Sie sind auf Seite 1von 1

WEST QURNA I - (IRAQ) IR INSPECTION REQUEST

IR No. CE-C1352 PROJECT SPECIFICATION: IQWQ-FT-NSPDS-00-040101


Contractor Project REV.0
Description: PROCEDURE: IQWQ-CE1092-CPZZZ-00-0003_0 -CIVIL
WORK CONSTRUCTION PROCEDURE
Produced Water ITP: IQWQ-CE1092-CPQAC-00-0001 REV. 1 CIVIL
Treatment M109 INSPECTION AND TEST PLAN
DRWG NO: IQWQ-CE1091-CDFND-D6-0003
- AWQ0109 Rev No:1
Sht No: /
Civil NDE Instrumentation Material Inspection
Structural Painting Pre Hydrotest Walk down Any Others (mention Below)
HDPE Mechanical Equipment Hydrotest
Welding Piping Reinstatement
PWHT Electrical Mechanical Completions
MONTHS DAYS
JAN FEB MAR APR MAY JUN 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1
JUL AUG SEP OCT NOV DEC 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

No ITEM/TAG Number AREA Time of


Description LOCATION Inspection Inspection Execution Result

Witness to test concrete cubes (compressive ALFO CENTER 12:30


LAB
Accepted
strength at 7 days) for containment of pump in
DS6. Accepted with Comments
(fill the comments below)
Rejected
Rescheduled
Follow up

TICK THIS BOX IF NO EMIL / SOC and if it is a WITNESS as per ITP,


(by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
Comments for this QA activity: (include any Handmade drawing)

SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT


Construction Subcontractor CPECC QC representative EMIL Construction EMIL QC representative
NAME: NAME: NAME NAME
Signature: Signature: Signature: Signature:

Date: Date: Date: Date:


CPECC to Produce ITP, Procedure, Method Statement, Drawings, Plot Plans, Material Certificates, and all other related documents
as per the requirement of this particular IR for which this has been raised, Document compliance for IR is a must