Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 1-
Ver 4.0, August 2017
A sustainable innovative world-class utility.

We are committed to the happiness of our stakeholders and promoting


Dubais vision through the delivery of sustainable electricity and water services
at a world-class level of reliability, efficiency and safety in an environment that
nurtures innovation with a competent workforce and effective partnerships;
supporting resources sustainability.

For Generations to come.

Integrity.
Fairness.
Transparency.
Teamwork.
Industry leadership.
Professionalism.
Corporate Social Responsibility.
Customer focus.
Sustainability.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 2-
Ver 4.0, August 2017
INDEX

Page
S.No. Description
No.
1. INTRODUCTION 5

2. DIRECTORY OF SERVICES 6

2.1 SERVICE OWNER 6

2.2 OFFICE WORKING HOURS 6

2.3 SERVICE SUBMISSION CHANNELS 6

2.4 SERVICES LOCATION 7

2.5 SERVICES COMMUNICATION 8

2.6 TYPE OF TECHNICAL SERVICES 8


3. TECHNICAL SERVICES & COORDINATION PRINCIPLES 9

4. APPLICATION TYPE VS APPLICANT TYPES 10

5. INFRASTRUCTURE PROJECTS CLASSIFICATION 10

SUBMISSION REQUIREMENTS FOR TS&C SERVICES

6. SUBMISSION REQUIREMENTS FOR COMPLETION CERTIFICATE 12

6.1 GENERAL REQUIREMENTS FOR COMPLETION CERTIFICATE 13

DETAILED REQUIREMENTS FOR AS BUILT APPROVAL / COMPLETION 15


6.2
CERTIFICATE (ROADS WORKS)

DETAILED REQUIREMENTS FOR AS BUILT APPROVAL / COMPLETION 16


6.3
CERTIFICATE (CABLES WORKS)

DETAILED REQUIREMENTS FOR AS BUILT APPROVAL / COMPLETION 17


6.4
CERTIFICATE (JOINT WORKS)

DETAILED REQUIREMENTS FOR AS BUILT APPROVAL / COMPLETION 18


6.5
CERTIFICATE (132KV & 400 KV WITH ROAD WORKS)
DETAILED REQUIREMENTS FOR AS BUILT APPROVAL / COMPLETION 20
6.6
CERTIFICATE (132KV & 400 KV OHTL WORKS)

DETAILED REQUIREMENTS FOR AS BUILT APPROVAL FOR ELECTRICITY WORKS 22


6.7
(NETWORKS)

BOQ APPROVAL REQUIRMENTS (DEWA BETTERMENT WORKS) FOR RTA 24


7.
PROJECTS ONLY (ROAD PROJECTS)

ESTIMATE REQUIRMENTS FOR HV CABLE DIVERISON WITHIN R.O.W (ROAD 26


8.
PROJECTS)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 3-
Ver 4.0, August 2017
MATERIAL APPROVAL REQUIRMENTS FOR HV CABLE DIVERISONS & FUTURE 28
9.
DUCTS WITHIN R.O.W (ROAD PROJECTS)
MATERIAL SPECIFICATION APPROVAL REQUIRMENTS FOR HV CABLE 30
10.
DIVERISONS (ALL PROJECTS)

SUB-CONTRACTOR PREQUALIFICATION APPROVAL REQUIRMENTS FOR HV 32


11.
CABLE DIVERISONS (ALL PROJECTS)

DEWA STANDARDS
CSV FILE SUBMISSION REQUIREMENTS FOR DUCTS (AS BUILT / COMPLETION 34
12.
CERTIFICATE & BOQ APPROVAL)

ISSUED DUCT MATERIAL MEASUREMENT SHEET FOR RECONCILIATION 42


13.
STATEMENT FOR DEWA (ED)

14. ISSUED DUCT MATERIAL RECONCILIATION SUMMARY FOR DEWA (ED) 43

ISSUED CABLES & JOINTS MATERIAL RECONCILIATION STATEMENT FOR DEWA 44


15.
(ED)

16. DETAILS OF MATERIAL COLLECTED FROM DEWA STORE FOR DEWA (ED) 45
17. DUCT SUMMARY DEWA (ED) BETTERMENT WORKS 46

18. DUCTS & DUCTS MARKER INSPECTION RECORD FOR DEWA (ED) WORKS 47

19. CABLE DIVERSION DETAILS FOR ESTIMATE 48


20. CABLE DIVERSION DETAILS DRAWING 49

21. BETTERMENT WORKS (AS BUILT DRAWINGS) 50

22. BETTERMENT WORK APPROVAL DRAWING 51

23. BETTERMENT WORK DUCT SUMMARY 52


24. WATER DEPARTMENT CHECKLIST (COMPLETION CERTIFICATE) 53

25. COVERING LETTER FORMAT 54

26. BUSINESS SUPPORT CONTRACT DETAILS (DEWA INTERNAL DEPARTMENT) 55

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 4-
Ver 4.0, August 2017
1. INTRODUCTION

