Beruflich Dokumente
Kultur Dokumente
1
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
2
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
3
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
4
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
5
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
6
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
7
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
8
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
9
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
580 mm size Orissa pan with low level cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. 580 mm Porcelain clay white glaze Orissa Pan
(Hindware, Parryware, Classica, bolan or equivalent.) 1 nos 3,273.00 3,273.00
b.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 3,455.00 3,455.00
c 32mmx60mm size flushing CP pipe 1 nos 495.00 495.00
7,223.00
d.1.5x45 Cm (" x18") PVC pipe connector 1 nos 139.00 139.00 7,362.00
Actual rate 11,442.00
15% contractor overhead 1,716.30
Rate per set Rs. 13158.30 Total (Rs.) 13,158.30
1002
500 mm IPWC with low level cistern (Indian pan)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. 580 mm Porcelain clay white glaze Indian Pan
(Hindware, Parryware, Classica, cera or eqv. ) 1 nos 1,019.00 1,019.00
b. P or S trap. 1 nos 572.00 572.00
c. White glazed foot rest 2 nos 407.00 814.00
d.10.0 ltr. porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 3,455.00 3,455.00
e. 32mmx60mm size flushing CP pipe 1 nos 495.00 495.00
f. 1.5x45 Cm (" x18") PVC pipe connector 1 nos 139.00 139.00 6,494.00
Actual rate 10,574.00
15% contractor overhead 1,586.10
Rate per set Rs. 12160.10 Total (Rs.) 12,160.10
1003
1
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1005
10.0 Litre. Porceline clay Cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories 1 nos 3,455.00 3,455.00
b. 1.5x45 Cm(" x18") pipe connector 1 nos 139.00 139.00 3,594.00
Actual rate 6,314.00
15% contractor overhead 947.10
Rate per set Rs. 7261.1 Total (Rs.) 7,261.10
1006
10.0 Lit. PVC Cistern with dual flushing systemcomplete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a.10.0 ltr.PVC low level flushing cistern 3/6 litre dual
materials flushing with complete accessories 1 nos 1,915.00 1,915.00
b.3.2x60 Cm(1"x24") flushing pipe 1 nos 495.00 495.00
c. 1.5x45 Cm(" x18") pipe connector 1 nos 139.00 139.00 2,549.00
Actual rate 5,269.00
15% contractor overhead 790.35
Rate per set Rs. 6059.35 Total (Rs.) 6,059.35
1007
I.P W C. COMODE with low level cistern complete set.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. Porcelain clay white glaze Indian Pattern Comode
(Hindware Parryware, or equivalent ) regular 1 nos 1,541.00 1,541.00
b.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories( Internal PVC fittings) 1 nos 3,455.00 3,455.00
c .Bakelite toilet seat cover 1 nos 268.00 268.00
d. 3.2x60 Cm (1 1/4"x24") flushing CP pipe 1 nos 495.00 495.00
e. 1.5x45 CM (" x18") PVC pipe connector 1 nos 139.00 139.00
f. screw, etc. Ls 40.00 5,938.00
Actual rate 10,018.00
15% contractor overhead 1,502.70
Rate per set Rs. 11520.70 Total (Rs.) 11,520.70
1008
E W C. COMODE with cistern and seat cover with complete set.
2
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1010
E.P W C. COMODE with Cistern seat cover complete set. ( One piece ) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 3 nos 575.00 1,725.00 4,080.00
a. Porcelain clay white glaze European Pattern
Comode with cistern , slow falling seat cover One
piece Ellisa, Plaza, mogen ( American standard) Cotto
materials or equivalent 1 nos 28,034.00 28,034.00
b.1.5x45 cm(" x18") PVC pipe connector 1 nos 139.00 139.00 28,173.00
Actual rate 32,253.00
15% contractor overhead 4,837.95
Rate per set Rs. 37090.95 Total (Rs.) 37,090.95
1011
50x40cm OVAL WASH BASIN with mixer COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 50x40cm Porcelain clay Oval white glaze Wash
basin (Hindware, Parryware, Classica, cera or
equivalent ) regular 1 nos 1,438.00 1,438.00
b. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 462.00 462.00
c. 15 mm CP basin mixer jaquar,Parrtware or
equivalent 1 nos 3,778.00 3,778.00
d. screw etc Ls 40.00 5,718.00
Actual rate 8,438.00
15% contractor overhead 1,265.70
Total (Rs.) 9,703.70
Rate per set Rs. 9703.70
1012
WASH BASIN 63x50cm with mixer COMPLETE SET ( American standard) Cotto
3
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1013
75x50 cm Wash BASIN with mixer , COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a .75x50cm Porcelain clay white glaze Wash basin
materials with all complete. 1 nos 6,051.00 6,051.00
b. 32 mm pvc bottle trap including 32mm CP waste 1 nos
coupling with CP chain and rubber plug etc. 462.00 462.00
c.15 mm CP basin mixer jaquar, parryware or equ. 1 nos 3,778.00 3,778.00
d. 1.5x45Cm ("x18") pipe connector 2 nos 139.00 278.00
e. screw etc Ls 40.00
10,609.00
Actual rate 13,329.00
15% contractor overhead 1,999.35
Rate per set Rs. 15328.35 Total (Rs.) 15,328.35
1014
50x40cm WASH BASIN WITH PEDESTAL AND MIXER COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a. 50x40cm Porcelain clay white glaze Wash basin
(Hindware Parryware, bolan or equivalent ) regular 1 nos 1,438.00 1,438.00
b. Bracket 1 nos 135.00 135.00
c. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 462.00 462.00
1015
50X40 CM WASH BASIN COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 2 nos 575.00 1,150.00 2,720.00
a) 50x40cm Porcelain clay white glaze Wash basin
(Hindware, Parryware, cera or equivalent ) Regular 1 nos 1,438.00 1,438.00
materials b. bracket 1 set 135.00 135.00
c.32 mm PVC bottle trap including 32mm cp waste
coupling with CP chain and rubber plug etc. 1 set 462.00 462.00
d. 15mm swan neck type cp pillar cock 1 nos 1,321.00 1,321.00
e. 1.5x45cm ("x18") pipe connector 1 nos 139.00 139.00 3,495.00
Actual rate 6,215.00
15% contractor overhead 932.25
Rate per set Rs. 7147.25 Total (Rs.) 7,147.25
4
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1017
45x30x15 (18"X12"X6") SMALL LAVATORY SINK COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 45x30x15 Cm (18"x12"x6") White glaze sink with C I
bracket (Hindware, Parryware cera or equivalent) 1 nos 1,605.00 1,605.00
b. 32 mm PVC bottle trap including 32mm waste
coupling with CP chain and rubber plug etc. 1 nos 462.00 462.00
materials c. 1.5cm (" ) dia.CP Sink cock (swan neck type) 1 nos 1,271.00 1,271.00
d.1.5x45 (" x18") pipe connector 1 nos 139.00 139.00 3,477.00
Actual rate 5,622.00
15% contractor overhead 843.30
Rate per set Rs. 6465.30 Total (Rs.) 6,465.30
1018
53x43x18cm ( 21"x17"x7") size LARGE LAVATORY SINK COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 53x43x18 (21"x17"x7") White glaze sink with C I
bracket (Hindware, Parryware, cera or equivalent ) 1 nos 2,157.00 2,157.00
b.PVC bottle trap including waste coupling with CP
chain and rubber plug etc. 1 set 462.00 462.00
materials c. 1.5Cm (") dia.Cp Sink cock 1 nos 1,271.00 1,271.00
d.1.5x45 ("x18") Pvc pipe connector 1 nos 139.00 139.00 4,029.00
Actual rate 6,174.00
15% contractor overhead 926.10
Rate per set Rs. 7100.1 Total (Rs.) 7,100.10
1019
60x45x25Cm ( 24"x18"x10") size LARGE KITCHEN SINK COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 1 nos 575.00 575.00 2,930.00
a. 60x45x25Cm (24"x18"x10") White glaze sink with
5
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1021
46.5x35.5x26.5 cm SIZE URINAL COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 46.5x35.5x26.5 cm White glaze flat back Urinal
