Sie sind auf Seite 1von 4

Project Construction of 33 & 11 KV Network and construction of 33/11

KV Primary substation to feed power supply to Zeenat Al Sahra


farms at Seih Al Khairat in Wilayat thumrait Dhofar
Governorate
DIWAN OF ROYAL COURT (RCA) - RURAL AREAS
Client Date 30-07-2017
ELECTRICITY CO. SAOC
Contractor CIVIL CONTRACTING CO (CIVLCO) . LLC Report. No TLC58/TC/AR/F1
Tender No. --- Device 11KV Auto Recloser

Test Report for 11KV Auto Recloser

Location: DIWAN OF ROYAL COURT 11KV Feeder

1.0 Auto Re-closure Details:

Make TAVRIDA ELECTRIC TYPE RC/TEL-05E


Model RC5_3 Rated Voltage 15.5KV
Aux. Supply 230V AC Rated Current 630A
Rated Frequency 50Hz Feeder Name 11KV OUT GOING FEEDER
Mfg. Year 2017 Short Time Current 16KA/3 sec
RCM. S. No. 25600885 Supply Voltage 85-265V AC

2.0 Testing Equipment Details:

Equipment Name Make & Model Serial Number Calibration Validity


Primary Injection Kit Omicron, CPC100 PB976V (V1) FOSTER
06.08.2018 5119/2 25
Insulation Tester Kyoritsu, 3125 W2031578 24-8-2017

3.0 IR Value:

Phase Applied Voltage CB Open CB CLOSE


R 5KV DC >1 T (R-R) >1 T (R-E)
Y 5KV DC >1 T (Y-Y) >1 T (Y-E)
B KV DC >1 T(B-B) >1 T (B-E)

Tested By Witnessed/Approved By
CIVIL CONTRACTING CO (CIVILCO) .LLC RURAL AREAS ELECTRICITY CO.SAOC
Sign: Sign;

Name: T. Satti Reddy, Name:


Date : 30-07-2017 Date :
4.0 Contact resistance:

Phase Injected Current(DC) Contact Resistance()


R Phase 100 A 67.75
Y Phase 100 A 74.75
B Phase 100 A 65.05

5.0 Auto Re Closer Setting:

5.1 MMI:

PROTECTION (ON/OFF) ON
EARTH FAULT (ON/OFF) ON
SENSITIVE E/F (ON/OFF) ON
CURRENT UNBALCNE (ON/OFF) ON
AUTO RELOSING (ON/OFF) ON
HOT LINE (ON/OFF) OFF
ACTOVE GROUP (1/2/3/4) Active Group-1

5.2 PROTECTION SETTINGS (Setting Group-1)

Function Setting
OVER CURRENT
OC1- Phase Low Set time delayed
Over Current Protection Enabled.
Type of TCC IEC SI
Pick up Current(Ip), A 150 A
TMS 0.1
EARTH FAULT
Earth Fault Protection Enabled
Type of TCC IEC SI
Current Setting 15A
TMS 0.05
SENSITIVE EARTH FAULT
Sensitive Earth Fault Protection (DT) Enabled.
Current Setting 5A
Tripping Time 5 sec
CURRENT UNBALANCE
Current unbalance protection (DT) Enabled
Current Setting 0.4 A
Tripping Time 10 sec
AUTO RECLOSER
Number of Trips to lock out for IDMT OC, IDMT EF 2
Number of Trips to lock out for SEF, CU 1
Reclosing Time 180 Sec

Tested By Witnessed/Approved By
CIVIL CONTRACTING CO (CIVILCO) .LLC RURAL AREAS ELECTRICITY CO.SAOC
Sign: Sign;

Name: T. Satti Reddy, Name:


Date : 30-07-2017 Date :
Reset Time 60 Sec
High set trips to lockout 1

6. Auto Re Closer Testing:

6.1 Measurement: (Primary injection)

Phase Injected Current Measured Current


R Phase 100 A 99 A
Y Phase 100 A 99 A
B Phase 100 A 100 A

Measurements are OK.

6.2 OVER CURRENT PROTECTION

CURRENT INJECTED Pick Up-A Drop out-A Tripping Time s


@ 300 A Injection
R-Y Phase 152 146 1.22
Y-B Phase 151 147 1.17
B- R Phase 151 146 1.19

Note: 5 X Is injection is not injected due to limitation of Testing Kit Capacity

6.3 EARTH FAULT PROTECTION

CURRENT INJECTED Pick Up-A Drop out-A Tripping Time ms Tripping Time ms
@ 30 A Injection @ 75 A Injection
R-Phase 16 13 521 218
Y-Phase 16 12 519 214
B- Phase 16 12 528 217

6.4 SENSITIVE EARTH FAULT PROTECTION

CURRENT INJECTED- 5.1 A Tripping-Sec


R- Phase 5.16
Y-Phase 5.17
B- Phase 5.14

6.4 CURRENT UNBALANCE PROTECTION

CURRENT INJECTED- Tripping-Sec


R-Y Phase- 20A 10.68
Tested By Witnessed/Approved By
CIVIL CONTRACTING CO (CIVILCO) .LLC RURAL AREAS ELECTRICITY CO.SAOC
Sign: Sign;

Name: T. Satti Reddy, Name:


Date : 30-07-2017 Date :
B Phase 0A -

7.0 Functional Testing

Test Functional Test Observation -1 Result

1 Manual Close A/R Operated OK


Manual Open
2 A/R Operated OK

3 A/R Switch ON and OC Protection A/R tripped & Reclosed OK

A/R Switch ON and OC and A/R closed and Lockout


4 Lockout operated OK
5 A/R Switch ON and E/F Protection A/R tripped & Reclosed
OK
5 A/R Switch ON and CU Protection A/R tripped and lockout
operated OK
6 A/R Switch ON and SEF Protection A/R tripped and
Lockout operated OK
7 A/R close block by Mechanical Liver A/R not closed
OK

8. REMARKS: Auto Re closer functions checked o.k

Tested By Witnessed/Approved By
CIVIL CONTRACTING CO (CIVILCO) .LLC RURAL AREAS ELECTRICITY CO.SAOC
Sign: Sign;

Name: T. Satti Reddy, Name:


Date : 30-07-2017 Date :