Infrastructure Information & Permits Department has updated Technical Services


guideline to provide basic information for submission of various approval requests within
R.O.W. for the following:

Infrastructure Project Completion Certificate

Infrastructure Project As-built Approval

Material Sample & Specification Approval (HV Cable Diversion & Ducts)

Estimate for HV Cable Diversion

Bill of Quantity for DEWA-ED Betterment Ducts (RTA Projects Only)

Electrical Sub Contractor Approval for cable diversion work

Miscellaneous

Infrastructure projects specifications are as follows:

Road Projects

Utilities Network Projects

General Projects

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 5-
Ver 4.0, August 2017
2. DIRECTORY OF SERVICES

2.1 SERVICE OWNER

The custodian of this service is Infrastructure Information & Permits Department


Technical Services & Coordination section.

2.2 OFFICE WORKING HOURS

Sunday to Thursday: 08:00 AM to 02:00 PM

2.3 SERVICE SUBMISSION CHANNELS

This document includes contact details for better communication with Technical
Service & Coordination Staff.

The applications can be submitted through following channels:

Online Submission through DEWA Portal

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 6-
Ver 4.0, August 2017
2.4 SERVICES LOCATION

DEWA WARSAN COMPLEX LOCATION:

o Coordinates DLTM:

E: 510197

N: 2782326

o WGS84 LONGITUDE & LATITUDE

E: 55o 26 4

N: 25o 8 48

DEWA AL HUDAIBA LOCATION:

o Coordinates DLTM:

E: 494784

N: 2793118

o WGS84 LONGITUDE & LATITUDE

E: 5516'54"

N: 2514'40"

2.5 SERVICES COMMUNICATION


Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 7-
Ver 4.0, August 2017
The Customer can communicate with Infrastructure Information & Permits
Department to avail the Technical Services at Customer Service Center NOC
Ground Floor at DEWA Warsan Complex as per the following details:

General Inquiry: 04-3221614 OR 04-3221280

E-Mail: tp.ii&p@dewa.gov.ae

2.6 TYPE OF TECHNICAL SERVICES

TECHNICAL SERVICES & COORDINATION section are provided to its valued


customers the following services:

Infrastructure Project Completion Certificate

Infrastructure Project As-built Approval

Material Sample & Specification Approval (HV Cable Diversion & Ducts)

Estimate for HV Cable Diversion

Bill of Quantity for DEWA future Ducts

Electrical Sub Contractor Approval for cable diversion work

Miscellaneous

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 8-
Ver 4.0, August 2017
3. TECHNICAL SERVICES & COORDINATIONS PRINCIPLES

INFRASTRUCTURE INFORMATION & PERMITS DEPARTMENT highlight the following


TECHNICAL SERVICES & COORDINATION principles to customers for their full adherence
and strict compliance wherever applicable in order to facilitate a smooth and fast
approval process.

The sample drawings are indicative, no referral made against sample drawings.

Duplicating / copying DEWAs stamp or malpractice the approved DEWA drawings


will lead to legal actions as per law number 6/2015.

If the scope of work has changed from the initial submission a new approval
should be acquired from INFRASTRUCTURE INFORMATION & PERMITS
DEPARTMENT.

All customers are hereby instructed to submit project as built drawing and obtain
a completion certificate to avoid to be blacklisted by DEWA in the future.

If the main contractor will be intended to sublet the DEWA related work, then the
approval of the same sub-contractor is necessary prior to start the work.

All the customers should complete DEWA requirements prior submission of any
application in line to avoid the rejection of the required application.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 9-
Ver 4.0, August 2017
4. APPLICATION TYPE VS APPLICANT TYPES

APPLICANT TYPES
TS&C APPLICATION TYPES
Consultant Contractor Sub-Contractor

BOQ (Betterment Work) DEWA


Future Ducts (RTA Projects only)
Estimate (HV Cable Diversion)

Electrical Sub Contractor Approval
(Cable Diversion Works)
Material Sample Approval (HV
Cable Diversion, Future Ducts &

Betterment Works)

Material Specification Approval


(HV Cable Diversion, Future

Ducts & Betterment Work)

Infrastructure Project As-built


Approval
Completion Certificate

Miscellaneous

Note: If any application will be submitted other than what is mentioned above will be rejected.

