Sie sind auf Seite 1von 7
Certificate as per CERC Tariff Regulations 2014 And CERC (Indian Electricity Grid Code) (Fourth Amendment) Regulations 2016 (For Inter State Transmission System) It is to certify that Asset: 2 No. 400kV conventional bays at Amritsar S/S and 4 No. 400kV GIS bays at Malerkotla S/S under Northern Region System Strengthening Scheme - XXXI-B meets the following requirements for declaration of Commercial operation: The Sub-station and Communication system confirm to the relevant Grid Standard and Grid Code, and are capable of operation to their full capacity. \ — a Feb X DAT tis! sna) Date: Chairman-com-Managing.Directors POWERGRID CORPORATION:OF:INDYA'LIRAT HEB” = Pe Grid Corporation of Inia 5) re ea /Go' ncerprise) (sre eR eae, are i22 008 (A Hoe Rene Za, Gurgaon 122008 (Haryana) Certificate as per CERC Tariff Regulations 2014 And CERC (Indian Electricity Grid Code) (Fourth Amendment) Regulations 2016 (For Inter State Transmission System) It is to certify that Asset: 2 No, 400kV conventional bays at Amritsar S/S and 4 No. 400kV GIS bays at Malerkotla S/S under Northern Region System Strengthening Scheme - XXXI-B meets the following requirements for declaration of Commercial operation: The Sub-station and Communication system confirm to the relevant Grid Standard and Grid Code, and are capable of operation to their full capacity. (1S. JHA) Date Chairman-com-Managing Director POWERGRID CORPORATION OF INDIA LIMITED (ARE ARR aT seu) POWER GRID CORPORATION OF INDIA LIMITED (A Goverment of India Enterprise) araehs “Weatasn Repon Reina Ped Garr, OSE GRID BTA WAN Ral Wind Coleen RR) WOE Fa WTA eat 86-2, RY a raters, at 26, Ros are, Yee Wiest, SOIL. em) - 180012, grane reO1O1- 2477985 Saige am / re vat ie 25M / PESM/DOCO / 2016 / Roti + 12.12.2016 NOTIFICATION OF DOCO This is further to our Notification of Trial Operation Ref, N2JM/PESM/DOCO/2016, dated 23/11/2016, Consequent to the successful Trial Operation, following assets under “Provision of 400KV Bays for Lines Under Northern Region System Strengthening Scheme-XXX1(Part-B)” have been put under Commercial Operation w.e.f 00.00 Hrs of 1” Dec, 2016 in terms of Clause 4 of CERC (Terms and Conditions of Tariff) Regulations, 2014 (a) “400/220KV Malerkotla GIS Substation Extension - 04 No. 400KV GIS Line Bays (b) 400/220KV Amritsar substation Extension - 02 Nos, 400KV line Bays”. ba da Pirie rigs fea, seat al Distribution: 1, Member Secretary, NRPC 2. NRLDC/NLDC 3. Beneficiaries as per enclosed list. a /s0105DL2009601188682 stax Rreea state artemis: (raring aot enc are arr ch) earthaber are wer ig, af Reva WHTTTT ¥e:POSOCO/NRLDC/SO-I /230/ ! 2 ‘fegetia: 02.12.2016 ertificate of Completion of Transmis ment Reference: |) (PCC, POWERGRID, NATS -l Communication dated 18.11.2016 regarding the submission of pre charging documents for 400 kV bays at 400 kY Amritsar (PG) S/s. li) Real time code issued by NRLDC on request of CPC, POWERGRID, NATSll on 22.11.2016.{NRLDC Code: 2276) ‘il) CPCC, POWERGRID, NRTS4I, Communication dated 28.11.2016 regarding the submission of post charging documents. Based on above references, it Is hereby certified that the following Transmission elements have been successfully completed the tril operation | «YR AOR Bays No. af0A13 at Amritsar (PG) | (Above 400 KY Bays are line bays (Min) for ‘Malerkotla +1 & I, These 400 kV lines are ta be commissioned by M/S Essel infrastructure | | Name of transmission Asset ue = — - == [Owner of Transmission Asset 2 POWERGRID (ate and Time of Energization for “3. aaanaone/tisa Commencement of_triai run operation: 22.11.2016/135, Date and Time of completion of tris run 5. 23.41.2026/1354 ‘operation: 6. 23.11.2016/1352 “Power flow through these bays could not be established a¢ 400 kV lines Arvitsa~ Wale are not yet commissioned, ‘This certificate is being issued in accordance with Regulation $ of CERC (Terms & Cendlitions of Tort) Regulations, 2014 to certify successful completion of total tral operation of transmission slernent Usage ofthis certificate for any other purpose is prohibited ara. a Recht saat: I Executive Director, NATS-II, POWERGRID, Jammu I Member Secretary, NRPC, New Delhi I. Head of NLOC, POSOCO, New Delhi IV. Manager, RTAMC, Jammu iN; uaotosoL200s¢orn88682 WATTS Fe: feaiw: 22.11.2016 Certificat letion of Trial test charginy ssion