Beruflich Dokumente
Kultur Dokumente
SDMIEC
Shandong Machinery I&E Group Corporation Ltd, a well-known
international enterprise in China, established in 1958, and located in the
famous port city of north China, Qingdao.
We have as our main markets in more than 120 countries and regions,
and we have more than 22 years experience for Coal Fire Power Plant,
Steam Boiler System, Water Treatment, Control System and EPC
contract.
Honeywell
PT. PUPUK
KALTIM
2X280 CFB
BOILER PLANT
CONTROL ROOM
Steam Turbine
Specification:
Capacity: 3MW up to 60 MW
Steam Turbine Type:
Whatever you want to lower the water consuming, remove the harmful chemicals, or provide the
high-pure water requested by the highest pressure boilers, we can provide you safe and reliable
water treatment technology that has been tested by the long-term running.
PT. TLG
2X12.5MW
GORONTALO
2X60T CFB
BOILERS
150KV
SUBSTATION
PT. PLN
1X10MW
(unit 3#)
KENDARI
1X60T CHAIN
STOKER BOILER
70KV
SUBSTATION
PT. PUPUK
KALTIM
2X280 CFB
BOILER PLANT
BONTANG
HIGH PRESSURE
STEAM 100BAR
Our experience
38 PT.IDEC ABADI WOOD at Tarakan 1x50t/h middle temp. middle pressure.Wood- 2007
INDUSTRIES, Indonesia chip.Fired.Boiler+1C7.5-3.43/0.98 Co-Gen
Turbine / Generator
39 PT.KALIMANTAN POWERINDO at Samarinda 2x45t/h middle temp. middle 2007
Indonesia pressure.Coal.Fired.Boiler+1C7.5-
3.43/0.98Co-Gen Turbine / Generator
40 PT.RIMBA RAYA LESTARI, at Samarinda 1x50t/h middle temp. middle pressure.Wood- 2007
Indonesia chip.Fired.Boiler+1C7.5-3.43/0.98 Co-Gen
Turbine / Generator
41 PT.NUBIKA JAYA, at Medan 1XN7.5-6.8+1XB7.5-6.8/0.33 Turbine / 2007
Indonesia Generator
42 PT.VICTORINDOALAMLESTARI at Medan 1XN6-2.9Turbine / Generator 2007
, Indonesia
EXPERIENCE LIST
No. Owner / Location/Country Power Plant Capacity Year
43 PT.CILIANDRA at Pekanru 1x35t/hmiddle temp. middle pressure Palm 2008
PERKASGROUP Indoensia Shell Fired Boiler+1B3-3.43/0.98 Co-Gen
Turbine / Generator
44 PT.PERMATA PRIMA at Jambi 2x40t/h middle temp. middle pressure CFB 2008
ELEKTRINDO Indonesia Boiler+2N7-3.43 Thermal Turbine /
Generator
45 PT. PLNKENDARIPOWER at Sulawesi 2x60t/h Sub-high Temp. Sub-high 2008
PLANT Kendari Pressure.Chain.Grate.Boiler+2N12-4.9
Indonesia Thermal Turbine / Generator
46 PT. PLNPERSERD at Riau Indonesia 2x60t/h Sub-high Temp. Sub-high Pressure 2008
CFB Boiler+2N12-4.9 Turbine/Generator
47 PT MEGA SURYA ERATAMA, at Surabaya 2x50t/h Sub-high Temp CFB 2008
Indonesia Boiler+2XC7.5MW
48 PT. Modaco Enersys, at Riau, 2X20t/h stoker boiler+2x3.5mw 2008
Indonesia turbine/generator
49 PT MEGA SURYA ERATAMA, at Indonesia 2x50t/h Sub-high Temp. Sub-high Pressure 2008
CFB Boiler+2C7.5-4.9 Co-Gen Turbine /
Generator
50 PT. SUKA JAYA MAKMUR, at Indonesia 1x40t/h middle temp. middle pressure Wood- 2008
chip Fired Boiler1N7-3.4 Turbine /
Generator
52 PT. FORTUNA CIPIA at Indonesia 1x55t/h middle temp. middle pressure Wood- 2008
SEJAHTERA, chip Fired Boiler1N6-3.43 Turbine /
Generator
51 PT. CILIANDRA PERKASA, at Indonesia 1x3MW POWER PLANT 2009
53 PT.EVERGREEN at Medan, 2 Units 40 T/H x 39 Bar x 450 C 100% Coal 2009
INTERNATIONAL PAPER, Indonesia Fired CFB Boiler & 1 Unit x 7.5 MW