5. INFRASTRUCTURE PROJECTS CLASSIFICATION

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 10 -
Ver 4.0, August 2017
SUBMISSION REQUIREMENTS

FOR TS&C SERVICES

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 11 -
Ver 4.0, August 2017
SUBMISSION REQUIREMENTS FOR

COMPLETION CERTIFICATE

(Final Clearance / As Built)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 12 -
Ver 4.0, August 2017
Service Type Completion Certificate (FINAL CLEARANCE)
6 Project Type General Projects

Sr.No. General Submission Requirements

1 Company covering letter.

2 Copy of DEWA(ED) approved as built drawing. (PDF Format if available)

DEWA(ED) approved shop drawing for Betterment Ducts / Cable Diversions. (PDF Format)

3 If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.


If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

DEWA (ED & WD) construction NOC & shop drawing NOC. (PDF Format)

4 If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.


If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

5 Key plan showing the full project area.

Project As Built Drawing incorporating DEWA services approved by project consultant & contractor
6
as follows :

As Built Drawing of DEWA (ED) Distribution Services (LV & HV Services) showing completed future
ducts & extension of the existing, spare & split ducts in different color with duct details. (V7 /
6.1
DWG & PDF Format) (For Detailed Information As Built Approval / Completion Certificate (All
Duct Works)

As-Built drawings for (6.6kv, 11kv, 33kv) cable diversion work. (V7 / DWG & PDF Format) (For

6.2 Detailed Information As Built Approval / Completion Certificate (All Cable Works & All Joint
Works)

As Built Drawings of DEWA (ED) Transmission Services (132kv/400kv cables & O.H.L Services).
6.3
(V7 / DWG & PDF Format)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 13 -
Ver 4.0, August 2017
Incorporate the existing 132KV cable route on the submitted as-built drawing, along with TLP

7 staff verification to confirm the clearance between existing 132KV trough/cable to finish work and
132KV cable route marker location in the project completed area.

As Built cross section showing clearly DEWA reservation and type of construction on top of DEWA
8
corridor according to the site condition and approved by the RTA. (PDF Format)

Material Reconciliation Statement (MRS) as per DEWA standard format for cable & Betterment
ducts (PDF Format) along with the following documents:
9
DEWA store issued voucher/store return.

Material transfer note if any.

Final Duct summary details for DEWA (ED) Betterment Work only as per DEWA standard format
10
signed and stamped by project consultant and contractor. (PDF Format)

11 DEWA Approval letter of material if procured from outside.

12 All approved BOQ by DEWA for Betterment Work. (Applicable to RTA Projects only)

Final actual Cost BOQ for DEWA (ED) betterment work acknowledged by RTA. (Applicable to RTA
13
Projects only)

Duct & Duct Marker inspection record singed by DEWA (ED.) representative for the future
14
proposed, spare, split and extension Ducts.

15 CSV files as per DEWA digital submission standard.

16 DEWA Water Department checklist clearance acknowledged by DEWA Water Project.

Water layout drawing, profile & cross section as built drawings acknowledged by DEWA Project &
17
Engineering Water Department.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 14 -
Ver 4.0, August 2017
Service Type As Built Approval / Completion Certificate (All Duct

6.1 Works)

Project Type Road Works

Sr.No. Detailed Submission Requirements

1 Duct summary details as per DEWA Format.

2 Number of Way layers, length & coordinates.

3 As-laid cross section.

Duct & duct marker Inspection Check List (signed by DEWA inspector). For proposed,
4
extension, spare & split duct.

5 Type of duct (road cutting / drilling).

6 Spare, Split & Extended ducts details in different color.

7 NOC / Clarification if proposed installed duct utilized before hand over to DEWA.

8 Depth of ducts.

9 All issued BOQ along with approved drawings

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 15 -
Ver 4.0, August 2017
Service Type As Built Approval / Completion Certificate (All Cable

6.2 Works)

Project Type Network Projects (All Cable Works)

Sr.No. Detailed Submission Requirements

1 Cable contract no & cable joint manufacture name & supplier contact no.

2 Date of Cable laid.

The followings should be shown in the Table:


Cable length,
Cable Type & Size,
3
Cable circuit name,
No. of joints,
Shutdown date

4 No. of Cables.

5 Bend Coordinate shown in the As built drawings.

6 Offset Distance shown in the As built drawings (Building line / ROW)

7 Distance between cables center to center.

8 New laid cable Start, End, Diverted, Cancelled Cable, Bend & Corner Point Coordinates.

9 Corridor cross section, Duct utilized & Cable laying cross section.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 16 -
Ver 4.0, August 2017
Service Type As Built Approval / Completion Certificate (All Joint

6.3 Works)

Project Type Network Projects (All Joint Works)

Sr.No. Detailed Submission Requirements

1 Jointer Name & Jointing Date

2 Joint Manufacture Name

3 Joint Coordinate

4 Supply Contract number

5 Joint Type (Heat/Cold Shrinkable/Compound Filled/XLPE etc.)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 17 -
Ver 4.0, August 2017
Service Type As Built Approval / Completion Certificate (132KV &

6.4 400KV with Road Projects)

Project Type Road Works

Sr.No. Detailed Submission Requirements

1 Company covering letter.

2 DEWA (ED & WD) construction NOC & shop drawing NOC. (PDF Format)

If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

As built drawing submitted in scale (1:1000) incorporating the Existing 132/400kV cable/OHL
route, circuit names, cable joint/link box location, clearance from the proposed road edge to
3
the cable/trough edge, OHL Horizontal and vertical clearance from the proposed road,
Horizontal clearance from the tower foundation to the road edge.