materials (Hindware, Parryware,cera or eqv.) 1 nos 1,825.00 1,825.00
b.screw etc. Ls 40.00 1,865.00
Actual rate 4,010.00
15% contractor overhead 601.50
Rate per set Rs. 4611.5 Total (Rs.) 4,611.50
1022
61x41x38 cm size Large Flat back Urinal
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
a.61x41x38 cm Large Flat back White glazed urinal
with bracket (Hindware, Parryware, Classica, cera or
materials equivalent.) 1 nos 4,052.00 4,052.00
b. 32 mm pvc bottle trap with all complete. 1 nos 462.00 462.00
c.screw etc. Ls 40.00 4,554.00
Actual rate 8,059.00
15% contractor overhead 1,208.85
Rate per set Rs. 9267.85 Total (Rs.) 9,267.85
1023
ANGLE BACK URINAL COMPLETE SET 45x35x27.5cm (18"X14"X11") SIZE (CORNER )
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a.18"X14"X11" White glaze Angle back back Urinal
materials cascade type (Hindware eqv.) 1 nos 1,572.00 1,572.00
b.screw etc. Ls 40.00 1,612.00
Actual rate 3,757.00
15% contractor overhead 563.55
Rate per set Rs. 4320.55 Total (Rs.) 4,320.55
1024
45x35cm SQUATTING PLATE URINAL
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 785.00 1,570.00
un skilled 1 nos 575.00 575.00 2,145.00
a. 45X35 cm White glaze squatting plate urinal
materials (Hindware or equivalent) 1 nos 1,177.00 1,177.00 1,177.00
Actual rate 3,322.00
15% contractor overhead 498.30
Rate per set Rs. 3820.3 Total (Rs.) 3,820.30
6
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1025
68x30cm size URINAL Partation with all complete.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 785.00 392.50
un skilled 0.5 nos 575.00 287.50 680.00
a.68X30 cm White glaze Division plate urinal
materials Partation (Hindware or equivalent) 1 nos 1,691.00 1,691.00
b.screw etc. Ls 40.00 1,731.00
Actual rate 2,411.00
15% conctractor overhead 361.65
Rate per set Rs. 2772.65 Total (Rs.) 2,772.65
1026
1000 litre stainless steel WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 785.00 -
un skilled nos 575.00 - -
a. 1000 liter stainless steel water tank 304 grade steel
materials with Inlet, outlet, over flow, cleanout hole etc. all 1 nos 16,814.00 16,814.00
compete
b.Tanki nipples etc. Ls 185.00 16,999.00
Actual rate 16,999.00
15% contractor overhead 2,549.85
Rate per nos Rs. 19548.85 Total (Rs.) 19,548.85
1027
1500 litre stainless steel WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 785.00 -
un skilled nos 575.00 - -
a. 1500 liter stainless steel water tank 304 grade steel
materials with Inlet, outlet, over flow, cleanout hole etc. all 1 nos 23,894.00 23,894.00
compete
b.Tanki nipples etc. Ls 185.00 24,079.00
Actual rate 24,079.00
15% contractor overhead 3,611.85
Rate per nos Rs. 27690.85 Total (Rs.) 27,690.85
1028
2000 litre stainless steel WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled nos 785.00 -
un skilled nos 575.00 - -
a. 2000 liter stainless steel water tank 304 grade steel
materials with Inlet, outlet, over flow, cleanout hole etc. all 1 nos 31,858.00 31,858.00
compete
b.Tanki nipples etc. Ls 185.00 32,043.00
Actual rate 32,043.00
15% contractor overhead 4,806.45
Rate per nos Rs. 36849.45 Total (Rs.) 36,849.45
1029
5000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 8 nos 575.00 4,600.00 7,740.00
a. 5000 Ltr. capacity pvc water tank with Inlet, outlet,
materials over flow, cleanout hole etc. 1 nos 60,000.00 60,000.00
b.Tanki nipples etc. Ls 279.00 60,279.00
Actual rate 68,019.00
15% contractor overhead 10,202.85
Rate per nos Rs. 78221.85 Total (Rs.) 78,221.85
7
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1030
1000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 4 nos 575.00 2,300.00 4,655.00
a. 1000Ltr. PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 12,000.00 12,000.00
b.Tanki nipples with wash out plug etc. Ls 188.00 12,188.00
Actual rate 16,843.00
15% contractor overhead 2,526.45
Rate per nos Rs. 19369.45 Total (Rs.) 19,369.45
1031
500 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 4 nos 575.00 2,300.00 4,655.00
a. 500 ltr PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 6,000.00 6,000.00
b.Tanki nipples with wash out plug etc. Ls 135.00 6,135.00
Actual rate 10,790.00
15% contractor overhead 1,618.50
Rate per nos Rs. 12408.5 Total (Rs.) 12,408.50
1032
2000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 6 nos 575.00 3,450.00 5,805.00
a.2000 Ltr.PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 24,000.00 24,000.00
b.Tanki nipples with wash out plug etc. Ls 421.00 24,421.00
Actual rate 30,226.00
15% contractor overhead 4,533.90
Rate per nos Rs. 34759.90 Total (Rs.) 34,759.90
1033
1.0 H.P. Electrical motor water pump, Submersible pump Italian
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.1.0 H P Electric motor pump (Submersible) Italian or
materials equivalent 1 nos 25,329.00 25,329.00
b.Zink oxide screws etc. Ls 40.00 25,369.00
Actual rate 29,659.00
15% contractor overhead 4,448.85
Rate per nos Rs. 34107.85 Total (Rs.) 34,107.85
1034
0.5 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.0.5 H P Electric motor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 6,075.00 6,075.00
b.Zink oxide screws etc. Ls 40.00 6,115.00
Actual rate 10,405.00
15% contractor overhead 1,560.75
Rate per nos Rs. 11965.75 Total (Rs.) 11,965.75
8
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1035
1.0 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.1.0 H P Electric motor pump with base plate
materials nuts,bolts,etc.set 1 nos 9,189.00 9,189.00
b.Zink oxide screws etc. Ls 40.00 9,229.00
Actual rate 13,519.00
15% contractor overhead 2,027.85
Rate per nos Rs. 15546.85 Total (Rs.) 15,546.85
1036
1 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton) supersuction
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a.1 H P Electric motor pump with base plate nuts, bolts
materials etc.set crompton supersuction. 1 nos 13,860.00 13,860.00
b.Zink oxide screws etc. Ls 40.00 13,900.00
Actual rate 18,190.00
15% contractor overhead 2,728.50
Rate per nos Rs. 20918.50 Total (Rs.) 20,918.50
1037
2 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 3 nos 575.00 1,725.00 4,865.00
a.2 H P Electricmotor pump with base plate nuts, bolts
materials etc.set crompton 1 nos 21,929.00 21,929.00
b.Zink oxide screws etc. Ls 40.00 21,969.00
Actual rate 26,834.00
15% contractor overhead 4,025.10
Rate per nos Rs. 30859.10 Total (Rs.) 30,859.10
1038
3 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 4 nos 575.00 2,300.00 5,440.00
a. 3 H P Electricmotor pump with base plate nuts, bolts
materials etc.set crompton 1 nos 23,153.00 23,153.00
b.Zink oxide screws etc. Ls 40.00 23,193.00
Actual rate 28,633.00
15% contractor overhead 4,294.95
Rate per nos Rs. 32927.95 Total (Rs.) 32,927.95
1039
5 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 4 nos 575.00 2,300.00 7,010.00
a. 5 H P Electricmotor pump with base plate nuts, bolts
materials etc.set crompton 1 nos 27,822.00 27,822.00
b.Zink oxide screws etc. Ls 40.00 27,862.00
Actual rate 34,872.00
15% contractor overhead 5,230.80
Rate per nos Rs. 40102.80 Total (Rs.) 40,102.80
9
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1041
CHROME PLATE TOILET PAPER HOLDER
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.Chrome plate toilet paper holder 1 nos 495.00 495.00
b.Zink oxide screw etc. Ls 40.00 535.00
Actual rate 621.35
15% contractor overhead 93.20
Rate per nos Rs. 714.55 Total (Rs.) 714.55
1042
Stainless Steel liquid soap container (cotto)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
a. Stainless Steel Liquid Soap container all complete.
