Certificate as per CERC Tariff Regulations 2014
And
CERC (Indian Electricity Grid Code) (Fourth Amendment) Regulations 2016
(For Inter State Transmission System)
It is to certify that Asset: 2 No. 400kV conventional bays at Amritsar S/S and 4
No. 400kV GIS bays at Malerkotla S/S under Northern Region System
Strengthening Scheme - XXXI-B meets the following requirements for declaration
of Commercial operation:
The Sub-station and Communication system confirm to the relevant Grid Standard
and Grid Code, and are capable of operation to their full capacity.
\
—
a Feb X
DAT tis! sna)
Date: Chairman-com-Managing.Directors
POWERGRID CORPORATION:OF:INDYA'LIRAT HEB” =
Pe Grid Corporation of Inia 5)
re ea /Go' ncerprise)
(sre eR eae, are i22 008 (A
Hoe Rene Za, Gurgaon 122008 (Haryana)Certificate as per CERC Tariff Regulations 2014
And
CERC (Indian Electricity Grid Code) (Fourth Amendment) Regulations 2016
(For Inter State Transmission System)
It is to certify that Asset: 2 No, 400kV conventional bays at Amritsar S/S and 4
No. 400kV GIS bays at Malerkotla S/S under Northern Region System
Strengthening Scheme - XXXI-B meets the following requirements for declaration
of Commercial operation:
The Sub-station and Communication system confirm to the relevant Grid Standard
and Grid Code, and are capable of operation to their full capacity.
(1S. JHA)
Date Chairman-com-Managing Director
POWERGRID CORPORATION OF INDIA LIMITED(ARE ARR aT seu)
POWER GRID CORPORATION OF INDIA LIMITED
(A Goverment of India Enterprise) araehs
“Weatasn Repon Reina Ped Garr, OSE GRID BTA WAN Ral Wind Coleen RR) WOE Fa WTA
eat 86-2, RY a raters, at 26, Ros are, Yee Wiest, SOIL. em) - 180012, grane reO1O1- 2477985
Saige am / re
vat ie
25M / PESM/DOCO / 2016 / Roti + 12.12.2016
NOTIFICATION OF DOCO
This is further to our Notification of Trial Operation Ref, N2JM/PESM/DOCO/2016, dated
23/11/2016, Consequent to the successful Trial Operation, following assets under “Provision of
400KV Bays for Lines Under Northern Region System Strengthening Scheme-XXX1(Part-B)”
have been put under Commercial Operation w.e.f 00.00 Hrs of 1” Dec, 2016 in terms of Clause 4 of
CERC (Terms and Conditions of Tariff) Regulations, 2014
(a) “400/220KV Malerkotla GIS Substation Extension - 04 No. 400KV GIS Line Bays
(b) 400/220KV Amritsar substation Extension - 02 Nos, 400KV line Bays”.
ba da Pirie
rigs fea, seat al
Distribution:
1, Member Secretary, NRPC
2. NRLDC/NLDC
3. Beneficiaries as per enclosed list.a
/s0105DL2009601188682
stax Rreea state artemis:
(raring aot enc are arr ch)
earthaber are wer ig, af Reva
WHTTTT ¥e:POSOCO/NRLDC/SO-I /230/ ! 2 ‘fegetia: 02.12.2016
ertificate of Completion of Transmis
ment
Reference:
|) (PCC, POWERGRID, NATS -l Communication dated 18.11.2016 regarding the
submission of pre charging documents for 400 kV bays at 400 kY Amritsar (PG) S/s.
li) Real time code issued by NRLDC on request of CPC, POWERGRID, NATSll on
22.11.2016.{NRLDC Code: 2276)
‘il) CPCC, POWERGRID, NRTS4I, Communication dated 28.11.2016 regarding the
submission of post charging documents.
