Sie sind auf Seite 1von 4

FIELD Quality plan

Sewage Treatment Plants at


KEC- Doddabele,Yellamalappachetty
QP.No- 1
WATERLEAU REV.no- 0 and Intermediate Sewage pumping Station and
(JV) Pumping Mains at Sadarmangala

CONCRETE TRIAL MIX

Client:
Package:
Agency:
LOA No:
Date of Testing:

S.NO.DESCRIPTION OBSERVATIONS
1 Type of C
2 Make/ Bra
3 Grade of
Agg Agg
Cement Sand Water Admixtur W/C Slump
Trial Mix: 20mm 10mm
(Kg) (Kg) (Kg) e (Kg) Ratio (mm)
(Kg) (Kg)
4 Design Mix:
Mix After
Moisture
5
Correctio
n:

Cube
Weight
Compres Age Date of Comp Strength Avg Comp
6 of Cube Load (KN)
sive (Days) Testing (N/mm2) Strength (N/mm2)
(Kg)
Strength:

Cube1 7
Cube2 7
Cube3 7
Cube4 28
Cube5 28
Cube6 28
7 Remarks:
AGENCY CCD
nts at
achetty
ping Station and
mangala

Actual
Slump
(mm)

Avg Comp
Strength (N/mm2)
FQA