materials 1 nos 5,885.00 5,885.00
b.Zink oxide screw etc. Ls 40.00 5,925.00
Actual rate 6,011.35
15% contractor overhead 901.70
Rate per nos Rs. 6913.05 Total (Rs.) 6,913.05
1043
PORCELAIN CLAY SOAP TRAY 15x15 cm (6"X 6") SIZE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.White glaze soap tray 1 nos 642.00 642.00
b.Zink oxide screw etc. Ls 40.00 682.00
Actual rate 768.35
15% contractor overhead 115.25
Rate per nos Rs. 883.60 Total (Rs.) 883.60
1044
CHROME PLATE SOAP DISH.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.C.P Soap dish 1 nos 495.00 495.00
b.Zink oxide screw etc. Ls 40.00 535.00
Actual rate 621.35
15% contractor overhead 93.20
Rate per nos Rs. 714.55 Total (Rs.) 714.55
1045
Stainless Steel towel rod 1.5x45cm ("x18")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a . Stainless Steel Towel rod 1 nos 1,204.00 1,204.00
b. Screws etc. Ls 40.00 1,244.00
Actual rate 1,416.70
10
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1046
C P towel rod 1.5x60cm ("x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(2/9) 0.22 nos 785.00 172.70 172.70
materials a .C P Towel rod 1 nos 1,615.00 1,615.00
b. Screws Ls 40.00 1,655.00
Actual rate 1,827.70
15% contractor overhead 274.15
Rate per nos Rs. 2101.85 Total (Rs.) 2,101.85
1047
C P towel rod 1.5x45cm ("x 18")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a . C PTowel rod 1 nos 1,532.00 1,532.00
b. Screws etc. Ls 40.00 1,572.00
Actual rate 1,744.70
15% contractor overhead 261.70
Rate per nos Rs. 2006.40 Total (Rs.) 2,006.40
1048
CP Glass Shelf with guard rail with glass
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a. C P Guard rail with glass 1 nos 660.00 660.00
b. Screws etc. Ls 40.00 700.00
Actual rate 872.70
15% contractor overhead 130.90
Rate per nos Rs. 1003.60 Total (Rs.) 1,003.60
1049
Looking Mirror Modi guard 450x600mm (18"x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials a.Bevelled edge looking mirror 50x40 cm 1 nos 1,417.00 1,417.00
b . Screws Ls 40.00 1,457.00
Actual rate 1,716.05
15% contractor overhead 257.40
Rate per nos Rs. 1973.45 Total (Rs.) 1,973.45
1050
73 mm Ms Seamless Pipes SCH 40
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 2.7 nos 785.00 2,119.50
un skilled 3.2 nos 575.00 1,840.00 3,959.50
a 73 mm OD Ms Seamless pipes SCH 40, 5.16 mm
materials thick 1 Rm 1,723.00 1,723.00
b. Jointing materials and painting Ls 350.00
2,073.00
Actual rate 6,032.50
15% contractor overhead 904.87
Rate per Rm Rs.. 6937.37 Total (Rs.) 6,937.37
11
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1051
101.6 mm Ms Seamless Pipes SCH 40
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 2.7 nos 785.00 2,119.50
un skilled 3.2 nos 575.00 1,840.00 3,959.50
a 101.6 mm Ms Seamless pipes SCH 40 ,5.74mm
materials thickness 1 Rm 2,914.00 2,914.00
b. Jointing materials and painting Ls 350.00
3,264.00
Actual rate 7,223.50
15% contractor overhead 1,083.52
Rate per Rm Rs.. 8307.02 Total (Rs.) 8,307.02
1052
CP Shower rose 7.5 cm (3") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials a.7.5cm dia shower rose fancy type with 30cm CP rod
1 nos 880.00 880.00 880.00
Actual rate 1,139.05
15% contractor overhead 170.85
Rate per nos Rs. 1309.90 Total (Rs.) 1,309.90
1053
Stainless Steel Shower rose
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials Stainless Steel Shower rose with complete set. 1 nos 2,889.00 2,889.00 2,889.00
Actual rate 3,148.05
15% contractor overhead 472.20
Rate per nos Rs. 3620.25 Total (Rs.) 3,620.25
1054
Stainless steel telephonic Shower Rose
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials Stainless steel telephonic Shower Rose 1 nos 1,204.00 1,204.00 1,204.00
Actual rate 1,463.05
15% contractor overhead 219.45
Rate per nos Rs. 1682.50 Total (Rs.) 1,682.50
1055
C.P . FLUSH VALVE ( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials 32 mm C.P Flush valve Euorpean pattern 1 nos 5,247.00 5,247.00 5,247.00
Actual rate 5,333.35
15% conctractor overhead 800.00
Rate per nos Rs. 6133.35 Total (Rs.) 6,133.35
1056
15mm CP Bib Cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials 15mm CP bib cock 1 nos 1,321.00 1,321.00 1,321.00
Actual rate 1,407.35
15% contractor overhead 211.10
Rate per nos Rs. 1618.45 Total (Rs.) 1,618.45
12
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1057
15mm Stainless Steel Bib Cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Stainless Steel bib cock 1 nos 4,296.00 4,296.00 4,296.00
Actual rate 4,382.35
15% contractor overhead 657.35
Rate per nos Rs. 5039.70 Total (Rs.) 5,039.70
1058
15mm Auto closing Bib Cock with aerator
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Auto closing bib cock with aerator 1 nos 2,536.00 2,536.00 2,536.00
Actual rate 2,622.35
15% contractor overhead 393.35
Rate per nos Rs. 3015.70 Total (Rs.) 3,015.70
1059
15mm Urinal Auto closing Valve with built in control cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Urinal Auto closing valve with 1 nos 2,616.00 2,616.00 2,616.00
built - in control cock
Actual rate 2,702.35
15% contractor overhead 405.35
Rate per nos Rs. 3107.70 Total (Rs.) 3,107.70
1060
15mm Stainless Steel Angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm Stainless Steel angle valve 1 nos 803.00 803.00 803.00
Actual rate 889.35
15% contractor overhead 133.40
Rate per nos Rs. 1022.75 Total (Rs.) 1,022.75
1061
C.P. 15mm Angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm fancy type angle valve 1 nos 900.00 900.00 900.00
Actual rate 986.35
15% contractor overhead 147.95
Rate per nos Rs. 1134.30 Total (Rs.) 1,134.30
1062
15mm two way angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm two way angle valve 1 nos 1,124.00 1,124.00 1,124.00
Actual rate 1,210.35
15% contractor overhead 181.55
Rate per nos Rs. 1391.90 Total (Rs.) 1,391.90
13
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1063
15mm dia Stainless Steel Pillar Cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15 mm dia Stainless Steel Piller Cock 1 nos 4,296.00 4,296.00 4,296.00
