Sie sind auf Seite 1von 3

GWP ELECTRICAL CONSTRUCTION

ENGINEERS * CONTRACTORS * TRADING


Address: # 999 ZONE 4, SAN VICENTE (EBUS), GUAGUA, PAMPANGA

Satellite Office Address: #11 Roselle St. Mon-El Subd., Dr. A Santos Ave., Sucat Paraaque

Telefax No. (02) - 799-8267

#REF!

#REF!
Diliman, Quezon City

PROJECT : ###

SUBJECT : Technical Specifications & Scope of Works

Supply and installation of the following :


1. Mobilization, site preparation, demobilization and clean up
2. Provision for safety requirements
3. 1 assy - MDP-UPLINK (Square D)
2 assy - 50AT ECB (Square D)
1 assy - 100AT ECB (Square D)
4. 8 sets - twistlock outlet and plug, 30A, 3-prong (P & S Legrand)
5. IMC pipes (Panasonic) including fittings and accessories
6. THHN copper wires (Philflex) with mechanical and crimp type terminal lugs
7. Wireways including fittings
8. Brackets and supports for conduits and cable trays
9. Testing and Commissioning
10. As built plans

For and Behalf of :

GWP Electrical Construction,

__signed__
Engr. Vic Serrano
Proprietor
GWP ELECTRICAL CONSTRUCTION Project : REPAIR OF "ON AIR" SIGNAGES

# 999 ZONE 4, SAN VICENTE (EBUS), Client : GMA Network Inc.

GUAGUA, PAMPANGA Location : Diliman, Quezon City

Telefax No. (02) - 799-8267

Item Material Labor


Item Description Qty. Unit Amount
No.
Unit Rate Amount Unit Rate Amount

A Dismantling of Signage unit 22 units N/A 0.00 #REF! #REF! #REF!

C Replacement of lamp receptacle by 2 E27 type 22 units #REF! #REF! #REF! #REF! #REF!
including disposal / turn-over of old receptacle to
the Owner

D 5W LED lamp 44 ea #REF! #REF! #REF! #REF! #REF!

E Termination, mounting and testing of unit 22 units N/A 0.00 #REF! #REF! #REF!

F Miscellaneous and Consumables 1 item #REF! #REF! #REF! #REF! #REF!

TOTAL AMOUNT #REF!


Thank you!!!

Das könnte Ihnen auch gefallen