Based on above references, it Is hereby certified that the following Transmission elements
have been successfully completed the tril operation
| «YR AOR Bays No. af0A13 at Amritsar (PG) |
(Above 400 KY Bays are line bays (Min) for
‘Malerkotla +1 & I, These 400 kV lines are ta be
commissioned by M/S Essel infrastructure
|
| Name of transmission Asset
ue
= — - ==
[Owner of Transmission Asset 2 POWERGRID
(ate and Time of Energization for “3. aaanaone/tisa
Commencement of_triai run operation: 22.11.2016/135,
Date and Time of completion of tris run 5. 23.41.2026/1354
‘operation: 6. 23.11.2016/1352
“Power flow through these bays could not be established a¢ 400 kV lines Arvitsa~ Wale
are not yet commissioned,
‘This certificate is being issued in accordance with Regulation $ of CERC (Terms & Cendlitions of Tort)
Regulations, 2014 to certify successful completion of total tral operation of transmission slernent
Usage ofthis certificate for any other purpose is prohibited
ara. a Recht
saat:
I Executive Director, NATS-II, POWERGRID, Jammu
I Member Secretary, NRPC, New Delhi
I. Head of NLOC, POSOCO, New Delhi
IV. Manager, RTAMC, JammuiN; uaotosoL200s¢orn88682
WATTS Fe: feaiw: 22.11.2016
Certificat letion of Trial test charginy ssion element
Reference:
CFCC, POWERGRID, NRTS = Communication dated 05.12.2036 regarding the submission of pre charging
‘documents for 400 kV bays at 400 kV Malerkotla (PG) 5s
4 Realtime coe issued by NRLOC on request of CPCC, POWERGRID, NATSU on 10.12.2016, NRLOC Code:
370)
18) CECC, POWERGRID, NRTS:1, Communication dated 11.11.2036 regarding the submission of post charging
ecuments,
Based on above references, it Is hereby cerifled that the following Transmission elements heve been
sueeesstully completed the trial operation
f 1400 WV Baye Ros HAIRS A167 & 4B we]
Malerkotle (PG)
(bove 400 kv Bays aro fine bays (Main & Tie) for
Armritsarl& land Kurukshetra, These 400 Ki |
lings are to be commissioned by M/S Essel |
| Infrastructure Led |
| Name of Transmission Asset
|
I POWERGRID
wai. 2016/iee
Owner of Transmission Asset: {2%
3
4. 10.11.2016/1659
5.
6
10.41,2016/1709
10.11.2016/1732
2, 10.41.2016/1708
8.10.11 2016/1703 i
9. tLAL2016/1658
| 10, ara aone/ses9
41. 11.11.2016/1708
32, 14.11.2016/1732
| aa anarzoie/s700
l | a4, st1n-2016/1703
Power flow through these Gays could not be established as 400 KV They AnvitarwalenGn bie
‘Kurukshetra-Malerkatia-0/C are net yet commissionee.
|
Date and Time of Enereization for
Commencement of trial un operation
Date and Time of completion af trial run
operation
Ths certificate is being issued In aceordance with Regulation § of CERC (Terms & Conditions of Taf
Regulations, 2014 to certify successful completion of total tral operation of transmission element. Usage af
this carttfieate for any other purpose is prohitited
Part: a8 fear
fete:
VW executive Director, nATS., POWERGRID, Jammu
Tl Member Secretary, NRPC; New Detunt (CORPORATE COMMERCIAL
\
POWERGRID CORPORA’
IN OF INDIA LTD.
8" June, 2017
Ref. No,
Sub.: Issuance of Certificate under COD Regulations of CERC
1.0 The procedure for Commercial operation declaration of
transmission system is specified under Regulation 4 of Central
Electricity Regulatory Commission (Terms and Conditions of
Tariff) Regulations, 2014. Subsequently, CERC has issued
Fourth Amendment in GERG (Indian Electricity Grid Code
Regulations 2016) vide Notification dated 6” April 2016
Detailed procedure for declaring trial operation, Commercial
operation date ete. for ISTS system has been given at Para 6.3
A4
2.0 AS per the above IEGC amendment in 6.3.44,
Quote:
“(vi) The transmission licensee shall submit a certificate from
CMD/ CEONMO of the Company that the transmission fine, Sub-
station and Communication system conform to t
Standard and Grid Code, and are copable of operation to their f
capacity.” Note Transmission licensee referred to in this Sub-
Regulation shall include “Deemed Transmission Licensee” as
er the provision of the Act.”
Unquote
This means that POWERGRID is also required to submit above
certificate upon commissioning of the transmission system
3.0 It has been a practice to submit the COD certificate signed by
ED of respective Region. However, CERC in its recent letter
dated 23.05.2017 in Petition No. 233/TT/2016 (copy enclosed) in
ERSS-XIl project in Eastern Region has advised POWERGRID
to submit the CMD certificate by 15.06.2017. Although the
Regulation was amended on 06.04.2016 but CERC was not
insisting on the CMD certificate so far
4.0 In view of above, it is necessary to furnish a CMD certificate as
per Regulation 6.3 A 4 Proviso (vi) of Central Electricity
Regulatory Commission (Indian Etectricity Grid Code)
feO 4 om wen am &, ys al afore)5.0
Regulations (Fourth amendment), 2019 in addition to the COD
Certificates being issued by Regional EDs
Draft certificate to this effect is attached herewith, On approval
the same would be forwarded to Region and in each exec cf
be missioning the proposal from Region would be required to
be sent to CMD through ED Region certifying that the
transmission system and communication system confirm to the
relevant Grid standard and Grid Code and are capaine of
poeration to their full capacity. This certificate shall be issued
before COD. The signed certificate shall be submitted to CERC
and shall become part of the petition,
Submitted please
AIHA NYE
09 06 Plt
(RAKESH PRASAD)
a
fartRe -otte
SMiCommiskc A dl Re we al
= De
ED(Comm1, alt
nO. ob
DIRECTOR (PROJ, Pa Co et )
\b Ge “
DIRECTOR (OPERATIONS) QC)
DIRECTORGINaNcE) Or
ie
tijd |
AS
RO A or wen ore 8, yw a afer)