from basment level to stairs 6-11 under the stairs set 1 1.8 1.05
ground level
stairs 12-13-14 stairs set 3 0.5 0.3 1.05
stairs 12-13-14 stair landing 1 4.1
stairs 15-25 stairs set 11 0.5 0.3 1.05
stairs 37-38-39-
stairs set 4 0.5 0.3 1.05
from ground level to 40
mezzanen level stairs 37-38-39-
under the stairs set 1 4.1
40
stairs 37-38-39-
stairs set 4 0.15 1.05
from ground level to 40
mezzanen level stairs 37-38-39-
under the stairs set 1 4.1
40
NO OF
depth add deduct NET
DRAWING
0.15 0.189
0.3 0.378
0.3 0.378
0.15 0.2835
0.3 0.567
0.15 0.14175
0.3 1.23
0.15 0.51975
0.2 0.693
0.4 0.952
0.15 0.4725
0.3 0.945
0.15 0.189
0.3 1.23
0.15 0.51975
0.2 0.693
9.38125
PARAPET) (m)
0x30 (floor)
add
1.26
0.63
1.26
1.89
0.945
0.945
4.1
3.465
1.7325
2.38
3.15
1.575
0.63
4.1
3.465
1.7325
33.26
B.O.Q FOR THE PROJECT
M3 BASMENT 0
M3 GROUND #REF!
M3 MEZZANEN #REF!
M3 1&2 #REF!
M3 3 TO 5 #REF!
M3 6 TO 10 #REF!
M3 11 TO 15 #REF!
M3 16 #REF!
aluminum railing(m)
stairs level length add
4.5
2.4
NO OF
depth add deduct NET
DRAWING
0.15 0.468
0.2 0.624
0.2 0.728
0.15 0.8775
0.3 1.755
4.4525
ing(m)
floor) m2
add
3.12
1.56
3.64
5.85
2.925
17.095
staff stairs
stairs 1-52 under the stairs set 4 3.6 1.3 0.3 5.616
stairs 52-437 stairs set 350 0.5 0.3 1.3 0.15 20.475
stairs 437-449 under the stairs set 1 3.3 1.3 0.3 1.287
stairs 63-85-107-129-
151-173-195-217-239-
stair landing 18 1.2 2.9 0.3 18.792
261-283-305-327-349-
371-393-437
stairs 74-96-118-140-
162-184-206-228-250-
stair landing 18 1.87 2.9 0.3 29.2842
272-294-316-338-360-
382-404-426-449
aluminum railing(m)
stairs level no length add total
2 7.50 15
22 6.30 138.6
stairs 63-85-107-129-
151-173-195-217-239-
stair landing 18 1.2 2.9 62.64
261-283-305-327-349-
371-393-437
stairs 74-96-118-140-
162-184-206-228-250-
stair landing 18 1.87 2.9 97.614
272-294-316-338-360-
382-404-426-449