element Reference: CFCC, POWERGRID, NRTS = Communication dated 05.12.2036 regarding the submission of pre charging ‘documents for 400 kV bays at 400 kV Malerkotla (PG) 5s 4 Realtime coe issued by NRLOC on request of CPCC, POWERGRID, NATSU on 10.12.2016, NRLOC Code: 370) 18) CECC, POWERGRID, NRTS:1, Communication dated 11.11.2036 regarding the submission of post charging ecuments, Based on above references, it Is hereby cerifled that the following Transmission elements heve been sueeesstully completed the trial operation f 1400 WV Baye Ros HAIRS A167 & 4B we] Malerkotle (PG) (bove 400 kv Bays aro fine bays (Main & Tie) for Armritsarl& land Kurukshetra, These 400 Ki | lings are to be commissioned by M/S Essel | | Infrastructure Led | | Name of Transmission Asset | I POWERGRID wai. 2016/iee Owner of Transmission Asset: {2% 3 4. 10.11.2016/1659 5. 6 10.41,2016/1709 10.11.2016/1732 2, 10.41.2016/1708 8.10.11 2016/1703 i 9. tLAL2016/1658 | 10, ara aone/ses9 41. 11.11.2016/1708 32, 14.11.2016/1732 | aa anarzoie/s700 l | a4, st1n-2016/1703 Power flow through these Gays could not be established as 400 KV They AnvitarwalenGn bie ‘Kurukshetra-Malerkatia-0/C are net yet commissionee. | Date and Time of Enereization for Commencement of trial un operation Date and Time of completion af trial run operation Ths certificate is being issued In aceordance with Regulation § of CERC (Terms & Conditions of Taf Regulations, 2014 to certify successful completion of total tral operation of transmission element. Usage af this carttfieate for any other purpose is prohitited Part: a8 fear fete: VW executive Director, nATS., POWERGRID, Jammu Tl Member Secretary, NRPC; New Det unt (CORPORATE COMMERCIAL \ POWERGRID CORPORA’ IN OF INDIA LTD. 8" June, 2017 Ref. No, Sub.: Issuance of Certificate under COD Regulations of CERC 1.0 The procedure for Commercial operation declaration of transmission system is specified under Regulation 4 of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014. Subsequently, CERC has issued Fourth Amendment in GERG (Indian Electricity Grid Code Regulations 2016) vide Notification dated 6” April 2016 Detailed procedure for declaring trial operation, Commercial operation date ete. for ISTS system has been given at Para 6.3 A4 2.0 AS per the above IEGC amendment in 6.3.44, Quote: “(vi) The transmission licensee shall submit a certificate from CMD/ CEONMO of the Company that the transmission fine, Sub- station and Communication system conform to t Standard and Grid Code, and are copable of operation to their f capacity.” Note Transmission licensee referred to in this Sub- Regulation shall include “Deemed Transmission Licensee” as er the provision of the Act.” Unquote This means that POWERGRID is also required to submit above certificate upon commissioning of the transmission system 3.0 It has been a practice to submit the COD certificate signed by ED of respective Region. However, CERC in its recent letter dated 23.05.2017 in Petition No. 233/TT/2016 (copy enclosed) in ERSS-XIl project in Eastern Region has advised POWERGRID to submit the CMD certificate by 15.06.2017. Although the Regulation was amended on 06.04.2016 but CERC was not insisting on the CMD certificate so far 4.0 In view of above, it is necessary to furnish a CMD certificate as per Regulation 6.3 A 4 Proviso (vi) of Central Electricity Regulatory Commission (Indian Etectricity Grid Code) feO 4 om wen am &, ys al afore) 5.0 Regulations (Fourth amendment), 2019 in addition to the COD Certificates being issued by Regional EDs Draft certificate to this effect is attached herewith, On approval the same would be forwarded to Region and in each exec cf be missioning the proposal from Region would be required to be sent to CMD through ED Region certifying that the transmission system and communication system confirm to the relevant Grid standard and Grid Code and are capaine of poeration to their full capacity. This certificate shall be issued before COD. The signed certificate shall be submitted to CERC and shall become part of the petition, Submitted please AIHA NYE 09 06 Plt (RAKESH PRASAD) a fartRe -otte SMiCommiskc A dl Re we al = De ED(Comm1, alt nO. ob DIRECTOR (PROJ, Pa Co et ) \b Ge “ DIRECTOR (OPERATIONS) QC) DIRECTORGINaNcE) Or ie tijd | AS RO A or wen ore 8, yw a afer)

Das könnte Ihnen auch gefallen