Clearance details from the proposed bridge, ramp, and sidewall of ramp, bridge pillar/pier, and

4 underpass to the existing 132/400 kV cable and crossing details, cable protection details to be
submitted.

Details of OHL tower protection (crash barrier) Height limit gantry, fencing details, access from

5 the proposed road to the OHL corridor (If the proposed road is close/crossing to the OHL
corridor).

Access to the substation to be shown to the drawing (If the proposed road close to the
6
substation.

If the proposed road is over the existing 132 kV cable/trough, Length of the cable protection,
7
spare duct details with ends coordinates to be shown to the drawing.

The proposed road/road widening over the existing duct bank, edge of the proposed road to

8 the existing cable duct bank edge to be shown. If the duct bank is extended details and ends
coordinates to be provided.

If the Proposed road edge is close to the cable joint/link box locations, 4 corners coordinates of

9 the joint box, Horizontal clearance from the joint/link box to the road edge to be shown to the
drawing.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 18 -
Ver 4.0, August 2017
If any utility services / diversions included in the proposed roadwork contract, horizontal &

10 vertical clearance details of the services, (Water, Drainage, storm water, Irrigation pipelines
Etc., Etisalat duct, Electricity HV and LV) Crossing details, Protection details to be submitted.

If any landscaping work included under the road project within the vicinity of the existing
11
132/400 kV cable and OHL services those details to be submitted.

Clearance from the road signal post, street light poles to the existing 132/400 kV cable and
12
OHL to be provided.

If the 132 kV Cable diversions/OHL raising included under the road contract, Separate As built
13
drawing to be submitted as per DEWA standard. (Refer to General Requirements).

The contractor and the consultant make sure that back filling works over the existing cable
route where the construction related works carried out over/within the vicinity of the 132/400
14
kV cable and OHL area and route markers displaced/removed/damaged during the work
execution are replaced. (If any).

If the existing link box level is below the proposed road /landscaping level, the existing link box

15 to be lifted above the proposed road/landscaping level and protected with suitable protection
in order to avoid water stagnation around/inside the link box area.

16 Joint site inspection from TLM personnel may be required to confirm the above details provided.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 19 -
Ver 4.0, August 2017
Service Type As Built Approval / Completion Certificate (132KV &

6.5 400KV O.H.T.L PROJECTS)

Project Type Networks

Sr.No. Detailed Submission Requirements

1 Company covering letter.

2 DEWA (ED & WD) construction NOC & shop drawing NOC. (PDF Format)

If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

Clearance from the boundary line /ROW/ Road edge to the cable diversion to be
3
marked on the drawing.

Cross section details of services crossing i.e. mainly for water and other pressure
4
pipe line crossings, Existing 132 KV cable crossing, Road crossing etc

Detailed cross section for 132KV cable corridor.


5

Duct bank/Drilling portion including length and GPS coordinates.


6

Directional Drilling profile details with GPS coordinates.


7

Cable schedule showing the section wise route length.


8

Pilot /F.O cable joint location marked with GPS coordinates and detailed section.
9

Cable route layout inside the substation (if any).


10

Updated substation layout showing new 132 KV cable route along with existing
11
provided (If any).

Single line drawing showing cable in duct bank area/ protection with Inter lock
12
tile/Directly buried area.

Cable diversion contract No., Cable manufacture name, Cable test report, Data of
13 cable laid, Cable type and size, No. Of cables, Cable Warranty, Distance between
cable center to center and cable circuit Name.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 20 -
Ver 4.0, August 2017
Cable joint details I.e. Coordinates (Four corners, DLTM), Joint type, Jointer name
14
and date, Joint Manufacture name.

Spare Duct details. Duct coordinates, No. Of ways/layers, Duct inspection checklist
15 (Signed by DEWA Inspector), Type of duct (road cutting/drilling), Extended
duct/split duct details (If any). (Refer to Template Section).

Type of proposed OHL Tower, Test report, Technical specifications, Plan, Elevation,
16 Cross section of the tower with dimensions, insulator and other used component for
the proposed tower to be provided.

Profile drawings including the nearest existing OHL to the proposed OHLs to be
17
submitted.

Horizontal clearance from the proposed road edge to the proposed tower foundation
18
/ tower protection barrier edge to be provided.

Vertical clearance details from the proposed road level to the lowest OHL conductor
19
(After raising the tower) to be provided.