Actual rate 4,382.35
15% contractor overhead 657.35
Rate per nos Rs. 5039.70 Total (Rs.) 5,039.70
1064
15mm CP concealed stop cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm CP concealed stop cock 1 nos 1,755.00 1,755.00 1,755.00
Actual rate 1,841.35
15% contractor overhead 276.20
Rate per nos Rs. 2117.55 Total (Rs.) 2,117.55
1065
G.M.15 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15mm gate valve 1 nos 802.00 802.00 802.00
Actual rate 888.35
15% contractor overhead 133.25
Rate per nos Rs. 1021.60 Total (Rs.) 1,021.60
1066
G.M. 20 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a.20 mm gate valve 1 nos 998.00 998.00 998.00
Actual rate 1,084.35
15% contractor overhead 162.65
Rate per nos Rs. 1247.00 Total (Rs.) 1,247.00
1067
G.M. 25mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.25mm gate valve 1 nos 1,608.00 1,608.00 1,608.00
Actual rate 1,780.70
15% contractor overhead 267.10
Rate per nos Rs. 2047.80 Total (Rs.) 2,047.80
1068
G.M.32 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.32 mm gate valve 1 nos 2,294.00 2,294.00 2,294.00
Actual rate 2,466.70
15% contractor overhead 370.00
Rate per nos Rs. 2836.70 Total (Rs.) 2,836.70
14
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1070
G.M. 50 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.50 mm gate valve 1 nos 4,599.00 4,599.00 4,599.00
Actual rate 4,944.40
15% contractor overhead 741.66
Rate per nos Rs. 5686.06 Total (Rs.) 5,686.06
1071
G.M.65 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.65 mm gate valve 1 nos 9,509.00 9,509.00 9,509.00
Actual rate 9,854.40
15% contractor overhead 1,478.16
Rate per nos Rs. 11332.56 Total (Rs.) 11,332.56
1072
G.M 80 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 785.00 628.00 628.00
materials a.80 mm gate valve 1 nos 11,823.00 11,823.00 11,823.00
Actual rate 12,451.00
15% contractor overhead 1,867.65
Rate per nos Rs. 14318.65 Total (Rs.) 14,318.65
1073
G.M.100 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 785.00 628.00 628.00
materials a 100 mm gate valve 1 nos 19,365.00 19,365.00 19,365.00
Actual rate 19,993.00
15% contractor overhead 2,998.95
Rate per nos Rs. 22991.95 Total (Rs.) 22,991.95
1074
15 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. 15 mm G M check valve 1 nos 744.00 744.00 744.00
Actual rate 830.35
15% contractor overhead 124.55
Rate per nos Rs. 954.90 Total (Rs.) 954.90
15
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1076
25 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.25 mm G M check valve 1 nos 1,479.00 1,479.00 1,479.00
Actual rate 1,651.70
15% contractor overhead 247.75
Rate per nos Rs. 1899.45 Total (Rs.) 1,899.45
1077
32 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials a.32 mm G M check valve 1 nos 2,186.00 2,186.00 2,186.00
Actual rate 2,358.70
15% contractor overhead 353.80
Rate per nos Rs. 2712.50 Total (Rs.) 2,712.50
1078
50mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials a 50 mm G M check valve 1 nos 4,194.00 4,194.00 4,194.00
Actual rate 4,453.05
15% contractor overhead 667.95
Rate per nos Rs. 5121.00 Total (Rs.) 5,121.00
1079
65mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a. 65 mm G M check valve 1 nos 8,521.00 8,521.00 8,521.00
Actual rate 8,866.40
15% contractor overhead 1,329.96
Rate per nos Rs. 10196.36 Total (Rs.) 10,196.36
1080
80mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials a.80 mm G M check valve 1 nos 11,381.00 11,381.00 11,381.00
Actual rate 11,726.40
15% contractor overhead 1,758.96
Rate per nos Rs. 13485.36 Total (Rs.) 13,485.36
1081
100mm GM CHECK VALVE with flange
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 785.00 345.40 345.40
materials 100mm GM CHECK VALVE with flange 1 nos 16,084.00 16,084.00 16,084.00
Actual rate 16,429.40
15% contractor overhead 2,464.41
Rate per nos Rs. 18893.81 Total (Rs.) 18,893.81
16
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1082
PVC FLOOR TRAP 11x7.5cm (4" X 2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
un skilled 0.10 nos 575.00 57.50 143.85
materials Floor Trap 11x7.5cm (4" X 2") 1 nos 280.00 280.00 280.00
Actual rate 423.85
15% contractor overhead 63.57
Rate per nos Rs. 487.42 Total (Rs.) 487.42
1083
ALUMINIUM GRATING 100mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 785.00 47.10 47.10
materials Aluminium Grating 100 mm 1 nos 41.00 41.00 41.00
Actual rate 88.10
15% contractor overhead 13.21
Rate per nos. Rs. 101.31 Total (Rs.) 101.31
1084
C P GRATING 12.5cm (5") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 785.00 47.10 47.10
materials C P GRATTING 12.5cm (5") DIA SIZE 1 nos 61.00 61.00 61.00
Actual rate 108.10
15% contractor overhead 16.21
Rate per nos. Rs. 124.31 Total (Rs.) 124.31
1085
C P GRATING 110mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 785.00 47.10 47.10
materials C P GRATTING 110 mm (4") DIA SIZE 1 nos 48.00 48.00 48.00
Actual rate 95.10
15% contractor overhead 14.26
Rate per nos. Rs. 109.36 Total (Rs.) 109.36
1086
160mm dia DWV PIPE, SN-4
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.09 nos 785.00 855.65
un skilled 0.65 nos 575.00 373.75 1,229.40
a . 160 mm dia DWV Upvc Pipe with Double sockets
materials SN-4, Astral or eqv. 1 Rm 1,350.00 1,350.00
1,350.00
Actual rate 2,579.40
15% contractor overhead 386.91
Rate per Rm Rs. 2966.31 Total (Rs.) 2,966.31
1087
110mm dia DWV PIPE SN-4
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
a . 110 mm dia DWV Upvc Pipe with Double sockets
materials SN-4, Astral or eqv. 1 Rm 473.00 473.00
473.00
Actual rate 721.45
15% contractor overhead 108.21
Rate per Rm Rs. 829.66 Total (Rs.) 829.66
17
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1089
Stainless Steel wall Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. Stainless Steel Wall mixture complete set. 1 nos 4,061.00 4,061.00 4,061.00
Actual rate 4,147.35
15% contractor overhead 622.10
Rate per set Rs. 4769.45 Total (Rs.) 4,769.45
