 1 Rm 239.00 239.00
b. PPR fittings Ls 50.00
289.00
Actual rate 308.55
15% contractor overhead 46.28
Rate per Rm Rs. 354.83 Total (Rs.) 354.83

1153
PPR Pipe( Poly propylene Random Co-polymer ) , 50 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 50 mm PP-R Pipe,(PN-10,SDR 11),napatop or eqv 1 Rm 372.00 372.00
b. PPR fittings Ls 50.00
422.00
Actual rate 441.55
15% contractor overhead 66.23
Rate per Rm Rs. 507.78 Total (Rs.) 507.78

1154
150 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 15 nos 575.00 8,625.00 10,980.00
materials a.150 mm RCC hump pipe np2 32 Rm 503.00 16,096.00
b.150 mm RCC collar 13 nos 126.00 1,638.00
c. cement 0.035 mt 15,080.00 527.80
d. sand 0.05 cum 2,083.29 104.16
e. Jute 1.6 kg 50.00 80.00 18,445.96
Actual rate 29,425.96
15% contractor overhead 4,413.89
Rate per Rm Rs. 1057.49 Total (Rs.) 33,839.85

30
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1155
200 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 20 nos 575.00 11,500.00 14,640.00
materials a.200 mm RCC hump pipe np2 32 Rm 653.00 20,896.00
b.200 mm RCC collar 13 nos 165.00 2,145.00
c. cement 0.052 mt 15,080.00 784.16
d. sand 0.08 cum 2,083.29 166.66
e. Jute 2.4 kg 50.00 120.00 24,111.82
Actual rate 38,751.82
15% contractor overhead 5,812.77
Rate per Rm Rs. 1392.64 Total (Rs.) 44,564.59

1156
300 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 22 nos 575.00 12,650.00 17,360.00
materials a.300 mm RCC hump pipe np2 32 Rm 1,109.00 35,488.00
b.300 mm RCC collar 13 nos 277.00 3,601.00
c. cement 0.083 mt 15,080.00 1,251.64
d. sand 0.13 cum 2,083.29 270.82
e. Jute 3.63 kg 50.00 181.50 40,792.96
Actual rate 58,152.96
15% contractor overhead 8,722.94
Rate per Rm Rs. 2089.87 Total (Rs.) 66,875.90

1157
400 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 22 nos 575.00 12,650.00 17,360.00
materials a.400 mm RCC hump pipe np2 32 Rm 1,542.00 49,344.00
b.400 mm RCC collar 13 nos 386.00 5,018.00
c. cement 0.083 mt 15,080.00 1,251.64
d. sand 0.13 cum 2,083.29 270.82
e. Jute 3.63 kg 50.00 181.50 56,065.96
Actual rate 73,425.96
15% contractor overhead 11,013.89
Rate per Rm Rs. 2638.74 Total (Rs.) 84,439.85

31
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1158
600 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 785.00 7,065.00
un skilled 35 nos 575.00 20,125.00 27,190.00
materials a.600 mm RCC hump pipe np2 32 Rm 2,418.00 77,376.00
b.600 mm RCC collar 13 nos 605.00 7,865.00
c. cement 0.218 mt 15,080.00 3,287.44
d. sand 0.3 cum 2,083.29 624.98
e. Jute 7 kg 50.00 350.00 89,503.42
Actual rate 116,693.42
15% contractor overhead 17,504.01
Rate per Rm Rs. 4193.66 Total (Rs.) 134,197.43

1159
150 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 15 nos 575.00 8,625.00 10,980.00
materials a.150 mm RCC hump pipe np3 32 Rm 1,122.00 35,904.00
b. cement 0.035 mt 15,080.00 527.80
c. sand 0.05 cum 2,083.29 104.16
d. Jute 1.6 kg 50.00 80.00 36,615.96
Actual rate 47,595.96
15% contractor overhead 7,139.39
Rate per Rm Rs. 1710.47 Total (Rs.) 54,735.35

1160
200 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 20 nos 575.00 11,500.00 14,640.00
materials a.200 mm RCC hump pipe np3 32 Rm 1,495.00 47,840.00
b. cement 0.052 mt 15,080.00 784.16
c. sand 0.08 cum 2,083.29 166.66
d. Jute 2.4 kg 50.00 120.00 48,910.82
Actual rate 63,550.82
15% contractor overhead 9,532.62
Rate per Rm Rs. 2283.85 Total (Rs.) 73,083.44

