PROYECTO: ASFALTANDO

EVALUACIN: CALLE JUAN TU CORREGIMIENTO, RENGLN


XXIII-CIRCUNVALACION N13,
PONUGUITA
LONGITUD: 492M - ANCHO: 6.0M
PROVINCIA DE VERAGUAS
inicio:17-3-14 Duracin total: 32 das
DURACIN meses
N DETALLE COSTO
(mes)
1 2 3 4 5 6 7 8 9 10 11 12
1 DRENAJES TUBULARES 2 B/. 77,810.00 3 25937 25936.7 25936.67
2 CANALES O CUNETAS PAVIMENTADAS 11 B/. 468,360.00 4 117090 117090 117090 117090
3 ESTRUCTURAS DE HORMIGON 10 B/. 45,510.00 3 15170 15170 15170
4 ACERO DE REFUERZO 9 B/. 2,238.00 1 2238
5 MATERIAL SELECTO O SUBBASE 3 B/. 351,920.00 4 87980 87980 87980 87980
6 BASE DE AGREGADOS PETREOS 4 B/. 537,404.00 3 179134.67 179135 179135
7 RIEGO DE IMPRIMACION 5 B/. 223,680.00 2 111840 111840
8 CARPETA DE HORMIGON ASFALTICO 6 B/. 443,925.00 5 88785 88785 88785 88785 88785
9 TRATAMIENTO SUPERFICIAL ASFALTICO 7 B/. 514,464.00 5 102892.8 102892.8 102892.8 102892.8 102892.8
CAJAS DE REGRISTROS TRAGANTES Y COLECTORES
12 7200 7200 7200 7200 7200
10 B/. 36,000.00 5

SEALAMIENTO PARA EL CONTROL DEL TRANSITO 14


11 B/. 37,000.00 2 18500 18500
12 PINTURA TERMOPLASTICA 13 B/. 46,587.50 2 23293.75 23293.75
ESCARIFICACION Y CONFORMACION DE CALZADAS
13 EXISTENTES 1 B/. 129,528.00 3 43176 43176 43176
LIMPIEZA DE ALCANTARILLAS DE TUBO
O CAJON , TRAGANTE , CORDON
CUNETA 8 B/. 41,910.00 5 8382 8382 8382 8382 8382
B/. 2,956,336.50 total por dia 43176 69113 157093 113917 267114.67 267115 298672 451359.8 453597.8 324349.8 366143.55 144686.55
total acumulado B/. 2,956,336.50
% de avance 1.46 2.34 5.31 3.85 9.04 9.04 10.10 15.27 15.34 10.97 12.39 4.89
% de avance acumulado 100.00
total acumulado 43176 112289 269381 383298 650412.67 917527 1216199 1667558.8 2121157 2445506.4 2811649.95 2956336.5

Chart Title
3500000
3000000
2500000
2000000
1500000
Chart Title
3500000
3000000
2500000
2000000
1500000
1000000
500000
0
0 2 4 6 8 10 12 14

Das könnte Ihnen auch gefallen