1090
15mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.16 nos 575.00 92.00 233.30
materials a.15 mm G. I . Pipe 'B ' class 1 Rm 120.00 120.00
b. G I fitting and painting Ls 100.00
c. Jointing materials Ls 25.00 245.00
Actual rate 478.30
15% contractor overhead 71.74
Rate per Rm Rs. 550.04 Total (Rs.) 550.04
1091
20 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.16 nos 575.00 92.00 233.30
materials a. 20 mm G. I . Pipe B' class 1 Rm 152.00 152.00
b. G I fitting and painting Ls 100.00
c. Jointing materials Ls 25.00 277.00
Actual rate 510.30
15% contractor overhead 76.54
Rate per Rm Rs. 586.84 Total (Rs.) 586.84
1092
25 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 785.00 141.30
un skilled 0.32 nos 575.00 184.00 325.30
materials a. 25 mm G. I . Pipe B ' class 1 Rm 230.00 230.00
b. G I fitting and painting Ls 125.00
c. Jointing materials Ls 25.00 380.00
Actual rate 705.30
15% contractor overhead 105.79
Rate per Rm Rs. 811.09 Total (Rs.) 811.09
18
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1094
40 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 785.00 211.95
un skilled 0.32 nos 575.00 184.00 395.95
materials a.40 mm G. I . Pipe 'B ' class 1 Rm 345.00 345.00
b. G I fitting and painting Ls 135.00
c. Jointing materials Ls 25.00 505.00
Actual rate 900.95
15% contractor overhead 135.14
Rate per Rm Rs. 1036.09 Total (Rs.) 1,036.09
1095
50mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 785.00 211.95
un skilled 0.32 nos 575.00 184.00 395.95
materials a 50 mm G. I . Pipe 'B ' class 1 Rm 473.00 473.00
b. G I fitting and painting Ls 150.00
c. Jointing materials Ls 25.00 648.00
Actual rate 1,043.95
15% contractor overhead 156.59
Rate per Rm Rs.. 1200.54 Total (Rs.) 1,200.54
1096
80mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 0.27 nos 785.00 211.95
un skilled 0.32 nos 575.00 184.00 395.95
materials a 80 mm G. I . Pipe 'B ' class 1 Rm 752.00 752.00
b. G I fitting and painting Ls 175.00
c. Jointing materials Ls 25.00 952.00
Actual rate 1,347.95
15% contractor overhead 202.19
Rate per Rm Rs.. 1550.14 Total (Rs.) 1,550.14
1097
Stainless Steel Basin Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. Stainless Steel Basin mixture complete set. 1 nos 6,741.00 6,741.00 6,741.00
Actual rate 6,827.35
15% contractor overhead 1,024.10
Rate per set Rs. 7851.45 Total (Rs.) 7,851.45
19
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1099
Inspection Chamber 315mm (12"X12")
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
Inspection Chamber body 32cm 1 nos 3,000.00 3,000.00
Inspection Chamber Riser 1 nos 1,490.00 1,490.00
materials Inspection Chamber Lid with cover 1 nos 2,829.00 2,829.00 7,319.00
Actual rate 7,578.05
15% contractor overhead 1,136.70
Rate per set Rs. 8714.75 Total (Rs.) 8,714.75
1100
Inspection Chamber 45cm dia (18"X18")
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
Inspection Chamber body 45x45cm 1 nos 8,284.00 8,284.00
Inspection Chamber Riser 1 nos 2,634.00 2,634.00
materials Inspection Chamber Lid with cover 1 nos 4,395.00 4,395.00 15,313.00
Actual rate 15,572.05
15% contractor overhead 2,335.80
Rate per set Rs. 17907.85 Total (Rs.) 17,907.85
1101
50 mm dia PVC PIPE 6 KG/CM. SQ.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/18) 0.06 nos 785.00 47.10
un skilled(1/10) 0.10 nos 575.00 57.50 104.60
materials a.50 mm dia. Pvc pipe 1 RM 99.00 99.00
b. Jointing materialsetc. Ls 25.00 124.00
Actual rate 228.60
15% contractor overhead 34.29
Rate per Rm Rs. 262.89 Total (Rs.) 262.89
1102
75 mm dia PVC PIPE 6 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
un skilled 0.11 nos 575.00 63.25 149.60
materials a.75 mm dia. Pvc pipe 1 Rm 222.00 222.00
b. Jointing materialsetc. Ls 25.00 247.00
Actual rate 396.60
15% contractor overhead 59.49
Rate per Rm Rs. 456.09 Total (Rs.) 456.09
20
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1104
15.0 Ltr WATER HEATER ( Aeroston Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
a. 15.0 Ltr wate heater including copper pipe connector
materials with coupling and other necessary fittings complete. 1 nos 11,770.00 11,770.00
b. Jointing materialsetc. Ls 25.00 11,795.00
Actual rate 15,300.00
15% contractor overhead 2,295.00
Rate per nos Rs. 17595.00 Total (Rs.) 17,595.00
1105
FIBER BATH TUB American standard or eqv.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
materials a. Bath tub 5"-6"x2"-6" with complete fittings. 1 nos 9,100.00 9,100.00
b. Jointing material set. Ls 25.00 9,125.00
Actual rate 13,415.00
15% contractor overhead 2,012.25
Rate per nos Rs. 15427.25 Total (Rs.) 15,427.25
1106
C.P. TELEPHONIC SHOWER with mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 785.00 785.00
un skilled 1 nos 575.00 575.00 1,360.00
a. Bath tub spout(Hot and cold) with Telephonic
materials shower. 1 nos 4,693.00 4,693.00 4,693.00
Actual rate 6,053.00
15% contractor overhead 907.95
Rate per set Rs. 6960.95 Total (Rs.) 6,960.95
1107
SENSOR FLUSH VALVE FOR URINAL ( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
C.P Flush valve for urinal sensor type electric
materials Euorpean pattern 1 nos 10,340.00 10,340.00 10,340.00
Actual rate 10,426.35
15% contractor overhead 1,563.95
Rate per nos Rs. 11990.30 Total (Rs.) 11,990.30
21
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1109
Sensor cock with mixer for basin (Battery operating)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.00 nos 785.00 785.00 785.00
materials Sensor mixer for basin (Battery operating) 1 nos 19,885.00 19,885.00 19,885.00
Actual rate 20,670.00
15% contractor overhead 3,100.50
Rate per set Rs. 23770.50 Total (Rs.) 23,770.50
1110
C.P. SINK Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a. Sink mixture complete set. 1 nos 4,341.00 4,341.00
b. Jointing material set. 25.00 4,366.00
Actual rate 4,452.35
15% contractor overhead 667.85
Rate per set Rs. 5120.20 Total (Rs.) 5,120.20
1111