1161

300 mm RCC hump pipe NP3


b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 22 nos 575.00 12,650.00 17,360.00
materials a.300 mm RCC hump pipe np3 32 Rm 2,686.00 85,952.00
b. cement 0.083 mt 15,080.00 1,251.64
c. sand 0.13 cum 2,083.29 270.82
d. Jute 3.63 kg 50.00 181.50 87,655.96
Actual rate 105,015.96
15% contractor overhead 15,752.39
Rate per Rm Rs. 3774.01 Total (Rs.) 120,768.35

32
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1162
400 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 22 nos 575.00 12,650.00 17,360.00
materials a.400 mm RCC hump pipe np3 32 Rm 3,433.00 109,856.00
b. cement 0.083 mt 15,080.00 1,251.64
c. sand 0.13 cum 2,083.29 270.82
d. Jute 3.63 kg 50.00 181.50 111,559.96
Actual rate 128,919.96
15% contractor overhead 19,337.99
Rate per Rm Rs. 4633.06 Total (Rs.) 148,257.95

1163
600 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 785.00 7,065.00
un skilled 35 nos 575.00 20,125.00 27,190.00
materials a.600 mm RCC hump pipe np3 32 Rm 5,309.00 169,888.00
b. cement 0.218 mt 15,080.00 3,287.44
c. sand 0.3 cum 2,083.29 624.98
d. Jute 7 kg 50.00 350.00 174,150.42
Actual rate 201,340.42
15% contractor overhead 30,201.06
Rate per Rm Rs. 7235.67 Total (Rs.) 231,541.48

1164
140 mm Plastic Gutter WATER PIPE ( HALF ROUND)
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 9 nos 575.00 5,175.00 9,885.00
materials a. 140 mm Plastic water pipe (Half round Gutter) 30 Rm 177.00 5,310.00
b. Joint Bracket 8 nos 285.00 2,280.00
c. Short Stop End 1 nos 106.00 106.00
d. Stop End Outlet 1 nos 339.00 339.00
e. Running Outlet 2 nos 391.00 782.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 480.00 480.00
g. Support Bracket 30 nos 85.00 2,550.00
h. Rafter Bracket 30 nos 86.00 2,580.00
i. Top Bracket 30 nos 56.00 1,680.00 16,107.00
Actual rate 25,992.00
15% contractor overhead 3,898.80
Rate per Rm Rs. 996.36 Total (Rs.) 29,890.80

1165
180 mm Plastic Gutter WATER PIPE ( HALF ROUND)
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 9 nos 575.00 5,175.00 9,885.00
materials a. 180 mm Plastic water pipe (Half round Gutter) 10 Rm 335.00 3,350.00
b. Joint Bracket 8 nos 398.00 3,184.00
c. Short Stop End 1 nos 156.00 156.00
d. Stop End Outlet 1 nos 471.00 471.00
e. Running Outlet 2 nos 575.00 1,150.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 658.00 658.00
g. Support Bracket 30 nos 120.00 3,600.00
h. Rafter Bracket 30 nos 122.00 3,660.00
i. Top Bracket 30 nos 101.00 3,030.00 19,259.00
Actual rate 29,144.00
15% contractor overhead 4,371.60
Rate per Rm Rs. 1117.18 Total (Rs.) 33,515.60

33
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


1166
250 mm Plastic Gutter WATER PIPE ( HALF ROUND)
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 9 nos 575.00 5,175.00 9,885.00
materials a. 250 mm Plastic water pipe (Half round Gutter) 10 Rm 650.00 6,500.00
b. Joint Bracket 8 nos 682.00 5,456.00
c. Short Stop End 1 nos 335.00 335.00
d. Stop End Outlet 1 nos 891.00 891.00
e. Running Outlet 2 nos 1,072.00 2,144.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 1,541.00 1,541.00
g. Support Bracket 30 nos 333.00 9,990.00
h. Rafter Bracket 30 nos 353.00 10,590.00
i. Top Bracket 30 nos 182.00 5,460.00 42,907.00
Actual rate 52,792.00
15% contractor overhead 7,918.80
Rate per Rm Rs. 2023.69 Total (Rs.) 60,710.80