Existing and proposed Tower Nos., distance between either sides of the existing
20
towers to the proposed the tower(s), to be provided.

Access road to the proposed tower location to be provided.


21

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 21 -
Ver 4.0, August 2017
Service Type As Built Approval (Electricity Works)
6.6 Project Type Networks

Sr.No. Submission Requirements

1 Company covering letter.

2 DEWA(ED) approved shop drawing for Betterment Ducts / Cable Diversions. (PDF Format)

If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.


If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

DEWA (ED & WD) construction NOC & shop drawing NOC. (PDF Format)

3 If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

Project As Built Drawing of DEWA Services approved by project consultant & contractor as
4
follows :

As Built Drawing of DEWA (ED) Distribution Services (LV & HV Services) showing proposed

4.1 duct & extension of the existing, spare & split ducts in different color with duct details. (V7
/ DWG & PDF Format)

As-Built drawing for (6.6kv, 11kv, 33kv) cable diversion work. (V7 / DWG & PDF Format)
4.2

As Built Drawing of DEWA (ED) Transmission Services (132kv/400kv cables & O.H.L
4.3
Services). (V7 / DWG & PDF Format)

As Built cross section showing clearly DEWA (ED & WD) reservation and type of construction

5 on top of DEWA corridor according to the site condition & approved by RTA. (V7 / DWG & PDF
Format)

Duct summary details for DEWA (ED) Betterment Work only as per DEWA standard format
6
signed and stamped by project consultant and contractor. (PDF Format)

DEWA Approval letter of material if procured from outside.


7

Duct & Duct Marker inspection record singed by DEWA (ED) representative for the future
8
proposed, spare, split and extension Ducts.

Incorporate the existing 132KV cable route on the submitted as-built drawing, along with TLP

9 staff verification to confirm the clearance between existing 132KV trough/cable to finished work
and 132KV cable route marker location in the project completed area.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 22 -
Ver 4.0, August 2017
SUBMISSION REQUIREMENTS FOR

B.O.Q (Betterment Work)

(RTA PROJECTS ONLY)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 23 -
Ver 4.0, August 2017
Service Type BOQ Approval (Betterment Work) for RTA Projects Only
7 Project Type Road Projects

Sr.No. Submission Requirements

Covering Letter Addressed to Senior Manager Infrastructure Information & Permits (II&P)
1
Department.

DEWA Approved Final Design NOC & Construction NOC (if issued). (PDF Format)
2
If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

3 DEWA (ED) Proposed Ducts layout drawing. (PDF & DWG/V7 Format)

Bill of Quantity for DEWA (ED) betterment works both option collect & Lay / Supply & Lay signed

4 and stamped by the contractor & Consultant and same should be acknowledged by RTA. (PDF
Format)

Duct Summary Details for DEWA (ED) proposed Ducts Only as per DEWA format signed and
5
stamped by the contractor & Consultant. (PDF Format)

6 CSV File for the proposed ducts as per DEWA standard digital requirements.

7 RTA Approved Cross Section along with cross section marker layout.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 24 -
Ver 4.0, August 2017
SUBMISSION REQUIREMENTS FOR

ESTIMATE

(HV CABLE DIVERSIONS within ROW)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 25 -
Ver 4.0, August 2017
Service Type Estimate for HV Cable Diversion within ROW
8 Project Type Infrastructure Projects

Sr.No. Submission Requirements

Covering Letter indicating the Type & Quantity of Materials, Addressed to Senior Manager
1
Infrastructure Information & Permits (II&P) Department.

DEWA approved Shop Drawing NOC Shows the proposed & existing Cable Diversion & Joints
2
details with clear legend along with the following details: (PDF Format)
Cable length.
Joints coordinates.
No. of joints.
Material type.
Commissioning date of existing cable.
Cable summary details as per DEWA standard.

DEWA Approved Construction NOC. (PDF Format)


3
If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

Proposed Work Program for cable diversion work signed & stamped by the contractor &
4
consultant. (PDF Format)

5 Revised work program for each revision. (PDF Format)

6 DEWA Sub-Contractor Approval of diversion work for the project (33kv, 11kv & LV). (PDF Format)

7 DEWA material approval if planned to procure from outside of DEWA. (PDF Format)

8 Payee Detail Who will pay the Estimate Amount

Trench Detail showing the numbers of cables with length of each trench signed and
9
stamped by the consultant & contractor. (PDF Format)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 26 -
Ver 4.0, August 2017
SUBMISSION REQUIREMENTS FOR

MATERIAL Sample & Specification

APPROVAL

(HV CABLE DIVERSIONS & DUCTS)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 27 -
Ver 4.0, August 2017
Material Sample & Specification Approval (HV Cable
Service Type
9 Diversion & Ducts)

Project Type Infrastructure Projects

Sr.No. Submission Requirements

Covering letter from consultant mentioned the purpose of requesting the material, Addressed to
1
Senior Manager Infrastructure Information & Permits (II&P) Department.