C I Cover 45x45cm (18"X18") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials CI Cover 45x45cm (18" X 18") 14 kg wt. 1 nos 2,436.00 2,436.00 2,436.00
Actual rate 2,695.05
15% contractor overhead 404.25
Rate per set Rs. 3099.30 Total (Rs.) 3,099.30
1112
C I Cover 55x55cm (22"X 22") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05 259.05
materials CI Cover 22" X 22" of 20 kg wt. 1 nos 3,249.00 3,249.00 3,249.00
Actual rate 3,508.05
15% contractor overhead 526.20
Rate per set Rs. 4034.25 Total (Rs.) 4,034.25
1113
Fire Post
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 5 nos 785.00 3,925.00
un skilled 2 nos 575.00 1,150.00 5,075.00
materials a. Landinng valve ISI marked is : 5290, Hose
box 18 gauge mild steel, 75x60x25cm (30"x24"x10") to
accommodate two hose length of 15 meters each and
one branch pipes with locking arrangement, 2 lengths
Jayashree RRL hose
(ISI is : 636 in 15 meter length with male and female
coupling dully binded with wires, Branch pipe short
GM.)( minimax) 1 sets 27,214.00 27,214.00 27,214.00
Actual rate 32,289.00
15% contractor overhead 4,843.35
Rate per set Rs. 37132.35 Total (Rs.) 37,132.35
22
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1115
Fire hose reel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 4 nos 785.00 3,140.00
un skilled 2 nos 575.00 1,150.00 4,290.00
a. Swinging hose reel with 20 mm hydraulic rubber
braided hose 30 mt. Long, swinging up to 170 nozzle,
materials
U shape reel carriel, diamension 31" heigth over all
29" projection from wall (minimax) 1 sets 19,700.00 19,700.00 19,700.00
Actual rate 23,990.00
15% conctractor overhead 3,598.50
Rate per set Rs. 27588.50 Total (Rs.) 27,588.50
1116
G.M. 25mm float valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 785.00 172.70 172.70
materials G.M. 25mm float valve 1 nos 1,297.00 1,297.00 1,297.00
Actual rate 1,469.70
15% contractor overhead 220.45
Rate per nos Rs. 1690.15 Total (Rs.) 1,690.15
1117
Grab bar American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.22 nos 785.00 172.70 172.70
materials Grab bar American standard 1 nos 5,885.00 5,885.00
b. Zink oxide screw etc. Ls 40.00 5,925.00
Actual rate 6,097.70
15% contractor overhead 914.65
Rate per nos Rs. 7012.35 Total (Rs.) 7,012.35
1118
Euro Guard (Filter)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
23
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1120
Kitchen Sink 150 cm long
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 785.00 2,355.00
un skilled 2 nos 575.00 1,150.00 3,505.00
1121
Hand drayer Germany
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35 86.35
materials a) Hand dryer with complete accessories 1 nos 18,832.00 18,832.00 18,832.00
Actual rate 18,918.35
15% contractor overhead 2,837.75
Rate per nos Rs. 21756.10 Total (Rs.) 21,756.10
1122
4 Kg/cm2, High Density Polethene Pipe 50mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
materials a.High density polethene pipe 50mm. 1 RM 81.00 81.00 81.00
Actual rate 329.45
15% contractor overhead 49.41
Rate per Rm Rs. 378.86 Total (Rs.) 378.86
24
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1124
4 Kg/cm2, High Density Polethene Pipe 125 mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 785.00 133.45
un skilled 0.20 nos 575.00 115.00 248.45
materials a.High density polethene pipe 125 mm. 1 RM 490.00 490.00 490.00
Actual rate 738.45
15% contractor overhead 110.76
Rate per Rm Rs. 849.21 Total (Rs.) 849.21
1125
4 Kg/cm2, High Density Polethene Pipe 140mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.20 nos 785.00 157.00
un skilled 0.25 nos 575.00 143.75 300.75
materials a.High density polethene pipe 140mm.dia. 1 RM 621.00 621.00 621.00
Actual rate 921.75
15% contractor overhead 138.26
Rate per Rm Rs. 1060.01 Total (Rs.) 1,060.01
1126
4 Kg/cm2, High Density Polethene Pipe 160mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 785.00 196.25
un skilled 0.33 nos 575.00 189.75 386.00
materials a.High density polethene pipe 160mm. Dia 1.0 RM 807.00 807.00 807.00
Actual rate 1,193.00
15% contractor overhead 178.95
Rate per Rm Rs. 1371.95 Total (Rs.) 1,371.95
1127
4 Kg/cm2, High Density Polethene Pipe 180mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 785.00 259.05
un skilled 0.50 nos 575.00 287.50 546.55
materials a.High density polethene pipe 180mm. 1.0 RM 1,019.00 1,019.00 1,019.00
Actual rate 1,565.55
15% contractor overhead 234.83
Rate per Rm Rs. 1800.38 Total (Rs.) 1,800.38
1128
4 Kg/cm2, High Density Polethene Pipe 200mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.50 nos 785.00 392.50
un skilled 0.50 nos 575.00 287.50 680.00
materials a.High density polethene pipe 200mm. 1.0 RM 1,260.00 1,260.00 1,260.00
Actual rate 1,940.00
15% contractor overhead 291.00
Rate per Rm Rs. 2231.00 Total (Rs.) 2,231.00
25
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1130
560 mm dia 100 kg CI heavy Cover
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 785.00 785.00
un skilled 3.0 nos 575.00 1,725.00 2,510.00
materials a.100 kg CI heavy Manhole cover. 1.0 sets 14,712.00 14,712.00 14,712.00
Actual rate 17,222.00
15% contractor overhead 2,583.30
Rate per set Rs. 19805.30 Total (Rs.) 19,805.30
1131
CPVC Pipe SDR 13.5, 15mm (1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a. 15 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 115.00 115.00
b. Cpvc fittings Ls 100.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 245.00
Actual rate 258.60
15% contractor overhead 38.79
Rate per Rm Rs. 297.39 Total (Rs.) 297.39
1132
CPVC Pipe SDR 13.5, 20mm (3/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a. 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 160.00 160.00
b. Cpvc fittings Ls 100.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 290.00
Actual rate 303.60
15% contractor overhead 45.54
Rate per Rm Rs. 349.14 Total (Rs.) 349.14
1133
CPVC Pipe SDR 13.5, 25mm (1") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 210.00 210.00
b. Cpvc fittings Ls 120.00
c. Jointing materials (flow guard adesive soln) Ls 30.00 360.00