Extraction Steam Turbine
54 PT. TENAGA at Sulawesi 2x60t/h Sub-high Temp. Sub-high Pressure 2010
LISTRIK.GORONTALO Indoensia CFB Boiler+2N12-4.9Turbine / Generator
55 PT MEGA SURYA ERATAMA at Surabaya, 2 Units 50 T/H x 54 Bar x 485 C 100% Coal 2010
Indonesia Fired CFB Boiler & 2 Units x 7.5 MW
Extration Condensing Steam Turbine
56 PT. PERMATA PRIMA at Jambi 2X7MW steam turbines, 2x40t/h CFB boiler 2010
ELEKTRINDO province,
Indonesia
57 PT. Indonesia Fibreboard at Palembang 1X15MW 2011
Industry Indoesia
58 PT.POLYCHEM INDONESIA at Jakarta 3 Units 75 T/H x 54 Bar x 540 C 100% Coal 2011
TBK Indoensia Fired CFB Boiler & 2 Units x 15 MW
Condensing Steam Turbine
59 PT.BABELINDO ENERGI, at Indonesia 2X40t/h Sub-high Temp. Sub-high stoker 2011
boiler+ 2X N7MW Turbine/Generator
60 PT.BUKIT ASAM (PERSERO) at Bandar 2 Units 50 T/Hr x 54 Bar x 485 C 100% Coal 2013
Lampung City, Fired CFB Boiler & 2 Units x 8 MW
Indonesia Condensing Steam Turbine
61 PT HARMONI ENERGY at Bau Bau, 2 Units 50 T/Hr x 54 Bar 485 C 100% Coal 2013
BAUBAU Indonesia Fired CFB Boiler & 2 Units x 7.5 MW
Condensing Steam Turbine
62 PT. PUPUK KALIMANTAN at Bontang, 2X280t/h CFB Boilers, 100 Bar, 535 C, Coal 2013
TIMUR Indonesia Fired CFB boiler system
63 PT. PLN (KENDARI) POWER at Sulawesi 1x60t/h Sub-high Temp. Sub-high Pressure 2013
PLANT Tenggara Chain Grate Boiler, 1N12-4.9 Thermal
Indoensia Turbine- Generator
EXPERIENCE LIST
64 PT.PERMATA HIJAU PALM INDONESIA 2x75t/h middle Temp. Sub-high Pressure 2012
OLEO 1X12MW THERMAL MEDAN CFB Boiler1C12-6.80/0.49 Turbine /
POWER PLANT Generator
65 PT. GENDHIS MULTI MANIS INDONESIA 2x60 t/h middle temperature middle 2012
(GMM.) Blora , Indonesia 2x60 BLORA pressure bagasse or coal firing Boiler
TPH BAGASSE OR COAL
FIRING BOILER ISLAND
66 PT. INDOMUDA SATRIA INDONESIA 2x25t/h middle temp. middle pressure 2012
INTERNUSA PLTU SOFIFI SOFIFI, Packaged Boiler2N4-3.43 Turbine /
(2x3.0MW) MALUKU Generator
67 PT. PLN (PERSERO) PLTU INDONESIA, 2x45t/h Sub-high Temp. Sub-high 2012
TANJUNG SELOR (2x7MW) TANJUN Pressure Chain Grate Boiler2N9.5-4.90
SELOR Turbine / Generator
68 PT. WIJAYA TRIUTAMA INDONESIA, 1x130t/h High temperature High pressure 2013
PLYWOOD INDUSTRY 1x30 BANJARMASIN CFB Boiler1N30-8.83 Turbine /
MW POWER PLANT Generator
69 PT. EXPLOITASI ENERGI INDONESIA,TE 2x35t/h Sub-high Temp. Sub-high 2013
INDONESIA, TBK 2X7MW MBILAHAN Pressure CFB Boiler2N7-4.9 Turbine /
COAL FIRED STEAM Generator
POWER PLANT
70 PT. INDO PUSAKA BERAU INDONESIA,BE 1N7-3.43 Turbine / Generator 2013
TURBINE 1X7MW RAU
71 PT. IDECABADI WOOD INDONESIA, 1x60t/h middle temp. middle pressure 2013
INDUSTRIES 17MW TARAKAN Wood-chip Fired Boiler1C7-3.43/1.47
THERMAL POWER PLANT Turbine / Generator
72 PT. PLN (PERSERO) PLTU INDONESIA, 2N7-4.90 Turbine / Generator 2013
TEMBILAHAN (2x7MW) SUMATARA
73 PT. PERMATA HIJAU PALM INDONESIA, 1x75t/h middle Temp. Sub-high Pressure 2013
OLEO 1x6MW THERMAL MEDAN CFB Boiler1B6-6.80/0.49 Turbine /
POWER PLANT Generator
74 PT. PUSAKA JAYA INDONESIA, 3X85 t/h CFB boiler, 2x18MW 2014
INTERNATIONAL PALU Turbine/Generators
SOME PROJECT SITE VIEW
SDMIEC