Relevant Material Specification as per DEWA standard requirements from DEWA approved
2
suppliers/manufactures.

Supplier and Manufacture Details.


3

Material Sample if requested by DEWA will be forwarded to DEWA Al Hudaiba Office directly.
4

DEWA Construction / Shop Drawing NOC issued to the project.

5 If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

Clear photographs of material.


6

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 28 -
Ver 4.0, August 2017
SUBMISSION REQUIREMENTS FOR

SUB-CONTRACTOR PREQUALIFICATION

APPROVAL for CABLE DIVERSIONS

under infrastructure project

(Within R.O.W)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 29 -
Ver 4.0, August 2017
Sub-Contractor Prequalification Approval
Service Type
11 (HV Cable Diversion Works)

Project Type All Projects

Sr.No. Submission Requirements

Covering letter mentioned the scope of work, Addressed to Senior Manager Infrastructure
1
Information & Permits (II&P) Department.

DEWA Construction NOC issued to the project.

2 If NOC issued before 20/12/2015, a copy from NOC drawings to be submitted.

If NOC issued on or after 20/12/2015, NOC cover letter is sufficient.

Prequalification documents with the following valid documents.


Trade License
Commercial License
3
Key Personal CVs
Jointers IDs
List Issued by MOL (UAE Ministry of Labor)

4 Quantity of proposed diverted work.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 30 -
Ver 4.0, August 2017
DEWA STANDARDS

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 31 -
Ver 4.0, August 2017
12. Digital Data Submission Requirements for Conduit System
(CSV FILE)

12.1 INTRODUCTION

DEWA requires drawings to be submitted in standardized digital format. This will enable DEWA to process

the applications more efficiently. The intent is that the required hardcopy and digital submission be

produced from the same digital source without significant modification.

This document describes the standards to be followed when submitting digital drawings to DEWA. Any

questions concerning these standards or exceptions to these standards due to special circumstances

should be referred to DEWA IT Department for further clarification.

12.2 GENERAL REQUIREMENTS

All digital drawings submitted to DEWA must confirm to the following requirements.

12.2.1. DOCUMENTATION

The following documentation is required when submitting digital drawings to DEWA Document

describing the content of digital data, including project details. Example:

Project Name: Palm Island


File Name(s): 132kV_ThePalm.shp, 33kV_ThePalm.shp, etc

Date: July 1, 2004

Company Name: Contractor LLC

Contact Person: John Doe

Contact Phone: +971 50 555 5555

Contact E-mail: John.Doe@contractor.co.ae

Format: SHP/DWG2000/DXF/DGNv7

Layers submitted: Layer1, 2,3,6,23,25,34

Thumbnail images of drawings

o Digital drawing files (ESRI Shape files/DGN/DWG/DXF files)


o Comma Delimited File (CSV) sheet describing attributes of features included in the
CAD drawings. This document is not required if digital drawing is submitted in ESRI
shape file format.

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 32 -
Ver 4.0, August 2017
12.2.2. CO-ORDINATE SYSTEM

All drawings co-ordinates must be projected using the Dubai Local Transverse Mercator projection

(DLTM).

Projection:
o Transverse Mercator
Parameters:
o Longitude of Origin 55:20:00:00 d:m:s

o Latitude of Origin 0:00:00.000 d:m:s

o False Easting 500,000.000 m

o False Northing 0.000 m

o Scale Factor along Longitude of Origin 1.0000

o Geodetic Datum: WGS84

o Ellipsoid WGS84 (Standard parameters)

o Equatorial Radius: 6378137.000 m Polar

Radius:6356752.314m

o Eccentricity: 0.0818191908426215

o Flattening: 0.00335281066474746

o Flattening Inverse: 298.257223563002


Units and Formats:
o Geographic Units: d:m:s

o Format: Long/lat. Precision: 4, Positive N,E

o Projection Units: m

o Format: Easting/Northing Precision: 3

o Height Units: m Precision: 3

o Geocentric Units: m Precision: 3

o Distance Units: m Precision: 3

o Angular Units: deg Precision: 6

12.2.3. ACCURACY OF CO-ORDINATES IN DIGITAL


DRAWINGS

The accuracy of the co-ordinates submitted to DEWA shall be clearly mentioned on the submitted

drawings or in attached documentation.

12.2.4. DIGITAL DRAWING FORMAT STANDARDS


Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 33 -
Ver 4.0, August 2017
All drawing submitted to DEWA must be delivered in one of the following standardized drawing

formats

Preferred drawing format by DEWA


o ESRI Shape files (*.shp) are preferred by DEWA

o Trial-pit details containing cross-section drawings shall be submitted in any CAD

format as specified below.