Actual rate 379.55
15% contractor overhead 56.93
Rate per Rm Rs. 436.48 Total (Rs.) 436.48
26
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1135
CPVC Pipe SDR 13.5, 40mm (1 1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 366.00 366.00
b. Cpvc fittings Ls 150.00
c. Jointing materials (flow guard adesive soln) Ls 50.00 566.00
Actual rate 585.55
15% contractor overhead 87.83
Rate per Rm Rs. 673.38 Total (Rs.) 673.38
1136
CPVC Pipe SDR 13.5, 50mm (2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 50 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 559.00 559.00
b. Cpvc fittings Ls 175.00
c. Jointing materials (flow guard adesive soln) Ls 50.00 784.00
Actual rate 803.55
15% contractor overhead 120.53
Rate per Rm Rs. 924.08 Total (Rs.) 924.08
1137
CPVC CTS.15 mm ball Valve( 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 15 mm CPVC ball valve, CTS sockets, 1 set 365.00 365.00 451.35
Actual rate 451.35
15% contractor overhead 67.70
Rate per Rm Rs. 519.05 Total (Rs.) 519.05
1138
CPVC CTS. 20 mm ball Valve( 3/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 20 mm CPVC ball valve, CTS sockets, 1 set 486.00 486.00 572.35
Actual rate 572.35
15% contractor overhead 85.85
Rate per Rm Rs. 658.20 Total (Rs.) 658.20
1139
CPVC CTS. 25 mm ball Valve (1")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 25 mm CPVC ball valve, CTS sockets, 1 set 588.00 588.00 674.35
Actual rate 674.35
15% contractor overhead 101.15
Rate per Rm Rs. 775.50 Total (Rs.) 775.50
27
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1141
CPVC CTS. 40 mm ball Valve (1 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 40 mm CPVC ball valve, CTS sockets, 1 set 1,643.00 1,643.00 1,729.35
Actual rate 1,729.35
15% contractor overhead 259.40
Rate per Rm Rs. 1988.75 Total (Rs.) 1,988.75
1142
CPVC CTS. 50 mm ball Valve (2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 785.00 86.35
materials a. 50 mm CPVC ball valve, CTS sockets, 1 set 2,117.00 2,117.00 2,203.35
Actual rate 2,203.35
15% contractor overhead 330.50
Rate per Rm Rs. 2533.85 Total (Rs.) 2,533.85
1143
Multilayer composite PEX/AL/PEX Pipe , 16mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a.16 mm mulitlayer composite PAP Pipe, sangahi or eq 1 Rm 101.00 101.00
b. Brass fittings Ls 50.00
c. Jointing materials Ls 25.00 176.00
Actual rate 189.60
15% contractor overhead 28.44
Rate per Rm Rs. 218.04 Total (Rs.) 218.04
1144
Multilayer composite PEX/AL/PEX Pipe , 20mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a.20 mm mulitlayer composite PAP Pipe 1 Rm 119.00 119.00
b. Brass fittings Ls 50.00
c. Jointing materials Ls 25.00 194.00
Actual rate 207.60
15% contractor overhead 31.14
Rate per Rm Rs. 238.74 Total (Rs.) 238.74
1145
Multilayer composite PEX/AL/PEX Pipe , 25mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.25 mm mulitlayer composite PAP Pipe 1 Rm 180.00 180.00
b. Brass fittings Ls 75.00
c. Jointing materials Ls 25.00 280.00
Actual rate 299.55
15% contractor overhead 44.93
Rate per Rm Rs. 344.48 Total (Rs.) 344.48
28
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1147
Multilayer composite PEX/AL/PEX Pipe , 40 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.40 mm mulitlayer composite PAP Pipe, 1 Rm 446.00 446.00
b. Brass fittings Ls 100.00
c. Jointing materials Ls 25.00 571.00
Actual rate 590.55
15% contractor overhead 88.58
Rate per Rm Rs. 679.13 Total (Rs.) 679.13
1148
Multilayer composite PEX/AL/PEX Pipe , 50 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.50 mm mulitlayer composite PAP Pipe, 1 Rm 653.00 653.00
b. Brass fittings Ls 125.00
c. Jointing materials Ls 25.00 803.00
Actual rate 822.55
15% contractor overhead 123.38
Rate per Rm Rs. 945.93 Total (Rs.) 945.93
1149
PPR Pipe( Poly propylene Random Co-polymer ) , 20 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 785.00 7.85
un skilled 0.01 nos 575.00 5.75 13.60
materials a.20 mm PP-R Pipe,(PN-10,SDR 11), napatop or eqv 1 Rm 63.00 63.00
b. PPR fittings Ls 25.00
88.00
Actual rate 101.60
15% contractor overhead 15.24
Rate per Rm Rs. 116.84 Total (Rs.) 116.84
1150
PPR Pipe( Poly propylene Random Co-polymer ) , 25 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.25 mm PP-R Pipe,(PN-10,SDR 11) napatop or eqv 1 Rm 95.00 95.00
b. PPR fittings Ls 25.00
120.00
Actual rate 139.55
15% contractor overhead 20.93
Rate per Rm Rs. 160.48 Total (Rs.) 160.48
29
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1152
PPR Pipe( Poly propylene Random Co-polymer ) , 40 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a.40 mm PP-R Pipe,(PN-10,SDR 11)napatop or eqv 1 Rm 239.00 239.00
b. PPR fittings Ls 50.00
289.00
Actual rate 308.55
15% contractor overhead 46.28
Rate per Rm Rs. 354.83 Total (Rs.) 354.83
1153
PPR Pipe( Poly propylene Random Co-polymer ) , 50 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 785.00 8.63
un skilled 0.019 nos 575.00 10.92 19.55
materials a. 50 mm PP-R Pipe,(PN-10,SDR 11),napatop or eqv 1 Rm 372.00 372.00
b. PPR fittings Ls 50.00
422.00
Actual rate 441.55
15% contractor overhead 66.23
Rate per Rm Rs. 507.78 Total (Rs.) 507.78
1154
150 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 15 nos 575.00 8,625.00 10,980.00
materials a.150 mm RCC hump pipe np2 32 Rm 503.00 16,096.00
b.150 mm RCC collar 13 nos 126.00 1,638.00
c. cement 0.035 mt 15,080.00 527.80
d. sand 0.05 cum 2,083.29 104.16
e. Jute 1.6 kg 50.00 80.00 18,445.96
Actual rate 29,425.96
15% contractor overhead 4,413.89
Rate per Rm Rs. 1057.49 Total (Rs.) 33,839.85
30
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1156
300 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 22 nos 575.00 12,650.00 17,360.00
materials a.300 mm RCC hump pipe np2 32 Rm 1,109.00 35,488.00
b.300 mm RCC collar 13 nos 277.00 3,601.00
c. cement 0.083 mt 15,080.00 1,251.64
d. sand 0.13 cum 2,083.29 270.82
e. Jute 3.63 kg 50.00 181.50 40,792.96
Actual rate 58,152.96
15% contractor overhead 8,722.94