1.5cm C.P. Water Spray


sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 785.00 196.25
un skilled 0.17 nos 575.00 97.75 294.00
a.Water spray (Health faucet) with 1.2 m. long flexible
materials
pipe. 1 sets 1,113.00 1,113.00 1,113.00
Actual rate 1,407.00
15% contractor overhead 211.05
Rate per No Rs. 1618.05 Total (Rs.) 1,618.05

34
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District

50mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete UNIT : 1.0 nos
Description of
Materials cost Labour cost
S.N materials Total
Net Overhead
Jointing Total Skilled @Rs unSkilled @Rs Total amount Remark
amount 15%
Fittings material amount 785/day 575/day labour (Rs.)
No Amount No Amount amount
1167 Plain Tee 68.00 5.00 73.00 0.08 62.80 0.10 57.50 120.30 193.30 28.99 222.29
1168 Bend 90 degree 46.00 5.00 51.00 0.08 62.80 0.10 57.50 120.30 171.30 25.69 196.99
1169 Bend 45 degree 45.00 5.00 50.00 0.08 62.80 0.10 57.50 120.30 170.30 25.54 195.84

75 mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete


UNIT : 1.0 nos
Materials cost Labour cost
Skilled unSkilled @Rs Total
Description of Jointing Total Total Net Overhead
S.N Fittings amount Remark
materials material amount labour amount 15%
@Rs785/day 575/day (Rs.)
amount
No Amount No Amount
1170 Vent cowl 53.00 5.00 58.00 0.11 86.35 0.10 57.50 143.85 201.85 30.27 232.12
1171 Plain tee 147.00 5.00 152.00 0.11 86.35 0.10 57.50 143.85 295.85 44.37 340.22
1172 Plain door tee 198.00 5.00 203.00 0.11 86.35 0.10 57.50 143.85 346.85 52.02 398.87
1173 Bend 90 degree 108.00 5.00 113.00 0.11 86.35 0.10 57.50 143.85 256.85 38.52 295.37
1174 Door bend 139.00 5.00 144.00 0.11 86.35 0.10 57.50 143.85 287.85 43.17 331.02
1175 Bend 45 degree 88.00 5.00 93.00 0.11 86.35 0.10 57.50 143.85 236.85 35.52 272.37
1176 Y- Branch 168.00 5.00 173.00 0.11 86.35 0.10 57.50 143.85 316.85 47.52 364.37
1177 Cross tee 322.00 5.00 327.00 0.11 86.35 0.10 57.50 143.85 470.85 70.62 541.47
1178 Pipe clip 28.00 5.00 33.00 0.00 0.00 0.00 0.00 0.00 33.00 4.95 37.95

110 mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete
UNIT : 1.0 nos

Materials cost Labour cost


Total
Description of Net Overhead
S.N Jointing Total Skilled @Rs unSkilled @Rs Total amount Remark
materials Fittings amount 15%
material amount 785/day 575/day labour (Rs.)
No Amount No Amount amount
1179 Vent cowl 87.00 5.00 92.00 0.16 125.60 0.20 115.00 240.60 332.60 49.89 382.49
1180 Plain tee 279.00 5.00 284.00 0.16 125.60 0.20 115.00 240.60 524.60 78.69 603.29
1181 Door tee 369.00 5.00 374.00 0.16 125.60 0.20 115.00 240.60 614.60 92.19 706.79
1182 Bend 90 degree 200.00 5.00 205.00 0.16 125.60 0.20 115.00 240.60 445.60 66.84 512.44
1183 Door bend 242.00 5.00 247.00 0.16 125.60 0.20 115.00 240.60 487.60 73.14 560.74
1184 Bend 45 degree 158.00 5.00 163.00 0.16 125.60 0.20 115.00 240.60 403.60 60.54 464.14
1185 Y- Branch 363.00 5.00 368.00 0.16 125.60 0.20 115.00 240.60 608.60 91.29 699.89
1186 Cross tee 510.00 5.00 515.00 0.16 125.60 0.20 115.00 240.60 755.60 113.34 868.94
1187 Pipe clip 37.00 5.00 42.00 0.00 0.00 0.00 0.00 0.00 42.00 6.30 48.30
1188 Gully trap 302.00 5.00 307.00 0.16 125.60 0.20 115.00 240.60 547.60 82.14 629.74