Other acceptable drawing formats


o MicroStation design files (.dgn) up to Version 7

o AutoCAD drawing files (.dwg) up to AutoCAD 2000

o ASCII, binary and partial drawing interchange files (.dxf) that comply with DXF

standards

12.2.5. MAP ORIENTATION

All drawings shall be delivered in a non-rotated orientation (North facing up).

12.2.6. 2D VERSUS 3D DRAWINGS

All drawings are to be submitted as two dimensional (2D) graphic files. Three-dimensional

Drawings are not acceptable except if specified by DEWA.

12.3. DIGITAL STANDARDS FOR ELECTRICITY CONDUIT

SYSTEM

The following standards shall be followed when submitting Electricity Conduit System Drawings.

12.3.1. REQUIREMENTS FOR DATA DELIVERED IN ESRI

SHAPE FORMAT

The following shape files shall be delivered, whichever are applicable:

FeatureClass (Layername) Shape (Featuretype) Subtype Attributes

ConduitSystem Polyline 1-Duct Bank, DuctType,NumDuct,D


2-Trench, epth,NoOccupied
3-Truf

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 34 -
Ver 4.0, August 2017
Other attributes to be present in all the above-mentioned ESRI shape files:

Subtype (Containing Subtype value as mentioned in Subtype column)

State

Created by (Supplier of drawing)

Creation Date

Modified By

Modification Date

Consultant / Contractor Name

Project Name

Contract number

Description

Duct size

Material

Number of ducts Type of duct

Remarks (if any)

Subtype, State, Duct Size, Material, Number of Ducts and Type of ducts shall be entered as coded
values as listed in appendix 1.

ESRI Shape file templates can be delivered as and when requested for.

12.3.2. REQUIREMENTS FOR DATA DELIVERED IN CAD


(DGN/DXF/DWG) FORMAT

The following specification shall be applicable for CAD drawings:

12.3.2.1. General Requirements

New Conduits should be placed as Lines on Layer 48. Ducts should be labeled with Duct
Type and State on the CAD file.

All new Conduits (Line features) must be clearly distinguishable from existing features
by symbology and labels (Existing/New/Proposed).

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 35 -
Ver 4.0, August 2017
For each feature the following spatial data is required: StartPoint, EndPoint and
TurningPoints if applicable). Features must have x,y co-ordinates as label text near the
respective location on the drawing. These co-ordinates shall be on level 10.

All drawings delivered to DEWA shall have an attached CSV file containing all features,
their X,Y location (StartPoint, EndPoint and TurningPoints) and shall include attributes
(same attributes as mentioned in 2) specified in a tabular form. Sample CSV template
available in Appendix 2. Subtype, State, Duct Size, Material, Number of Ducts and Type
of ducts shall be entered as coded values as listed in appendix 1

An additional reference number can be added (if required) to enable relationships


between the graphics in CAD and attributes in CSV.

Trial-pit details containing cross-section drawings shall include XY co-ordinates;


direction of cross section view; Z coordinates relative to sea level and ground.

APPENDIX 1, SPECIFICATION OF CODED VALUES FOR

VARIOUS FIELDS

Subtype

Code State

1 Duct Bank

2 Trench

3 Turf

State

Code State

2 Proposed

3 Cancelled

4 In service

5 Approved for Construction

6 Constructed/As laid

Type of Duct

Code Conduit Nominal Voltage

5 132 kV

26 33-11 kV

27 LV

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 36 -
Ver 4.0, August 2017
Encasement Type

Code Encasement Type

BF Back Fill

CCRT Concrete

UNK Unknown

Duct Size

Code Duct Size

2 2"

4 4"

6 6"

12 12"

18 18"

24 24"

30 30"

36 36"

42 42"

48 48"

Duct Number

Code DuctNumber

2 UNKNOWN

4 1

5 2

6 3

7 4

8 2x4

9 4x6

10 3x4

11 6x4

12 1x6

13 2x6

14 3x6

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 37 -
Ver 4.0, August 2017
15 10

16 16

17 6

18 8

19 2x8

20 2x12

21 2x16

22 3x8

23 3x12

24 5

25 7

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 38 -
Ver 4.0, August 2017
APPENDIX 2, SAMPLE 4B CSV FILE TEMPLATE

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 39 -
Ver 4.0, August 2017
13. Issued Duct Material Measurement Sheet for
Reconciliation Statement for DEWA (ED)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 40 -
Ver 4.0, August 2017
14. ISSUED DUCT MATERIAL RECONCILIATION SUMMARY FOR
DEWA (ED)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 41 -
Ver 4.0, August 2017
15. ISSUED CABLES & JOINTS MATERIAL RECONCILIATION
STATEMENT FOR DEWA (ED)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 42 -
Ver 4.0, August 2017
16. DETAILS OF MATERIAL COLLECTED FROM DEWA STORE
FOR DEWA (ED)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 43 -
Ver 4.0, August 2017
17. DUCT SUMMARY FOR PROPOSED DEWA (ED) BETTERMENT
WORKS