Rate per Rm Rs. 2089.87 Total (Rs.) 66,875.90
1157
400 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 22 nos 575.00 12,650.00 17,360.00
materials a.400 mm RCC hump pipe np2 32 Rm 1,542.00 49,344.00
b.400 mm RCC collar 13 nos 386.00 5,018.00
c. cement 0.083 mt 15,080.00 1,251.64
d. sand 0.13 cum 2,083.29 270.82
e. Jute 3.63 kg 50.00 181.50 56,065.96
Actual rate 73,425.96
15% contractor overhead 11,013.89
Rate per Rm Rs. 2638.74 Total (Rs.) 84,439.85
31
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1159
150 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 785.00 2,355.00
un skilled 15 nos 575.00 8,625.00 10,980.00
materials a.150 mm RCC hump pipe np3 32 Rm 1,122.00 35,904.00
b. cement 0.035 mt 15,080.00 527.80
c. sand 0.05 cum 2,083.29 104.16
d. Jute 1.6 kg 50.00 80.00 36,615.96
Actual rate 47,595.96
15% contractor overhead 7,139.39
Rate per Rm Rs. 1710.47 Total (Rs.) 54,735.35
1160
200 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 785.00 3,140.00
un skilled 20 nos 575.00 11,500.00 14,640.00
materials a.200 mm RCC hump pipe np3 32 Rm 1,495.00 47,840.00
b. cement 0.052 mt 15,080.00 784.16
c. sand 0.08 cum 2,083.29 166.66
d. Jute 2.4 kg 50.00 120.00 48,910.82
Actual rate 63,550.82
15% contractor overhead 9,532.62
Rate per Rm Rs. 2283.85 Total (Rs.) 73,083.44
1161
32
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
1163
600 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 785.00 7,065.00
un skilled 35 nos 575.00 20,125.00 27,190.00
materials a.600 mm RCC hump pipe np3 32 Rm 5,309.00 169,888.00
b. cement 0.218 mt 15,080.00 3,287.44
c. sand 0.3 cum 2,083.29 624.98
d. Jute 7 kg 50.00 350.00 174,150.42
Actual rate 201,340.42
15% contractor overhead 30,201.06
Rate per Rm Rs. 7235.67 Total (Rs.) 231,541.48
1164
140 mm Plastic Gutter WATER PIPE ( HALF ROUND)
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 9 nos 575.00 5,175.00 9,885.00
materials a. 140 mm Plastic water pipe (Half round Gutter) 30 Rm 177.00 5,310.00
b. Joint Bracket 8 nos 285.00 2,280.00
c. Short Stop End 1 nos 106.00 106.00
d. Stop End Outlet 1 nos 339.00 339.00
e. Running Outlet 2 nos 391.00 782.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 480.00 480.00
g. Support Bracket 30 nos 85.00 2,550.00
h. Rafter Bracket 30 nos 86.00 2,580.00
i. Top Bracket 30 nos 56.00 1,680.00 16,107.00
Actual rate 25,992.00
15% contractor overhead 3,898.80
Rate per Rm Rs. 996.36 Total (Rs.) 29,890.80
1165
180 mm Plastic Gutter WATER PIPE ( HALF ROUND)
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 785.00 4,710.00
un skilled 9 nos 575.00 5,175.00 9,885.00
materials a. 180 mm Plastic water pipe (Half round Gutter) 10 Rm 335.00 3,350.00
b. Joint Bracket 8 nos 398.00 3,184.00
c. Short Stop End 1 nos 156.00 156.00
d. Stop End Outlet 1 nos 471.00 471.00
e. Running Outlet 2 nos 575.00 1,150.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 658.00 658.00
g. Support Bracket 30 nos 120.00 3,600.00
h. Rafter Bracket 30 nos 122.00 3,660.00
i. Top Bracket 30 nos 101.00 3,030.00 19,259.00
Actual rate 29,144.00
15% contractor overhead 4,371.60
Rate per Rm Rs. 1117.18 Total (Rs.) 33,515.60
33
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
34
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
50mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete UNIT : 1.0 nos
Description of
Materials cost Labour cost
S.N materials Total
Net Overhead
Jointing Total Skilled @Rs unSkilled @Rs Total amount Remark
amount 15%
Fittings material amount 785/day 575/day labour (Rs.)
No Amount No Amount amount
1167 Plain Tee 68.00 5.00 73.00 0.08 62.80 0.10 57.50 120.30 193.30 28.99 222.29
1168 Bend 90 degree 46.00 5.00 51.00 0.08 62.80 0.10 57.50 120.30 171.30 25.69 196.99
1169 Bend 45 degree 45.00 5.00 50.00 0.08 62.80 0.10 57.50 120.30 170.30 25.54 195.84
110 mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete
UNIT : 1.0 nos
35
Government of Nepal
Ministry of Urban Development
Department of Urban Development and Building Construction
Building Construction and Maintenance Division Office
Kathmandu
75 mm dia DWV Upvc leakproof, Moulded pipe specials supplying , fixing,Jointing, laying all complete UNIT : 1.0 nos
Materials cost Labour cost
Skilled @Rs unSkilled @Rs Total Total
Description of Net Overhead
Jointing Total 785/day 575/day labour amount Remark
materials Fitting amount 15%
material amount amount (Rs.)
S.N No Amount No Amount
1196 Bend 90 degree 177.00 10.00 187.00 0.11 86.35 0.20 115.00 201.35 388.35 58.25 446.60
1197 Vent cowl 230.00 10.00 240.00 0.11 86.35 0.20 115.00 201.35 441.35 66.20 507.55
1198 Door tee 349.00 10.00 359.00 0.11 86.35 0.20 115.00 201.35 560.35 84.05 644.40
1199 45 Degree bends 140.00 10.00 150.00 0.11 86.35 0.20 115.00 201.35 351.35 52.70 404.05
1200 Plain tee 222.00 10.00 232.00 0.11 86.35 0.20 115.00 201.35 433.35 65.00 498.35
1201 Y- Branch 288.00 10.00 298.00 0.11 86.35 0.20 115.00 201.35 499.35 74.90 574.25
1202 Door bend 81.00 10.00 91.00 0.11 86.35 0.20 115.00 201.35 292.35 43.85 336.20
110 mm dia DWV Upvc leakproof, Moulded pipe supplying , fixing,Jointing, laying all complete UNIT : 1.0 nos
Materials cost Labour cost
Skilled unSkilled @Rs Total
Description of Net Overhead
S.N Jointing Total Total amount amount Remark
materials Fitting @Rs785/day 575/day 15%
material amount amount (Rs.)
No Amount No Amount
1203 Bend 90 degree 323.00 10.00 333.00 0.16 125.60 0.20 115.00 240.60 573.60 86.04 659.64
1204 Vent cowl 161.00 10.00 171.00 0.16 125.60 0.20 115.00 240.60 411.60 61.74 473.34
1205 Door tee 453.00 10.00 463.00 0.16 125.60 0.20 115.00 240.60 703.60 105.54 809.14
1206 45 Degree bends 282.00 10.00 292.00 0.16 125.60 0.20 115.00 240.60 532.60 79.89 612.49
1207 Plain tee 437.00 10.00 447.00 0.16 125.60 0.20 115.00 240.60 687.60 103.14 790.74
1208 Y- Branch 475.00 10.00 485.00 0.16 125.60 0.20 115.00 240.60 725.60 108.84 834.44
1209 Door bend 103.00 10.00 113.00 0.16 125.60 0.20 115.00 240.60 353.60 53.04 406.64