35
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu

Sanitary Rate Analysis 2072/073 for Kathmandu District


160 mm dia DWV Upvc leakproof, Moulded pipe specials supplying,fixing,Jointing, laying all complete UNIT : 1.0 nos
Materials cost Labour cost
Total
Description of Skilled unSkilled @Rs Net Overhead
S.N Total amount Remark
materials Jointing Total @Rs785/day 575/day amount 15%
Fitting labour (Rs.)
material amount
No Amount No Amount amount
1189 Bend 90 degree 988.00 10.00 998.00 0.11 86.35 0.10 57.50 143.85 1141.85 171.27 1313.12
1190 160*110 Reducer 449.00 10.00 459.00 0.11 86.35 0.10 57.50 143.85 602.85 90.42 693.27
1191 Door tee 2016.00 10.00 2026.00 0.11 86.35 0.10 57.50 143.85 ### 325.47 2495.32
1192 45 Degree bends 864.00 10.00 874.00 0.11 86.35 0.10 57.50 143.85 ### 152.67 1170.52
1193 Plain tee 1157.00 10.00 1167.00 0.11 86.35 0.10 57.50 143.85 ### 196.62 1507.47
1194 Y- Branch 2118.00 10.00 2128.00 0.11 86.35 0.10 57.50 143.85 ### 340.77 2612.62
1195 Door bend 864.00 10.00 874.00 0.11 86.35 0.10 57.50 143.85 ### 152.67 1170.52

75 mm dia DWV Upvc leakproof, Moulded pipe specials supplying , fixing,Jointing, laying all complete UNIT : 1.0 nos
Materials cost Labour cost
Skilled @Rs unSkilled @Rs Total Total
Description of Net Overhead
Jointing Total 785/day 575/day labour amount Remark
materials Fitting amount 15%
material amount amount (Rs.)
S.N No Amount No Amount
1196 Bend 90 degree 177.00 10.00 187.00 0.11 86.35 0.20 115.00 201.35 388.35 58.25 446.60
1197 Vent cowl 230.00 10.00 240.00 0.11 86.35 0.20 115.00 201.35 441.35 66.20 507.55
1198 Door tee 349.00 10.00 359.00 0.11 86.35 0.20 115.00 201.35 560.35 84.05 644.40
1199 45 Degree bends 140.00 10.00 150.00 0.11 86.35 0.20 115.00 201.35 351.35 52.70 404.05
1200 Plain tee 222.00 10.00 232.00 0.11 86.35 0.20 115.00 201.35 433.35 65.00 498.35
1201 Y- Branch 288.00 10.00 298.00 0.11 86.35 0.20 115.00 201.35 499.35 74.90 574.25
1202 Door bend 81.00 10.00 91.00 0.11 86.35 0.20 115.00 201.35 292.35 43.85 336.20

110 mm dia DWV Upvc leakproof, Moulded pipe supplying , fixing,Jointing, laying all complete UNIT : 1.0 nos
Materials cost Labour cost
Skilled unSkilled @Rs Total
Description of Net Overhead
S.N Jointing Total Total amount amount Remark
materials Fitting @Rs785/day 575/day 15%
material amount amount (Rs.)
No Amount No Amount
1203 Bend 90 degree 323.00 10.00 333.00 0.16 125.60 0.20 115.00 240.60 573.60 86.04 659.64
1204 Vent cowl 161.00 10.00 171.00 0.16 125.60 0.20 115.00 240.60 411.60 61.74 473.34
1205 Door tee 453.00 10.00 463.00 0.16 125.60 0.20 115.00 240.60 703.60 105.54 809.14
1206 45 Degree bends 282.00 10.00 292.00 0.16 125.60 0.20 115.00 240.60 532.60 79.89 612.49
1207 Plain tee 437.00 10.00 447.00 0.16 125.60 0.20 115.00 240.60 687.60 103.14 790.74
1208 Y- Branch 475.00 10.00 485.00 0.16 125.60 0.20 115.00 240.60 725.60 108.84 834.44
1209 Door bend 103.00 10.00 113.00 0.16 125.60 0.20 115.00 240.60 353.60 53.04 406.64