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 44 -
Ver 4.0, August 2017
18. DUCTS & DUCTS MARKER INSPECTION RECORD FOR DEWA
(ED) WORKS

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 45 -
Ver 4.0, August 2017
19. CABLE DIVERSION DETAILS FOR ESTIMATE

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 46 -
Ver 4.0, August 2017
20. CABLE DIVERSION DETAILS DRAWING

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 47 -
Ver 4.0, August 2017
21. BETTERMENT WORK AS BUILT DRAWINGS

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 48 -
Ver 4.0, August 2017
22. BETTERMENT WORK APPROVAL DRAWING

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 49 -
Ver 4.0, August 2017
23. BETTERMENT WORK DUCT SUMMARY (Proposed)

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 50 -
Ver 4.0, August 2017
24. WATER DEPARTMENT CHECKLIST

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 51 -
Ver 4.0, August 2017
25. COVERING LETTER FORMAT

Letter Ref. No: .


Date:

Dubai Electricity & Water Authority,


P.O. Box No. 564,
DUBAI,
United Arab Emirates

Attention: Eng. Amina Ali Hashem


Senior Manager Infrastructure Information & Permits Department

Project No & Name: .

Subject: .

Scope of Work in detail

Titles of Drawings / Documents attached with this application

..

Contact Details of concerned Engineer for technical discussion or information along with
name & designation.

Manager / Authorized Signatory,


Name & Signature
Contact Details

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 52 -
Ver 4.0, August 2017
26. BUSINESS SUPPORT CONTACT DETAILS

Sl Function
Services Description Email Contact No Fax No
No Department

Infrastructure
No Objection Certificate
1 Information & TP.II&P@dewa.gov.ae 04-3221614 04-3072239
(NOC)
Permits (II&P)

Infrastructure
Shop drawing approval-
2 Information & TP.II&P@dewa.gov.ae 04-3221262 04-3072239
Electricity
Permits (II&P)

Infrastructure
BOQ approval for 04-3221280
3 Information & TP.II&P@dewa.gov.ae 04-3072239
Electricity Ducts 04-3221268
Permits (II&P)

Infrastructure
Material approval for cable 04-3221280
4 Information & TP.II&P@dewa.gov.ae 04-3072239
diversion-Electricity 04-3221268
Permits (II&P)

Estimation for Cable


Infrastructure
relocation within 04-3221280
5 Information & TP.II&P@dewa.gov.ae 04-3072239
R.O.W(Under Road 04-3221268
Permits (II&P)
Projects)- HV

Infrastructure Project As Infrastructure


04-3221280
6 Built drawing approval- Information & TP.II&P@dewa.gov.ae 04-3072239
04-3221268
(Electricity &Water) Permits (II&P)

Infrastructure Project Infrastructure


04-3221280
7 Completion Certificate - Information & TP.II&P@dewa.gov.ae 04-3072239
04-3221268
(Electricity & Water) Permits (II&P)

Work supervision request Distribution


04-5066630 04-5066791
9 for Existing HV cable Maintenance DP.MZ3@dewa.gov.ae
04-5066570 04-5066794
Protection (DM)

04-5066272
Mohamed.Hathab@dewa.gov.ae
055-9338638
Distribution
HV Cables Shutdown for 04-5066189
11 Project 04-3983635
ananthakumar.r@dewa.gov.ae
Relocation
Planning 055-8369550

04-5066531
Muthukumar.R@dewa.gov.ae
050-2365817

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 53 -
Ver 4.0, August 2017
Supervision request for Project
execution
diversion Existing HV Mhossain@dewa.gov.ae 04-5066251
12 (Distribution 04-3983635
Services (Cables and Ratan.Roy@dewa.gov.ae 04-5066250
Project
Ducts) Planning)

Laying of HV Cables Project Amrou.Mousa@dewa.gov.ae


13 (6.6/11/33 kV) execution Biju.Nair@dewa.gov.ae 055-5100210 04-3983635
(Distribution)

Estimation for HV cable CS.InfrastructureServices@dewa.


14 PN&E-NM 04-3227965 04-3229094
diversion within the plot gov.ae

Sample Submission for Tendering & DP.TE@dewa.gov.ae


15 Material Approval Engineering 04-3227663 04-3229037
Department

Back to Top
Submission Guide Lines
Infrastructure Information & Permits
TECHNICAL SERVICES &
Department - TECHNICAL SERVICES
& COORDINATION Section
COORDINATION Services Page- 54 -
Ver 4.0, August 2017

Das könnte Ihnen auch gefallen