1) Before laying the first layer of bricks clean the entire floor. Stack the bricks properly instead of
2) In case of clay bricks, bricks should be soaked in water before start of work .
3) Lay the first layer of bricks considering the diagonals and dimensions of the room.
4) Check the level and right angles at the corner for the first layer. For external walls, check the
plumb from external side of the beam. For internal walls check the plumb from the beam edge
5) Provide door openings at the first level and window openings at sill level as per working drawings.
10) All the vertical and horizontal joints should be properly filled and racked.
11) If readymade door frames are to be fixed along with brickwork, they should be checked for plumb
12) R.C.C bands with nominal steel shall be provided at 5 ft height for 4 brickwork. And also for 6
13) Gap between top layer of brickwork and beam bottom shall be filled with metal with mortar.
14) The brickwork surface should be cleaned with jute bag at the end of day work.
15) All the layers should be laid in line and plumb. Level of the brickwork should be checked after
17) Thin mortar should be applied to the column where the brickwork would be touching the column.
18) If adjacent walls are not to be raised simultaneously, then pin bricks should be left every alternate
layers as to have bonding/interlocking between the walls.