Wisdom - Integrity - Excellence
T TAYLOR'S UNIVERSITY
SCHOOL OF ARCHITECTURE. BUILDING. DESIGN
Centre for Modem Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
SOFTWARE APPLICATION FOR QUANTITY SURVEYING [CSC 60603]
Assignment Tit
‘% of Assessment: 25%
Assignment date: (5th Sep 2017)
Submission date: Week 6 (2 Sep 2017)
(ot (Group Project)
Assessment brief
Objectives
1.) Toexpose stunts to atferentypes of sotware rogram avaiste inthe construction market
2) To imo ost ned one es incon and risions he GS stare a Canon
Learning Outcomes
LUpon success completion ofthe subject, students wil be abe:
1.) Distinguish he cfarent types of software srograms avaiable the marke and tei imation in usage,
Project 1
The zim of projec iso expose students to diferent types of software progcams avaiable inthe constuction market
and ther itatons in usage. Students sre required to prepare a reparton =
A) Compare te functions and imitation of SIM QS computer software in the market. Summavies your information
and recommend the best BM softmare with supporting reasons and data,
8B) Compare benefits and constants of Bulking Infomaton Nodetiny (BIM), GAD Measurement and Manual
Measurement n=
|. Preparation I Biting Stage
IL Design Stage
I, Precnastuctan StageIV. Conseucion Stage
V. Obes
Submission Requirement:
Doeumentationd Presentation
+ Ad bound report complete with visual and photographs incleshe of dlaing and documentation of your
projet.
+ Word processed, fn! site 11, Al, 15 spacing wih maximum of 25 pages.
Soficopy is aque to be attached wih the hardcopy.
+ Group presenaton wih powerpoint sides
Assessment Criteria
Breakdown of marks:
A) Compare the funcons and imitin of Bld QS computer sofware tthe market. Summaries your information
and recommend he best BIM QS software wih supporting reasons and deta. —60 maxes
B} Compare benefis and constants of Buldng Infamation Modeling (BIN), CAD Measurement and Manual
Measurement in - 40 aks
|, Prepartion Briefing Steps
| Design Stage
IL Preoanstuction Stage
WV. Construction Stage
Vi Others
“The assessment for ths project wil be based on your~
= Demonstrated understanding ofthe project bit
(Quel and city of tne documented drewingsiphotographs and detaing ofthe system
Materity and nchness of contents
Clear visual and written communication of your understanding ofthe project
Appropriate use of drawings/photographs standard-eg, symbolsproting, label and specications.